Models VERSARAIL ALUMINUM STAIR RAILING 73013153 INSTALLATION INSTRUCTIONS 73013154 73013155 73013156 Owner's Manual Version 1.0 VERSASTAIR_BOM V1 3/2012 www.barretteoutdoorliving.com
VERSARAIL ALUMINUM STAIR RAILING INSTALLATION INSTRUCTIONS BEFORE YOU BEGIN: *2 PERSON INSTALLATION RECOMMENDED It is the responsibility of the installer to meet and/or exceed all code and safety requirements, and to obtain all required building permits. The deck and railing installer should determine and implement appropriate installation techniques for each installation. Barrette Outdoor Living and its distributors shall not be held liable for improper or unsafe installations. Locking Strip Rail Post Top Post Top Rail Profile Bracket Bracket Balusters Base Trim Base Mount Rail Locking Strip Bracket 6' Stair Kits Include: (2) Rails (1) Top Rail Profile (2) Locking Strips (15) Balusters (1) Stair Bracket Kit with Screws (2 Top Rail Brackets) (2 Bottom Rail Brackets)
Closely follow post installation instructions. 2.1 STEP 1. Install Aluminum Post and Base Trim Temporary deck board 1.1) Trim Post sleeve to desired length. In most cases, the post at the bottom of the stairs will need to be longer than the post on the deck, to accomodate stair angles. (41" bottom stair post is recommended for a 36" finished rail height. 47" bottom stair post is recommended for a 42" finished rail height.) 1.2) Make sure the top and bottom posts for stairs are installed so the base trims are installed at the nose of each tread. 1.3) Check to ensure the posts are plumb. STEP 2. Prepare the bottom rail 2.1) Place a temporary 5/4" deck board on top of stair noses for proper spacing underneath rails. STEP 3. Assemble your stair section 3.1) Place top and bottom rail on a smooth, flat and clean surface. Then orient the top and bottom rails so that the "ridges" inside the rails are in the same direction and facing up. 3.2) Thread all pickets through holes in rails being careful to have the "hole" in each picket going in the same direction, and proper direction. (Holes should face the rail ridges.) 3.3) Make sure pickets threaded through rails are about 2" above rail and in-line with each other. 3.4) Snap in bumps from plastic locking strip into holes of the pickets for both top and bottom rails. Make sure arrows on locking strips face rails. 3.5) Push first picket into bottom rail, followed by the second and third, until the last picket. Then repeat for top rail. The engagement between the rails, pickets and locking strip is about 75% at this point. 3.6) Stand up rail section and fully lock the pickets into the rails. Place one foot on the top of the bottom rail, between second and third picket while at the same time placing a hand under the bottom of the top rail between second and third picket. Push with foot and pull with hand until locking is complete (You should hear a snap). Repeat this process for the middle and end of the panel. All the pickets should now be "locked" into the top and bottom rails. (NOTE: If a snap is not heard or felt, use a rubber mallet to tap underneath of top rail to ensure a full connection.) 3.7) If the aluminum rail is to be installed with no vinyl topper line up hand rail profile on top of the top rail. Press it down onto the top rail so it fits snug. 3.1 3.2-3.3 Ridges 3.4 3.6
STEP 3. (CONTINUED) STEP 4. Slide bracket covers on ends of both top and bottom rails. (NOTE: Bracket covers are not used on the top rail when a rail topper is installed.) Size/Cut rails to length 4.1) Place assembled stair section onto installed temporary deck board and clamp stair section to installed posts. 4.2) Remove temporary spacer board. 3.8 4.3) Hold stair bracket (both bracket and base) against the installed stair posts and mark end of bracket (Repeat in all four bracket locations). 4.4) While holding brackets and bases on posts, mark base holes on post for pre-drill locations (repeat in all four bracket locations). 4.5) Remove clamped stair section from posts. Locate your previously marked lines on your stair rail section, add 1" from your predetermined marks for bracket depth and cut all four marks at a 90 angle. 4.1 4.3 4.4 4.5 Add 1"
STEP 5. Install Stair Rail section 5.2 5.4 5.1) Using previous marks on posts (made in step 4.4) pre-drill with 5/32" drill bit in all locations. 5.2) Attach all four bases to posts with #10x3/4" flat head screws provided. 5.3) Slide brackets onto ends of assembled stair rail section in all four locations. 5.5 5.4) Slide entire stair rail section with brackets in between installed stair rail posts and line up with installed bases. 5.5) While holding stair section with brackets in between already installed bases, pre-drill through side holes on plates into back leg of brackets with 9/32" drill bit and connect brackets to bases with 1/4" sex bolts provided. STEP 6. Installing Elite Composicore Rail Topper 6.1 If using Elite Composicore rail toppers as an add-on to your aluminum rail sections follow these next steps to finish your installation. 6.1) Hold your Composicore stair rail next to the completely installed aluminum stair section. 6.2) At the edge of each post (entire distance from post to post) trace the exact angle of the stair installation onto the Elite Composicore rail. 6.3) Using a chopsaw cut the Elite composicore rail to the exact line traced in Step 6.2. 6.4) Attach Elite Composicore rail to the already installed aluminum stair rail section. Place the cut Composicore railing over the alumiinum top rail, fitting between posts. 6.2 6.5) Then, on both sides and both ends of railing, pre-drill through side of Composicore railing with 1/8" drill bit into the aluminum railing. Attach Composicore topper to aluminum railing stair section with four 3/4" color matched screws provided.
www.barretteoutdoorliving.com VERSASTAIR_BOM V1 3/2012