PDCA Driven-Pile Terms and Definitions



Similar documents
GLOSSARY OF TERMINOLOGY

METHOD OF STATEMENT FOR STATIC LOADING TEST

PILE FOUNDATIONS FM 5-134

vulcanhammer.net This document downloaded from

High Strain Dynamic Load Testing of Drilled Shafts

PROVA DINAMICA SU PALI IN ALTERNATIVA ALLA PROVA STATICA. Pile Dynamic Load test as alternative to Static Load test

ALLOWABLE LOADS ON A SINGLE PILE

NEGATIVE SKIN FRICTION AND SETTLEMENT OF PILES. Dr. Bengt H. Fellenius, P. Eng. University of Ottawa, Canada

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

The advantages and disadvantages of dynamic load testing and statnamic load testing

Comprehensive Design Example 2: Foundations for Bulk Storage Facility

CH. 2 LOADS ON BUILDINGS

Technical Notes 3B - Brick Masonry Section Properties May 1993

Reinforced Concrete Design

PDHonline Course S151A (1 PDH) Steel Sheet Piling. Instructor: Matthew Stuart, PE, SE. PDH Online PDH Center

Step 11 Static Load Testing

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by

Design of pile foundations following Eurocode 7-Section 7

DESIGN OF PILES AND PILE GROUPS CONSIDERING CAPACITY, SETTLEMENT, AND NEGATIVE SKIN FRICTION

Objectives. Experimentally determine the yield strength, tensile strength, and modules of elasticity and ductility of given materials.

Table of Contents 16.1 GENERAL Overview Responsibilities

Dynamic Pile Analysis Using CAPWAP and Multiple Sensors Camilo Alvarez 1, Brian Zuckerman 2, and John Lemke 3

Driven Concrete Pile Foundation Monitoring With Embedded Data Collector System

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

ADVANCEMENTS IN STATNAMIC DATA REGRESSION TECHNIQUES

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

SPECIFICATIONS, LOADS, AND METHODS OF DESIGN

Safe & Sound Bridge Terminology

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load

Seismic Analysis and Design of Steel Liquid Storage Tanks

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Copyright 2011 Casa Software Ltd. Centre of Mass

STATNAMIC : Pile Load Testing Equipment

RECENT ADVANCES IN THE DESIGN OF PILES FOR AXIAL LOADS, DRAGLOADS, DOWNDRAG, AND SETTLEMENT

Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites

bi directional loading). Prototype ten story

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

System. Stability. Security. Integrity. 150 Helical Anchor

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

How To Model A Shallow Foundation

INSTALLATION SPECIFICATION FOR DRIVEN PILES

Tension Development and Lap Splice Lengths of Reinforcing Bars under ACI

SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING MATERIALS Materials Materials shall be in accordance with the following:

When the fluid velocity is zero, called the hydrostatic condition, the pressure variation is due only to the weight of the fluid.

VERTICAL MICROPILE LATERAL LOADING. Andy Baxter, P.G.

SECTION 1 GENERAL REQUIREMENTS

Design of reinforced concrete columns. Type of columns. Failure of reinforced concrete columns. Short column. Long column

DEM modelling of the dynamic penetration process on Mars as a part of the NASA InSight Mission

Figure A-1. Figure A-2. continued on next page... HPM-1. Grout Reservoir. Neat Cement Grout (Very Flowable) Extension Displacement Plate

Proceedings of the ASME 28 TH International Conference on Ocean, Offshore and Arctic Engineering OMAE2009 May 31 June 5, 2009, Honolulu, Hawaii, USA

6 RETROFITTING POST & PIER HOUSES

EN Eurocode 7. Section 10 Hydraulic Failure Section 11 Overall Stability Section 12 Embankments. Trevor L.L. Orr Trinity College Dublin Ireland

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

The elements used in commercial codes can be classified in two basic categories:

STRESS AND DEFORMATION ANALYSIS OF LINEAR ELASTIC BARS IN TENSION

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

Structural Axial, Shear and Bending Moments

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P

How to Design Helical Piles per the 2009 International Building Code

Load and Resistance Factor Geotechnical Design Code Development in Canada. by Gordon A. Fenton Dalhousie University, Halifax, Canada

PILE TESTING SPECIFICATION

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

8.2 Elastic Strain Energy

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES

Figure 1.1 Vector A and Vector F

AN EXPLANATION OF JOINT DIAGRAMS

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

FRICTION, WORK, AND THE INCLINED PLANE

Optimising plate girder design

MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS

PILE FOUNDATION CONSTRUCTION INSPECTION

CHAPTER 6 WORK AND ENERGY

Physics 2A, Sec B00: Mechanics -- Winter 2011 Instructor: B. Grinstein Final Exam

CHAPTER 9 FEM MODELING OF SOIL-SHEET PILE WALL INTERACTION

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)

Introduction to Mechanical Behavior of Biological Materials

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

When showing forces on diagrams, it is important to show the directions in which they act as well as their magnitudes.

Dynamic Load Testing of Helical Piles

CEEN Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Physics 11 Assignment KEY Dynamics Chapters 4 & 5

Kentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015

Breakaway Walls

Acceleration levels of dropped objects

Map Patterns and Finding the Strike and Dip from a Mapped Outcrop of a Planar Surface

HOW TO DESIGN CONCRETE STRUCTURES Foundations

Prelab Exercises: Hooke's Law and the Behavior of Springs

Transcription:

PDCA Driven-Pile Terms and Definitions This document is available for free download at piledrivers.org. Preferred terms are descriptively defined. Potentially synonymous (but not preferred) terms are identified with the nomenclature same as Preferred Term. Allowable Stress Design ( ASD ) A design method in which stresses caused by design loads are not permitted to exceed a percentage of the elastic limit of the components. Batter(ed) pile Same as Inclined pile. Beginning of restrike ( BOR ) The first representative restrike hammer blow. Blow count A measure of the effort required to advance a pile, quantified as the number of hammer impacts required for the pile to penetrate a certain distance, having units of blows per length; can be derived from Set. Equivalent blow count A blow count measured over one penetration length and then converted to another penetration length (e.g., 10 blows per inch converts to an equivalent blow count of 120 blows per foot; 10 blows per 25 mm converts to an equivalent blow count of 120 blows per 300 mm). Boot plate Same as Toe plate. Capacity (ASD) The maximum (ultimate) load capable of being resisted. It is the lesser of the geotechnical or structural capacity. Comparable LRFD term: Resistance, nominal. Assigned capacity The capacity determined from a load test; it depends on the type of load test, and the method of data interpretation. It is the lesser of the geotechnical or structural capacity. Bearing capacity Same as Compression capacity. Compression capacity The maximum (ultimate) compression (downward) load capable of being resisted. It is the lesser of the geotechnical or structural capacity. Geotechnical capacity The maximum (ultimate) load capable of being resisted by soil and/or rock. Initial capacity The maximum (ultimate) load capable of being resisted immediately at end of initial drive. It is the lesser of the geotechnical or structural capacity. Lateral capacity The maximum (ultimate) lateral (horizontal) load capable of being resisted. It is the lesser of the geotechnical or structural capacity. Long-term capacity The maximum (ultimate) load capable of being resisted at some specific time after end of initial drive. It is the lesser of the geotechnical or structural capacity. It may be more (e.g., geotechnical: setup; structural: concrete fill), or less (e.g., geotechnical: relaxation; structural: corrosion, deterioration) than the initial capacity. Shaft capacity The maximum (ultimate) load capable of being resisted by a pile s shaft. Structural capacity The maximum (ultimate) load capable of being applied to a pile that does not exceed its nominal material strength or buckling limit. Tension capacity The maximum (ultimate) tension (upward) load capable of being resisted. It is the lesser of the geotechnical or structural capacity.

PDCA Driven-Pile Terms and Definitions 2 Toe capacity The maximum (ultimate) load capable of being resisted by a pile s toe. Ultimate capacity same as Capacity. Uplift capacity same as Tension Capacity. Usable geotechnical capacity The maximum (ultimate) load capable of being continuously resisted (long-term) by soil and/or rock resistance. It may be more (e.g., set-up), or less (e.g., liquefaction, relaxation, scour) than the initial geotechnical capacity. Usable structural capacity The maximum (ultimate) load capable of being continuously applied (long-term) to a pile that does not exceed its nominal material strength or buckling limit. It may be more (e.g. concrete fill), or less (e.g. corrosion, deterioration) than the initial structural capacity. Cushion Material(s) used to dampen and more-evenly distribute forces due to impact. Hammer cushion Material(s) placed in a pile-driving helmet. Pile cushion Material(s) placed on a concrete pile head to reduce pile stresses. Downdrag 1. Downward movement of soil relative to a pile. 2. Pile settlement due to drag force. Drag force Load transferred to a pile at some location above the neutral plane due to downward movement of soil relative to the pile. Maximum drag force The cumulative drag force transferred to a pile from the pile head to the neutral plane. Dragload same as Drag force. Driving stress, allowable The maximum stress which is permitted to occur anywhere in the pile during driving, determined as the pile nominal material stress multiplied by a reduction factor. Driving stress, maximum The maximum stress occurring anywhere in the pile during driving. It should be less than or equal to the allowable driving stress. Dynamic method of analysis Evaluating capacity, impact force, integrity, transferred energy, etc. by simplified equations using the measured strains and accelerations induced by high-strain impacts on a pile. Dynamic monitoring Recording impact-induced strain and acceleration in a pile (e.g., during driving), with the data presented in terms of stress and transferred energy in the pile, as well as capacity estimates. Elastic shortening Downward pile movement resulting from compression of the pile material under compression (downward) loading. The head movement will be larger than the toe movement. Elastic lengthening Upward pile movement resulting from elongation of the pile material under tension (upward) loading. The head movement will be larger than the toe movement. Embedment length The length a pile penetrates into geomaterials. Estimated embedment length The length it is estimated a pile will penetrate into geomaterials, generally for bidding purposes only. Design minimum embedment length The minimum length into geomaterials a pile must penetrate to satisfy design requirements (e.g., lateral concerns, liquefaction, scour, settlement control, tension) before other termination criterion or criteria are applied. End of initial drive ( EOID ) The last full blow of pile installation.

PDCA Driven-Pile Terms and Definitions 3 Follower A structural section placed between the hammer and the pile during driving. Foundation A structural system which transfers loads to geomaterial. Foundation unit, deep A structural unit which transfers the majority of its load or stress to geomaterial at a depth (or depths) considerably larger than the unit s width. Geomaterial Material (native or fill) through which a pile penetrates, or on which a pile terminates. Water is not a geomaterial. Impact force The force at the time of the first velocity peak, delivered by a pile driving hammer to the pile head; it can be measured by dynamic monitoring. Inclined pile A pile driven at an angle to the vertical. Load Force applied to a pile. Allowable load (ASD) The lesser of the allowable geotechnical load or the allowable structural load. Allowable geotechnical load (ASD) The maximum permissible pile load, generally determined as the usable geotechnical capacity divided by a safety factor. For lateral loads, it is generally determined as the load corresponding to a maximum allowable deflection. Allowable structural load (ASD) The maximum permissible pile load, determined as the usable structural capacity multiplied by a reduction factor. Applied load The load actually acting on a pile. Design load (ASD) The maximum load calculated to be applied to a pile based on expected loading conditions (dead, live, soil, wind, snow, rain, flood, and earthquake) and foundation geometry; it is not permitted to exceed the allowable geotechnical load or the allowable structural load. Corresponding LRFD term: Load, nominal. Factored load (LRFD) The sum of nominal loads from different load sources multiplied by their applicable load factors. Nominal load (LRFD) The maximum load calculated to be applied to a pile based on expected loading conditions (dead, live, soil, wind, snow, rain, flood, and earthquake) and foundation geometry. Service load same as Load, applied. Sustained load A load whose application duration is longer than the surrounding soil requires to consolidate/settle (e.g., dead load or long-term live load such as furnishings or tank contents). Transient load A load whose application duration is shorter than the surrounding soil requires to consolidate/settle (e.g., live load such as wind, impact, or traffic). Load and Resistance Factor Design ( LRFD ) A reliability-based design method in which force effects caused by factored loads are not permitted to exceed the factored resistance of the components. Load Factor A multiplier applied to force effects accounting primarily for the variability of loads, analysis inaccuracy, and the probability of simultaneous occurrence of different loads. Load test A procedure during which load is applied to the pile. Dynamic load test A procedure during which one or more impact loads are applied to a pile, while measuring strain and acceleration, for the purpose of evaluating pile resistance.

PDCA Driven-Pile Terms and Definitions 4 Rapid load test A procedure during which a force pulse (with a duration between 10 and 1000 times the ratio of the length of the pile and the wave speed) is applied to the pile, while measuring load and displacement, for the purpose of evaluating pile resistance. Static load test A procedure during which measured loads are applied relatively slowly to a pile, while measuring pile movement. Manufacturer s rated energy The manufacturer s specified energy of a powered hammer. Neutral plane The location where equilibrium exists between the sum of sustained compression load plus drag force and the sum of mobilized positive shaft resistance and mobilized toe resistance. The neutral plane is also where relative movement between the pile and soil is zero. Pile, driven A slender column, having a preformed shape and size, that can be inspected prior to and during installation, which is installed by impact hammering, vibrating or pushing into the earth and used to resist axial and/or lateral loads. Pile head A pile s uppermost end. Pile impedance (Z) A material property of a pile cross section, determined as the product of the Young s modulus (E) and cross-sectional area (A), divided by the wave speed (c): Z = EA/c. Can also be determined as the product of the mass density (ρ), wave speed, and cross-sectional area: Z = ρca. Pile point A special type of pile shoe. Pile shaft The portion of a pile between the pile head and the pile toe. Pile shoe A separate reinforcement attached to the pile toe to facilitate driving, protect a pile s lower end, and/or improve toe resistance. Pile tip same as Pile toe. Pile toe A pile s lowermost end. Redrive A substantial number of impacts, or a substantial time of vibration, which significantly deepens the pile s toe elevation. Refusal The driving condition evidenced by negligible set, associated with the hammer impact force being insufficient to overcome driving resistance; it is often associated with an equivalent blow count of approximately 10 blows per inch (10 blows per 25 mm). Not to be confused with Termination criteria. Relaxation A decrease in pile capacity which occurs after driving (associated with decreased capacity at or near the toe). Replacement pile A pile installed in another pile s stead (e.g., when the original pile is unsatisfactory). Resistance The sum of all mobilized forces (static and dynamic) that oppose a pile load. Factored resistance (LRFD) The nominal resistance multiplied by a resistance factor. Maximum driving resistance The maximum (ultimate) soil and/or rock resistance during driving (the driving resistance in an upper layer may exceed the driving resistance at end of drive). Nominal resistance (LRFD) The maximum (ultimate) load capable of being resisted, governed by the lesser of the geotechnical capacity or material strength limit. Equivalent ASD term: Capacity. Shaft resistance The load resisted by a pile s shaft; it must be less than, or equal to, the shaft capacity.

PDCA Driven-Pile Terms and Definitions 5 Negative shaft resistance Soil resistance acting downward along a pile shaft because of an applied tension (upward) load; it must be less than, or equal to, shaft capacity. Positive shaft resistance Soil resistance acting upward along a pile shaft because of an applied compression (downward) load; it must be less than, or equal to, shaft capacity. Toe resistance The load resisted by a pile s toe; it must be less than or equal to the toe capacity. Resistance Factor A multiplier applied to nominal resistance accounting primarily for variability of material properties, structural dimensions and workmanship, and resistance prediction uncertainty. Restrike An impact, or limited series of impacts, to a previously driven pile to assess its capacity or integrity. Safety Factor (ASD) 1. The ratio of usable geotechnical capacity to allowable geotechnical load. 2. The ratio of usable geotechnical capacity to design load. (see Commentary below for difference between allowable load and design load) Set The pile penetration per hammer impact; can be derived from Blow count. Set-Up An increase in a pile s geotechnical capacity which occurs after driving (most-often associated with increased shaft capacity). Signal matching analysis A rigorous numerical evaluation of the dynamic monitoring data from an individual hammer blow to estimate static pile capacity, relative soil resistance distribution, pile stresses, and dynamic soil properties, using pile and soil models (more-comprehensive than dynamic method of analysis). Skin friction Soil resistance acting along a pile shaft, caused by soil moving relative to the pile shaft; it must be less than, or equal to, the shaft capacity. Negative skin friction Soil resistance acting downward along a pile shaft, caused by soil moving downward relative to the pile shaft. Positive skin friction Soil resistance acting upward along a pile shaft, caused by soil moving upward relative to the pile shaft. Termination criterion or criteria Conditions which must be satisfied to allow field construction control to stop driving a pile (e.g., usually achieving a minimum equivalent blow count, evidencing a minimum dynamic monitoring estimated capacity, and sometimes achieving a design minimum embedment length due to lateral concerns, liquefaction, scour, settlement control, tension there is a difference between estimated embedment length and design minimum embedment length). Toe elevation The elevation of a pile s toe. Estimated toe elevation The toe elevation at which it is estimated a pile will terminate. Maximum toe elevation The highest toe elevation at which a pile can terminate and satisfy a certain design requirement (e.g., lateral concerns, liquefaction, settlement control, scour, tension). Toe plate A plate attached to a pipe pile s toe, making it a closed-end pile. Toe resistance Same as Capacity, Toe. Transferred energy Energy transferred to the pile head; it can be determined as the integral over time of the product of force and velocity. Wave speed The speed of strain propagation in a pile due to impact.

PDCA Driven-Pile Terms and Definitions 6 Wave trace A graphic representation against time of strain, acceleration, force or velocity in a pile due to impact.

PDCA Driven-Pile Terms and Definitions 7 Commentary Allowable load versus Design load Although these terms are commonly used interchangeably, they have different meanings. Allowable load is the lesser of the geotechnical capacity divided by a safety factor, or the structural capacity multiplied by a reduction factor. It is the resistance to load permitted to be provided by a pile, and is consistent among all similarly installed piles on a project. Design load is the load required to be resisted by a specific pile, and can be location-specific. For example, if a design column load divided by the piles allowable load calculates that 4.3 piles are required to support that column, 5 piles will be installed, and the piles design load will be less than their allowable load (i.e., 4.3 5=86% of their allowable load). A pile s design load can also depend on its location within a pile group; piles nearer the group perimeter may have higher design loads owing to overturning moments, even though all piles in the group have the same allowable load. Inclined pile versus Battered or Batter pile versus Raker pile versus Raking pile Battered pile can literally mean, or at least connote, damage, especially to lay people (courts of law). Batter pile is likely a colloquial shortening of battered pile. Inclined pile is therefore preferred. Load test versus Loading test A load test would determine the load in a pile, as a load cell or strain gage might do to measure service load. A loading test applies load to the pile. Minimum embedment length versus Maximum toe elevation versus Minimum toe elevation Minimum toe elevation, when literally interpreted, means the lowest elevation at which the pile toe can terminate, which means the pile can terminate at any higher toe elevation (at any shallower embedment length): exactly the opposite of what it is intended to mean. Maximum toe elevation is correct using similar nomenclature; minimum embedment length is preferred (see Termination criteria). A minimum embedment length, or a maximum toe elevation, should only be specified if required to satisfy a certain design requirement (e.g., lateral concerns, liquefaction, settlement control, scour, tension). Static load test failure Static load tests, or static load test piles, are sometimes said to have failed. At times, this refers to a pile which geotechnically plunged, but did not exhibit requisite capacity. However, if one of the static load test s objectives was to plunge the pile, and the pile did not plunge, the test failed in that regard, even if the pile exhibited requisite capacity. If a static load test s intent was to plunge the pile, and the pile did plunge, and in doing so exhibited at least requisite capacity, it was a successful test in two regards (plunging and required capacity), but the test or the pile might be still be referred to as having failed. The negative connotation attached to designating a static load test pile which geotechnically plunged as having failed may inappropriately preclude a designteam member from incorporating that pile into the permanent structure, potentially adversely affecting the project in a number of ways. It should be recognized that the static load test pile s plunging failure mode (permanent toe displacement under load) occurs with every hammer blow which advances a pile during installation.

PDCA Driven-Pile Terms and Definitions 8 Additionally, when a pile geotechnically plunges, it might be said that the pile failed, when in fact the soil failed.