SHIPS AND OFFSHORE STRUCTURES Offshore Structure Design And Construction Paul A Frieze OFFSHORE STRUCTURE DESIGN AND CONSTRUCTION



Similar documents
Offshore Structures. Offshore Drilling Equipment

Platform Technologies for Offshore Renewable Energy Conversion Diego Vannucci, RINA

Structural concepts for minimum facility platforms for Marginal field development in western offshore, India

Monobuckets and the competitiveness versus monopiles and jacket structures.

Steel construction. Solutions for the renewable energy and offshore sectors. published by energyengineering magazine

OWPST & Titan 200 & UK Offshore

A Cost- Effective Computational Tool for Offshore Floater Design

An Overview of Design, Analysis, Construction and Installation of Offshore Petroleum Platforms Suitable for Cyprus Oil/Gas Fields

International Association of Drilling Contractors

Standards for design of offshore wind farm structures and their foundations

MEK4450. Templates & Manifolds. 29 August Templates and Manifolds. This module will cover:

Hurricanes and the Offshore oil and Natural Gas Industry

The Use of Coatings for Corrosion Control on Offshore Oil Structures. J. Peter Ault, P.E. Consultant Ocean City, NJ

Kodiak Deepwater Project Challenges and Solutions

COWI offshore wind marine engineering services

Design methodology and numerical analysis of a cable ferry

GRAVITY BASE FOUNDATIONS

Oil and Gas Offshore.

Overturning Stability of Offshore Wind Power Substructure with Bucket Foundation

Noble Denton marine services - marine warranty survey

Introduction BAM and Van Oord GBF - Concrete Centre Conference, December 2012

Position keeping costs of floating offshore platforms for marine renewable energies

Offshore Wind Turbine Support Structures

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991

Statistics of wave crests from second order irregular wave 3D models

Marine integrity monitoring Offshore oil and gas

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

RISER SYSTEMS. Our world class innovation solving your riser challenges

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

Technical Project Description for Offshore Wind Farms (200 MW)

PROJECT MANAGEMENT SERVICES

First Power Production figures from the Wave Star Roshage Wave Energy Converter

OFFSHORE INDUSTRY REQUIREMENTS AND RECENT METOCEAN TECHNOLOGY DEVELOPMENTS

An insights report by the Energy Technologies Institute. Offshore Wind Floating Wind Technology

Design of Offshore Wind Farms Prepared by Flemming Jakobsen & Andrass Ziska Davidsen LICENGINEERING A/S

Advantages of our solution

Depth-independent solution for Offshore Wind the WindFloat

4. PROGRAMME OF WORK: PROJECT ACTIVITIES, TIMESCALE AND COSTS

RESUME for Dr. Walter L. Kuehnlein

Scope of EN Clarification Document

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

Facilities Pori construction yard

Seismic Analysis and Design of Steel Liquid Storage Tanks

Self-Elevating Platforms Guidelines for Operations and Towages UNCONTROLLED

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

MOBILE OFFSHORE UNITS

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011

Communication Links for Offshore Platforms. A User s Guide to Troposcatter Communications

ICHEME SYMPOSIUM SERIES NO. 139 A METHODOLOGY FOR CONCEPT RISK ASSESSMENT OF OFFSHORE DEVELOPMENTS

HV Submarine Cable Systems Design, Testing and Installation

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

Steel joists and joist girders are

2001/069. Decks, stairways,gangways and their associated handrails OFFSHORE TECHNOLOGY REPORT HSE

An Introduction to Oil and Gas Well Servicing

Helping Our Customers Achieve Superior Results. Offshore Handling Equipment

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Horizon Survey and Geotechnical Companies

CE591 Lecture 8: Shear Walls

INTRODUCTION OF KEY STAFF

Simulation of Offshore Structures in Virtual Ocean Basin (VOB)

International Legal Regime of Offshore Structures- Environmental Concerns By Violeta S. Radovich

Dynamic Stability of Flared and Tumblehome Hull Forms in Waves

EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES

Technip Offshore Finland

INNWIND.EU Offshore wind energy DTU Contributions to WP4.2 Technology, ecomony, trends and research. Henrik Bredmose Thomas Buhl

Geotechnical Design Monopile Foundations for Offshore Wind Turbines

Helical Piles. A Practical Guide to Design and Installation

2015 CT Offshore A/S Diving Assistance Sub Station Debris Clearance WODS Wind Farm

13. FPSO Operational Problems Don Smith, OGP

LIFE EXTENSION ISSUES FOR AGEING OFFSHORE INSTALLATIONS

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

A 38-story design-build steel structure features a staggered-truss frame

Total Subsea Solutions

The Advance of New ROV Conveyed Geotechnical Acquisition Tools - Going Where No Man Has Gone Before. Subsea UK Expo February 2014

King Post Wall Information

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

Loads Tools Checks Reports

Ageing and life extension

Subsea Drilling Systems

Offshore engineering. an Atkins company

Structural integrity management framework for fixed jacket structures

Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service

What is QuickBase? Traditional foundations (left) compared with QuickBase (right)

Life-Cycle Cost of a Floating Offshore Wind Farm

NUMERICAL SIMULATION OF REGULAR WAVES RUN-UP OVER SLOPPING BEACH BY OPEN FOAM

SEISMIC RETROFITTING OF STRUCTURES

Joist. Reinforcement. Draft 12/7/02

The information, including design data, photographs, drawings, and maps were obtained from the operating companies and from Belmar files.

Technip Offshore Finland

Send your directly to

OTC Managing the Cost & Schedule Risk of Offshore Development Projects Richard E. Westney Westney Project Services, Inc.

Safe & Sound Bridge Terminology

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Offshore Wind: some of the Engineering Challenges Ahead

Extreme Wave Effects on Deep Water TLPs Lessons Learned from the Snorre A Model Tests

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

Technical Assignment 2 TABLE OF CONTENTS

RISK BASED ASSESSMENT FOR OFFSHORE JACKET PLATFORM IN NIGER DELTA, NIGERIA (CORROSION AND FATIGUE HAZARDS)

What is geotechnical risk?

Transcription:

OFFSHORE STRUCTURE DESIGN AND CONSTRUCTION Paul A Frieze PAFA Consulting Engineers, UK Keywords: Jacket structures, topsides, design, construction, metocean, geotechnical, loads, load combinations, piling, offshore foundations, corrosion protection Contents 1. Introduction 2. Types of Offshore Structures 3. Functional Requirements 4. Fundamental Design Requirements 5. Meteorological and Oceanographical Information 6. Geotechnical Information 7. In-Service and Temporary Design Situations 8. Loading Categories 9. Loading Combinations 10. Structural Analysis 11. Materials and Welding 12. Topsides Design 13. Jacket Design 14. Piling and Foundation Design 15. Introduction to Corrosion Protection Glossary Bibliography Biographical Sketch Summary Structures deployed offshore for oils and gas field development are reviewed and their functional needs defined. Fundamental design requirements for fixed steel structures, in particular, those for jackets and topsides, are spelt out together with the expectations of metocean and geotechnical surveys. Temporary and in-service design requirements, involving appropriate loads and combinations, are defined as well as the demands for structural analysis and materials and welding. Topsides and jacket design needs are presented in some detail and pile and other foundation assessments described. Basic corrosion protection requirements are reviewed. 1. Introduction Offshore structures have developed rapidly over the last three to four decades. Much of this has been driven by the need to exploit deeper waters as a result of depletion of shallow water easy-to-reach fields, buoyed by a generally continually rising price of oil and, more recently, gas. On occasions, however, serious falls in the oil price have punctured these developments sometimes significantly, leading to major consolidation within the industry.

This need for deepwater developments and, as well, a desire to continue to exploit depleting shallow water reserves has spawned new forms of offshore structures for production, such as production semi-submersibles, tension leg platforms in a variety of shapes and sizes, monohulls (ship-shaped units), spars, monotowers, and production jack-ups. Jackets have continued to be exploited in a variety of ways using different construction methods, all aimed at speeding up design, fabrication and installation. 2. Types of Offshore Structures 2.1. Overview There are two main categories of offshore structures, fixed and floating. Each has a number of sub-categories see Table 1 which also lists their uses, advantages and disadvantages. Subsea completions are also structures that are placed on the seafloor basically to support equipment. They are, however, not usually considered to be an offshore structure in the generally accepted use of the term. Structure sub-categories Uses Advantages Disadvantages Fixed steel structures Jacket Drilling, Very common, well No storage, WD 1) < 100 - see Figure 1 production proven, dry trees m Tower Drilling, Very common, well No storage, WD 400 m - see Figure 2 production proven, dry trees Jack-up Drilling, Common, well proven No storage, water depth < - see Figure 3 production for production, dry trees 100 m, foundation (few) stability issues Compliant tower Drilling, Dry trees, large no of No storage, current - see Figure 4 production wells, large payload maxm 535 m up to 1000 m, large heavy structure in deep water Gravity structure Drilling, Storage, dry trees WD 300 m - see Figure 5 production Monotower Drilling, Unmanned, well No storage, limited - see Figure 6 production proven, dry trees number of wells, WD < 100 m Floating steel structures Monohull - see Figure 7 Semi-submersible - see Figure 8 Tension platform leg Production Early production, storage, well proven, large variation in payload, large deck space, deep water Drilling, production Drilling, production, Early production, low heave motion, well proven, dry trees Dry trees, roll, pitch & heave negligible, WD current maxm 1850 m up to 3000 m, wet trees, sensitive to motions WD current maxm 2440 m up to 3000 m, no storage, wet trees WD current maxm 1450 m up to 1500 m,,

- see Figure 9 dry trees several varieties no storage, sensitive to changes in payload Spar - see Figure 10 Drilling, production, storage (limited) Dry trees WD current maxm 1700 m up to 3000 m, roll, pitch & heave significant Table 1. Categories of fixed and floating offshore structures their uses, advantages and disadvantages Each of these units is considered in turn in the following subsections. 2.2. Jacket A jacket is a welded tubular space frame with three or more near vertical tubular chord legs with a bracing system between the legs. The jacket provides support for the foundation piles, conductors, risers, and other appurtenances. A jacket foundation includes leg piles which are inserted through the legs (Figure 1) and connected to the legs either at the top, by welding or mechanical means, or along the length of the legs, by grouting. Figure 1. Jacket showing driving of pile through jacket leg

Additional piles, called skirt piles, can be inserted through and connected to sleeves at the base of the structure. Leg and skirt piles jointly anchor the structure and transfer both vertical and horizontal actions to the seabed. Where the piles are only connected to the legs at the jacket top, the forces are transferred to the piles at the connection and the jacket hangs from the piles. Where the piles are connected by full length grouting, the jacket behavior is similar to that of a tower (Section 2.3), with the legs and piles acting together as composite components. 2.3. Tower The tower is also a welded tubular space frame with three or more near vertical tubular chord legs with a bracing system between the legs. The tower provides support for the topsides, conductors, risers and other appurtenances. Figure 2. Tower structure showing cluster piles A tower foundation usually includes cluster piles which are inserted through and connected to sleeves around the corner legs at the base of the structure (Figure 2). Additional piles, called skirt piles, can be inserted through and connected to sleeves at the

base and along the perimeter of the structure. As an alternative to piles, a tower can be supported by another foundation system that supports it at its base, such as bucket foundations. Cluster and skirt piles, or other foundation system, anchor the structure and transfer both vertical and horizontal actions to the seabed. The global behavior of a tower is that of a vertical cantilever with all actions being transferred to the foundation system at the base of the tower. 2.4. Jack-Up Figure 3. Jack-ups in the elevated positions

A jack-up comprises a floating hull and three or more legs, which can move up and down relative to the hull. It reaches its operational mode by lowering the legs to the sea floor and then raising the hull to the required elevation. The legs can be moved independently and are supported at their bottom ends by spudcans (Figure 3). Prior to raising the hull, the spudcans are pressed into seabed, a process termed preloading. Preloading pre-compresses the soil so as to reduce the chance of punch-through which, if it occurs, can partly or fully destabilize the platform. The majority of jack-ups are built for short-term operation at different locations around the world. As metocean and foundation conditions vary between locations, such jack-ups have to be assessed for each particular location. A few jack-ups are purpose-built for production at a single location, although there can be the intent for eventual their reuse at other locations. 2.5. Compliant Tower A compliant tower is a flexible structure with flex elements (principally flexible legs or axial tubes) to control mass and stiffness characteristics so as to mitigate the effects of periodic wind, wave and current forces. Natural periods are usually greater than 25 sec so they are generally well outside wave periods. Figure 4. Compliant tower

Compliant towers are relatively slender compared with jacket/tower structures but have higher installation costs and use a considerable amount of steel. They can support a large number of wells (> 40), with dry trees, and can sustain a large payload (Figure 4). 2.6. Gravity Structure Gravity structures (or gravity-based structures as they are often termed) are fixed structures that are held in-place against environmental actions solely by their weight plus that of any contained ballast, together with foundation resistance resulting from their weight and lateral resistance from any skirts. The majority of gravity structures are constructed of concrete (Figure 5) although a very limited number have been built of steel. 2.7. Monotower Figure 5. Gravity structure A monotower is a fixed structure in which the whole structure, or at least the upper part of the structure, consists of a single vertical column (tubular or framed) that carries the topsides (Figure 6).

Figure 6. Monotower - here with only one deck with helipad on top Where the monotower consists of a single vertical column over its full height that continues into the seabed as the foundation pile, this is described as a free-standing caisson or simply caisson. A braced caisson is a monotower where the lower part of the column is laterally supported by one or more inclined braces between the column and one or more foundation piles. Monotowers are designed to be unmanned or not normally manned. - - - TO ACCESS ALL THE 175 PAGES OF THIS CHAPTER, Visit: http://www.eolss.net/eolss-sampleallchapter.aspx

Bibliography API RP 2A Recommended Practice of Planning, Designing and Constructing Fixed Offshore Platforms, American Petroleum Institute, Washington. Dalrymple R.A., Heideman, J.C. (1989). Non-linear Water Waves on a Vertically-Sheared Current, Wave and Current Kinematics and Loading, E & P Forum Workshop, Paris. [Demonstrates waves alternately stretch and compress the current profile under crests and troughs]. Eastwood, J.W., Watson, C.J.H. (1989). Implications of Wave-Current Interactions for Offshore Design, Wave and Current Kinematics and Loading, E & P Forum Workshop, Paris. [Demonstrates waves alternately stretch and compress the current profile under crests and troughs]. Forristall G.Z. (1978). On the statistical distribution of wave heights in a storm, J. Geophysical Research, pp 2353-58. [Describes an approximate method to estimate maximum wave height in a given return period based on statistics derived from sea states, with particular reference to the Gulf of Mexico]. Forristall G.Z. (1996). Measurements of current blockage by the Bullwinkle platform, J. Atmospheric and Oceanic Technology, Volume 13, No 6, pp 247-266. [Describes application of the actuator disc model to determining current blockage]. Forristall G.Z., Ewans K.C. (1998). World-wide Measurements of Directional Wave Spreading, J. Atmospheric and Oceanic Technology, Volume 15, pp 440-469. [Presents directional spreading factors for open water conditions]. Longuet-Higgins M.S. (1952). On the statistical distribution of the heights of sea waves, J. Marine Research, 11, pp 245-66. [Pioneer paper on the determination of short-term distribution of wave heights assuming them to be Rayleigh distributed]. Rodenbusch G., Forristall G.Z. (1986). An empirical model for random directional wave kinematics near the free surface", Proc. 18th Offshore Technology Conference, Paper OTC 5097, Houston. [Describes Delta-stretching, a method to extend the kinematics obtained from linear theory into the wave crest above the still water level]. Tromans P.S. Anatürk A.R., Hagemeijer P.M. (1991). A new model for the kinematics of large ocean waves - application as a design wave, 1st International Offshore and Polar Engineering Conference, Edinburgh, ISOPE. [Provides the basis of New Wave Theory]. Tromans P.S., Vanderschuren L. (1995). Response based design conditions in the North Sea: application of a new method. Proc. 27th Offshore Technology Conference, Paper OTC 7683, Houston. [Provides a statistically correct method based on storms to estimate the long-term distribution of maximum wave heights]. Tucker M.J. (1989). An improved Battjes method for predicting the probability of extreme waves, Applied Ocean Research, Vol. 4, pp 212-213. [Describes a method for estimating design values of significant wave height based on short measured wave data sets]. Tucker M.J., Pitt E.G. (2001). Waves in Ocean Engineering. Elsevier Ocean Engineering Book Series Vol. 5, Amsterdam. [Discusses statistically correct methods for estimating long-term distribution of maximum wave heights, the Pierson-Moskowitz wave frequency spectrum, and double-peaked spectrum parameterizations]. Wheeler J.D. (1970). Method for calculating force produced by irregular waves. J. Petrol. Tech. V 22, pp 473-486. [Describes stretching of linear wave kinematics]. Biographical Sketch Dr Paul A Frieze BSc in Civil Engineering MSc and PhD in Structural Engineering

CEng, FRINA, MIStructE, MSNAME, ACIArb. BSI Committee 525/12, International Offshore Structures Code. UK Leader to ISO/TC 67/SC 7, International Offshore Structures Code: WG 5 Floating Structures - Editing Panel WG 3/P3 Fixed Steel Structures - Members Technical Core Group WG 5/P3 Floating Structures - Convener Inspection & Condition Monitoring WG 7/P3 Jack-Ups - Member Structural Strength WG 7/P10 Jack-Ups Member Calibration & Acceptance Criteria ISO/TC 8/SC 8/WG 3 Ship limit state criteria Joint-writer of ISO 18072-1, Ship structures Part 1: General requirements for their limit state assessment Prime author of ISO 18072-2, Ship structures Part 2: Requirements for their ultimate limit state assessment ISSC Chairman 2006, Member 1979-2009. Senior Lecturer at Dept of Naval Architecture & Ocean Engineering, Glasgow University, 1978-84. Structural engineering manager in Wimpey Offshore, John Brown Production, London Centre for Marine Technology, and AME (1986-1990). Established PAFA Consulting Engineers in 1990 initially as consultant then opened office in 1998. Since then has worked on a wide range of onshore/offshore projects. Published over 100 technical papers, 3 Books (co-editor), Chief Editor - Journal of Marine Structures (retired) Specializes in: design (ultimate strength, damage assessment), code/standard development (including structural reliability analysis and load and resistance factor derivation), and risk-based inspection (RBI). Extended UK steel bridge code BS 5400-3 to include the effects of lateral pressure, an approach approved by UK Nuclear Installations Inspectorate. Has undertaken forensic work on constructional risks and damage assessment cases and appeared as expert witness in disputes involving damage, construction defects, and design criteria of a range of predominantly marine structures but also domestic and industrial structures.