Opera house facts. Architect: Snøhetta AS. Photo: Trond Isaksen



Similar documents
Flytower with understage areas. Main Auditorium. Production Area. Foyer

THE ACOUSTIC DESIGN OF THE NEW DRAMA HOUSE FOR THE ROYAL THEATRE IN COPENHAGEN

THE UNIVERSITY OF EDINBURGH George Square Library

Commercial Building Valuation Report

Projects. Cultural centre in Jinan. Europaconcorsi Beta. Grand Theatre. JINAN, China. Publications Jinan Cultural Centre

Tennessee 07/01/14. Contracting Class Codes with Descriptions (8)

FACTS. The National Museum of Art, Architecture and Design Vestbanen Oslo, Norway

SECTION ACOUSTICAL WALL TREATMENT. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

THERMAL LOSSES Thermal Losses Calculations

RESIDENTIAL WOOD DECKS

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER May 2015

NEW TO THE NEIGHBORHOOD

2015 COURTICE SANTA CLAUS PARADE Sunday, December 6, 2015 at 12pm ENTRANT S SHEET

Table H.42 Number of new internal jobs added to the list requiring the attention of the Housing Ministry as at 30 November 2015

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

TD AMERITRADE Park Omaha

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

Segreti Design Scope of Interior Design Services

Commercial Building Valuation Report

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

Ministry of the Environment Decree on accessible building

Important Information for Owners of Buildings in Flood Zones

The EFGCP Report on The Procedure for the Ethical Review of Protocols for Clinical Research Projects in Europe (Update: April 2011) Norway

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Squash Court Design general points

Norway universally designed by 2025

Technical Bulletin: Understanding the ADA and Implications for Office Design

11 13 November 2015, Berlin. Service packages Other marketing services. 50th Symposium Procurement and Logistics.

Sample Reserve Fund Study Analysis

Accessibility Design Advice

QUEEN MARY 2 GUEST ACCOMMODATION

ÚBUDA IRODA BARÁZDA CENTER. Barázda Street th District, Budapest, Hungary. Topographical Lot Number: 3990/2

Acoustical Design of a Multi-Purpose Hall for Natural and Amplified Sound

University of Cambridge: Programme Specifications MASTER OF PHILOSOPHY (A) IN ENVIRONMENTAL DESIGN IN ARCHITECTURE

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Section 6. Off-street Bicycle Space Regulations

HEBDEN BRIDGE PICTURE HOUSE TECHNICAL INFORMATION FOR HIRERS UPDATED OCTOBER CAPACITY. Stalls: 257 Seats per row: 22(Max)

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ON MOST schemes, the architectural design of. Flexible strategy. Case study. The Forum

Marketing Coordinator Bootcamp Session 2: ABCs of AEC

10' 16' Maximum. Backwall 5' 5'

Building and Planning

PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE

Construction Contractors License Application Step-by-Step

T170 Interior Design Technology MTCU Code Program Learning Outcomes

2 Axis Solar Tracker / 12 Kw

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

The Homeowner s Building Application Checklist for Constructing a Residential Sundeck

HILBERT CIRCLE THEATRE

PROJECT COST ESTIMATES & FEASIBILITIES

BIM. Building Intelligent Models For Better Information Management. By: Sean Arbic

52 Ways To Save. 3. Ask for feedback. Ask about the pros and cons of different elements of your design and how each will affect your budget.

Guide to Preparing a Quality Management Plan for Registered Code Agencies (under the Building Code Act, 1992 and Building Code )

CLEAR-DIVISIONS CENTERFOLD

CARMEL PLACE, NEW YORK, NY

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Dimensioning and Estimating Brick Masonry

Design Scenario Interior Design STAR Event

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

Revised Scheme of Service. for. Artisans. (Carpentry, Masonry, Welding, Painting, Plumbing)

Construction Contractors License Application Step-by-Step

The first apartment house renovation with Passive House components in Norway

CLEAR-DIVISIONS VARIOFOLD

STAVANGER REGION. Welcome to the versatile city of Stavanger.

Construction Technologies Career Field Pathways and Course Structure

2012 Graduation Schedule

Current Thinking Guide to

BROWNSVILLE STRUCTURES STUDY. July Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania

PERMITS REQUIRED & PERMIT EXEMPTIONS

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No May 15, 2013

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Case Study 13 Schools of Architecture and Design, Wellington tertiary education institute, New Zealand

TECHNICAL RIDER

Basement Window Installation Guide Hopper and Sliding

Mesirow Financial An Ounce of Prevention: Emergency Preparedness and Response

Green Buildings Guidelines for Harvard

At this time, no edtpa is required for this field.

EXAM GUIDE. Schematic Design. Overview 2. Interior Layout Vignette 3 Sample Passing Solution 5 Sample Failing Solution 6

CHARLOTTE COUNTY Community Development Department

CLEAR-DIVISIONS APERTO

Klosterenga, Oslo, Norway, page - 1

C-2 Construction, Inc. - NAICS Codes

The Integrated Design Process

Standard the the Raising

Transcription:

The new

Opera house facts The new opera house basks in the evening sun at the water s edge in Oslo. A total of 36 000 marble and granite slabs have been laid down to create the characteristic appearance. Architect: Snøhetta AS. Photo: Trond Isaksen

opera house facts In July 1999 Statsbygg was commissioned to plan for a new opera house. In the year 2000 an open architect competition was held which attracted the largest number of entries of any such competition in Norway. An international jury selected the architecture firm Snøhetta as the winner. The opera house is 38 500 square metres in size and has close to 1000 rooms. The house is divided into three main sections: the audience section, the rehearsal and administration section and the workshop section. The house has three stages: the Main Stage with approximately 1400 seats, Scene 2 with up to 440 seats and Rehearsal Stage 1 with 200 seats. The workshop section with paint workshop, carpentry workshop and smithy was brought into use on 1 September 2007, six months ahead of the original plan. Execution A total of 60 building contracts have been supervised. The project management organization has changed according to requirements, but has on average consisted of 20 individuals and project director Roar Bjordal from Statsbygg. In addition, the project organization has had 30 associated foremen. During the entire project period there has been close cooperation with The Norwegian Opera & Ballet. The opera house is a very complex building and it has been demanding for everyone who has participated in the project. The market situation in recent years has also presented a challenge; it has been difficult to attract bids, and the prices offered have frequently been well above budget. This has necessitated certain simplifications and close control of finances in order to complete the project within budgetary constraints. The chandelier In 2007 it has largely been the technical contracts that have been carried out. That is to say electrical, heating, ventilation and plumbing and not least theatre technology. In addition the final decoration work has been completed. The audience seating has been installed and the chandelier in the Main Stage has been hoisted into place. It was designed and built in cooperation between Snøhetta, Eidskog Mekaniske Verksted and Hadeland Glassworks and has a diameter of seven metres. The Main Stage with impressive acoustics has approximately 1400 seats. Oak is a widely used material indoors in the new opera house such as here in a hallway by the foyer. Photo: Trond Isaksen

opera house facts In 2007 the final stones were laid down on the plaza. Finally, the 36 000 pieces in the marble and granite jigsaw were completed. All were ready-cut in various shapes and sizes. The foyer also has marble flooring. Theatre technology The building contains advanced stage technology, particularly on the Main Stage and Stage 2. The Main Stage has 16 elevators that can be moved up and down independently. It has a moveable rotating stage, two side stages and a background stage. Stage 2 will also be equipped with advanced theatre technology and a very advanced electro-acoustic system. Achievement of goals The main goal for the opera house project was that the building should manifest itself as an important monument that both highlights Norway as a nation of culture and the Norwegian Opera & Ballet s significance in The Norwegian culture and society. The huge interest the project has generated during the construction period indicates that this goal will be achieved. During the construction period Statsbygg has hosted and informed more than 70 000 people on various aspects of the building. Facilities for the disabled Statsbygg has cooperated closely with societies for the disabled during the entire construction period. They have been given access to drafts and provided several suggestions that have been taken into account. One example is talking signs, which guide the blind and visually impaired. The stages will be equipped with induction loops and the Main Stage has a total of 72 possible wheelchair spaces. Foto: Trond Isaksen

Opera house facts Building commissioner: Principal: Architect: Statsbygg The Ministry of Culture and Church Affairs Snøhetta AS The steering group for the project consists of representatives from: The Ministry of Culture and Church Affairs, the Ministry of Government Administration and Reform, the Norwegian Opera & Ballet and Statsbygg. the art project The works of art for the opera house have been commissioned and produced by Public Art Norway (KORO). Project cost (NOK per 01.07.2008) Construction project NOK 4356000000 Equipment and furnishings project NOK 178700000 Project history 1998: Proposal to the Norwegian Parliament for the building of a new opera house on the Vestbane site. No majority obtained for the proposed site. 1999: Three sites proposed: Vestbanen, Bjørvika and the Folketeater building. On the 15th of June a parliamentary majority votes to build a new opera house in Bjørvika. 2000: International Architect competition. 240 entries from all over the world are received. On the 22nd of June the Norwegian architect firm Snøhetta is declared the winner. 2001: The pilot project for the new opera house is prepared. 2002: Royal Proposition concerning the new opera house is put before Parliament and approved on the 16th of June. Preparatory on-site work commences. 2003: Groundwork starts on the 17th of February. 2004: The foundation stone is laid by HM King Harald on the 3rd of September. 2005: The Fly Tower, the opera s highest point, is completed on the 11th of May. 2006: Installation work and stone masonry commences. 2007: The construction project is completed during the winter. 2008: Moving, rehearsals and opening gala (12th of April) statistics Gross area: 38,500 m² Public areas: 11,200 m² Stage areas: 8,300 m² Rehearsal, administration, workshops: 19,100 m² Base: 15,590 m² Length, including plaza: 242 m Building length: 207 m Building width: 110 m Max. ceiling height above stage: 54 m Depth of stage below sea level: 16 m Number of rooms: 1578 Number of stages: 3 Seating capacity Main Stage: 1358 Seating capacity Scene 2: 440 Seating capacity rehearsal stage: 200