Addendum 3 WMMHC-Lake House May 15, 2015 Architect s Project #: 14.003



Similar documents
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Building Permit Application

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

BUILDING SAFETY UNIT

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

SECTION GENERAL PROVISIONS FOR HVAC WORK

Water Leak 1: Intrusion Policy

Crawford Inspection Services C.C.B. #

October 5, 2015 Dear Client,

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

Building Condition Assessment Report

Building Condition Assessment Report

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Vision Home Inspection

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

City of Oviedo Commercial Shell Building Permit Application Guidelines

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

City of Elk River BASEMENT Office Use Only

COMPREHENSIVE PROPERTY INSPECTIONS

ENHANCED LABORATORY HVAC SYSTEM

HEANEY General Contracting, Inc.

Home Inspection Report

Orlando Home Inspection Services

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Aurora Mall. Aurora (Denver), Colorado

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

BUILDING PERMIT SPECIFICATIONS

SECTION MORTUARY REFRIGERATORS

Exhibit IV Approved Measures List. Page 1 of 5

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

Mobile Home Pre-Inspection Checklist

Inspecting to a higher standard.

Schedule of Maintenance Fees

Vari Inspection Services

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

City of St. Charles Basement Finish or Remodel

Home Inspection Report

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

PROPERTY INSPECTION REPORT

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA Addendum No.

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design Schematic Design Project Manual

Arapahoe County Residential Water Heater Installation and Inspection Guide

GENERAL WIRING RULES FOR HOUSES

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Propery Inspection Report

I NI NP R Inspected Items

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

FIRE ALARM SYSTEM CHECKLIST For Addressable Systems PRIOR TO INSPECTION

City of Riverside Building & Safety Division Phone: (951)

The Uniform Building Inspection Report Condensed

SEATTLE CITY OF ASSESSMENTS. Northwest Senior Center nd Ave NW. Teen Parent Home nd Ave E

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

Element D Services Plumbing

2014 British Columbia Building Code Changes

Inspection Tech. (330) Inspected By: Aaron Westerburg

How To Get A Building Permit In Florida

MECHANICAL PLAN REVIEW REQUIREMENTS

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS

Does Wall Township require an inspection by the building department on resale of a home?

Gramercy Place Condo Association, Inc.

Summit Series Single Section and Double Section Homes

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

TENANT DESIGN MANUAL UPDATED JULY 2015

Total Home Inspection Checklist

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Questions and Answers for Heating and A/C Contractors

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

Inspecton Report. Property Address:

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

PLAN SUBMITTAL INFORMATION

A Seller s Guide to the Home Inspection By

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Basics of HVAC Cleaning

Property Condition Assessment

2. What building projects are exempted? (permit not required)

EXPRESS PERMITS (No Plan Check Required)

State of Connecticut Department of Public Health RADON PROGRAM

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

PROPERTY INSPECTION REPORT

HV AC CODE CHECKLISTS

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Transcription:

Addendum 3 WMMHC-Lake House May 5, 05 Architect s Project #: 4.003 This Addendum forms part of the Construction Documents dated 4/30/5 and modifies them as follows: GENERAL:. None. SPECIFICATIONS:. 0433.7 A Exterior Stile and Rail doors are to be warranted for one () year. 3. 0433.3 B Exterior stile and rail wood doors are to be fir species. 4. 0533 Patio doors (a and b) are to be fiberglass doors. Basis of design product is Jeld-Wen Aurora A500 with exterior finish to match windows and interior finish to be douglas fir. Provide glazing per specification and ADA thresholds. 5. 0700 Doors b and 9b have been deleted. 6. 0700 D-3 is a HM framed door, 90 min rated. The door is 3-0 x3-0 and is located in the crawl space. SUBSTITUTIONS: Note: All Substitutions are to meet or exceed Project Specifications with respect to finish, design style, construction, etc. 7. None Approved Substitution: None DRAWINGS:. A.-Site Plan See Add 3. for location of propane tank and concrete pad. Add note #3 to site plan that reads: PROVIDE 6'x3' CONCRETE PAD FOR BACK-UP GENERATOR PROPANE TANK. LOCATE PER CODE AND COORDINATE WITH AUTHORITIES HAVING JURISDICTION. 9. A.3 Schedules Door Schedules: D-6 is a wood framed door. 0. A.3 Schedules Door Schedules: D-3 is located in the crawl space, and is 3-0 x3-0 with a hollow metal frame. This is a 90 min rated door. Provide hardware per schedules.. A.3 Schedules Door Schedule: Door type 3 is to be a fiberglass door per specifications. See note above.. A.3 Schedules Window Types: Window types E and F are hollow metal divided light frames. The divided lights are not shown to scale graphically. Please provide hollow metal frame with welded hollow metal divided lights. MacArthur, Means & Wells, Architects, PC

3. A3. and A3. See Add 3. for locations of louvers, signage and dryer terminations on elevations. STRUCTURAL: 4. None MECHANICAL: 5. See attached addendum from ACE PLUMBING: 6. See attached addendum from ACE ELECTRICAL: 7. See attached addendum from ACE ATTACHMENTS: Add 3. ( page) Add 3. ( page, x7) Addendum from ACE ( pages) End of Addendum 3. MacArthur, Means & Wells, Architects, PC 5 West Alder Street, Missoula, MT 590 Telephone (406) 543.500 Fax (406) 37.9367 mmw@mmwarchitects.com

4 4 4 4 7 DS JUT 3 '-0" 3 STORAGE 30 7 CONTRACTOR TO ENSURE REQUIRED CLEARANCES AROUND ALL MECHANICAL AND ELECTRICAL UNITS 9 FD 5 Site Plan " = 0'-0" Western Montana Mental Health Center- Lake House Polson, Montana 4.003 /A. Add 3. 05/5/5

4 3 5 5 5 PT- PT-5 PT- 7 ST- 3 4 6 A4. 5 5 9 6 0 PT-4 PT- PT- PT- PT-3 9 A. PT- '-6" A3. &A3. Western Montana Mental Health Center- Lake House Add 3. Polson, Montana 4.003 05/5/5 East Elevation (Add 3.) /4" = '-0" West Elevation (Add 3.) /4" = '-0"

0 E. Broadway Suite #40 Missoula, Montana 590 406-549-460 (phone) 406-549-406 (fax) WMC Lake House - Polson, MT ADDENDUM NO. 3 May 4, 05 PROJECT MANUAL MECHANICAL, PLUMBING and ELECTRICAL General Notes:.) The additions, clarifications, and corrections contained herein shall be made to the Project Manual, Drawings, and Schedules for the above referenced project, and shall be included in the scope of work and proposals to be submitted. References made below to the Project Manual and Drawings shall be used as a general guide only. Bidder shall determine the extent of work affected by Addendum items. Specifications Mechanical & Plumbing Prior Approvals Section Item Manufacturer 4600 Security Plumbing Fixtures Acorn 333 Metal Ducts Lewis & Lambert Metal Ducts Western Spiral/Omni Duct Round Ducts and Fittings Metco 3700 Air to Air Energy Recovery Air Flow RenewAire 36 Split-System Air-Conditioners Trane 30593 Testing, Adjusting, and Balancing for HVAC Precision Test & Balance Drawings Mechanical and Plumbing Sheet M.0 CRAWL SPACE MECHANICAL PLAN. Change Modified duct sizes and routing. See attached sketch Add. M.0.. Change Modify quantity and location of fire/smoke dampers. See attached sketch Add. M.0. Sheet M. FIRST FLOOR MECHANICAL PLAN. Edit Change to duct main sizes. See attached sheet. See attached sketch Add. M.0.. Change Number and location of fire/smoke dampers. See attached sheet. See attached sketch Add. M.0. WMMHC-Lake House 5/4/5 Addendum No. 3 Page-

Sheet P.0 - PLUMBING COVER SHEET. Change- Plumbing Fixture Schedule LAV-. Manufacturer to be Bradley, model HSL. Provide with BIR3 spray head with battery, TMA thermostatic mixing valve. Color to be selected by architect. Sheet P. PLUMBING DETAILS. Add Domestic water riser detail #4. Water meter installed and furnished by contractor to be size. Sheet P. FIRST FLOOR DOMESTIC WASTE AND VENT PLAN. Edit Change LAV- location in Bathroom 0. See attached sketch Add. P.0. Sheet P3.0 CRAWL SPACE DOMESTIC WATER PLUMBING PLAN. Edit Change LAV- location in Bathroom 0. See attached sketch Add. P3.0. Sheet P3. FIRST FLOOR DOMESTIC WATER PLUMBING PLAN. Edit Change LAV- location in Bathroom 0. See attached sketch Add. P3.0. ELECTRICAL: Specification Section 646:.) CLARIFY: PART.3: Commercial type load centers with plug-in breakers are acceptable where rating and configuration allows. This will likely not be possible for some panels and panelboards with bolt-on breakers will be required..) CHANGE: PART.3E: Lugs shall be mechanical type. 3.) CLARIFY: No TVSS or SPD required. Sheet E0.:.) CHANGE: SINGLE-LINE DIAGRAM: Equipment ground is likely not needed from the service disconnect 'CB A' to the CT Can. Utility will likely bond the CT Can and meter to the neutral. Coordinate connection requirements at the service with Mission Valley Power prior to installation..) CLARIFY: SINGLE-LINE DIAGRAM: Service disconnect 'CB A' shall be an enclosed circuit breaker. Sheet E.:.) CHANGE: Condensing Units -4 to single phase. See attached sketch - Add E.. Sheet E6.:.) CHANGE: LIGHTING FIXTURE SCHEDULE: Clarify - Type 'W' shall be Teron Lighting #SDM L5. 00V-77V- CGL-XX-40K. Architect to select finish from standard choices..) CLARIFY: PANEL SCHEDULES: All panels are Main Lug Only. 3.) CHANGE: PANEL SCHEDULE: See attached sketch to reflect changes to mechanical equipment connection requirements. 4.) CHANGE: MECHANICAL EQUIPMENT CONNECTION SCHEDULE: See attached sketch to reflect changes to mechanical equipment connection requirements. ATTACHMENTS. Electrical Sketches: Add E., Add E6., Add E6.. End of Addendum 3 WMMHC-Lake House 5/4/5 Addendum No. 3 Page-

MECHANICAL KEYNOTES 4" EXHAUST FROM OWNER PROVIDED CLOTHES DRYER ROUTED IN WALL UP TO ATTIC SPACE. EH-#, ELECTRIC UNIT HEATER. SEE SCHEDULE ON SHEET M.0 FOR COORDINATION. 3 AH-, ELECTRIC AIR HANDLER. SEE SCHEDULE ON SHEET M.0 AND DETAIL /M. FOR COORDINATION. 4 HRV-, HEAT RECOVERY VENTILATOR. SEE SCHEDULE ON SHEET M.0 FOR COORDINATION. SEE DETAIL 3/M. FOR FURTHER INFORMATION. 5 ROUTE 4" EXHAUST DUCT UP AND TERMINATE IN SIDE WALL WITH BOX HOOD. COORDINATE BOX HOOD AND ELEVATION WITH ARCHITECT. 6 6" EXHAUST DUCT ROUTED DOWN TO OVERHANG IN ROOF AND TERMINATED WITH PERFORATED GRILLE. COORDINATE GRILLE AND LOCATION WITH ARCHITECT. GRILLE SIZE TO BE APPROXIMATELY " X ". 7 EF-#, CEILING MOUNTED EXHAUST FAN. SEE SCHEDULE ON SHEET M.0 FOR COORDINATION. INTERLOCK WITH LIGHTS. ROUTE 0" X " SUPPLY DUCT AND 4" X 4" RETURN DUCT MAINS UP FROM CRAWL SPACE TO ATTIC SPACE AS SHOWN. SEE CRAWL SPACE PLAN FOR COORDINATION. 9 ROUTE 6" EXHAUST DUCT FROM EF-, EXHAUST FAN UP THROUGH ROOF AT APPROXIMATE LOCATION SHOWN. AND TERMINATE WITH GOOSENECK. 0 ROUTE 6" EXHAUST DUCT FROM CRAWL SPACE EXHAUST FAN UP THROUGH ROOF AT APPROXIMATE LOCATION SHOWN AND TERMINATE WITH GOOSENECK. ROUTE " EXHAUST DUCT FROM HRV- IN CRAWL SPACE UP THROUGH ROOF AT APPROXIMATE LOCATION SHOWN AND TERMINATE WITH GOOSENECK. 6" EXHAUST DUCT STUBBED OUT NO LESS THAN ' FROM EF-5. COVER END WITH BIRD SCREEN. BALANCE TO 50 CFM. 3 RS/RL PIPING FROM CU- TO AH-. SEE SHEET M. FOR COORDINATION. 4 AH- THERMOSTAT, MOUNT AT 4" AFF. COORDINATE EXACT LOCATION PRIOR TO ROUGH-IN. PROVIDE WITH LOCKING COVER ON THERMOSTAT. 5 ROUTE 0" X " SUPPLY AND RETURN DUCTS UP FROM CRAWL SPACE TO ATTIC SPACE AS SHOWN. SEE SHEET M3.0 FOR COORDINATION. 4.003 HVAC Add M.0 05/4/5 C D E G 3 EH AH 3 0"x" HRV 4 RL RS CRAWL SPACE ACCESS DOOR 4"x4" 3 F/SD C D E G CD-4 60 CFM 6 Secure Bedroom 03 7 EF Bathroom 0 RG-4 45 CFM 3 Secure Bedroom 04 RG-4 75 CFM 6"x0" CD-4 90 CFM RG-5 365 CFM CD-4 00 CFM 0"ø CD-3 Secure Living Room 50 CFM 0 "x4" 0"x0" 0"ø CD-3 50 CFM Electrical/ Storage 0 RG-4 50 CFM "ø 0"x" 4 RG-3 90 CFM 4"x4" T "x4" Secure Office 06 W/D RG-4 5 CFM 0 9 RG-4 50 CFM 4"ø F/SD 5 F/SD WMMHC - LAKE HOUSE POLSON, MONTANA H F/SD H CD-5 400 CFM RG-4 5 CFM Seclusion 05 0"ø CD-3 00 CFM "ø CRAWL SPACE MECHANICAL PLAN Add M.0 /" = '-0" FIRST FLOOR MECHANICAL PLAN Add M.0 /" = '-0"

PLUMBING KEYNOTES ROUTE 4" SAN UP THROUGH FLOOR TO WC- AND OFFSET " V OVER TO AND UP WALL. ROUTE 3" SAN UP THROUGH FLOOR TO FD- AND OFFSET " V UP WALL. 3 ROUTE " SAN UP TO LAV- AND CONTINUE -/" V UP WALL. 4 ROUTE " SAN UP THROUGH FLOOR TO SH-# AND OFFSET " V UP WALL. LOCATE SQUARE DRAIN IN FLOOR TILE. COORDINATE WITH ARCHITECT FOR EXACT LOCATION. 4.003 SANITARY Add P.0 05/4/5 G SH- WC- 4"ø SAN Bathroom 0 4 LAV- FD- 3"ø SAN "ø V 3 V.T.R. /"ø V "ø SAN 3"ø SAN "ø V "ø V "ø V 3"ø SAN WMMHC - LAKE HOUSE POLSON, MONTANA FIRST FLOOR DOMESTIC WASTE AND VENT PLAN Add P.0 /4" = '-0"

PLUMBING KEYNOTES ROUTE /" HW/CW UP TO SH-. -/4" CW UP THROUGH FLOOR AT APPROXIMATE LOCATION SHOWN TO SERVE FIXTURE SHOWN. SEE SHEET P3.O FOR COORDINATION. 3 /" HW/CW UP THROUGH FLOOR AT APPROXIMATE LOCATION SHOWN TO SERVE FIXTURE SHOWN. SEE SHEET P3.O FOR COORDINATION. 4 CS-, / CIRCUIT SETTER SET TO GPM. 5 3/4" CW UP THROUGH FLOOR AT APPROXIMATE LOCATION SHOWN TO SERVE FIXTURE SHOWN. SEE SHEET P3.O FOR COORDINATION. 6 ROUTE -/4" CW UP TO SERVE WC-. 7 ROUTE 3/4" CW UP TO SERVE WH-. COORDINATE PENETRATION TO WALL CAVITY WITH ARCHITECT. 9 ROUTE /" HW/CW UP TO LAV-. 4.003 WATER Add P3.0 05/4/5 G 3/4"ø CW 7 6 /4"ø CW /4"ø CW /"ø CW /"ø HW 9 CS- 4 /"ø HWRC /"ø CW /"ø HW G WH- 3 5 3 WC- SH- LAV- Bathroom 0 WMMHC - LAKE HOUSE POLSON, MONTANA CRAWL SPACE DOMESTIC WATER PLUMBING PLAN Add P3.0 /4" = '-0" FIRST FLOOR DOMESTIC WATER PLUMBING PLAN Add P3.0 /4" = '-0"

4.003 FIRST FLOOR POWER PLAN Add E. 05/5/5 3 4 A A B C D E G WP WR A-5,54 #0 AWG M M M M CU-4 Secure Bedroom 03 A-4,6 CU-3 WP WR A-0, A-0 CU- Secure Bedroom 04 A-6, METER BASE M CU- GEN ALARM CT CAN ATS A-,4 A-47 Electrical/ Storage 0 A CB 'A' A S A-6? FACP A- MD and Therapy 09 S- S- #0 AWG A-7,9 A-5 TR Director's Office 0 S-6 B C D E WMMHC - Lake House Polson, Montana W/D 3 4 FIRST FLOOR POWER PLAN Add E. /4" = '-0"

Branch Panel: A Location: Space 4 Volts: 0/0 Wye A.I.C. Rating: K Supply From: Phases: 3 Mains Type: Mounting: Surface Wires: 4 Mains Rating: 600 A Enclosure: Type MCB Rating: 0 A 4.003 ELECTRICAL SCHEDULES Add E6. 05/5/5 Notes: PROVIDE 00A 3-POLE BREAKER AS SUBFEED, PROVIDE PROVISION IN SPACES 3, 40, 4 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT AHU- 60 A 3 4500... 935... 30 A CU- 3 -- -- -- 4500... 935... -- -- -- 4 5 -- -- -- 4500... 935... 30 A CU- 6 7 AHU- 60 A 3 4500... 935... -- -- -- 9 -- -- -- 4500... 5... 35 A CU-3 0 -- -- -- 4500... 5... -- -- -- 3 AHU-3 0 A 3 633... 935... 30 A CU-4 4 5 -- -- -- 633... 935... -- -- -- 6 7 -- -- -- 633... 500... 3 30 A EH- 9 AHU-4 60 A 3 4500... 500... -- -- -- 0 -- -- -- 4500... 500... -- -- -- 3 -- -- -- 4500... 54... 90 A S 4 5 EH- 30 A 3 500... 376... -- -- -- 6 7 -- -- -- 500... 0 VA -- -- Provision 9 -- -- -- 500... 0 VA -- -- Provision 30 3 DWH- 45 A 3 000... 0 VA -- -- Provision 3 33 -- -- -- 000... 0 VA -- -- Provision 34 35 -- -- -- 000... 0 VA -- -- Provision 36 37 Provision -- -- 0 VA 7... 3 00 A PANEL 'A' 3 39 Provision -- -- 0 VA 969... -- -- -- 40 4 Provision -- -- 0 VA 33... -- -- -- 4 Total Load: 54440 VA 5346 VA 5956 VA Total Amps: 456 A 436 A 499 A Legend: WMMHC - Lake House Polson, Montana Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Lighting - Exterior 956 VA 5.00% 95 VA Motor 76759 VA 05.99% 359 VA Total Conn. Load: 6640 VA Other 0 VA 00.00% 0 VA Total Est. Demand: 350 VA Receptacle 4063 VA 55.95% 4703 VA Total Conn.: 46 A Power 0 VA 0.00% 0 VA Total Est. Demand: 375 A Lighting 3440 VA 5.00% 4300 VA Notes:

WMMHC - Lake House 4.003 ELECTRICAL SCHEDULES Add E6. 05/5/5 Mechanical Equipment Connection Schedule Type Voltage Amps (MCA) MOCP Wire Callout Disconnect Provided By Disconnect Installed By AHU- 0 (55) 60 "C, 3#6, #0G MC EC AHU- 0 (55) 60 "C, 3#6, #0G MC EC AHU-3 0 (70) 0 -/"C, 3#3, #G MC EC AHU-4 0 (55) 60 "C, 3#6, #0G MC EC CU- 0.6 30 3/4"C, #0, #0G EC EC CU- 0.6 30 3/4"C, #0, #0G EC EC CU-3 0.3 35 "C, #, #0G EC EC CU-4 0.6 30 3/4"C, #0, #0G EC EC DWH- 0 33.3 45 "C, 3#, #0G EC EC EF- 0.5 0 3/4"C, 3#, #G EC EC EF- 0.5 0 3/4"C, 3#, #G EC EC EF-3 0.5 0 3/4"C, 3#, #G EC EC EF-4 0.5 0 3/4"C, 3#, #G EC EC EF-5 0.5 0 3/4"C, 3#, #G EC EC EH- 0 0. 30 3/4"C, 3#0, #0G MC EC EH- 0 0. 30 3/4"C, 3#0, #0G MC EC HRV- 0 0.5 0 3/4"C, #0, #0G MC EC HWRC- 0. 0 3/4"C, #, #G EC EC Polson, Montana