Fire Safety In High Rise Building



Similar documents
FIRE-FIGHTING DESIGN BRIEF REPORT

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata Developer Premier Mica Mining And Manufacturing Company

Decree of the Ministry of the Environment. on fire safety of garages

Errata has been identified as follows:

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

RESIDENTS FIRE SAFETY INFORMATION PACK

RESIDENTS FIRE SAFETY INFORMATION PACK

GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA)

RESIDENTS FIRE SAFETY INFORMATION PACK

Name Of Occupancy Date. Yes No Describe

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS

CHAPTER 9 FIRE PROTECTION SYSTEMS

REVIEW ON FIRE REGULATIONS FOR NEW HIGH-RISE COMMERCIAL BUILDINGS IN HONG KONG AND A BRIEF COMPARISON WITH THOSE IN OVERSEAS

Fire Evacuation Procedures Network Building, 97 Tottenham Court Road, London, W1

St. John s University

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

- 5 - Table1. Maximum Compartment Volumes

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors.

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

Fire precautions in dwellings. Private sector housing Providing homes building communities

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website

Overview of Hotel Fire Safety Requirements

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

Fire Safety Requirements for Child Care Centre

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Spray Booth Guideline

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

Important Ontario Fire Code Information for Building Owners in the City of Windsor

Excerpts from the Canadian National Building Code (NBC)

Appraisal of Passive and Active Fire Protection Systems in Student s Accommodation

Building Control Guidance Note

LIQUEFIED PETROLEUM GASES

An inventory of hazardous materials used in your workplace will prove useful.

Fire Safety Risk Assessment Checklist for Residential Care Premises

2007 ICC FINAL ACTION AGENDA

CITY OF LONDON SCHOOL FOR GIRLS FIRE SAFETY, PROCEDURE AND RISK ASSESSMENT POLICY

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Schedule B to By-law

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE

General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R

Walking and Working Surface Checklist:

FIRE SAFETY SIGNAGE - UCL FIRE SAFETY STANDARD

FIRE RISK ASSESSMENT

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

AON SPRINKLER CERTIFICATION

A. Fire Protection Plan. B. Access and Parking

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

Firefighter Review. Instructor Guide

Al-Balqa Applied University

MINNESOTA STATE DEPARTMENT OF PUBLIC SAFETY

Ethanol Vehicle and Infrastructure Codes and Standards Citations

General Fire Code Requirements Within Commercial Tenant Spaces

Format for scrutinising the Hill Station Building Applications ( Current File No /2001-HSBA) The application shall be accompanied by

The terms hazard and risk are often used, which we define as the following:

Winnipeg Fire Department Fire Prevention Branch

MOTOR FUEL DISPENSING SAFETY

Building Codes Update: The 2009 International Fire Code and the Apartment Industry

Decree of the Ministry of the Environment on fire safety of ventilation systems

SPECIFIC GUIDANCE FOR A HOUSE IN MULTIPLE OCCUPATION (HMO) CONVERTED ENTIRELY INTO SELF CONTAINED FLATS

Basement Development Construction requirements for the development of basements in residential dwellings.

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

Schedule B to By-law Part A Fees Payable for Permits

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Fire Safety Risk Assessment

Introduction. CE marked construction products

Civil Engineering Sector Labour-Management Health and Safety Committee

Ministry of the Environment Decree. on housing design

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Indiana Building Rehabilitation Standard

Chapter 2 MEANS OF ESCAPE

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

FIRE ALARM PLAN REVIEW. Office of the State Fire Marshal Massachusetts Department of Fire Services December 2009

FIRE SAFETY ONLINE TRAINING

Life Safety Code Enabling References

City of Bettendorf Fire Alarm System Requirements

EMERGENCY EVACUATION PLAN FOR LIFE AND FIRE SAFETY

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

Commercial Fire Inspections

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

1.0 APPOINTMENTS 2.0 FIRE RISK ASSESSMENTS

New York City Department of Buildings

Current as of 11/10/08 1 of 1

Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards

CODE OF PRACTICE FOR MINIMUM FIRE SERVICE INSTALLATIONS AND EQUIPMENT

Caravan Sites and Control of Development Act Permanent Residential Mobile Home Sites Licence Conditions

FIRE RATED WIRING. What the FT4! Paul Latreille, C.E.T. Ottawa Branch Manager

SPECIAL RESIDENCE (ASSISTED SELF-PRESERVATION) OCCUPANCIES (Adopted by the State of Oregon)

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

THE FACTORIES A D OTHER PLACES OF WORK ACT (Cap 514)

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

Decree of the Ministry of the Environment on fire safety of buildings

Transcription:

Fire Safety In High Rise Building CLASSIFICATION OF BUILDINGS AS PER NATIONAL BUILDING CODE 1. GROUPING. Group A - Residential : Lodgings, Dwellings, Dormitories, Flats, Hotels. Group B Group C - Educational : School, Colleges, Recreations. - Institutional : Hospitals, Homes for aged, Orphanages, Jails, Mental Hospital, reformatories. Group D - Assembly : Theatres, Drama Hall, Assembly Halls, Auditorium, Exhibition, Restaurants, Place of workship, Terminal etc.

Group E - Business : Office, Labs, Computer Installations Group F - Mercantile : Shops, Stores, Market. Group G - Industrial : Assembly Plants, Labs, Pumping stations, Refineries, Saw mills. Group H - Storage : All types of storages, Sheds, trucks & marine terminals, Garages, Hangars, Stables. Group J - Hazardous : Used to store highly combustible or explosive materials which may produce poisonous fumes or explosions or toxic etc. WIDTH OF ROAD Sections:- As per section 4.6 (a) of part 3 & 7.4.1 (a) of part IV of N.B.C. The road which abuts a High rise building to be constructed shall be more then 12 meter width.the road should be hard surfaced to carry a minimum weight of 18,000 Kgs, the maximum weight of a Fire Engine. 12 m 12 m NOT TO BE CONSIDER. 12 m 12 m

ENTRANCE WIDTH & HEIGHT CLEARANCE Section:- As per section 4.6 (c) of part C & 7.4.1(d) of part IV of N.B.C. Every High rise building should have at least 2 means of access, one remote to the other, of minimum width 4.5m. with height clearance of 5m. This minimum width is essential to facilitate free movement of fire units. 5 m 4.5 m 4.5 m 5 m 12 m SETBACK OR OPEN SPACES Section : As per table 2 of section 8.2.3.1 of part III of N.B.C. 1/3 OF TOTAL HEIGHT OF BUILDING. UPTO 30 M. HEIGHT 6 M.

Sufficient open space (setbacks) around residential buildings, as indicated in the next slide, is essential to facilitate free movement and operation of Fire Service vehicles. Sr.No Height of building in Meters Exterior open spaces/setbacks to be left on all sides. Minimum in meters 1. Above 9.5 up to 12 4.5 2. Above 12 up to 15 5.0 3. Above 15 up to 18 6.0 4. Above 18 up to 21 7.0 5. Above 21 up to 24 8.0 6. Above 24 up to 27 9.0 7. Above 27 up to 30 10.0 8. Above 30 up to 35 11.0 9. Above 35 up to 40 12.0 10. Above 40 up to 45 13.0 11. Above 45 up to 50 14.0 12. Above 50 16.0

For other Occupancies the setbacks shall have to be allowed as follows: a. Educational buildings - Except for nursery schools, the open space shall not be less than 6 meters. b. Institutional buildings - open space shall not be less than 6 meters. c. Assembly building - Except in front, open space shall not be less than 6 meter and front open space shall not be less than 12 meters. d. Business/Mercantile & storage building Open space around the building shall not be less than 4.5meters. It can be relaxed in certain circumstances. e. Industrial/Hazardous building Minimum 4.5 meters open space shall be kept around the building for the height up to16 meters. Open space shall be increased by 0.25meters for next each 1 meter height of the building.

Car Parking in Setback / Open Spaces. If the setback area / open spaces is more then 12 meter, the provision for car parking Can be done in the setback or open spaces at the periphery of the courtyard leaving the 6 meter motorable road. Section: As per section 4.6 (b) of appendix B of part III of N.B.C. CAR PARKING 6 M. MOTARABLE ROAD. IF MORE THAN 12 METER.

CAR PARKING Section As per section B/8 of appendix B of part III of N.B.C Car Parking shall have to be done at the basement with provision for minimum 2 ramps one remote to other. 3 2 1 G B STAIRCASES Section :- As per section 12.18 of part III, 8.5.1 (Table 24), 8.6.2,8.9,8.10,8.13, 9.3.5(a),10.4.1,11.3.2 of part IV & appendix D1.3,D1.4 of part of NBC. a) Every high rise building Have minimum 2 number of Staircases. b) Width of staircases varies from 1 m. to 2 m. C) For residential building width of staircases should be 1 mtr.

d) Out of 2 staircases, 1 can be used as a fire escape staircase. e) Width of fire escape should be minimum 0.75 meter. f) Number of staircases shall be given as per the travel distances. 22.5 m 22.5 m 22.5 m 22.5 m g) Staircase shall not be extended to basement to prevent smoke, heat & gases. From the basement smoke, heat 7 gases can be travel to upper floors. h) Access to the basement from the ground should be through a separate staircase, which is not connected to main staircase (i.e. It should be remote to each other.) i) Staircase shall be of enclosed type to prevent entry of smoke & fire to the staircase & vice versa. j) Spiral staircase shall be provided up to 9 mtr. Height. k) External staircase normally shall not be allowed.

LIFTS Section:- as per section 18 of part III & 6.18 & appendix A.15 of part IV of NBC. a) Minimum 1 lift capable of carrying minimum 8 persons weighing 545 kgs. Shall be provided for every high rise building. b) Landing doors of lifts shall open to ventilated lobby & shall have a fire resistance of 1 hour. c) 1 lift shall be designed as a Fire Lift d) Fireman Switch shall be provided for each lift. e) Lifts shall not be used as means of evacuation. f) Collapsible gates shall not be provided for the lift. g) If more than 1 lifts are installed the partition wall should be of minimum 2 hours fire resistance.

THE REFUGE AREA Section: As per section 8.12.3 on part IV of NBC, the refuge area shall be provided on the periphery of the floor & open to air atleast on one side protected with suitable railing. a) For floors above 24m & 54m up to 39m one refuge area on the floor immediately above 24m. b) For floors above 39m one refuge area on the floor immediately above 39m & so on after 15m refuge area shall be provided. 39m 24m RA Service Ducts As per appendix D 1.9 part IV of N.B.C. all the services ducts, if provided, should have to be enclosed by walls of at least 2 hour fire resistance & should have to be sealed at every alternate floor with non-combustible materials having at least 2 hour fire resistance. The sealing at floor level is to prevent travel of smoke & fire to the upper floors through the ducts.

BUILT IN FIRE FIGHTING SYSTEM WET RISER CUM DOWN COMMER SYSTEM Wet riser : It is a vertical pipeline (dia. depends on the floor area of the building) connected to a bottom tank(underground water tank). Down Commer : It is a vertical pipeline (dia. depends on the floor area of the building) connected to a overhead tank.

WET RISER CUM DOWN COMMER SYSTEM Dry riser : It is a vertical pipe which is always kept dry to avoid the freezing of water. Hydrant : It is a horizontal pipe line with outlet of 63 mm. dia. connected to underground water tank. WET RISER Wet riser cum down commer or only down commer system shall be provided for residential building. For commercial building only only wet-riser system shall be provided. For hotels wet-riser cum down commer both the systems shall be provided. Diameter of riser will be 150mm for all the buildings. For each 1000m 2 floor area or it s part one riser shall be provided. At every landing twin outlet each of 63mm dia. shall be provided (one should be connected to hose reel & another should be to hose & branch).

Length of hose should be shall that it should reach at the last point of floor area. Minimum two courtyard hydrants shall be provided (courtyard hydrant will be an extention to riser). Hose reel hose of 12mm dia. shall be provided from landing valve to wet-riser at each floor. A separate fire service inlet shall be provided at the ground floor. Location of wet-riser shall be preferable as near to staircase.

WATER TANK Under Ground Water Storage tank The Capacity of Terrace Level Tank Underground water storage tank varies from 50,000 ltrs. to 250,000 ltrs. Depending on the type & occupancy of the buildings. The capacity of terrace level water storage tank varies from 10,000 ltrs. to 20,000 ltrs. Depending on the type & occupancy of the building. Above mentioned water tank capacity is for 1 riser. If the number of risers will be more than 1, than quantity of water shall be increased in that proportionate. In addition to this if automatic sprinkler, drenchers are provided for special risk then this will be additional quantity of water.

PUMP CAPACITY For underground water storage tank, pump shall be installed of a capacity either 1800 L.P.M. or 2400 L.P.M. depending on the type and occupancy of the building along with jocky pump. At topmost hydrant we should get a pressure of not less than 3.5 bar. For terrace level water storage tank,pump shall be installed of a capacity either 450 L.P.M. occupancy of the building. Alternative source of supply for the pump shall be provided.

FIRE ALARM SYSTEM Manually operated Electrical fire alarm system Automatic Fire Alarm System Depending on the occupancy, M.O.E.F.A. system or automatic operated system shall be provided in the building. Every building more than 15m in height shall provide both I.e. M.O.E.F.A & A.F.A.

Residential & office buildings between 15m & 24m in height may be exempted from installation of automatic fire alarm system if local fire brigade is well equipped to face the emergency up to 24m. One has to manually operate the glass in M.O.E.F.A.S. M.O.E.F.A.S. requires a special person or separate person to operate. Fire Alarm System

FIRE DETECTION SYSTEM Section: As per section 7.9 of part IV of NBC. (8 of Appendix A) Different types of detectors are provided as per the risk involved in the area. Zones are made as per the risk or as per the floor. 2way communication system to be provided which will help to contact from ground floor to specific floor or vice-versa. Mike on every floor has to be provided. On mike instructions can be given as per situation. Manual call points, automatic detector & public address system shall be interlinked. Detectors shall be installed as per IS 2189/ 1988. Fire Detection System

SPRINKLER SYSTEM Section: As per section 7.10.7 of part IV of NCB. Sprinkler system is a must for basement parking & other risk areas where large quantities of combustible materials are stored. Each sprinkler should cover 6.96m 2 area. Normally a separate sprinkler should be provided for a separate car. Sprinklers may connect to main water tank & pump, but capacity of the tank & pump shall be increased in that proportionate. The capacity of water tank shall be calculated on the basis of sprinklers. SPRINKLER SYSTEM

Alternate Power Supply As per appendix D-1.5 of part IV of N.B.C. a stand by generator should be installed to supply power for staircase lighting, corridor lighting, fire pump, pressurization fan & blowers, in the event of disconnection of failure of main supply.

PORTABLE FIRE EXTINGUISHERS. Section: As per section 7.10.4 part IV of N.B.C. First Aid Fire fighting appliances shall be provided & installed in accordance with LATEST IS 2190. Escape Route As per section 8.2.5 of part IV of NBC, the escape route should be marked with a sign board on the corridor & passage to guide evacuation. Normally, the escape route sign board must be written in luminous paint for easy identification. This is to guide every occupant of the building who is bound to panic in the event of accident.

Public Address System As per appendix D.5 of part IV of NBC, every high rise building should have a public address system with 2 way communication to conduct evacuation in a systematic manner & to communicate any messages to occupants on every floor from the control room. FIRE OFFICER Section: As per section D6 (Appendix D) of part IV of N.B.C. Fire Officer / Supervisor for Hotels, Business & Mercantile Buildings with Height more than 30 m.

PROVISION OF HELIPAD Section: As per D 10(Appendix D) of part IV of N.B.C. For High rise buildings above 60 m in height provision for Helipad should be made. Fire Drills & Fire Orders Section: As per section D 8 (Appendix D) of part IV of N.B.C. Fire Safety Plan: It`s very important to have a fire safety plan to prevent & extinguish any fire in the building with details action to be taken by each occupant. Telephone nos. of all emergence services much be indicated in the plan.

Why DRILLS? Drills provide virtually the only means, short of an actual incident, of measuring the state of readiness and of testing the effectiveness of an emergency response plan Robert B. Kelly PLANNED DRILLS KNOWN TO MANAGEMENT TEAM TRY 2 / 3 SCENARIOS AT DIFFERENT TIMES / SHIFTS KNOWN TO MINIMUM CONIFIDENTIAL DRILL SURPRISE DRILL TRY 2 / 3 SCENARIOS ASSESSMENT of PREPAREDNESS

TRAINING Nothing would be done at all, if a man waited till he could do it so well, that no one could find fault with it. -Cardinal Newman