Safely delivering excellence in decommissioning, waste management and reprocessing



Similar documents
Guide to nuclear decommissioning

Progress on the Sellafield site: an update

UK Strategy for the Management of Solid Low Level Radioactive Waste from the Nuclear Industry

Nuclear Decommissioning Authority Business Plan

Draft Business Plan. Financial year beginning April 2016 to fi nancial year ending March 2019

ACCREDITATION. APM Corporate CASE STUDY

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES

Magnox lifetime plan 2013

Optimised Management of Orphan Wastes in the UK

Nuclear Decommissioning Authority Business Plan

Integrated Risk Management Solutions

Management of Radioactive Waste & Materials Inventory Data

2.0 Land Quality Programme

Strengthening Technical Specialist Training for an Expanding Nuclear Power Programme in the UK

Draft Strategy. Published January 2016 for Consultation

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT

Basic principles of radioactive waste management

APPENDIX CC NUCLEAR WASTE STORAGE

The Management of Radioactive Waste from the Nuclear Medicine Sector. Peter Hayes

Strategic Guidance on the Management of LLW and ILW / LLW Cross Boundary Pond Furniture

Fuel Cycle R&D to Safeguard Advanced Ceramic Fuel Skills Strategic Options

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay

Office for Nuclear Regulation

Managing Radioactive Waste Safely. Proposals for developing a policy for managing solid radioactive waste in the UK

INTEGRATED RISK MANAGEMENT SOLUTIONS

Supply Chain Guide Working together in partnership

Cost Comparison of Spent Fuel Storage and Deep Geological Disposal

chester simplex Providing innovative products, engineering and management solutions

Chemical Decontamination and Fluid Handling Services

INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600

ACCREDITATION. APM Corporate CASE STUDY

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Best Practices and Approaches to Supply Chain Management

Radioactive Waste Management at Paks NPP

WASTE STREAM 2Y51 Analytical Services Process Facilities - North Labs

Managing the Nuclear Legacy. A strategy for action

International Action Plan On The Decommissioning of Nuclear Facilities

NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012

Government Degree on the Safety of Nuclear Power Plants 717/2013

British Nuclear Group Reactor Sites Chemistry Issues NuSAC SCR Meeting - April 4 th 2006

INDUSTRIAL SITE SERVICES. sharing responsibility

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES AUSTRALIA NATIONAL NUCLEAR ENERGY CONTEXT

London Underground Environment Strategy

Best Practicable Environmental Option Study for Management of Radioactive Waste Arisings from the Dounreay Site Restoration Plan. Issue 1.

Status, responsibilities and missions of ANDRA (France)

Treatment Centers for Radioactive Waste

Significant incidents in nuclear fuel cycle

Nuclear Engineering Doctorate Programme Prospectus

= A CND briefing by Davida Higgin, April The links between nuclear power = and nuclear weapons

Waste management. The failure of the rational waste management policy

THE DECOMMISSIONING OF COMMERCIAL MAGNOX GAS XA COOLED REACTOR POWER STATIONS IN THE UNITED KINGDOM

Technological Development to Support a Change in the United Kingdom's Strategy for Management of Spent AGR Oxide Fuel

Replacement of steam generators at Ringhals nuclear power plant.

Asset Management. Enabling effective estates strategies >

Radioactive Waste Management the French case

Waste Transfer Pricing Methodology for the disposal of higher activity waste from new nuclear power stations

2015 Sustainability Report Key Data

Submarine Dismantling Project (SDP) Consultation Document on the Site for Interim Storage of Intermediate Level Radioactive Waste

Management of spent fuel and radioactive waste in Finland national programme in accordance with Article 12 of the Council Directive 2011/70/Euratom

Welcome and introductions Campbell Keir, Director, Energy and UK Infrastructure, UK Trade & Investment

Fujitsu Group s Environmental Management: Outline of Environmental Protection Program (Stage IV)

Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) Yasuharu Igarashi

Nuclear Waste Management in Finland

ENGINEERING TOMORROW...TODAY

Nuclear Waste A Guide to Understanding Where We've Been and Where We're Going

Headline Findings. Public Opinion on UK Nuclear Energy

Ellipse + Fieldreach Network Rail, AMT-Sybex Case Study

Oman Environmental Services Holding Company

SAVANNAH RIVER SITE S MACROENCAPSULATION PROCESSING OF LESS THAN 3700 BQ/GM1 TRU ISOTOPIC MIXED WASTE FOR DISPOSAL AT THE NEVADA TEST SITE

A review by HM Nuclear Installations Inspectorate. Magnox Electric plc s strategy for decommissioning its nuclear licensed sites

Management System Manual International Nuclear Services Ltd and Pacific Nuclear Transport Ltd

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide

GE Power & Water Water & Process Technologies. Water and Process Solutions for the Refining Industry

The Importance of Physics to Economic Growth

ASTM C26 LONG RANGE PLAN Committee on the Nuclear Fuel Cycle

Andreeva Bay Facilities for SNF Management. CEG IAEA Workshop - February 2010

Nuclear Energy University Programs (NEUP) Fiscal Year (FY) 2016 Annual Planning Webinar Mission Suppor+ng: Fuel Cycle Technologies (MS- FC- 1)

Use of electronic seals and remote data transmission to increase the efficiency of safeguards applied in a static Plutonium store

Transcription:

Sellafield site overview Safely delivering excellence in decommissioning, waste management and reprocessing www.nda.gov.uk www.sellafieldsites.com www.nuclearmanagementpartners.com

People, partnerin Under the ownership of Nuclear Management Partners, a consortium made up of URS, Areva and AMEC, we are safely delivering nuclear decommissioning, waste management and commercial operations at Sellafield in West Cumbria.

Sellafield site. Covering an area of four square kilometres on the West Cumbrian coast, Sellafield spans the entire history of the UK s civil nuclear industry. Sellafield is one of the most complex and compact nuclear licensed sites in the world. Over 1,000 facilities simultaneously perform a range of nuclear operations and many are dependent on each other. These operations include decommissioning, the processing and storage of low, intermediate and high level wastes and fuel manufacturing and recycling. The Sellafield site is as old as the UK s nuclear industry itself, having started life during World War II. While the site and our commercial focus have changed in many ways; our commitment to demonstrating excellence in the nuclear field remains. When it started operations during World War II, Sellafield was known as Windscale and was home to factories producing TNT explosives in support of the war effort. Sellafield is also home to the world s first commercial nuclear power station, Calder Hall, which was opened by Her Majesty Queen Elizabeth II in 1957 and operated safely for almost 50 years. We are managing one of the most complex nuclear sites in the world. Our experience across the nuclear fuel cycle; from operating a reactor; designing, commissioning, operating and decommissioning a nuclear facility and safely managing low, intermediate and high level waste is all being utilised to deliver world class operations and accelerated high hazard risk reduction at Sellafield. g, performance Decommissioning. Reprocessing. Waste management.

We employ over 8,000 of the most experienced and highly regarded nuclear workers in the world at Sellafield. Continual learning underpins our world class performance. Our people Working at Sellafield requires dedication, disciplined professionalism and a range of technical skills and experience. We are committed to expanding this skills base and to supporting the next generation of nuclear workers. David McNerney, NMP Executive Director for Sellafield Ltd, Human Resources Our challenge at Sellafield is unique. With over 1,000 buildings to decommission and demolish and many more facilities that support the processing and storage of nuclear waste; working at Sellafield is not an average nine-to-five career. Over 8,000 of our employees work at Sellafield safely delivering hundreds of nuclear decommissioning projects while simultaneously managing, processing and storing low, intermediate and high level nuclear waste; reprocessing used nuclear fuel from around the world and manufacturing new fuel; and applying innovative engineering solutions. Whether our employees work in a plant or an office; wear a respirator or a suit; manage waste or reprocess fuel; they are all helping to deliver accelerated high hazard risk reduction on behalf of our customer, the Nuclear Decommissioning Authority (NDA). Our safe delivery of commercial operations such as reprocessing and fuel manufacturing raises additional revenue that we can use to accelerate high hazard risk reduction. We safely manage, process and store all levels of radioactive waste that arises from our decommissioning and commercial operations. Our design and implementation of engineered solutions will continue to help us to get the best out of our facilities, constantly raising our performance. We are committed to the development of our employees and the skills that they need to meet the future challenges of the organisation. This commitment includes supporting the next generation of nuclear workers through our socio-economic programme of support and involvement with educational establishments from primary schools to universities. We routinely measure radiation doses around our sites.

One in five of our employees have a specific safety role helping to ensure our safety performance is world class across our operations and sites.

At Sellafield we are safely delivering a diverse portfolio of nuclear decommissioning, waste management, fuel manufacturing and recycling. What we do Our sites are home to the most diverse nuclear portfolios in the world. Sellafield covers four square kilometres and is home to some of the UK s oldest facilities including the world s first civil nuclear reactor Calder Hall. It is also home to our commercial reprocessing operations in the Thorp and Magnox facilities. Our decommissioning and commercial operations at Sellafield are underpinned by an exceptional track record in nuclear waste management. With over 50 years experience in this area our employees are able to manage, process and store low, intermediate and high level waste. Our portfolio at Sellafield is unique and so is our track record. We have proven capability at the site in the fields of nuclear decommissioning, nuclear waste management and reprocessing. Building on our track record, we are constantly striving for raised performance from all of our sites, facilities and employees. We will continue to engage with our stakeholders as we seek to safely realise our vision of achieving the NDA s assigned missions through safe, sustainable, world class performance to become the site and workforce of choice for potential new missions. All of our operations at Sellafield are done on behalf of, and under contract to, the NDA whose mission of high hazard risk reduction echoes our own determination to decommission the legacy on our sites.

We have over 25 years experience on some of the most challenging projects in the world, ranging from plutonium reactor chimneys through to laboratories used for medical research. Decommissioning When decommissioning commenced the site focus at that time was on commercial reprocessing and waste management. Minimal funding delayed real decommissioning progress until the formation of the NDA which shifted the emphasis to accelerated decommissioning. Sellafield s Decommissioning Directorate now manages all of the current and future decommissioning on the Sellafield site. The focus for decommissioning is the acceleration of high risk and high hazard reduction activities, to fulfil the company goal: to make Sellafield safer, cleaner, more productive, more cost effective, and a better neighbour each and every day. The Group s portfolio is one of the largest and most diverse in the world today, with a total value of approximately 23 billion.

We are world leaders in nuclear waste management, having successfully processed and stored low, intermediate and high level nuclear waste from UK and overseas customers at our sites for over 50 years. Waste management We deliver an integrated nuclear waste management programme which seeks to reduce waste volumes arising as part of our current commercial activities as well as historic operations, ensuring that waste is stored safely, minimising the risk to the public and environment. We have made major advances in the treatment of these wastes over the past 30 years with the development and implementation of comprehensive waste management processes and techniques. These include the development and introduction of encapsulation technology used to treat intermediate level waste. Significant progress has already been made with the retrieval and treatment of historic as well as current waste arisings. Future challenges in waste management lie in supporting the delivery of high hazard reduction at Sellafield and Capenhurst and acceleration of this mission. The greatest technical challenge we face is the cost-effective retrieval and treatment of the historic wastes at Sellafield. High level waste (HLW) The most radioactive form of nuclear waste and is produced as part of our reprocessing operations. At Sellafield, we vitrify the HLW into a solid form, reducing its volume to one third of its original size. Intermediate level waste (ILW) Less radioactive than HLW and includes fuel element cladding, contaminated equipment and radioactive sludge. We store ILW in stainless steel drums, which are filled with cement grouting and placed into special above-ground storage facilities at Sellafield. Low level waste (LLW) Slightly radioactive and includes protective clothing, laboratory equipment, paper towels and gloves which have been used in the controlled areas of a nuclear site, hospital or nuclear research centres. We compact this waste and transfer it to the Low Level Waste Repository for disposal.

We have been safely managing spent radioactive fuel at Sellafield for over fifty years. Reprocessing Reprocessing takes used fuel which has been removed from a nuclear reactor to recover the reusable materials. After about four years in a reactor the fuel becomes less efficient, however reprocessing allows 97% of this used fuel to be recycled back into new fuel. Reprocessing has been carried out at Sellafield for well over five decades and in this time more than 50,000 tonnes of fuel has been safely separated. If all of this used fuel were to be recycled into new fuel, it would generate enough electricity to meet all of the UK s electricity needs for over two years. There is a huge amount of reprocessing experience at Sellafield which has been technically proven as the effective way to treat used nuclear fuel. The very first reprocessing facility was opened in the early 1950s. Then In the 1960s the Magnox reprocessing facility started operating and is still operating to this day. It is regarded as the workhorse having reprocessed over 44,000 tonnes of fuel. The Thorp reprocessing facility began reprocessing back in 1994. Sellafield has reprocessed fuel from nuclear reactors in both the UK and abroad. 50,000 tonnes of fuel has been reprocessed at Sellafield.

The complexity of Sellafield, the age of its infrastructure and the interdependent nature of its facilities and operations will continue to provide a unique nuclear challenge. The challenge There is nowhere else in the world where you can find the number or complexity of operations that all happen within a four square kilometre footprint. We are talking about 50 year old buildings needing to be decommissioned a stone s throw away from a construction site and active buildings and about operations that are dependent on the performance of other facilities on the site. This is what our workforce delivers every single day and this is where we excel. Dr Todd Wright, NMP Sponsored Managing Director, Sellafield Ltd We are tackling many individual challenges at Sellafield. The overall challenge for the site and for Sellafield Ltd as a whole is to deliver accelerated high hazard risk reduction on behalf of our customer, the NDA. Some of our plants at Sellafield are degraded and, despite our continuing care, continue to deteriorate. The facilities hold some of the UK s highest nuclear hazards and we are dedicated to expertly reducing those hazards. Cost-effectively retrieving and treating waste. Safety and protection of our workforce remains our top priority. This will be done by designing, building and integrating waste retrieval equipment, preparing the facilities for retrieval operations and then retrieving and immobilising or treating the waste to put it into a safe state. This presents us with significant challenges, however by applying modern techniques and treatments to the decommissioning process we are able to deliver excellent work, and deliver it safely. Our commitment to applying best practice and fitfor-purpose solutions will see us continue to work in partnership with our workforce, supply chain and parent body organisations; applying all of our available resources to achieving our mission. We are committed to open, transparent partnering with all our stakeholders.

From the birth place of the UK s commercial nuclear industry to its ability to manage all forms of nuclear waste; Sellafield is home to excellence. Our successes Liquor Activity Reduction The start of a regular Liquor Activity Reduction (LAR) transfer programme saw a crucial step taken on the road towards safely decommissioning the Magnox Swarf Storage Silo. The process involves ejecting radioactive liquid out of the 50 year old waste silo and moving it right across the Sellafield site via a high level shielded pipe bridge for treatment. By continually replacing the silo liquor with clean water, radioactivity levels are significantly reduced, consequently reducing dose uptake to workers in the facility. Waste management performance Sellafield is the only nuclear site in the UK that can manage, process and store all three levels of nuclear waste; low level, intermediate level and high level. Low level waste from Sellafield, hospitals and research facilities is compacted to reduce its volume before being sent to the Low Level Waste Repository. Intermediate level waste is mixed with grout and stored in stainless steel drums in specially engineered above ground stores. High level waste is vitrified, reducing its volume and rendering it into a safe and stable form ahead of transportation and storage. Our proven performance in the field of nuclear waste management has seen us safely manage Safety nuclear waste is Sellafield for over Ltd s top priority 50 years. Recycling used nuclear fuel The recycling of used nuclear fuel that has been in a nuclear reactor for around four years is another unique capability that we deliver at Sellafield. In the absence of reprocessing the used fuel would need to be disposed of as waste. Start of retrievals A programme of work to install a suite of sludge retrievals equipment into the pond has seen the start of sludge retrievals from the Pile Fuel Storage Pond floor. Sludge, in the form of corrosion products and windblown materials is collected by the Sludge Retrieval Hood and transferred to the in pond sludge storage corral pending future treatment through the Local Sludge Treatment Plant. The start of retrievals builds on previous successes for the team, who have already desludged six of the Withdrawal and Decanning Bays and exported 16 redundant fuel skips from the pond over the last year and creates a strong foundation for the team to accelerate future retrieval programmes.

www.nda.gov.uk www.sellafieldsites.com www.nuclearmanagementpartners.com