Guide to nuclear decommissioning

Size: px
Start display at page:

Download "Guide to nuclear decommissioning"

Transcription

1 Guide to nuclear decommissioning Contents: What is decommissioning? Stages of decommissioning Site restoration Waste management The UK decommissioning industry The international picture What is decommissioning? There comes a time in the life of any power station nuclear, coal or oil-fired when age takes its toll and it becomes uneconomic to run any longer. Once this stage has been reached the decision has to be taken to shut it down. Eventually the plant is taken to pieces to remove any hazardous material, the debris disposed of and the site left in a safe condition which is visually acceptable. This is called decommissioning. Each project is treated on its merits; actions can range from simply closing the facility to dismantling and restoration of the land for other use. Decommissioning is not unique to the nuclear industry. For example, chemical companies use similar practices to dismantle and dispose of obsolete plants which have been used to handle hazardous compounds. In the course of restoring a nuclear site, a variety of facilities need to be decommissioned. Reactors, support laboratories and plants used for fuel and waste storage and treatment all present challenges involving many different types of contaminated material. The overriding approach with any decommissioning project is to ensure safety and protection for the environment. UKAEA has carried out more nuclear cleanup work than any organisation in Europe, dismantling 15 reactors and over 40 major radioactive facilities. Today, new nuclear plant is designed with decommissioning in mind. However, many of the facilities removed by UKAEA were experimental devices built in the early days of the nuclear industry. UKAEA has proved largely through innovative use of existing technology that such facilities can be removed safely, predictably and costeffectively. Reactor decommissioning at Harwell

2 Stages of decommissioning There are three stages of decommissioning a nuclear facility: 1. Initial decommissioning Reactors are defuelled and the fuel usually moved away from the reactor. All non-fixed contaminated components are removed. For non-reactor facilities, all radioactive sources and readily removable equipment are taken out. The structure is maintained intact and the atmosphere inside the containment building and enclosures are controlled. This stage is sometimes referred to as post operational clean-out (POCO). 2. Decontamination and dismantling Contaminated equipment is dismantled in carefully planned steps. This involves decontamination to minimise the amount of radioactive waste which is generated. Once a building is stripped of all its internal equipment, it is carefully surveyed to determine the extent of contamination in the building fabric. Simple processes of washing and scabbling are generally sufficient to decontaminate the building. 3. Demolition Once all radioactive and other hazardous material (such as asbestos or mercury) have been removed, the building is refurbished for alternative uses or demolished if no longer required. Demolition is carried out in the same way as for any industrial building, although stringent controls are applied to monitor for the possible presence of radioactivity. The land is then remediated and returned to a condition where no radioactive hazard remains. In some cases the stages will follow directly one after the other. However, they are often separated by periods of care and maintenance to allow for radioactive decay.

3 Site restoration Restoring the environment of a whole nuclear site involves integrating a large range of individual projects within an overall programme. UKAEA has led the development of site restoration plans that prioritise these projects based on safety, environmental and cost considerations. The end-point for decommissioning a site depends on the potential for its future use. Ideally the site will be restored for unrestricted alternative use. However, our overriding consideration is whether it is the Best Practicable Environmental Option (BPEO). The BPEO assessment takes account of the needs of the environment, safety of workers and the local community, and the practicability of the clean-up operations. Consulting our stakeholders is an integral part of the BPEO assessment process. Where the assessment decides that release of land for unrestricted use is the BPEO, UKAEA seeks regulatory approval to delicense or remove it from nuclear site restrictions. This involves remediating the land and carrying out extensive environmental surveys to demonstrate to the regulators that there is no danger from ionising radiation. Restored nuclear sites can often be regenerated for the benefit of local communities. UKAEA has successfully established business centres at its Harwell and Winfrith sites, and sold former research sites at Risley and Culcheth for commercial development. 1. New business premises at the Harwell site 2. The site of a major plutonium facility at Winfrith has been restored to greenfield

4 Waste management Decommissioning nuclear facilities can generate large amounts of radioactive waste. Much of this waste is no more harmful than Brazil nuts, coffee or garden fertiliser, which are naturally radioactive. UKAEA has experience in managing a wide variety of waste types safely and securely. In each case we assess all relevant options, so that the chosen strategy represents the best balance of environmental, safety, economic and community considerations. UK radioactive wastes are classified into a number of categories, as follows. Very low-level waste (VLLW) Waste which can be safely disposed of with ordinary refuse, each 0.1 m 3 of material containing less than 400 kbq of beta/gamma activity or single items containing less than 40 kbq of beta/gamma. Comprises of demolition rubble and similar materials. Low-level waste (LLW) Wastes containing radioactive materials other than those acceptable for disposal with ordinary refuse, but not exceeding 4 GBq/te alpha or 12 GBq/te beta/gamma activity. LLW accounts for by far the largest volume of waste from nuclear activities almost 90%. The waste includes anything from contaminated tools and equipment to rubble from demolished facilities. - Solid LLW at our English sites is mainly sent to the LLW disposal facility at Drigg in Cumbria. Dounreay LLW is held on the site pending a longer-term disposal solution. - Liquid LLW at UKAEA sites is treated to remove as much of the radioactivity as possible before discharging the treated liquid within stringent authorised limits. Separated solids containing the radioactivity are immobilised and managed with other solid wastes on the sites. Intermediate-level waste (ILW) Wastes with radioactivity levels greater than LLW, but which do not require heating to be taken into account in the design of storage or disposal facilities ILW. Material can vary from solid reactor components to liquid coolants and sludges from treatment processes. There is no UK disposal facility for ILW and the Government is consulting on a long-term national strategy for managing it. - UKAEA policy is to condition solid and liquid ILW in a passively safe form and store it securely until a permanent disposal route is available. High-level waste (HLW) The temperature of this waste can rise significantly as a result of its radioactivity, so this factor has to be taken into account in designing storage or disposal facilities. HLW arises from the reprocessing of spent nuclear fuel. - UKAEA sites do not have any HLW. For more information on radioactive waste, please see

5 The UK decommissioning industry The Nuclear Decommissioning Authority (NDA) is responsible for overseeing the 48 billion restoration of the UK s 20 civil nuclear sites, including those operated by UKAEA. The NDA provides national co-ordination and ensures that best practice and value for money is being achieved. It contracts out the management of its site clean-up programmes UKAEA is a contractor for management of the Dounreay, Harwell, Windscale and Winfrith sites. The NDA monitors site clean-up progress against Near Term Work Plans showing the detailed scope of work for the first three years and long-range Lifecycle Baseline plans covering the entire restoration process. They are available at UKAEA s decommissioning operations in the UK are regulated by the Nuclear Installations Inspectorate part of the Health and Safety Executive and by the Environment Agency (Dounreay is subject to regulation by the Scottish Environment Protection Agency). The regulators must be satisfied that all relevant health, safety and environmental considerations are being met before projects can be carried out. The international picture Around the world, nuclear clean-up is becoming a major growth industry, with over 400 reactors being decommissioned or awaiting decommissioning. UKAEA s work in cleaning up UK nuclear sites has set international standards. Pioneering decommissioning projects such as the Windscale Advanced Gas-cooled Reactor have attracted interest from organisations facing similar challenges in other countries. We are therefore well placed to advise on best practice, and so far we have supplied consultancy services to decommissioning agencies in over a dozen countries including South Africa, Australia, Denmark and Canada. We also help raise global understanding of decommissioning issues through collaboration agreements with France's Commissariat a l'energie Atomique (CEA), the Idaho National Engineering and Environmental Laboratory in the USA, Italian Government Agency SOGIN and Electricité de France. Decommissioning the Windscale Advanced Gas-cooled Reactor

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES Introduction 1. This statement of the UK Government and devolved administrations policy on the decommissioning of nuclear facilities updates

More information

Safely delivering excellence in decommissioning, waste management and reprocessing

Safely delivering excellence in decommissioning, waste management and reprocessing Sellafield site overview Safely delivering excellence in decommissioning, waste management and reprocessing www.nda.gov.uk www.sellafieldsites.com www.nuclearmanagementpartners.com People, partnerin Under

More information

UK Strategy for the Management of Solid Low Level Radioactive Waste from the Nuclear Industry

UK Strategy for the Management of Solid Low Level Radioactive Waste from the Nuclear Industry UK Strategy for the Management of Solid Low Level Radioactive Waste from the Nuclear Industry August 2010 Executive Summary The UK strategy for the management of solid low level radioactive waste from

More information

The Management of Radioactive Waste from the Nuclear Medicine Sector. Peter Hayes

The Management of Radioactive Waste from the Nuclear Medicine Sector. Peter Hayes The Management of Radioactive Waste from the Nuclear Medicine Sector Peter Hayes This is GE Healthcare Medical Diagnostic s From Organ to Cellular Contrast Agents Nuclear medicines & diagnostics Molecular

More information

Basic principles of radioactive waste management

Basic principles of radioactive waste management Title of publication Basic principles of radioactive waste management An introduction to the management of higher activity radioactive waste on nuclear licensed sites Joint guidance from the Office of

More information

Storage and Disposal of ILW and HLW in the UK: Implications for Copeland

Storage and Disposal of ILW and HLW in the UK: Implications for Copeland Storage and Disposal of ILW and HLW in the UK: Implications for Copeland BILL MILLER, JULIE TOOLEY & GAVIN THOMSON DECEMBER 2006 A REPORT FOR COPELAND BOROUGH COUNCIL Publication title CAN CO092 0003 Version

More information

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Liquid Effluent Treatment Plant (LETP) Land Clean-Up Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to

More information

Managing Radioactive Waste Safely. Proposals for developing a policy for managing solid radioactive waste in the UK

Managing Radioactive Waste Safely. Proposals for developing a policy for managing solid radioactive waste in the UK Managing Radioactive Waste Safely Proposals for developing a policy for managing solid radioactive waste in the UK Managing Radioactive Waste Safely Proposals for developing a policy for managing solid

More information

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES MEXICO [2005] NATIONAL NUCLEAR ENERGY CONTEXT Commercial utilisation of nuclear power in Mexico started in 1990 and by 2002 there were

More information

Best Practicable Environmental Option Study for Management of Radioactive Waste Arisings from the Dounreay Site Restoration Plan. Issue 1.

Best Practicable Environmental Option Study for Management of Radioactive Waste Arisings from the Dounreay Site Restoration Plan. Issue 1. Best Practicable Environmental Option Study for Management of Radioactive Waste Arisings from the Dounreay Site Restoration Plan Issue 1.0 June 2003 Contents Project Team...iv Abbreviations and acronyms...v

More information

Nuclear Decommissioning Authority Business Plan

Nuclear Decommissioning Authority Business Plan Nuclear Decommissioning Authority Business Plan Financial year beginning April 2015 to fi nancial year ending March 2018 March 2015 23117210 2 Nuclear Decommissioning Authority Business Plan Financial

More information

Magnox lifetime plan 2013

Magnox lifetime plan 2013 Magnox plan summary Magnox lifetime plan 2013 Magnox plan summary Magnox lifetime plan 2013 Magnox, owned by EnergySolutions, is the management and operations contractor responsible for ten nuclear sites

More information

Replacement of steam generators at Ringhals nuclear power plant.

Replacement of steam generators at Ringhals nuclear power plant. Decommissioning of nuclear power plants Replacement of steam generators at Ringhals nuclear power plant. Photo: Börje Försäter/Hallands Bild Repairs provide experience Swedish experience of complete dismantlement

More information

APPENDIX CC NUCLEAR WASTE STORAGE

APPENDIX CC NUCLEAR WASTE STORAGE APPENDIX CC NUCLEAR WASTE STORAGE APPENDIX CC NUCLEAR WASTE STORAGE MICHIEL P.H. BRONGERS 1 SUMMARY Nuclear wastes are generated from spent nuclear fuel, dismantled weapons, and products such as radio

More information

Managing the Nuclear Legacy. A strategy for action

Managing the Nuclear Legacy. A strategy for action Managing the Nuclear Legacy A strategy for action Managing the Nuclear Legacy A strategy for action Presented to Parliament by the Secretary of State for Trade and Industry by Command of Her Majesty. July

More information

Draft Business Plan. Financial year beginning April 2016 to fi nancial year ending March 2019

Draft Business Plan. Financial year beginning April 2016 to fi nancial year ending March 2019 Draft Business Plan Financial year beginning April 2016 to fi nancial year ending March 2019 January 2016 . Nuclear Decommissioning Authority Draft Business Plan Financial year beginning April 2016 to

More information

Fundamentals of the management of radioactive waste

Fundamentals of the management of radioactive waste An introduction to the management of higher-level radioactive waste on nuclear licensed sites Guidance from the Health and Safety Executive, the Environment Agency and the Scottish Environment Protection

More information

Delivering world class performance in safety, health, quality and environmental protection

Delivering world class performance in safety, health, quality and environmental protection Safety and the environment overview Delivering world class performance in safety, health, quality and environmental protection www.nda.gov.uk www.sellafieldsites.com www.nuclearmanagementpartners.com Safety

More information

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES AUSTRALIA NATIONAL NUCLEAR ENERGY CONTEXT

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES AUSTRALIA NATIONAL NUCLEAR ENERGY CONTEXT RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES AUSTRALIA NATIONAL NUCLEAR ENERGY CONTEXT Australia is one of the only developed countries that does not use electricity, either indigenous

More information

International Action Plan On The Decommissioning of Nuclear Facilities

International Action Plan On The Decommissioning of Nuclear Facilities International Action Plan On The Decommissioning of Nuclear Facilities A. Introduction Decommissioning is defined by the International Atomic Energy Agency (the Agency) as the administrative and technical

More information

INTRODUCTION. Three Mile Island Unit 2

INTRODUCTION. Three Mile Island Unit 2 INTRODUCTION here was an accident at Three Mile Island Unit 2 on March 28,1979. It caused extensive damage to the plant's nuclear fuel core. Most of the plant's major systems were relatively undamaged.

More information

2.0 Land Quality Programme

2.0 Land Quality Programme 2.0 Land Quality Programme The Sellafield site has a legacy of ground contamination from its historical use as a Royal Ordnance factory and its subsequent development as a nuclear facility. The ground

More information

AECL s Radioactive Waste Management Activities: Programs, Plans and Challenges

AECL s Radioactive Waste Management Activities: Programs, Plans and Challenges AECL s Radioactive Waste Management Activities: Programs, Plans and Challenges Joan Miller, Vice-President Decommissioning & Waste Management 2013 February 25 UNRESTRICTED / ILLIMITÉ Presentation Outline

More information

Security and Safeguards Considerations in Radioactive Waste Management. Canadian Nuclear Safety Commission

Security and Safeguards Considerations in Radioactive Waste Management. Canadian Nuclear Safety Commission Security and Safeguards Considerations in Radioactive Waste Management Raoul Awad Director General, Directorate of Security and Safeguards Canadian Nuclear Safety Commission Radioactive Waste Management

More information

INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600

INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600 INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600 - CRAFT - The International Project on COMPLIMENTARY SAFETY

More information

A review by HM Nuclear Installations Inspectorate. Magnox Electric plc s strategy for decommissioning its nuclear licensed sites

A review by HM Nuclear Installations Inspectorate. Magnox Electric plc s strategy for decommissioning its nuclear licensed sites A revie by HM Nuclear Installations Inspectorate Magnox Electric plc s strategy for decommissioning its nuclear licensed sites A revie by HM Nuclear Installations Inspectorate Magnox Electric plc s strategy

More information

Nuclear Decommissioning Authority. Business Plan 2012-2015

Nuclear Decommissioning Authority. Business Plan 2012-2015 Business Plan 2012-2015 Business Plan 2012-2015 Business Plan presented to Parliament pursuant to Schedule 3 of the Energy Act 2004. Business Plan laid before Scottish Parliament by the Scottish Ministers

More information

Optimised Management of Orphan Wastes in the UK

Optimised Management of Orphan Wastes in the UK Optimised Management of Orphan Wastes in the UK ICEM13, Brussels, Belgium 9 th September 2013 Slimane Doudou, Jennifer McTeer, Stephen Wickham (Galson Sciences Ltd) Rob Thied, Richard Woodcock (Nuclear

More information

Draft Strategy. Published January 2016 for Consultation

Draft Strategy. Published January 2016 for Consultation Draft Strategy Published January 2016 for Consultation 1 Introduction to the Consultation How to Respond In this consultation, the NDA wants to hear from members of the public, nuclear regulators, employees

More information

British Nuclear Group Reactor Sites Chemistry Issues NuSAC SCR Meeting - April 4 th 2006

British Nuclear Group Reactor Sites Chemistry Issues NuSAC SCR Meeting - April 4 th 2006 British Nuclear Group Reactor Sites Chemistry Issues NuSAC SCR Meeting - April 4 th 2006 Presented by: Dr Malcolm Pick, Senior Engineering Consultant, Decommissioning Support Branch, Engineering and Technical

More information

Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) Yasuharu Igarashi

Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) Yasuharu Igarashi Nuclear Damage Compensation and Decommissioning Facilitation Corporation Activities of Nuclear Damage Compensation & Decommissioning Facilitation Corporation (NDF) June 3, 2015 Yasuharu Igarashi Executive

More information

Resource Planning Update. June 16, 2016 Board Meeting Presentation

Resource Planning Update. June 16, 2016 Board Meeting Presentation Resource Planning Update June 16, 2016 Board Meeting Presentation Strategic Directives SD-9 Resource Planning: The Board of Directors recognizes that the District will have to adapt to the rapidly changing

More information

Submarine Dismantling Project (SDP) Consultation Document on the Site for Interim Storage of Intermediate Level Radioactive Waste

Submarine Dismantling Project (SDP) Consultation Document on the Site for Interim Storage of Intermediate Level Radioactive Waste Submarine Dismantling Project (SDP) Consultation Document on the Site for Interim Storage of Intermediate Level Radioactive Waste 14th November 2014 Contents PART A - Introduction 1. Background 4 2. The

More information

Open Government Status: FULLY OPEN. NuSAC/SCR/07/9 HEALTH AND SAFETY COMMISSION NUCLEAR SAFETY ADVISORY COMMITTEE SUB-COMMITTEE ON RESEARCH

Open Government Status: FULLY OPEN. NuSAC/SCR/07/9 HEALTH AND SAFETY COMMISSION NUCLEAR SAFETY ADVISORY COMMITTEE SUB-COMMITTEE ON RESEARCH Open Government Status: FULLY OPEN NuSAC/SCR/07/9 HEALTH AND SAFETY COMMISSION NUCLEAR SAFETY ADVISORY COMMITTEE SUB-COMMITTEE ON RESEARCH 6 February 2007 ACCESS TO INDEPENDENT TECHNICAL CAPABILITY Paper

More information

THE DECOMMISSIONING OF COMMERCIAL MAGNOX GAS XA9848063 COOLED REACTOR POWER STATIONS IN THE UNITED KINGDOM

THE DECOMMISSIONING OF COMMERCIAL MAGNOX GAS XA9848063 COOLED REACTOR POWER STATIONS IN THE UNITED KINGDOM THE DECOMMISSIONING OF COMMERCIAL MAGNOX GAS XA9848063 COOLED REACTOR POWER STATIONS IN THE UNITED KINGDOM G. HOLT Magnox Electric pic, Berkeley Centre, Berkeley, Gloucestershire, United Kingdom Abstract

More information

Status, responsibilities and missions of ANDRA (France)

Status, responsibilities and missions of ANDRA (France) Status, responsibilities and missions of ANDRA (France) Marie-Claude DUPUIS ANDRA - CEO Contents 1. Legal framework, organization and general information 2. ANDRA today: An Industrial Operator An Innovating

More information

INDUSTRIAL SITE SERVICES. sharing responsibility

INDUSTRIAL SITE SERVICES. sharing responsibility INDUSTRIAL SITE SERVICES sharing responsibility safe, professional industrial site services Veolia Environmental Services is an international, market-leading waste management company providing a comprehensive

More information

Nuclear Decommissioning Authority Business Plan 2011-2014.

Nuclear Decommissioning Authority Business Plan 2011-2014. Business Plan 2011-2014. Business Plan. 2011-2014 Business Plan presented to Parliament pursuant to Schedule 3 of the Energy Act 2004. Business Plan presented to Scottish Parliament pursuant to Schedule

More information

Andreeva Bay Facilities for SNF Management. CEG IAEA Workshop - February 2010

Andreeva Bay Facilities for SNF Management. CEG IAEA Workshop - February 2010 Andreeva Bay Facilities for SNF Management CEG IAEA Workshop - February 2010 Presentation Outline Technical challenges at Andreeva Bay Strategic objectives and principles applied to the solution Measures

More information

Chemical Decontamination and Fluid Handling Services

Chemical Decontamination and Fluid Handling Services Chemical Decontamination and Fluid Handling Services Westinghouse is a global industry expert in decontamination and fluid handling processes, with proven abilities in decontamination and remediation work.

More information

2006 Standard Application Processing Time. 10 months. 14 months

2006 Standard Application Processing Time. 10 months. 14 months Air and Radiation Management Administration General Permit to Construct - without expanded public review Air Quality Permit to Construct - with expanded public review but limited public interest 11 months

More information

Significant incidents in nuclear fuel cycle

Significant incidents in nuclear fuel cycle IAEA-TECDOC-867 Significant incidents in nuclear fuel cycle INTERNATIONAL ATOMIC ENERGY AGENCY The IAEA does not normally maintain stocks of reports in this series. However, microfiche copies The originating

More information

EUROPEAN COMMISSION NUCLEAR SAFETY AND THE ENVIRONMENT. Recycling and Reuse of radioactive Material in the Controlled Nuclear Sector.

EUROPEAN COMMISSION NUCLEAR SAFETY AND THE ENVIRONMENT. Recycling and Reuse of radioactive Material in the Controlled Nuclear Sector. EUROPEAN COMMISSION NUCLEAR SAFETY AND THE ENVIRONMENT Recycling and Reuse of radioactive Material in the Controlled Nuclear Sector Report EUR 18041 i Executive Summary A review of the feasibility of recycling

More information

Onkalo: Recent policies on the disposal of nuclear waste in Finland

Onkalo: Recent policies on the disposal of nuclear waste in Finland Onkalo: Recent policies on the disposal of nuclear waste in Finland Burkhard Auffermann, Finland Futures Research Centre Climate Policy Strategies and Energy Transition, session on Nuclear Waste Governance

More information

Cost Comparison of Spent Fuel Storage and Deep Geological Disposal

Cost Comparison of Spent Fuel Storage and Deep Geological Disposal Unstable, Carbon Constrained dworld Cost Comparison of Spent Fuel Storage and Deep Geological Disposal GMS Abingdon Ltd gmsabingdon@btinternet.com Two Assertions That the costs of storing spent fuel above

More information

Azeri, Chirag & Gunashli Full Field Development Phase 3 Environmental & Socio-economic Impact Assessment. A10.1 Introduction...

Azeri, Chirag & Gunashli Full Field Development Phase 3 Environmental & Socio-economic Impact Assessment. A10.1 Introduction... APPENDIX 10 Normally Occurring Radioactive Material (NORM) Contents A10.1 Introduction... A10/3 A10.2 Occurrence & Concentration of NORM in Oil and Gas Operations... A10/4 A10.2.1 Probability of NORM formation

More information

WASTE STREAM 2Y51 Analytical Services Process Facilities - North Labs

WASTE STREAM 2Y51 Analytical Services Process Facilities - North Labs WASTE STREAM 2Y51 Analytical Services Process Facilities North Labs SITE SITE OWNER WASTE CUSTODIAN WASTE TYPE Sellafield Nuclear Decommissioning Authority Sellafield Limited LLW WASTE VOLUMES Stocks:

More information

Position paper on the implications of deep sea disposal of radioctive waste

Position paper on the implications of deep sea disposal of radioctive waste Agenda Item 4 English only OSPAR Convention for the Protection of the Marine Environment of the North-East Atlantic Meeting of the Radioactive Substances Committee (RSC) Stockholm (Sweden): 20-23 April

More information

Pesticide Spills. Chapter 26. In This Chapter. Keywords. Accidents. Pesticides Act and Environmental Protection Act

Pesticide Spills. Chapter 26. In This Chapter. Keywords. Accidents. Pesticides Act and Environmental Protection Act Chapter 26 Pesticide Spills In This Chapter Keywords Accidents After learning the information in this chapter, you will be able to: 1. Define a spill. 2. Describe when a spill must be reported to the Spills

More information

Waste Volume Reduction by Studsvik Nuclear AB. Anders Stenmark and Bo Wirendal September 16th, 2010

Waste Volume Reduction by Studsvik Nuclear AB. Anders Stenmark and Bo Wirendal September 16th, 2010 Waste Volume Reduction by Studsvik Nuclear AB Anders Stenmark and Bo Wirendal September 16th, 2010 Waste Streams from Industry The Nuclear Industry generates operational waste during its lifetime as well

More information

How To Decommission A Nuclear Plant

How To Decommission A Nuclear Plant International Atomic Energy Agency Decommissioning of Nuclear Facilities Management of Decommissioning Projects Lawrence E. Boing Manila, Philippines, October 2006 1 Lesson Objectives Understand the management

More information

Overview of Worldwide Nuclear Decommissioning

Overview of Worldwide Nuclear Decommissioning Overview of Worldwide Nuclear Decommissioning Patrick O Sullivan International Atomic Energy Agency 12 th December 2014 International Seminar Nuclear decommissioning : an opportunity for global and sustainable

More information

NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission

NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission Background The U.S. Nuclear Regulatory Commission (NRC)

More information

Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation. G.. d Amored

Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation. G.. d Amored Sino-Italian Cooperation Project Role and tasks of Arpa Piemonte in controlling and monitoring of ionizing and non ionizing radiation G.. d Amored Environmental Protection Agency of Piedmont Region (ARPA

More information

Asbestos Monitoring Plan Former ROF Bishopton

Asbestos Monitoring Plan Former ROF Bishopton Asbestos Monitoring Plan Former ROF Bishopton September 2010 1 Table of Contents 1. Introduction... 3 1.1. Summary of Key Requirements... 3 1.2. Setting... 4 1.3. About Exova... 4 1.4. Scope of this Document...

More information

Radioactive Waste Management the French case

Radioactive Waste Management the French case Radioactive Waste Management the French case Dr Gérald OUZOUNIAN ANDRA, Director Gerald.ouzounian@andra.fr ATOMEXPO 2012 Content General policy principles and rules in France Status of radioactive waste

More information

Environmental Remediation Examples and Remediation Strategic Planning

Environmental Remediation Examples and Remediation Strategic Planning Environmental Remediation Examples and Remediation Strategic Planning Yasuo Onishi (yasuo.onishi@pnnl.gov) October 16, 2011 Pacific Northwest National Laboratory, and Washington State University, Civil

More information

Project Dashboard - November 2015 Post CD-2 Active Projects

Project Dashboard - November 2015 Post CD-2 Active Projects Office of Project Management Oversight and s 1 EM Bechtel National 01-D-416 Waste Treatment and Immobilization Plant (WTP) $ 5,781,000,000 $ 12,263,000,000 R 2 EM Parsons Government Services 05-D-405 Salt

More information

ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION

ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION After concession is expired or at the end of its economic life, pipeline network and all associated structures are due for decommissioning

More information

Treatment Centers for Radioactive Waste

Treatment Centers for Radioactive Waste Treatment Centers for Radioactive Waste TREATMENT CENTERS FOR RADIOACTIVE WASTE Introduction Nuclear facilities such as nuclear power plants, reprocessing plants, nuclear fuel cycle production units, laboratories

More information

Constraints to Implementing Decommissioning and Environmental Remediation in IAEA Member States MAIN OUTCOMES

Constraints to Implementing Decommissioning and Environmental Remediation in IAEA Member States MAIN OUTCOMES 55 th IAEA General Conference Side Event organised by the Waste Technology Section Division of Nuclear Fuel Cycle and Waste Technology IAEA Department of Nuclear Energy Constraints to Implementing Decommissioning

More information

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Renew provides multidisciplinary engineering services to maintain and develop UK infrastructure focused in

More information

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004 Estates Division Imperial College London Room 503 Sherfield Building South Kensington Campus London SW7 2AZ, UK Tel: +44 (0)20 7594 9832 Fax: +44 (0)20 7594 9050 r.mayne@imperial.ac.uk www.imperial.ac.uk

More information

ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors)

ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) Contractors have the responsibility to ensure the health and safety of their workers and that their work

More information

The world s leading sustainability consultancy. Sustainable Solutions for the Oil and Gas Industry

The world s leading sustainability consultancy. Sustainable Solutions for the Oil and Gas Industry The world s leading sustainability consultancy Sustainable Solutions for the Oil and Gas Industry The oil and gas industry currently faces the greatest environmental, health and safety challenges in its

More information

Audit Report. Implementation of the Recovery Act at the Savannah River Site

Audit Report. Implementation of the Recovery Act at the Savannah River Site U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Audit Report Implementation of the Recovery Act at the Savannah River Site OAS-RA-L-11-12 September 2011 Department

More information

GAO. NUCLEAR REGULATION Regulatory and Cultural Changes Challenge NRC. Testimony

GAO. NUCLEAR REGULATION Regulatory and Cultural Changes Challenge NRC. Testimony GAO For Release on Delivery Expected at 9a.m.EDT Thursday, March 9, 2000 United States General Accounting Office Testimony Before the Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear

More information

Innovative Graded Approach to D&D Configuration Management 9393

Innovative Graded Approach to D&D Configuration Management 9393 ABSTRACT Innovative Graded Approach to D&D Configuration Management 9393 C.M. Kronvall, FJ Muller, R.S. Spencer CH2MHill Plateau Remediation Contract P.O. Box 1600, Richland, WA 99352 CH2MHill Plateau

More information

DRAFT Milestones and Recommendations: Fuel Cycle OECD/IEA 2010

DRAFT Milestones and Recommendations: Fuel Cycle OECD/IEA 2010 DRAFT Milestones and Recommendations: Fuel Cycle 1 OECD/IEA 2010 Fuel cycle: - established technologies for all steps of the NFC, though R&D can help improve technologies, reduce costs, Front end: uranium

More information

ASTM C26 LONG RANGE PLAN Committee on the Nuclear Fuel Cycle

ASTM C26 LONG RANGE PLAN Committee on the Nuclear Fuel Cycle ASTM C26 LONG RANGE PLAN Committee on the Nuclear Fuel Cycle VISION STATEMENT ASTM C26 continues to be the Internationally-recognized leader in the development of consensus standards for the Nuclear Fuel

More information

Three Mile Island Unit 2 Overview and Management Issues

Three Mile Island Unit 2 Overview and Management Issues Three Mile Island Unit 2 Overview and Management Issues OECD-Nuclear Energy Agency 12 th Meeting of the WPDD November 2011 Paris France Andrew P. Szilagyi U.S. Department of Energy Office of 1 Subjects

More information

The UK Nuclear Power Industry

The UK Nuclear Power Industry 7.10 The UK Nuclear Power Industry An overview - A bright future for nuclear power The UK has a rich legacy of skills related to the nuclear power industry which have been built up over half a century,

More information

Contractor Signature: Title:

Contractor Signature: Title: LITTLETON/ENGLEWOOD WASTEWATER TREATMENT PLANT SPILL PREVENTION, COUNTERMEASURE, CONTROL AND CLEAN-UP DOCUMENT SUBMISSION The Littleton/Englewood Wastewater Treatment Plant (L/EWWTP) requires that all

More information

Performance and progress at Sellafield

Performance and progress at Sellafield Performance and progress at Sellafield The Sellafield Site In 2008 the Nuclear Decommissioning Authority (NDA) appointed Nuclear Management Partners (NMP) as the Parent Body Organisation for Sellafield

More information

RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND

RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND 1. NATIONAL FRAMEWORK FOR MANAGEMENT AND REGULATION OF RADIOACTIVE WASTE AND DECOMMISSIONING 1.1 National framework 1.1.1 Overview of national

More information

Human Resource Management in Nuclear Safety

Human Resource Management in Nuclear Safety Human Resource Management in Nuclear Safety Christer Viktorsson Nuclear Installations Safety Role of the (IAEA) Established in 1957 143 Member States 2,200 staff Three Pillars: Safeguards Nuclear Technology

More information

Additional Facility Details for Release of Waste Area 3 (Seattle, Washington)

Additional Facility Details for Release of Waste Area 3 (Seattle, Washington) 1. Description of facility to be released. The facility to be released is a separate structure, identified and referred to as Waste Area 3 and also as Waste Station #3, in documents and survey forms, located

More information

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay RC-17 Radiation Protection in Waste Management and Disposal Implementing the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Alejandro V. Nader

More information

Nuclear Development. Decommissioning. Nuclear Power Plants. Policies, Strategies and Costs

Nuclear Development. Decommissioning. Nuclear Power Plants. Policies, Strategies and Costs Nuclear Development Decommissioning Nuclear Power Plants Policies, Strategies and Costs N U C L E A R E N E R G Y A G E N C Y Nuclear Development Decommissioning Nuclear Power Plants: Policies, Strategies

More information

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES FRANCE NATIONAL NUCLEAR ENERGY CONTEXT

RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES FRANCE NATIONAL NUCLEAR ENERGY CONTEXT RADIOACTIVE WASTE MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES FRANCE NATIONAL NUCLEAR ENERGY CONTEXT Commercial utilisation of nuclear power in France started in 1959 and by 2007 there were 59 nuclear

More information

REAL PROPERTY ASSET MANAGEMENT (DOE O 430.1B) REQUIREMENTS CHECKLIST

REAL PROPERTY ASSET MANAGEMENT (DOE O 430.1B) REQUIREMENTS CHECKLIST DOE O 430.1B Requirements The management of real property assets must take a corporate, holistic, and performance-based approach to real property life-cycle asset management that links real property asset

More information

March 21, 2012. Environmental Management Program Strategies: A National Responsibility

March 21, 2012. Environmental Management Program Strategies: A National Responsibility Written Statement of David Huizenga Senior Advisor for Environmental Management United States Department of Energy Before the Subcommittee on Energy and Water Development Committee on Appropriations United

More information

Undercover storage requirements for waste/recycling depots

Undercover storage requirements for waste/recycling depots Waste Information Sheet Undercover storage requirements for waste/recycling depots Update September 2010 EPA 845/10: This information sheet has been prepared for waste management and resource recovery

More information

IAEA Recommendations on a Decommissioning Plan (DP)

IAEA Recommendations on a Decommissioning Plan (DP) IAEA Recommendations on a Decommissioning Plan (DP) Ernst Warnecke, IAEA-NSRW Patrick O Sullivan, IAEA-NEFW Research Reactor Decommissioning Demonstration Project (R²D²P) Review of a Decommissioning Plan

More information

NAPCS Product List for NAICS 54162: Environmental Consulting Services

NAPCS Product List for NAICS 54162: Environmental Consulting Services NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,

More information

Design and Construction policy for sustainable buildings and Campus environments

Design and Construction policy for sustainable buildings and Campus environments ESTATES SUPPORT SERVICE Design and Construction policy for sustainable buildings and Campus environments 1.0 INTRODUCTION The Higher Education Funding Council for England, responding to Governmental direction,

More information

Carriers Cargo Liability Insurance. Policy Wording

Carriers Cargo Liability Insurance. Policy Wording Carriers Cargo Liability Insurance Policy Wording Contents ZU10587 - V5 05/13 - CGEL-007554-2013 Welcome to Zurich About Zurich... 2 Duty of Disclosure... 2 Non-disclosure or Misrepresentation... 2 Our

More information

MARSHALL UNIVERSITY HAZARDOUS WASTE DISPOSAL SECTION

MARSHALL UNIVERSITY HAZARDOUS WASTE DISPOSAL SECTION MARSHALL UNIVERSITY HAZARDOUS WASTE DISPOSAL SECTION TABLE OF CONTENTS POLICY STATEMENT.2 REFERENCE PROCEDURE 3 l.0 Purpose.3 2.0 Scope 3 3.0 Definitions 4 4.0 Responsibilities 5 5.0 Procedure.7 11/16/2005

More information

IDENTIFYING YOUR WASTE

IDENTIFYING YOUR WASTE United States Environmental Protection Agency EPA530-F-97-029 September 1997 http://www.epa.gov Solid Waste and Emergency Response IDENTIFYING YOUR WASTE THE STARTING POINT This brochure explains the methodology

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

10 Nuclear Power Reactors Figure 10.1

10 Nuclear Power Reactors Figure 10.1 10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of

More information

Strengthening Technical Specialist Training for an Expanding Nuclear Power Programme in the UK

Strengthening Technical Specialist Training for an Expanding Nuclear Power Programme in the UK Strengthening Technical Specialist Training for an Expanding Nuclear Power Programme in the UK John L Robertson, Director of Education and Nuclear Skills, Gen2 Presentedat the International Conference

More information

Integrated Risk Management Solutions

Integrated Risk Management Solutions Integrated Risk Management Solutions Our services 2 RPS Integrated Risk Management Solutions provides specialist HSE & Risk Management consultancy services to the energy industry and other major hazard

More information

Specification Essential Desirable

Specification Essential Desirable High Standards High Expectations Learning through Partnership Person Specification: Facilities Manager It is expected that the successful candidate will satisfy the following specification Specification

More information

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY Page 1 of 7 ISSUED: 5/00 REVISED: 08/06 1. Potential Releases of Radioactive Materials to Unrestricted Areas The Environmental Health and Safety Department (EHRS) must be notified immediately if an emergency

More information

URENCO Capenhurst Site Integrated Waste Strategy. URENCO UK Limited

URENCO Capenhurst Site Integrated Waste Strategy. URENCO UK Limited URENCO Capenhurst Site Integrated Waste Strategy URENCO UK Limited 1 Executive Summary This document describes the URENCO Integrated Waste Strategy (IWS) for managing radioactive and non-radioactive wastes

More information

Decommissioning and clearance of laboratories

Decommissioning and clearance of laboratories Health and Safety Services Safety Note 65 Decommissioning and clearance of laboratories This Safety Note provides guidance to Schools on the decommissioning and clearance of laboratories prior to handing

More information

Nuclear Waste A Guide to Understanding Where We've Been and Where We're Going

Nuclear Waste A Guide to Understanding Where We've Been and Where We're Going Nuclear Waste A Guide to Understanding Where We've Been and Where We're Going National Conference of State Legislatures The presentation was created by the National Conference of State Legislatures and

More information

Department of Public Works. Recycling policy for buildings and civil infrastructure

Department of Public Works. Recycling policy for buildings and civil infrastructure Department of Public Works Recycling policy for buildings and civil infrastructure A whole-of-government recycling policy for buildings and civil infrastructure Policy statement The Queensland Government

More information

Illegally Dumped Asbestos Clean Up Program Guidelines

Illegally Dumped Asbestos Clean Up Program Guidelines Illegally Dumped Asbestos Clean Up Program Guidelines October 2013 Contents Introduction... 1 Assessment criteria... 2 Eligibility... 3 Application process... 5 Further information... 8 Glossary... 10

More information