IRB 2600ID-15/1.85 Simple integration, high performance



Similar documents
ABB Robotics, June IRB 1200 Overview. ABB Group August 21, 2014 Slide 1

The modular Line and Room Gantry design from SCHUNK

Robotics. DressPack Application Equipment & Accessories

Phil Crowther, Product Management, April 2015 YuMi IRB Overview

Selecting Robots for Use in Drug Discovery and Testing

How To Program A Laser Cutting Robot

[ means: Save time, money and space! MAXXMILL 500. Vertical milling center for 5-side machining

5 WAYS TO EVEN GREATER EFFICIENCY

New robot improves costefficiency. spot welding. 4 ABB Review 3/1996

Stirling Paatz of robot integrators Barr & Paatz describes the anatomy of an industrial robot.

Servo/Hydraulic Press Brake. HG Series HG 5020, HG 8025, HG 1303, HG 1703 HG 1704, HG 2203, HG 2204

Hose packages 70 Robot System Products Product catalogue 2014

Ecopaint Robot Painting Station

The Quality Connection. High Performance Cable Solutions for the World of Semiconductors

The Quality Connection. High Performance Cable Solutions for the World of Semiconductors

SIMRAD SD10 Sailboat Drive

How To Use A Balancing Arm

Robust. Flexible. Strong. EGN Universal Gripper

T-SERIES INDUSTRIAL INCLINOMETER ANALOG INTERFACE

Hyster Tire Handling Solutions. Complete Line of Fork Truck Mounted Tire Handlers

Robots. KUKA Roboter GmbH. KR AGILUS sixx. With W and C Variants Specification KR AGILUS. sixx. Issued: Version: Spez KR AGILUS sixx V12

Industrial Robotics. Training Objective

ABB Robotics. Product specification IRB 1600

Bringing good things ahead

MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION

The Less is More Approach to Robotic Cable Management

Machining Center Equipped with Unparalleled Rigidity and Agility NHX6300

Durmazlar has aimed continous development since 1956

Certified according to DIN EN ISO 9001 Technical Datasheet C-Flow Coriolis Mass Flow Meter

Design of a Universal Robot End-effector for Straight-line Pick-up Motion

made easy Robotic cable management Managing the six-axis platform in robotics requires special consideration when designing cabling systems.

Robotics. Efficient robot-based automation for solar cell and module production

GANTRY ROBOTS FLEXIBILITY SPEED PRECISION

Programming ABB Industrial Robot for an Accurate Handwriting

SINGLE-AXIS ROBOTS FLIP-X. Series

Tilt switches N3 / N4... MEMS technology, one or two axis. Use. Options. + long lifetime and highly reliability due to mechanism-free MEMS technology

EXCAVATOR SAFETY TRAINING

OPTICAL MEASURING MACHINES

UltiMate Torque Arms & UltiMate Torque Tubes

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale

DMS 680. Universal length measuring system gauge inspection for»iso 9000«requirements

Smooth. Slim. Flexible. EVG Universal Gripper

1.1 DIMENSIONS AND WEIGHT PAG LOAD CENTRE FOR LIFTING PAG STORAGE CONDITIONS PAG. 2

PreciTrack3D GmbH. PRECI 3D TRACK PRECI 3D GUN PRECI 3D SCAN PRECI 3D ROBOGUN PRECI 3D CONFOCAL PRECI 3D REF Tube Inspection & Measurements PRODUCTS

1. HANDLING MACHINES PRODUCTION SERIES BZ Single-column portal / manipulators

SIMULATION PRE-INSTALLATION GUIDELINES CONTRACTOR REQUIREMENTS FOR ROOM PREPARATION

INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS. Published: April 1999

Certified according to DIN EN ISO 9001 Technical Datasheet TRICOR Series Mass Flow Meters

19" Data Racks. Adjustable feet To compensate for uneven floors and assure great stability all feet can be up to 20 mm adjusted.

Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales

CNC Portal Milling Machine FZ 32. High Performance Milling Technology

Söll GlideLoc Aluminium Ladders. Vertical fall protection system Certified according to EN 353-1:2002 and CNB/P/11.073

PHYSICS 111 HOMEWORK SOLUTION #9. April 5, 2013

Original Assembly Guide

PALLETS ROLLER CONVEYOR LOADING CONVEYOR CHAIN TRANSFER TURNTABLE ROLLER STOP

RIA : 2013 Market Trends Webinar Series

DITCH WITCH MT12 MICROTRENCHER. ditchwitch.com

Pipe Cutting and Beveling Clamshells

Simple. Intelligent. The SIMATIC VS 100 Series. simatic MACHINE VISION.

301.7D. Mini Hydraulic Excavator

Plastics for Longer Life. The NEW Multi-Axis Energy Chain for Robots. Triflex

COIL PAC. Subec AB, Sprängarvägen 16, Saltsjö-Boo, Sweden, Tel.: , Fax: , info@subec.se

Chapter 8: Rotational Motion of Solid Objects

Universal Mount Industrial Monitors

Panel Carts refer Page Intex Price Guide All prices are exclusive of GST

Select your application!

Wildland Fire Remote Monitor

HEAVY DUTY STORAGE GAS

Problem Set 1. Ans: a = 1.74 m/s 2, t = 4.80 s

ATM SECURITY ATM CASSETTE GUARD KEY FEATURES. High security Rapid installation Simple operation Time locks & delays Proven track record

ADA Design Guide Washrooms & Showers

Tubular connection elements

ESAB MIG/MAG Robot packages Yaskawa Motoman

Suction assembly for l IBC and 205 l drums mm suction tube Suction assembly for tanks mm suction tube.


The emergency provisions affect the following Building Code sections:

Key data. The practical machines for your specific grinding solution. A member of the United Grinding Group. The Art of Grinding.

This week. CENG 732 Computer Animation. Challenges in Human Modeling. Basic Arm Model

Products / Applications / Solutions. Your Intelligent Robotics Par tner

DISHWASHERS BUMPERS BEER CRATES CHAIRS PC HOUSINGS SIDE TRIM PANELS KUKA ROBOTS FOR THE PLASTICS INDUSTRY

Field bus connections Link structure CMS link structure CMS, B-design. Brochure

CASE HISTORY #2. APPLICATION: Piping Movement Survey using Permalign Laser Measurement System

PLM series Permanent load lifting magnets

Press Release ABB at GIFA 2015 Meeting the automation demands of the foundry and forging industries

Introduction to Beam. Area Moments of Inertia, Deflection, and Volumes of Beams

Mechanics of Balance

Creating a 2D Geometry Model

microscope OP-Dent-5

Profile rail guides LLR

EXTeRUS. EXTeRUS - With patented design, able to join technology. and quality of materials with a charming shape. Unique

Selecting and Sizing Ball Screw Drives

BAGGAGE HANDLING SYSTEMS. Trastecnica S.p.A. Handling Baggage Systems Edition Rev

The Reliable Outsource

SELECTION, APPLICATION AND MAINTENANCE

Fredriksons conveyor systems handle goods with a width from 20 mm up to 600 mm.

N20xxA, N34xxA NON-SPRING RETURN DIRECT-COUPLED DAMPER ACTUATORS FOR FLOATING AND 2-POSITION CONTROL

POLLUX TP-703VLM. Pallet

TECHNICAL DATA. 2. LISTINGS AND APPROVALS See Tables 1 & 2.

Ultra Laptop Support Desk Mount Series

CHAPTER 15 FORCE, MASS AND ACCELERATION

Transcription:

Per Lowgren, Product Manager, Medium robots IRB 2600ID-15/1.85 Simple integration, high performance February 9, 2011 Slide 1

Overview of main features General purpose robot for integrated dressing solutions. Agile, compact and high performing Tailored for for material handling and machine tending. Longest reach in its class. Outstanding wall mounting capabilities. Optimized bending radius of hose package for long life expectancy and easy access inside machines. Optional flexible conduit February 9, 2011 Slide 2

General purpose robot to suit many applications Machine tending Material handling Assembly Inspection Arc welding Laser welding Dispensing February 9, 2011 Slide 3

Key data Payload: 15 kg Reach: 1850 mm (to center of axis 5) Height: 1600 mm Foot print: 676 mm x 511 mm Weight: 273 kg February 9, 2011 Slide 4

Load diagram with additional armloads (1 + 10 kg) Up to 15 kg Z 1 kg 10 kg L February 9, 2011 Slide 5

Load diagram with additional armloads (1 + 10 kg) Up to 17 kg with wrist vertical 10 kg L 1 kg Z Load diagram permits +/- 10 degrees on axis 5. Check RobotLoad for your specific load case. February 9, 2011 Slide 6

Working range at center of 5th axis Reach forward: 1850 mm Reach below the base: 1171 mm Reach above the base: 2145 mm Horizontal stroke: 3400 mm IRB 2600ID-15/1.85 February 9, 2011 Slide 7

Working range and max speed per axis Range Max speed Axis 1 +180 to -180 175 /s Axis 2 +155 to -95 175 /s Axis 3 +75 to -180 175 /s Axis 4 +175 to -175 360 /s Axis 5 +120 to -120 360 /s Axis 6 +400 to -400 500 /s ± 191 rev. max February 9, 2011 Slide 8

Performance & accuracy Pose repeatability, RP: Pose accuracy, AP: Linear path repeatability, RT: Linear path accuracy, AT: Pose stabilization time, PSt: (to within 0.2 mm of the position) 0.03 mm 0.01 mm 0.30 mm 0.80 mm 0.05 s February 9, 2011 Slide 9

Main Dimensions 1027 187 238 786 135 R 172 min turning radius of axis 4 R 337 min turning radius of axis 1 445 1600 900 150 255.7 255.7 276 (291) 150 676 275 February 9, 2011 Slide 10

Flexible mounting Floor, wall, ceiling & tilted (round the Y-axis) Wall mounting, max working range for axis 1 is ±40 degrees with max payload and armload. More with reduced loads. Max tilting angle for full axis 1 working range is 40 degrees with max payload and armload. More with reduced loads. Check with RobotLoad for your specific load case. February 9, 2011 Slide 11

Easy to integrate Customer interfaces To customer equipment DeviceNet, PROFIBUS or Parallel I/O (CP/CS) Air EtherNet/IP or PROFINET February 9, 2011 Slide 12

Easy to integrate Mechanical mounting interfaces M8 (x2) M8 (x2) M6 (x2) M6 (x2) M6 (x2) M8 (x4) M6 (x2) M8 (x4) M8 (x4) February 9, 2011 Slide 13

Easy to integrate Mechanical mounting interfaces M6 (x2) Tool flange February 9, 2011 Slide 14

Easy to integrate Flexible conduit (option) CAD bilder Mattias Features 36 mm diameter empty conduit for user hoses and signal cables. Large capacity - less than 30% utilized with 4 air hoses and 4 signal cables. Can handle the full working range of axis 4-6. The rotation of the conduit follows the rotation of the hoses and cables inside. Can be fixed in the rear (see lower image), free rotation at the wrist end. Mounted on delivery or available as spare part. Benefits Much simplified engineering of the cable solution from the rear of the upper arm to the wrist. RobotStudio offline programming possible with few or no touch-ups required Prolonged life expectancy of hoses and cables when routed inside the flexible conduit. Lower cost of ownership. Fewer production stops due to cabling issues. February 9, 2011 Slide 15

Summary Up to 90% shorter programming time thanks to a combination of controlled upper arm cabling movements and RobotStudio offline programming with few or no touch-ups. Up to 15% shorter cycle times vs. the competition thanks to the reduced cabling movements, QuickMove and high accelerations. Drastically reduced costs for upper arm cabling investments thanks to the flexible conduit, housing the cables and hoses for the end-of-arm tooling. Up to 75% reduced costs for maintenance of cablings incl. material and production stops savings. The first ID robot in its class - with outstanding performance in process applications which reduces waste. Suitable for dispensing and laser equipment thanks to a hollow wrist diameter of 50 mm to accommodate process equipment. February 9, 2011 Slide 16

, IRB 2600ID February 9, 2011 Slide 17