Procurement Routes. Curtin University of Technology



Similar documents
Verification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review

EFFECT OF PROCUREMENT SYSTEMS ON THE PERFORMANCE OF CONSTRUCTION PROJECTS

Contracting Practices in Mega Projects

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES

Professional Practice Commission: March Alternative Project Delivery Systems

CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED

The FIDIC Suite of Contracts

2.6 Select a. procurement route. cabe. Contents

A guide to appointing an architect

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

To be used in conjunction with the Invitation to Tender for Consultancy template.

6.0 Procurement procedure 1 Infrastructure

Report Capital Works Procurement: The Selection of a Building Procurement Method

ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU

The programming, design

Introduction Building project management

PROGRAMME FOR INTERNATIONAL STUDENT ASSESSMENT (PISA) 2018: CALL FOR TENDER PROCESS. An Overview

Guaranteed Maximum Price contracts in Western Australia

Menu of Architecture Services 2009

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note April 2000

A Guide to Small Works. A brief explanation

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG

Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process

Outsourcing Factsheet

Practice Note Deciding on the appropriate JCT contract

CABINET. 24 March 2015

The South African Council for the Project and Construction Management Professions. Guideline Scope of Services and Tariff of Fees

FWK Contract - Support for safety and accident analyses

Project Organization. System and Project Management 1.040/1.401J Nathaniel Osgood

Developing a Public-Private Partnership Framework: Policies and PPP Units

1.040 Project Management

Guarantee and Performance Bonds

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

RIBA Plan of Work 2013 Overview

Appendix 18 NEC3 Options

How To Design A Project

Standard operating procedure

PERFORMANCE BONDS IN CONSTRUCTION. information for Contractors and Sub-Contractors

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting

Intelligent Procurement

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

Project Manager Facilities and Development

Concessions and PPPs. Brief 18. Public Procurement. August 2011

Tender Evaluation and Contract Award

PROJECT PROCUREMENT MANAGEMENT

Consultancy Services Proposal

The value of frameworks

Engineering Council of South Africa

Procurement Strategy and Contract Selection

Infrastructure Procurement Options Guide

Project Delivery Methods & Contract Types CSTM 102 Spring 2013

You and Your Contractor

Client Skills: Skills required by Government as the Construction Industry Client

Construction Procurement Policy Project Implementation Process

Schools and Directorates Funded Projects for building, alteration and decorative works

Certificate in Construction Project Management

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

Reporting The Project Board shall report to the sponsoring Department political board.

Outsourcing. Knowledge Summary

BANKA SOCIETE GENERALE ALBANIA

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

Parkes Lees Architects Ltd

Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services

Guide to Procuring Construction Projects

GUIDANCE NOTE Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities

HOW TO RESPOND TO THE BASIC NEED CHALLENGE

CIC Scope of Services Users Pages

Civil engineering design and construct a guide to integrating design into the construction process

DIRECTORATE OF ESTATES & FACILITIES

Royal Institute of British Architects. Procurement policy. Building teams achieving value

Delivering Efficiency Through Collaborative Working

RIBA Fees Calculator

Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement

Association of Independent Schools of NSW Block Grant Authority Limited PROJECT AND CONSTRUCTION MANAGEMENT GUIDELINES

ANNEX 8 Contract Management Strategy

香 港 特 別 行 政 區 政 府. The Government of the Hong Kong Special Administrative Region. Development Bureau Technical Circular (Works) No.

INSIGHTS. Are some services too important to outsource? Service Integration & Management (SIAM)

Check. They re Chartered. Chartered Project Managers

The Utilities Exchange Limited

A Guide to Standard forms of Construction Contract Outlining Key Characteristics and Components

OLB certification process for Forestry Companies GP01

Contract Management Handbook. A Guide to contract management at the University

Procurement Processes and Tools

ANNEX IV Procurement by grant Beneficiaries in the context of European Union external actions 1

Briefing document: Understanding the Royal Institute of British Architects (RIBA) Building Contracts. 5 November 2014

Contracts, agreements and tendering

The Role of Building Construction Project Team Members In Building Projects Delivery

THE RELATIONSHIP BETWEEN THE CLIENT, CLIENTS PROJECT TEAM AND THE EPCM PROJECT TEAM. Mr C. A. F. Sweet The South Institute of Mining and Metallurgy

NEVARIS TAI-SOFTWARE TENDER AWARDING INVOICE

Your guide to the residential architectural process. A step-by-step guide from Context Architects

The Gateway Review Process

Capital Works Management Framework Guidance Note. Planning and Control of Capital Costs GN 2.2

2. Subject to any special rules applied by the College's funding bodies, the tendering procedures will be applicable to:

MSc in Construction Management (Cycle 2, level 4)

SAMPLE INVITATION TO TENDER ADVERTISEMENT (CONTRACT)

BANKA SOCIETE GENERALE ALBANIA

Alliance model in renovation projects, case Vuolukiventie 1

2.1 STAGE 1 PROJECT PROCUREMENT STRATEGY

Transcription:

Procurement Routes An Overview Curtin University of Technology

Overview of Principal Routes Traditional / conventional design led Design and construct Management (Fee)

Traditional Client appoints consultants to: Administer contract - certify payment Develop a design based on an agreed budget Client appoints contractor direct to: Organise works programme Establish the site and carry out the work Key issues: Separation of contractor from design Client reliant on design team for quality of tender documents

Traditional - Tendering Single stage Tenders are usually based on complete design Two stage Tenders based on partially developed consultant design Contractor assists with final development of design and tender documents First stage tenderer may tender/ negotiate second (construction) stage

Traditional - Variants Contractor design portion Client consultant team completes the design for majority of the works Contractor completes the design balance of the works Used where specialist design input required

When is Traditional Suitable? Suitable for: All clients, including inexperienced clients A developing brief Complex projects Quality design development Cost certainty Less suitable for: Fast track (Overlapping of design and construction)

Design & Construct Client appoints Consultants to: Prepare outline design and employer s requirements

Design & Construct Client appoints contractor to: Complete design and construct the works Key Issues: Tendering is more expensive and riskier exercise for the contractor than with traditional approach Client has a single point of contact Changes made by client during design stage can be expensive

When is Design & Construct Suitable? Suitable for: All clients, including inexperienced ones and those who do not want a close involvement Cost certainty Not suitable for: Projects where client wishes substantial input to detailed design Projects with significant potential for change

Design & Construct - Variants Develop and Construct Client completes part of the design Contractor finishes the design and the construction Contractor may re-employ the original designers to complete the design Package Deal Contractor provides an off-the-shelf building Building type often modular so that its size can be adjusted

Design & Construct - Variants Single stage Contractor's tenders are usually based on an outline design and Employers Requirements Two stage Tenders based on a partially developed design Contractor assists with further development of design First stage tenderer has the opportunity to negotiate the second stage.

Design & Construct - Variants Two Stage with Guaranteed Maximum Price Contractor's tenders based on a partially developed consultant's design (Stage 1 tender) Preliminary and on costs agreed Contractor assists with further development of design Defined elements are negotiated and prices agreed. Contractor assess risk associated with design development of remaining undefined elements and GMP negotiated

Management Fee Client appoints consultants: Develop design with contractor Client appoints contractor: Paid a fee for managing the construction works Develops a programme for construction, design and tender documents in appropriate works packages Manages work package contractors

Key Issues: Management Fee Contractor brings practical buildability advice during design Contractor is reckoned to be more client orientated - more professional - leading to a less adversarial relationship but depends on the contractor's team Construction work is carried out by Work Package Contractors Design and the start on site often overlaps Less price certainty

Management Fee - Variants Management contracting Management Contractor contracts with Work Package Contractors Contractor manages the Works Package Contractors and arranges for their payment Construction management Client contracts directly with Work Package Contractors Contractor manages the Work Package Contractors Client arranges for their payment

Management Fee - Variants Construction Management Management Contracting

When is Management Suitable? Suitable for: Experienced clients Fast track projects Complex buildings Developing brief and constructability advice Less suitable for: Inexperienced clients Cost certainty before starting construction Client wanting to pass on risk to contractor

Risk Allocation

Criteria Certainty, risk, complexity, competition Time, cost, quality Value for money Market factors: cost of capital, interest rates, Market factors: cost of capital, interest rates, inflation, skills capacity

Procurement Comparison Comparison of Procurement Methods Traditional Design & construct Management Speed Not the fastest of methods Desirable to have all information at a tender stage Consider two stage or negotiated tendering Relatively fast method Pre-tender time largely depends on the amount of detail in the Employer s requirements Construction time reduced because design and construction proceed in parallel Early start on site is possible long before tenders have even been invited for some of the works packages Complexity Basically straightforward, but complications can arise if Employer requires that certain sub-contractors are used An efficient single contractual arrangement integrating design and early construction expertise within one accountable organisation Design and construction skills integrated at an early stage Complex management operation requiring sophisticated techniques

Procurement Comparison Comparison of Procurement Methods Traditional Design & construct Management Certainty Certainty in cost and time before commitment to build Clear accountability and cost monitoring at all stages There is a guaranteed cost and completion date Employer is committed to start building on a cost plan, project drawings and specification only Competition Competitive tenders are possible for all item Negotiated tenders reduce competitive element Difficult for the Employer to compare proposals which include for both price and design. May be difficult to evaluate for competitiveness No benefit passes to Employer if Contractor seeks greater competitiveness for specialist work and materials Management Contractor is appointed because of management expertise rather than because his fee is competitive However, competition can be retained for the works packages

Balancing of Criteria Comparison of Procurement Methods Traditional Design & Construct Management Summary Benefits in Benefits in Benefits in COST & TIME but at the expense of QUALITY COST & QUALITY but at the expense of TIME TIME & QUALITY but at the expense of COST

Key Issues Balance of Priorities Budget Programme Design Constraints Compliance with regulations and standing orders Approach to risk transfer Incentivisation Potential for Change