WATER SUPPLY & SANITATION



Similar documents
OUTLAY AT A GLANCE. Sector : COMPUTERISATION No. of Schemes: 3 Department : PLANNING AND RESEARCH

Water Management by Panchayat Raj institutions in Alappuzha District

Dr S.K. GUPTA Scientist D Central Ground Water Board. 25 th FEB. 2014

GUIDELINES FOR THE CONTINUATION OF SCHME ON REPAIR, RENOVATION AND RESTORATION (RRR) OF WATER BODIES IN XII TH PLAN

GUIDELINES FOR REPAIR, RENOVATION AND RESTORATION

GUIDELINES FOR THE CONTINUATION OF SCHEME ON REPAIR, RENOVATION AND RESTORATION (RRR) OF WATER BODIES IN XII TH PLAN

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

32/1/ /PVSE(Part-II) Ministry of New and Renewable Energy SPV Off Grid Division

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

Gram Panchayath Information and Questions

SANITARY SEWER MASTER PLAN

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

REDEFINING POVERTY LINES AND SURVEY OF BPL FAMILIES. ( Rural Areas)

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Vital Earth Composting Facility Flood Risk and Drainage Statement

Development of Rural Drinking Water Security Plan A Case Study from Raipur Block, Bhilwara District, Rajasthan

Agricultural Machinery Custom Hiring Centres (CHC) Model Scheme

Schneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, p i.

Understanding and Living With Your Septic System

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

SECTION III. LEACHING AREA REQUIREMENTS Residential square footage requirements are based on sidewall area only: Minimum square feet per bedroom

NREGA for Water Management

Type of Sewer Systems. Solomon Seyoum

U. Vellaiappan 1 * Sr. Project Executive DHAN Foundation Madurai ,Tamilnadu, INDIA dhantank@dhan.org ABSTRACT

Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences

Solar Irrigation in Bangladesh

Dr. Ambedkar Medical Aid Scheme (Revised 2013)

DONOR REPORT WATER PROJECTS 2015

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems

WORKSHOP ON CHALLENGES OF URBANISATION IN INDIA WITH FOCUS ON SOLID WASTE MANAGEMENT

Planning, Health and Environment Division

Maharashtra Budget Analysis

LIST OF COLLEGES IN THE U.T. OF PUDUCHERRY (GOVT./SOCIETY/PRIVATE)

PROJECT PROFILE MANUFACTURING AND SALES OF DOMESTIC LIGHTS WITH LED TECHNOLOGY. Prepared by. United Electrical Industries Ltd, Pallimukku, Kollam

Format for scrutinising the Hill Station Building Applications ( Current File No /2001-HSBA) The application shall be accompanied by

RULES FOR INSTALLATION OF COMMUNICATION TOWERS.

Design Criteria & Service Goals

After section 80B of the Income-tax Act, the following section shall be inserted with effect from the 1st day of April, 2006, namely:

KARNATAKA URBAN WATER SUPPLY & DRAINAGE BOARD BANGALORE WATER SUPPLY MANAGEMENT - A CASE STUDY OF HUBLI-DHARWAD

Township of Enniskillen. Asset Management Plan

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Water Partners International. August 2008

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency

A STUDY ON OWN FUND REVENUE GENERATION THROUGH COMMON PROPERTY RESOURCE MANAGEMENT IN MADANMOHANPUR GRAM PANCHAYAT, WEST BENGAL

175. PROFILE ON HIGH GRADE CONTRACTOR

Tamil Nadu would provide to its residents, high quality infrastructure all over the State comparable with the best in the world

Economic Empowerment of Women through Self Help Groups

PVR 1 LIC HOUSING FINANCE LIMITED Area Office. House Construction VALUATION REPORT BY PANEL VALUER FOR HOME LOAN

PROJECT PROFILE PACKAGED DRINKING WATER / MINERAL WATER

PERFORMA P-47A. Action Plan. Name of work Estimated cost / Approval No. & Date ( Rs. In lacs) Sr. No. Likely date of completion

Thames Water key Messages for London Borough of Ealing 25 th October 2005

Guidelines for setting up of Block Resource Centres (BRCs) for National Rural Drinking Water Programme (NRDWP) and Total Sanitation Campaign (TSC)

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

Ground Water Surveys and Investigation

Corporate stewardship Partnering to Improve Agricultural practices. Mumbai Randhir Chauhan

Life cycle energy analysis of water use system in Ara river watershed

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2

Standard terms and conditions

WASH Activities in Host Community. Oxfam Host Community Humanitarian Department Jordan 2015

AMRITSAR CITY DEVELOPMENT PLAN. Appraisal Report (Summary)

2007 Operating Budget Capital Budget 2007 Proposed Water and Wastewater Service Rate

Rainwater Harvesting Systems Cernunnos Homes Version 1.0

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

Drainage. Information for those with problem drains

Climate and Disaster Resilience Index of Asian Cities

DRAFT MODEL BILL FOR THE CONSERVATION, PROTECTION AND REGULATION OF GROUNDWATER

4 Water supply description

Designed and produced by geo-graphicsdesign.com DP 300 3/02

9. SCHEME FOR DEVELOPMENT/ STRENGTHENING OF AGRICULTURAL MARKETING INFRASTRUCTURE, GRADING AND STANDARDIZATION

Vijaya, Maasi 5, Thiruvalluvar Aandu Read:

Dar es Salaam Masterplan Ministry of Lands, Housing and Human Settlements Development

Session 2: Hot Water Supply

ACCOUNTING FORMAT FINANCIAL YEAR : GRAMA PANCHAYAT : KOCHILAKHUNTA BLOCK : BADASAHI DISTRICT : MAYURBHANJ STATE : ODISHA

Bolton s Flood Risk Management Strategy

The Town of Lakeshore Basement Flooding Information to Residents

EOI No: NIELIT/SHL/ESDM/ /190/526 Dated: 18/02/2015 EXPRESSION OF INTEREST. Expression of Interest (EOI) For

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Pre- FEASIBILITY REPORT

PRE- FEASIBILITY STUDY REPORT

Development enquiry request

Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation

ACCOUNTING FORMAT FINANCIAL YEAR : GRAMA PANCHAYAT : MANGOBINDPUR BLOCK : BADASAHI DISTRICT : MAYURBHANJ STATE : ODISHA

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Water Recycles poster

LOI Ref. No.: N/2015/IN000263/HR./000008/1103/00008 Date :

No.6/4/118/2010-BETDG Government of India Ministry of New and Renewable Energy (Bio Energy and Technology Development Group)

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

(

2. Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA)

Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants

Gravity-fed schemes. Technical brief. Introduction

Pre- FEASIBILITY REPORT

Transcription:

WATER SUPPLY & SANITATION Puducherry region relies totally on ground water resources. Karaikal, Mahe and Yanam regions depends both on surface water and ground water. The system of water supply is bifurcated into two major system namely, the Urban Water Supply and Rural Water Supply. The Pondicherry population is being served with about 300 tubewells. The total water requirement of 100 MLD is supplied through these tubewells. Domestic need share 16% of total ground water consumption. In Puducherry region, the urban area is divided into 9 zones and due to fast urbanization and developmental activities the peripheral areas and unutilized area in urban limit has become pucca residential areas which has resulted in formation of sub zones. Institutional loan will be sought for take up augmentation for this new zones. Aftermath of Tsunami and continuous pumping of ground water, the TDS level in the tube wells are getting increased. In order to supply drinking water with low TDS level, community water supply system has been introduced in 19 locations. By this community water supply system Government is supplying water in 20 litres cans through treatment plants @ Rs.7/- per can. It is also proposed to provided infiltration wells / gallery along the Sankarparani river near Thirukanji. All the above infrastructure development, source augmentation from surface water from Oussudu tank and river infiltration wells/gallery will be taken up in a phased manner accordingly to fund availability. In Karaikal region all augmentation works to sources, distribution system etc, have been regularly carried out as the population of town is expanding. Construction of 5MLD treatment plant at river Arasalar, providing community water purifying system at various places, six lakh litre capacity over head tank at Puduthurai, three litre capacity over head tank at Melakaksakudy and erection of deep borewells at various places. In Mahe region works relating to improving and updating the existing water supply distribution system and also for providing water supply / public taps in internal roads /lanes / footpaths of Mahe town by extending the distribution lines will be taken up. 249

In Yanam region, a scheme for augmentation of water supply was There are 13 nos. of over head tanks in Yanam region. An extent of 5-36-00 Hectares of land had been acquired for increasing the storage capacity of ground level reservoirs, separate pumping mains and additional sumps and motors are proposed for increasing supply hours. Augmentation of water supply scheme from the reservoir of Sir Arthur Cotton Barrage at Dowleswaram, Andhra Pradesh is in progress. 250

OUTLAY AT A GLANCE Sector : WATER SUPPLY & SANITATION No. of Schemes : 4 Department : PUBLIC WORKS (` in lakh) Eleventh Plan 2007-12 Actual Expenditure : 33718.17 Annual Plan 2011-12 Actual Expenditure : 10690.80 Annual Plan 2012-13 Approved Outlay : 12697.81 Annual Plan 2012-13 Revised Outlay : 10738.14 Annual Plan 2013-14 Proposed Outlay : 11410.97 Sl. No. Name of the Scheme Eleventh Plan 2007-12 Actual Expdr. Annual Plan 2011-12 Actual Expdr. Approved Outlay Annual Plan 2012-13 Revised Outlay (` in lakh) Proposed Outlay Annual Plan 2013-14 Of which capital content (1) (2) (3) (4) (5) (6) (7) (8) 1. Rural Water Supply - Operation and Maintenance. 2. Urban Water Supply - Operation and Maintenance. 5480.97 1603.00 1910.00 1501.07 1262.74 591.89 26343.97 8895.14 9752.81 9151.83 9782.23* 5099.00 3. Urban Sanitation. 505.00 60.00 125.00 84.84 65.00 65.00 4. Purchase of machinery & equipments / acquisition of land 5. Grant to Panchayat for Rural Water Supply / Public Health & Rural Sanitation (LAD) 895.22 13.50 910.00 0.40 301.00 1.00 493.01 119.16 -- -- -- -- Total 33718.17 10690.80 12697.81 10738.14 11410.97 5756.89 * Inclusive of ` 3400 under negotiated loan. 251

Sector : WATER SUPPLY & SANITATION Implementing Department : Scheme No. 1 PUBLIC WORKS 1. Name of the Scheme : Rural Water Supply - Operation & Maintenance 2. Objective of the Scheme : Towards quality improvements of the existing water supply systems in the rural areas. Purchase of machinery and equipments for execution of water supply programme in the rural areas. 3. Actual Physical Achievements during Eleventh Five Year Plan (2007-12) : i) 29 nos. of works completed for augmentation of water supply. i Additional source of water 11nos. of works completed 37 nos. of generator set were purchased Sinking of new bore well 42 nos. of works completed v) Provide distribution line 32 nos. of works completed v vi Improvements to the existing water supply system 46 nos. of works completed 18 nos. of over head tanks were constructed 24 Nos. of sumps were constructed Face lifting and chemical treatment 7 works completed x) Providing and laying of DI pumping main 42 works x xi x 16 compound wall works 25 nos. of pump house were constructed 46 nos. of pump sets / motors were purchased Land acquired for the construction of over head tank and pump house. 4. Physical Achievements for the Annual Plan 2012-13: i) 6 nos. of works completed for augmentation of water supply. i Additional source of water 2 nos. of works completed 8 nos. of generator set were purchased Sinking of new bore well 14 nos. of works completed v) Provide distribution line 6 nos. of works completed Improvements to the existing water supply system 9 nos. of works completed 252

v 5 nos. of over head tanks were constructed vi 5 Nos. of sumps were constructed Face lifting and chemical treatment 1 work completed x) 3 compound wall works 5 nos. of pump house were constructed x 8 nos. of pump sets / motors were purchased xi Land acquired for the construction of over head tank and pump house. 5. Proposed Physical Targets for Annual Plan 2013-14: i) 5 nos. of works will be taken for augmentation of water supply i Additional source of water 2 nos. of works will be completed 6 nos. of generator set will be purchased Sinking of new bore well 13 nos. of works will be completed v) Provide distribution line 8 nos. of works will be completed v vi Improvements to the existing water supply system 12 nos. of works will be 5 nos. of over head tanks will be constructed. 5 nos. of sumps will be constructed. Face lifting and chemical treatment work will be x) Providing and laying of DI pumping main 9 works will be x xi x 3 nos. of works of compound wall will be constructed. 5 nos. of pump house will be 8 nos. of pump sets / motors will be purchased. Land will be acquired for the construction of over head tank and pump house. 6. Remarks : Continuing Scheme Scheme No. 2 Sector : WATER SUPPLY & SANITATION Implementing Department : PUBLIC WORKS 1. Name of the Scheme : Urban Water Supply - Operation and maintenance 2. Objective of the Scheme : To provide protected drinking water to urban areas by extension of water supply lines, augmentation of urban water supply sources by construction over head tanks / reservoirs, 253

sumps etc., Proper treatment of water for drinking water purposes. Setting up of water testing laboratories in order to improve the quality of water to the public. 3. Actual Physical Achievements during Eleventh Five Year Plan (2007-12) : i) Rehabilitation of Water supply System in Zone I/II/III/IV i Additional source of water finding 30 nos. of works Augmentation of Water Supply 24 nos. of work Construction of over head reservoir 18 nos. of works v) Distribution lines were provided & laid in 27 areas. v vi Distribution grid lines 30 nos. of works Purchased 30 nos. of 50 hp, 100 hp, 120 hp mechanical seal for pump set Purchased 29 nos. of submersible motor pumps Extended / improved in water supply facilities in 29 areas. x) Additional source of water 8 nos. of works x xi x xv) x xv 29 nos. of generator sets purchased Sinking of new bore well 41 nos. of works completed Improvements to the existing water supply system 39 nos. of works 5 over head tanks were constructed. 23 sumps were constructed. Face lifting and chemical treatment 5 nos. of work Providing and laying of DI pumping main 40 works xvi 35 nos. of compound wall works constructed. x xx) x 7 nos. of pump house constructed. Purchased 8 nos. of pump sets / motors Land acquired for the construction of over head tank and pump house. 4. Physical Achievements for the Annual Plan 2012-13: i) Rehabilitation of Water supply System in Zone in left out areas. Additional source of water finding 3 nos. of works i Augmentation of Water Supply 2 nos. of work Construction of over head reservoir 2 nos. of works v) Distribution lines were provided & laid in 3 areas. 254

v vi Distribution grid lines 3 nos. of works Purchased 3 nos. of 50 hp, 100 hp, 120 hp mechanical seal for pump set Purchased 2 nos. of submersible motor pumps Extended / improved in water supply facilities in 2 areas. x) Additional source of water 2 nos. of works x xi x xv) x xv 4 nos. of generator sets purchased Sinking of new bore well 4 nos. of works completed Improvements to the existing water supply system 8 nos. of works 1 over head tank constructed. 4 sumps were constructed. Face lifting and chemical treatment one work Providing and laying of DI pumping main 3 works xvi 4 nos. of compound wall works constructed. x xx) x 2 nos. of pump house constructed. Purchased 3 nos. of pump sets / motors Land acquired for the construction of over head tank and pump house. 5. Proposed Physical Targets for Annual Plan 2013-14: i) Rehabilitation of Water supply System in Zone I South & North will be i Additional source of water finding 5 Nos. of works will be Augmentation of Water Supply 4 nos. of work will be Construction of over head reservoir 5 nos. of works will be v) Providing & laying distribution line in 7 areas will be v vi Distribution grid lines 10 nos. of works will be 50 hp, 100 hp, 120 hp mechanical seal will be purchased. 5 nos. of submersible motor pumps will be purchased. Extending / improvements in water supply facilities in 10 areas will be x) Additional source of water 2 Nos. of works will be x xi 6 nos. of generator set will be purchased. Sinking of new bore well 13 nos. of works will be Improvements to the existing water supply system 12 nos. of works will be 255

x xv) x xv 1 no. of over head tank will be constructed. 5 nos. of sumps will be constructed. Face lifting and chemical treatment work will be Providing and laying of DI pumping main 9 works will be xvi 3 nos. of works for the construction of compound wall will be x xx) x 5 nos. of pump house will be constructed. 4 nos. of pump sets / motors will be purchased. Land will be acquired for the construction of over head tank and pump house. Negotiated Loan i) Rehabilitation of water supply distribution grid in Zone-I, Part-I (South) of Pondicherry Town. i Rehabilitation of Water Supply Distribution grid Laying new water pipe lines with in bouleward area in lieu of rusted and old pipes. Rehabilitation of Water Supply distribution grid in Zone-I, Part III (North) of Podicherry town. Rehabilitation of Water Supply distribution grid in Zone-I, Part-II (Central) of Pondicherry Town. v) Rehabilitation of Water supply distribution grid in Zone-I, Part-II (Central), Construction of OHT raising of sump and road restoration of Pondicherry town. Water supply scheme for Arumpathapuram, Manavely village, Thattanchavady and Odiampet, G.N. Palayam and adjouring areas of Oulgaret Commune, Puducherry for pumping main, distribution gril, OHT and sump. v vi Laying of gravity main, Cherukkai, Mahe. Augmentation water supply system at Sembiapalayam and Pudukuppam village in Nettapakkam village, Puducherry Augmentation of water supply system in Ariyankuppam and surrounding areas zone-iv x) Augmentation of water supply system in Ariyankuppam and surrounding areas zone-v Moolakulam JJ Nagar is alos proposed under Hudco Loan scheme submitted to Government for augmentation of water supply to Moolakulam nd adjoining areas. Japan International Cooperation Agency (JICA) projects i) Construction of 5 MLD Treatment Plant at Right Bank of Arasalar in Karaikal. Proposed Water Supply Scheme for Karaikal (Central, North and South zones). 256

i Under Ground Sewerage system at Karaikal town, Karaikal. 6. Remarks : Continuing Scheme Scheme No. 3 Sector : WATER SUPPLY & SANITATION Implementing Department : PUBLIC WORKS 1. Name of the Scheme : Urban Sanitation 2. Objective of the Scheme : To provide sewage and sanitation facilities in the urban areas. 3. Actual Physical Achievements during Eleventh Five Year Plan (2007-12) : i) Augmentation of Water supply in Zone III, IV & Zone VIII 24 works i Comprehensive of Water supply Scheme 25 works Extension of Water Supply pipe line 5 nos. of works Erection and commissioning of gen sets 3 nos. v) Deep borewells in 3 areas were v Replacing the old damaged distribution line 5 nos. of works Laying of DI pumping 4 works completed 4. Physical Achievements for the Annual Plan 2012-13: i) Providing and laying DI pumping main Box culvert 5 works completed i Extension of distribution grid 7 nos. of works 5. Proposed Physical Targets for Annual Plan 2013-14: i) Extension of sewerage facilities in left of areas of Puducherry/Karaikal/Mahe/Yanam 25 works will be Restoration of roads for Zone VI & VII and adjoining areas in Puducherry 25 works will be i 2 recharging ponds will be constructed. Sewerage farm at Lawspet will be set up. v) 25 nos. of approach road works will be constructed. 5 nos. of treatment plant constructed. 6. Remarks : Continuing Scheme 257

Scheme No. 4 Sector : WATER SUPPLY & SANITATION Implementing Department : PUBLIC WORKS 1. Name of the Scheme : Purchase of machinery & equipments / acquisition of land. 2. Objective of the Scheme : Purchase of machinery and equipments for the execution of water supply programmes implemented by this Sector. Apart from this, necessary land acquisition proposal for the construction of OHTs, Pump houses for various capacities and laying of distribution lines are carried out by means of land acquisition process with the approval only from the Govt. of Puducherry 3. Actual Physical Achievements during Eleventh Five Year Plan (2007-12) : i) Acquisition of temple land at Sudhana Nagar, Murungapakkam, Ramana Nagar near Velrampet Puducherry. i Acquisition of land for treatment plant for Ousudu surface water. Acquisition of land for underground reservoir at Muthirapalayam. Land acquisition for rain water harvesting structure at Pandakkal. 4. Physical Achievements for the Annual Plan 2012-13: i) Acquisition of land in RSNo.9/4, Reddiarpalayam revenue village for construction of collection well & pumping station for zonevi, Puducherry. i Acquisition of Land for construction of OHT and sum in Nainarmandapam, Kombakkam, Sudhagar Nagar. Acquisition land for sewerage scheme in Krishna Nagar. 5. Proposed Physical Targets for Annual Plan 2013-14: i) Acquisition of land for construction of OHT and sum in Nainarmandapam, Sudhagar Nagar will be taken up. Acquisition land for sewerage scheme in Krishna Nagar will be taken up. 6. Remarks : Continuing Scheme 258