The Phased Introduction of Free Route Airspace into DK/SE FAB



Similar documents
Pilot Briefing Stockholm/Arlanda

How To Design An Airspace Structure

European AIS Database Developments of the EAD. Peter Matern Head of European AIM Unit

European Route Network Improvement Plan

Stockholm Control Requirements

Safety and Airspace Regulation Group

AIP-SVERIGE/SWEDEN 8 APR 2010 AD 2 ESSA Common to all SIDs: Unless otherwise specified, climb to 5000 ft.

STOCKHOLM/ARLANDA AERODROME FMS/RNAV SID

Overview of NM and CDM

Local Single Sky ImPlementation (LSSIP) SWEDEN

UK AIRSPACE Introduction

NEFAB ANSP Programme Business Plan ANSCB meeting 12 October 2015

Key Points from CMAC/FUA Related Seminar/Workshop

ATFCM OPERATING PROCEDURES FOR FLOW MANAGEMENT POSITION

Pilot Briefing for Helsinki-Vantaa Real Flight Event

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

INTENTIONALLY LEFT BLANK

STOCKHOLM/ARLANDA AERODROME FMS/RNAV SID

Information to VFR pilots

Ref.: AN 13/2.5-09/45 19 June 2009

CCAMS CONTINGENCY PLAN. Network Operations

ATFCM USERS MANUAL. Network Operations

NORWAY AIP AIRAC SUP 14/15 EFF 20 AUG TEL:...(+47)

Accessing B2B Web Services. Writen and presented by BOUSQUET-HOURAT BERTRAND

The Total Economic Value. Its application to the Single European Sky 2nd Reference Period

Merging arrival flows without heading instructions

International Civil Aviation Organization. The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3)

Training program for S2 (TWR) rating

TRIGGER NOTAM PERM AIP AIRAC AMDT 11/2015 WEF 12 NOV

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

A presentation of the NM19.5 to Externals via video-conference took place on the 16 th of September 2015.

Comparison of Air Traffic Management-Related Operational Performance: U.S./Europe

International Civil Aviation Organization

Creating the Functional Airspace Block Europe Central

AGREEMENT BETWEEN THE PORTUGUESE REPUBLIC AND THE KINGDOM OF SPAIN ON THE ESTABLISHMENT OF THE SOUTH WEST FUNCTIONAL AIRSPACE BLOCK (SW FAB)

Use of Free Software in European Air Traffic Flow Management

European AIS Database

AIP GEN GREECE 19 SEP 2013 GEN 3.4 COMMUNICATION SERVICES (COM)

LETTER OF AGREEMENT BRATISLAVA / BUDAPEST APPROVED BY ISSUED ON VALID FROM VERSION NR. 1.3 ( ) VALID UNTIL WITHDRAWAL

AIRSPACE INFRINGEMENTS

AIR TRAFFIC FLOW MANAGEMENT (ATFM)

ADS-B NRA deployment by DSNA

Initial 4D Trajectory Management Concept Evaluation

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

CS5 EAIMS Call For Interest Technical annexe

ATFM STATUS REPORT: SOUTH AFRICA

Real Time Simulation Oslo ASAP

A day in the life of an aircraft operator


BALTIC FAB CONCEPT OF OPERATIONS F I N A L. WG1, 5 April 2012 Version 1.0

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

PF3 ATC at its best Version History

YART Yet Another Route Tool!

SUMMARY. This information paper summarises the status of Airport CDM Trial s and Implementation. RECOMMENDATION

Regional References on solution/ mitigation of FPL problems. (Presented by Secretariat) EXECUTIVE SUMMARY

SESAR BENEFITS: TOMORROW STARTS NOW

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB

LONDON SOUTHEND AIRPORT CLASS D CONTROLLED AIRSPACE GUIDE

EUROCONTROL WORKSHOP. Centralised Services: A closer look at the Flight Plan and Airport Slot Consistency Service (CS1) Andy Woollin

User Forum EUROCONTROL s Brussels HQ. 18 January 2011 CDM@CDG

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

NORWAY AIP AIRAC SUP 26/15 EFF 10 DEC TEL:...(+47)

Development and Validation of Procedures. ICAO PBN Seminar Development and Validation of Procedures

Official Journal of the European Union L 13/3

THE ICAO EUR/NAT OFFICE ROUTE DEVELOPMENT GROUP EAST (RDGE) (Presented by the Secretariat) SUMMARY

Flight Plan and related messages

Airspace classification change

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: ASD

Optimisation and Prioritisation of Flows of Air Traffic through an ATM Network

Adapting to air traffic growth in Europe

REVIEW OF AIP SUPPLEMENT. (Presented by Singapore) Attached is a copy of the AIP SUPP for review by the Meeting.

Australian Organised Track Structure (AUSOTS)

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

AIR TRAFFIC MANAGEMENT OPERATIONAL CONTINGENCY PLAN NORTH ATLANTIC REGION. First Edition

NETWORK MANAGER RELEASE NOTES

Polska Agencja Żeglugi Powietrznej Polish Air Navigation Services Agency

NFPL IMPLEMENTATION ATS OPERATIONAL ASPECTS

Local Single Sky ImPlementation (LSSIP) NORWAY

EUROCONTROL Training Activities 2013

ENR 5 NAVIGATIONAL WARNINGS

Performance-based Navigation and Data Quality

PCP Active ECAC FCM05 REG ASP MIL APO USE INT IND NM

North European Functional Airspace Block Avinor, Norway EANS, Estonia Finavia, Finland LGS, Latvia. NEFAB Project CHANGE MANAGEMENT MANUAL

Air Navigation Charges Services EUROCONTROL can provide

AIP AMENDMENTS POST INTRODUCTION OF AFPEX (ASSISTED FLIGHT PLAN EXCHANGE SERVICE) UK AIP ENR 1.10

Remote Tower Operations

A. Amendments to AMC/GM to Part-FCL

First ATC Support Tools Implementation (FASTI) Validation Plan

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August Federal Aviation Administration

Central Route Charges Office

ARN D4-1 Concept of Operations Arlanda Airport

PBN Aeronautical Charts and Procedure Design

How To Improve The Safety Of An Airplane

ATFM delay report July Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

IBAC Bulletin B00-2 Pacific Implementation of RVSM and RNP 10/50NM Lateral

Airspace E. update. Controlled airspace in which IFR and VFR traffic is permitted

Transcription:

The Phased Introduction of Free Route Airspace into DK/SE FAB Airspace User Forum 2012 Pontus Bengtsson NUAC A specific airspace within which users shall freely plan their routes between an entry point and an exit point without reference to the ATS route network. In this airspace, flights will remain subject to air traffic control

Background 2001 Eurocontrol 8 State Free Route Airspace Project 2005 New ATM system implemented in Sweden (Thales) 2006 First PM 2007 Free Route Airspace Sweden (FRAS) project 2007 New ATM system implemented in Denmark (Thales) 2009-2011 Implementation of FRAS Phase 1-4 2009 Implementation of FRA in Lisboa and Shannon airspace 2011 Free Route Airspace DK/SE FAB project 2011 Implementation of FRA DK/SE FAB

Phased Implementation Five Steps Step 1: Implemented April 2009 Swedish UIR N61 >FL285 only horizontal entry/exit To a large extent a flight planning exercise. Gives a possibility to evaluate MIL Ops concept and gain experience of impact on ATC systems, adjacent countries etc. Enable deviation from Doc. 4444 recommendation for a point every 30 min/200 NM.~30 flights/day affected. Step 2: Implemented May 2010 Whole Swedish UIR >FL285 only horizontal entry/exit Gives a possibility to the concept in a medium density environment. Allows X-border dct as ATCC ESOS/MM is within one FIR but two different AoR:s with separate FDP:s. Estimated 500 flights/day

Phased Implementation Five Steps Step 3: Implemented Dec 2010 Swedish UIR N61 >FL285 including climbing/descending through FRAS Area Floor Gives an opportunity to evaluate access to FRAS area for climbing/descending traffic from non Major TMA AD. Estimated 700 flights/day. Step 4 : Implemented May 2011 Swedish UIR >FL285 including climbing/descending through FRAS Area Floor Includes traffic to/from Major TMA AD and the medium density environment. Estimated 1800 flights/day.

Phased Implementation Five Steps Step 5 : Implemented Nov 2011 Danish FIR & Swedish UIR >FL285 including climbing/descending through FRAS Area Floor Full implementation in DK/SE FAB Airspace Includes traffic climbing/descending through FRA Area Floor. Allows X-border dct as EKDK ACC/ATCC ESOS/ATCC MM is within one FAB but has separate FDP:s. Estimated 2300 flights/day.

Savings

ASM Denmark D-1 Preplan: Denmark has CDR1, CDR2 and CDR3. D-1 pre-planning with regard to availability to CDR are done according to the FUA concept. Closure of TSAs will be managed via CIAM, which generates a reject to AOs. Anchor points published around TSAs, which makes it possible to flightplan around TSAs Day of Operation: In activated TSAs OAT operations have priority and GAT cannot penetrate. When TRAs are active FL285+ GAT can be coordinated through via restricting OAT operations in levels or areas.

ASM Denmark

ASM Sweden The entire Swedish FIR is covered with MIL exercise areas with the exception Stockholm, Göteborg and Malmö TMA MIL exercise areas are normally available all levels with two limitations: ATS Routes between Sthlm Gbg - Malmö TMA and Sthlm Oslo TMA Strategic agreement with Air force normally avoids certain areas during peak hours

ASM Sweden D-1 Preplan: Sweden has CDR1 and CDR2. D-1 pre-planning with regard to availability to CDR are done according to the FUA concept. Major traffic flows are not CDR2. Day of Operation: 30 min prior to activation of a MIL exercise area ATCC is informed about the request. This information is put into the ATC system and made available to the controllers. This 30 min prior notification enables ATC to clean up the airspace. Priority Rules: In an activated MIL exercise area Mil has priority except for traffic on ATS-routes that penetrates the area (in FRA environment along an available ATS-route) These flights are up to coordination how to fly through the area. Agreed maximum of 20 NM in total will not exceed what is available via ATS route.

ASM Sweden Permanent ATS route CDR2 CDR1 Published route extension

Horizontal Connectivity Cross border within DK/SE FAB: It is not required to insert FIR BDR point between Köpenhamn FIR and Sweden FIR/UIR. More or less the same ATC system in Denmark and Sweden but the contents in the FDPs are local (EKDK/ESMM/ESOS). Messages exchanged via OLDI. Cross border to/from DK/SE FAB FRA Area: Required to insert FIR BDR point between DK/SE FAB and neighbouring airspace (due to CFMU Path Finder).

Two categories of aerodromes: ADs connected to non Major TMAs Vertical Connectivity ADs connected to Major TMAs being Stockholm, Göteborg Malmö/Köpenhamn/Halmstad, Östgöta and Oslo/Farris TMA FRA Departure/Arrival Transition Point for ADs connected to non Major TMAs SID/STAR final/initial waypoint is Transition Point to FRA operations or if no suitable SID/STAR a point within 25/50/100 NM from AD FRA Departure/Arrival Transition Point for ADs connected to Major TMAs. Flightplan according to description in AIP either via SID/STAR final/initial waypoint or via transit routes.

Vertical Connectivity / Transit routes for dep from ESSA Via RESNA SID RESNA - dct Via NOSLI SID NOSLI N850 ABAMA dct or NOSLI N850 TONSA L87 VIBAR dct

Vertical Connectivity / Transit routes for arr to ESSA Via ELTOK STAR DETSO N873 ARS Y36 ELTOK or Dct ELTOK (if trajectory north of PELIT) Via TRS STAR MIKNA N851 TRS or VIBAR Z330 TRS alt VIBAR L87 PELUP N851 TRS or ARMOD M607 TRS or ROGMI M996 TRS

RAD 3 categories ADs Within TMA - NIL Within Transit Point Required SID/STAR Outside Transit Point Required Transit Route + SID/STAR

Next step FRA in Sweden on trial basis until November 2013, in Denmark no such restriction 2013 New Safety Assessment and Impact Study prior to decision to permanent FRA DK/SE FAB Decision whether to keep ATS routes above FL285 or not Common FRA Area with neighbours?