PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS



Similar documents
Digital Energy ITI. Instrument Transformer Basic Technical Information and Application

CAPACITOR BANK TESTING SWP

SELECTION, APPLICATION AND MAINTENANCE

Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / SC / SC / 1250SC / 1600SC / 1800SC / 2000SC

Water Pump Replacement

3.0 CHARACTERISTICS. AR Auxiliary Relay High Speed, High Threshold C

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) J. Instruction Leaflet

Essential Electrical Concepts

Current Transformers. Bonneville Power Administration. Steve Laslo For the Hands On Relay School (3-12) Revision 1.1. February 21,

Tasarım ve Baskı: AJANSBRAND A

Tamini is the leading Italian company in the world for the design and production of industrial, power and special transformers.

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

ANALOG AND DIGITAL METERS ANALOG VS. DIGITAL METERS VOLTMETERS ANALOG AND DIGITAL

SECTION ELECTRICAL ACCEPTANCE TESTS

12-Volt Negative Ground Installation Instructions

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

Current & Instrument Transformers

Fig. 1 Analogue Multimeter Fig.2 Digital Multimeter

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

A.Y. McDonald Mfg. Co. Troubleshooting Submersible and Jet Pumps

The Charging System. Section 5. Charging System. Charging System. The charging system has two essential functions:

BUGGY SETUP GUIDE. Volume GOKARTSUSA GY6 150, CN250. Buggy Setup Guide

INSTALLATION GUIDE LOW VOLTAGE TRANSFORMER

TROUBLESHOOTING PRELIMINARY

12 Volt 30 Amp Digital Solar Charge Controller

Quickie Rhapsody Service Manual

CruzPro VAF110. AC Volts, Amps, Frequency, kw Monitor

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS

VOLTAGE REGULATOR AND PARALLEL OPERATION

understanding medium frequency induction melting furnace and its components

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

2740 Whitten Rd Bldg 103 Memphis, TN Telephone

PHYSICS 111 LABORATORY Experiment #3 Current, Voltage and Resistance in Series and Parallel Circuits

OVERCURRENT & EARTH FAULT RELAYS. To study the protection of equipment and system by relays in conjunction with switchgear.

Type SA-1 Generator Differential Relay

Electrical Practices for Construction Work

Troubleshooting Guide, Freedom and Fleet Power Inverter/Chargers

SELECTION, APPLICATION & MAINTENANCE

Underground Storage Tanks

Unit 24: Applications of Pneumatics and Hydraulics

CSA Z32 TESTING GUIDELINE AND PROCEDURES

Air Vantage 500 Kubota

Elektromotoren und Gerätebau Barleben GmbH

GROUND DETECTION CIRCUITS FOR STATIONARY APPLICATIONS (IN PLAIN DOWN TO EARTH LANGUAGE)

Technical Specification for Oil insulated Transformers U m < 24 kv up to 1250 kva

EVC40 EMERGENCY VOICE COMMUNICATION SYSTEM

T Substation Maintenance and Commissioning Test Equipment

SPECIFICATIONS OF STATCOM TRANSFORMER (FOR 2.5 MVAR STATCOM)

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

Experiment NO.3 Series and parallel connection

TROUBLESHOOTING ABS DIAGNOSTIC CODES L20293, Rev. 1/13

HM-W536 Install Guide

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

Takfan Machinery and Mould Co Ltd. Plug in Bushing. LV Monoblock. RMU Bushing. 4 Way CT Terminal.

Circuit Breakers. NRC Series. NRC Series

DC LOAD TESTING Gian Trento June 18 th, 2004

PSS10H/B PSS12H/A ILLUSTRATED PARTS LISTS

SWITCH YARD OPERATION IN THERMAL POWER PLANT(KaTPP Jhalawar Rajasthan)

SERVICE MANUAL RESIDENTIAL ELECTRIC AND LIGHT DUTY COMMERCIAL ELECTRIC WATER HEATERS. Troubleshooting Guide and Instructions for Service

UNITED ARAB EMIRATES FEDERAL ELECTRICITY AND WATER AUTHORITY

A Guide to Transformer Winding Resistance Measurements

Automatic Transfer Switch FT-10 Network Control Communications Module (CCM-T) Kit

Step Voltage Regulators

TROUBLESHOOTING GUIDE

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

Current Transformers Ratio / Polarity / Types

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original

INSTALLATION & SERVICE MANUAL. Display Panel

FUEL-16, Troubleshooting Fuel Supply Problems

11. COOLING SYSTEM 11-0 COOLING SYSTEM BET & WIN 50

Elektromotoren und Gerätebau Barleben GmbH

Technical data. Danfoss DHP-A

WINDING RESISTANCE TESTING

Draining and filling cooling system

GUIDE FOR TESTING POWER TRANSFORMERS

GEET Fuel Processor Plans

Sport Ice Elektro 124

SALVAGING FLOOD DAMAGED ELECTRICAL EQUIPMENT

ELECTRIC INSTANTANEOUS WATER HEATER

LG Air Conditioning Multi F(DX) Fault Codes Sheet. Multi Split Units

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

Practical Transformers: Operation, Maintenance and Testing

2. INDUCTIVE VOLTAGE TRANSFORMERS Oil-paper insulation Gas insulation

Druck PV 62x pneumatic/hydraulic pressure stations

HIGH VOLTAGE CALCULATIONS / EVALUATIONS. West Virginia Office of Miners Health, Safety & Training

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016

REMOVAL AND INSTALLATION

Current, Resistance and Electromotive Force. Young and Freedman Chapter 25

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

SERVICE SERVICE MANUAL FOR ALDE ELECTRICAL HEATER

HG600/HG800. Hydro-Power Unit. Installation and Operation Guide

E E V R E - R S - O S L O A L R

Parts Manual. TWIN 2 & 3 Parts & Accessories F210846R01. Your efficiency is our Challenge!

BATTERY SERVICE. This Automotive Series BATTERY SERVICE has been developed by. Kevin R. Sullivan. Professor of Automotive Technology Skyline College

32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw

Magnetic and Hydraulic-Magnetic Circuit Breaker 8340-G2...

OPERATING AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL SE

Transcription:

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values a) For 33/11 KV Power Transformer 2500 V megger is to be need. b) Power Transformer neutral Earthing is to be disconnected. c) Line terminal of the megger is to be connected to one of the HV Bushings of Power transformer and Earth terminal of megger is to be connected to Power transformer Body Earth Point. IR Values are to be read on the megger by meggering the Power transformer i) The above Value is to be noted as HV to Body ii) Then IR Value between LV terminal and body of Power transformer is to be measured & noted. ii) IR Values between HV & LV terminals are to be measured & noted. iv) The temperature of transformer oil at which the IR Values are measured is also to be noted. v) Particulars of megger is also to be noted. The maximum value shall be 60MΩ at 60 0 C temperature for transformer which are in service. For new transformer the value obtained shall be tallied with manufactures test results. 2. D.C. Resistance or Winding Resistance The Resistance of HV winding LV winding between their terminals are to be measured with precision milli ohm meter/ micro ohm meter. HV side RY= YB= BR= LV side ry = yb = br = rn = yn= bn = The values shall be compared with original test results. 3. Turns Ratio Test With turns Ratio meter, turns Ratio between HV & LV windings at various taps to be measured & recorded. At normal tap for 33/11 KV Delta/Star transformer the turns turns ratio is 5.196. At other taps values will be as per the percentage raise or lower at the respective tap positions. - 1 -

4.Voltage Ratio Test When Turns Ratio meter is not available, Voltage Ratio Test is done at Various tap position by applying 3 phase LT(415V) supply on 33 KV side of Power transformer. At Various taps applied voltage and Resultant voltages LV side between various Phases and phases& neutral measured with precision voltmeter & noted. 5. Short Circuit Test The four terminals on LV side of Power transformer are shorted with 50 sq. mm. copper cable. Three phase LT supply is applied on HV side of power transformer at normal tap and currents measured in all the phases on HV side and phases & neutral on LV side values noted. The Resultant HV & LV currents areas follows:- HV side current LT Voltage applied on 33 KV side of PTR X Rated HV current in all Phases = 33000 X Impedance Volts / 100 of PTR LV side phase LT Voltage applied on 33 KV side of PTR X Rated LV current Current in all phases = 33000 X Impedance Volts / 100 of PTR LV side neutral current shall be zero or less than 1.0 amp. 6) Magnetic Balance Test 415V, Two phase supply is to be applied to any two phases terminals on HV side of Power transformer and voltages in other two phase combination are to be measured. Sum of the Resultant two values shall be equal to the voltage applied. RY YB BR Result a) V (415 V) V 1 V 2 V= V 1 + V 2 b V 1 V (415 V) V 2 V= V 1 + V 2 ) c) V 1 V 2 V (415 V) - 2 -

7. Vector Group Test Connect HV side R Phase terminal to LV side R Phase terminal of Power transformer. Apply 3Phase 415 V supply to HV side of Power transformer. Measure Voltages between various terminals as follows. R,r n y b B Y Voltages between Rn ; Yn ; RY Voitages between Yb ; Yy ; Voltages between Bb ; By ; V RY = V RN + V YN V Yb = V Yy V Y b > V Bb 8. BDV Test of Oil Oil samples from top oil & bottom oil of Power transformer main tank as well as OLTC tank are to be collected and tested. Across 2.5 mm gap test Kit, The oil shall stand for KV For/ minute. 9. Magnetization Current Three phase LT Voltage of 415 V applied on HV side of Power transformer and currents are to be measured with milli ammeter. 1 to 2 percent of rated full load Applied The value shall be = current of PTR X Voltage 33000-3 -

PRE COMMISSIONING CHECKS ON POWER TRANSFORMERS Check that 1) Top & Bottom valves of radiators are in open position 2) All drain valves are in closed position with dummy plates in position duly fitted with bolts & nuts 3) All filler valves in closed position with dummy plates in position duly fitted with bolts & nuts 4) No oil leakages from radiators, valves, dummies, top cover, inspection covers, oil level gauges etc. 5) Silica gel breather is in position with silica gel filled & oil in oil cup 6) The air path of silica gel breather is free with out any seals to holes of the oil cup 7) Equalizing valve of the interconnecting pipe of vent pipe to conservator tank is in open position 8) Top oil filling point of conservator tank is in closed position with cover duly bolted. 9) The valves on either side of Bucholtz relay are in open position. 10) Thermometer pockets on main tank top cover are having oil inside & Thermometer sensing bulbs are in position duly nuts fixed properly. 11) The double earthing of neutral of Power transformer is done as per standards. 12) The double earthing of body of Power transformer is done as per standards. 13) The oil levels in conservator tank, OLTC Conservator tank. 14) The operation of main Bucholtz relay & OLTC Bucholtz relay ( Trips &alarms to be checked) 15) Operation of Transformer alarms. 16) The operation of PRV to trip the breakers or operation of alarms 17) The vent pipe diaphragm is intact. 18) The lock pieces are provided, duly welded to base channels, for the support wheels of transformers (If wheels are provided) 19) Tightness of all bolts, nuts, clamps, jumpers etc. Before charging the PTR air is to be released from air releasing points of main tank cover of PTR, OLTC top cover, Bucholtz relays, radiators, bushings, (All releasing bolts, screws, valves shall be kept in position fully tightened after releasing air from respective points). Tests on Breakers A) I) Status of Breaker Open Measure IR values between IN & Out terminals Each limb of breaker shall be more than 3000 MΩ II) Status of Breaker Close Measure resistant of each limb by connecting IN & Out terminals to a precision Micro ohm meter. The values shall tally with manufacturer s test report. - 4 -

III) Status of Breaker Close Measure IR values between phase & Body ground terminal of breaker for all limbs the values shall be more than 3000 MΩ B) Opening time & closing time tests to be done on all limbs. The values shall tally with test results of the Manufacturer. C) As follows: a) IR values of current Transformers are to be measured. b) Polarity check on current transformers is to be made. c) Primary injection test on current transformer is to be done to check operation of relays functioning of meters. d) Secondary Injection test on relays is to be done. e) DC tests on breakers panel are to be done. f) Calibration of meters is to be done. g) D.C. interlock are to be tested. h) Check that all Jumpers, clamps etc. are in to CT i) Clean all the bushings. j) Ensure no leakages from the CTs. Tests on Potential Transformers A) IR value are to be checked with megger. B) Ratio test is to be done. C) Polarity check is to be done. D) Check that there are no oil leakages E) Clamps & Jumpers properly tightened. Tests on Lightening Arrestors a) IR value are to be checked. b) Jumper connection to be checked Other tests in a Sub Station a) Battery charger & Battery to be checked for proper operation b) Earth Resistance is to be measured & noted. c) Meggering of Bus Bars is to be done. d) Check the entire earthing system in the Sub Station is as per standards. - 5 -