MAHARASHTRA POLLUTION CONTROL BOARD



Similar documents
Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust


PRE FEASIBILITY REPORT

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

How To Conduct An Environmental Impact Assessment

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

CENTRAL WAREHOUSING CORPORATION (A GOVT. OF INDIA UNDERTAKING) REGIONAL OFFICE: CHENNAI.

PROCON. .engineering your dreams.

Environmental Management Plan

For Empanelment of Registered Firms of Chartered Accountants for. conduct of Audit of Accounts and also Physical verification

1 VEGETABLE OIL REFINERY. 1.1 Introduction

95. EMISSION LIMITS FOR NEW DIESEL ENGINES (UP TO 800 KW) FOR GENERATOR SETS (GENSETS) APPLICATIONS. Emission Limits (g/kw-hr) for

IMPLEMENTING ISO 14001:

Tender No. CWC/RO-CNI/H&T-MDU I & II (Adhoc) / / Date: Tender notice

List of Top 100 BSE and NSE Listed companies arranged by Sector

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency

Methodology for Solar Power Projects

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Environmental Protection Department March 2010

CBS PRE DATA MIGRATIONS STATUS REPORT,

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

Perspective Plan for Technical Education in Maharashtra State October, 2012

Registration of Contractors for Various civil & Mechanical Engineering related works at GSFC Baroda Unit.

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

KIRLOSKAR FIRE FIGHTING PUMPS AND PACKAGES

PLANT LOCATION AND LAYOUT

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

VEGETABLE OIL REFINERY

GUIDANCE NOTES FOR WASTE MANAGEMENT

TENDER FOR INSTALLATION OF TEA/COFFEE VENDING MACHINES AND SUPPLY OF MATERIALS/CONSUMABLES AT CORPORATE OFFICE, GURGAON

Proposed Terms of Reference for EIA studies

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) AIR QUALITY DIVISION (AQD) ANNUAL REPORT - FISCAL YEAR 2002 (FY02)

Prof. Shyam R. Asolekar Centre for Environmental Science and Engineering Indian Institute of Technology Bombay Powai, Mumbai

El Paso Water Utilities Public Service Board. Application for Renewal Industrial Wastewater Discharge Permit

Greening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment

FLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management

For circulating the vacancy among Government Officers. (अज त क म र /Ajit Kumar ) Under Secretary to the Govt. of India

STAR HOUSE, 1 st FLOOR, PREMISES DEPARTMENT C- 5, G -BLOCK, BANDRA KURLA COMPLEX BANDRA (EAST), MUMBAI TENDER DOCUMENT FOR

New York State Department of Environmental Conservation 625 Broadway, Albany, NY Environmental Self Audit For Small Businesses

Computerisation of Land Records

SECTION-I. Mysore /Division / NOTICE INVITING TENDER

SULFUR RECOVERY UNIT. Thermal Oxidizer

TV18 Broadcast Limited

TENDER NOTICE. Tender for Printing of Calendars Wall Calendars, Desk Calendars & Date Calendars

Our Environmental Protection Plan RECYCLING CAPABILITIES AND ENVIRONMENTAL ACCOMPLISHMENTS

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

PROJECT PROFILE. Product : Red Iron Oxide. Product Code : 24117, Quality Standard : IS : 44 : 1991 IS : 05 : 1994

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

HINDUSTAN ORGANIC CHEMICALS LIMITED ( A Government of India Enterprise) Harchandrai House, 81, Maharshi Karve Marg Marine Lines, Mumbai

Dated 14 July, Director (A&F) NHIDCL

Environmental Management Systems in Hotels. 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel

BEFORE THE HARYANA ELECTRICITY REGULATORY COMMISSION BAYS NO , SECTOR 4, PANCHKULA HARYANA

Unscientific Hazardous Waste Disposal Site

Roha Residential Plots

TAMIL NADU POLLUTION CONTROL BOARD FORM I

Table 1.1: Typical Characteristics of Anaerobically Digested Wastewater

Environmental Initiatives in Supply Chain Institute for Supply Management Southeast Michigan Meeting April 10, 2014

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh

No. 22/9/2009-NSM (ST) भ रत सरक र/ Government of India नव न और नव करण य ऊर म त र ऱय / Ministry of New & Renewable Energy ***** Office Memorandum

Planning, Designing, Monitoring and Inspection of Wastewater Treatment Systems of Industries

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

REPUBLIC OF THE PHILIPPINES DEPARTMENT OF FINANCE BUREAU OF INTERNAL REVENUE Quezon City REVENUE MEMORANDUM ORDER NO

MUMBAI PORT TRUST. Invites applications from SC/OBC candidates for the following posts on regular/contract basis:-

KPMG Flash News 18 February 2011

ALL MEMBERS OF PRIZE PETROLEUM COMPANY LIMITED

Introduction to Waste Treatment Technologies. Contents. Household waste

Report on Oil Spill in Arbian Sea

Water Efficiency. Water Management Options. Boilers. for Commercial, Industrial and Institutional Facilities. Boiler Water Impurities

BEFORE THE ADJUDICATING OFFICER SECURITIES AND EXCHANGE BOARD OF INDIA [ADJUDICATION ORDER NO. AO/SM-LS/ERO/10/2016]

Permitting of Development and Infrastructure Projects in Abu Dhabi

Dy. General Manager (Information Technology)

ASME QRO Certification Program

Is India s petrochemicals industry poised for a boom?

at a disposal site for which a permit has been issued; or

Selected industries in Pimpri-Chinchwad area Sl. No.

Revised April (May) 2015

SAIL BOKARO STEEL PLANT ENVIRONMENT CONTROL DEPARTMENT

DIRECTORATE OF AIR TRAFFIC MANAGEMENT RAJIV GANDHI BHAWAN, NEW DELHI [File No. AAI/20012/131/2012-ARI (NOC)]

CHILLY AND TURMERIC POWDER

ALLIED PRINTING SERVICES, INC. CORPORATE SUSTAINABILITY AND ENVIRONMENTAL MANAGEMENT PROGRAM REPORT

English. Miba Friction Group

TABLE OF CONTENT

Software Technology Parks of India

Marsa Thermal Treatment Facility Yearly Emissions Statement

Energy and Cost Analysis in Pulp and Paper Industry by Auditing Techniques: A Case Study

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY

TRAINING SECTION FREQUENTLY ASKED QUESTIONS

BRIEF REPORT ENGINEERING SECTOR IN INDIA. January 2015

voestalpine Stahl, Linz, Austria Maximized Emission Reduction Of Sintering SIMETAL CIS MEROS plant Metals Technologies

Use of Substitute Fuels in Large Combustion Plants (LCPs)

COMPLIANCE MANAGEMENT STRATEGIES. Presented by: Megan Kazmierczak, ECS Eclipse

Sandoz Private Limited 10/22/15

EOI - Empanelment of Vendors for Load Testing. Expression of Interest (EOI) Empanelment of Vendors for Load Testing

Transcription:

MAHARASHTRA POLLUTION CONTROL BOARD Minutes of 14 th Appraisal Committee Meeting of 2015-2016 held on 02.02.2016 at 2.30 p.m. at 2 nd floor, Mantralaya Annexe, Mumbai-400 032.. The Appraisal Committee meeting of the Board was held on 02.02.2016. Following members of the Appraisal Committee were present: 1. Smt. Malini Shankar, Chairperson Addl. Chief Secretary, Environment Dept., Government of Maharashtra and Chairperson, MPCB, Mumbai. 2. Shri. Dr. P. Anbalagan Member Member Secretary, MPC Board, Mumbai 3. Shri. P. P. Nandushekhar, Member Technical Advisor (environment), MIDC, Mumbai Shri. Gautam Chatterjee, Additional Chief Secretary, Home (Transport) Dept., Mumbai, Shri. Rakesh Kumar, Scientist & Head, NEERI, Mumbai & Shri. P. K. Mirashe, Assistant Secretary (Technical), MPC Board, Mumbai could not attend the meeting. Leave of absence was granted to them. Following Officer of MPCB were present for the meeting: 1. Shri. Y. B. Sontakke, Joint Director (WPC), MPCB, Mumbai Special Invitee 2. Shri. V. M. Motghare (Joint Director (APC), MPCB, Mumbai Special Invitee 3. Technical Advisor, MPCB, Mumbai, The meeting thereafter deliberated on the fresh agenda items (Book-let no 31 (Part-I & II) & 32 (Part-I, II, III & IV) & 33) placed before the committee and following decisions were taken. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 1 of 32

Booklet 32 (Part - III) Fresh cases (Industry) 91 Uttam Value Steels Ltd. ( Cold Rolled Unit)., Bhugaon Link Road, Tal & Dist Wardha Renewal with increase e in CI 28.02.2020 It was decided to grant renewal of with increase in capital investment by imposing following conditions. 1. Industry shall submit BG of Rs. 10 lakhs towards O&M of pollution control system. shall be issued after submission of requisite fee. 92 Hindustan Platinum Pvt. Ltd., TTC Industrial, Navi Mumbai of two s and their amalgamation 30.04.2018 It was decided to grant renewal of of two s and their amalgamation with increased CI by imposing following conditions. 1. Industry shall extend the existing BG of Rs. 5 lakhs towards O&M of pollution control system. 2. Industry shall extend the existing BG of Rs. 2 lakh towards carryingout the performance audit of air pollution control equipments from renowned institute like NEERI or IIT. 3. The is issued as per the letter issued by CPCB to the industry dated 23.12.2015 regarding issuance of for enhanced capacity. shall be issued after submission of requisite fee. 93 Mahindra & Mahindra Ltd. (Tractor Div.), Akurli Road, Kandivali, Mumbai (increase in CI) 30.09.2020 It was decided to grant renewal of with increased CI by imposing following conditions. 1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards O&M of pollution control system. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 2 of 32

shall be issued after submission of requisite fee. 94 Epcos India Pvt. Ltd.,Plot. E - 22/25 MIDC Satpur, Dist - Nashik. 95 JSW Steel Coated Products Ltd., 176, 180/1/2/3/4/5/6/7/8/9/1 0, 271, 272, 273, Vashind, Tal Shahapur, Dist Thane Amendment in Existing with increase in CI 28.02.2017 It was decided to grant amendment in existing for replacement of DG sets with capacity 600 & 380 KVA to 1010 & 100 KVA respectively with following conditions; 1. All other conditions in the existing shall remain unchanged. 28.02.2021 It was decided to grant with increase in by imposing following conditions; 1. Industry shall send spent HCL acid to authorized Acid recovery plant in case of their ARP shutdown or operational problems. 2. Addition of stacks-4 Nos. for Galvanizing section, 2 Nos. for Thermopacks and include 4 Nos. waste heat recover boilers. 3. Industry to extend the existing BG of Rs. 10/- Lakhs for O & M of pollution control systems. It was decided to return back the BG of Rs. 2/- Lakhs obtained against increase of stack height as the industry has complied the same 96 Endurance Technologies Pvt. Ltd., (Disc Brake Division), K-226/2. MIDC Waluj, Aurangabad with increase in CI shall be issued after submission of requisite fee. 28.02.2020 It was decided to grant renewal of with increase in capital investment by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 5/- Lakhs towards O & M of pollution control system 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 3 of 32

shall be issued after submission of requisite fees 97 Ultratech Cement Ltd., Unit 1 & 2, Hotgi Cement works, Near Hotgi Railway station, At Hotgi, Tal South Solapur, Dist Solapur. 98 RSB Transmission (I) Ltd., Gat 908 Nagar Road, Village Sanaswadi, Tal Shirur, Dist Pune with increase in CI with increase in CI 31.10.2020 It was decided to grant with increase in CI by imposing following conditions; 1. BG of Rs. 5/- Lakhs from BG of Rs. 10/- Lakhs obtained for O & M of pollution control systems to be forfeited & top up BG of Rs. 10/- Lakhs to be submitted to make total BG of Rs. 15/- Lakhs for O & M of pollution control systems (source). 2. Industry to submit fresh BG of Rs. 5/- Lakhs towards control of fugitive emissions. shall be issued after submission of requisite fees 28.02.2021 It was decided to grant with increase in CI by imposing following conditions; 1. Industry is allowed to for 24 hrs as SRO has reported compliance of ID issued by the Board. 2. BG s of Rs. 3/- Lakhs, Rs. 5/- lakhs & Rs. 2/- Lakhs obtained for compliance of ID may be released as SRO has reported compliance of the same. 3. Industry to submit BG of Rs. 5/- Lakhs for compliance of noise limit at night time. 4. BG of Rs. 5/- Lakhs obtained against O & M of pollution control systems shall be forfeited as stack, ambient & JVS reports are exceeding the ed limit & obtain top up BG of Rs. 10/- Lakhs for O & M of pollution control systems. shall be issued after submission of requisite fees 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 4 of 32

99 Perkins India Pvt. Ltd., G-1, Additional Shendra, Aurangabad 100 Elringklinger Automotive, G-2, MIDC Ranjangaon, Pune 101 Cipla Ltd., MIDC, Kurkumbh, Pune (decrease in CI) (increase in CI) 30.09.2020 It was decided to grant renewal of with decreased CI and water budget as per by imposing following conditions. 1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards O&M of pollution control system. shall be issued after submission of requisite fee. 30.04.2020 It was decided to grant renewal of with increased CI & water budget, Fuel quantity, HW & Non-HW quantity by imposing following conditions 1. Industry shall submit the fresh BG of Rs. 10 lakh towards O&M of pollution control system and return the existing BG of Rs. 5 lakh as BG was not valid. 2. Industry shall upgrade the existing STP of adequate capacity to treat the domestic effluent so as to achieve the ed standards within 03 months and submit the BG of Rs. 5 lakh towards compliance of the same. shall be issued after submission of requisite fee. 30.04.2020 It was decided to grant renewal of by imposing following conditions: 1. Industry shall submit the BG of Rs 5 lakh for O & M of Pollution Control System. 2. Industry shall carryout hazardous waste audit from renowned institute such as NEERI, IIT, ITC etc within a period of 3 months and submit a BG of 2 lakhs towards the same. shall be issued after submission of justification of increase in CI. and requisite fee. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 5 of 32

102 Raymond UCO Denim Pvt. Ltd., C-1, MIDC Lohara, Yavatmal 1st to for expansion of new spin flash dryer & 1st to for expansion of captive power plant from 5 MW to 6 MW with renewal of of unit C-1 & their amalgamation with Unit C-4 with increased CI 31.01.2019 It was decided to grant 1st to for expansion of new spin flash dryer & 1st to for expansion of captive power plant from 5 MW to 6 MW with renewal of to of unit C-1 & their amalgamation with Unit C-4 with increased CI by imposing textile BG regime and following conditions:- 1. This is issued with overriding effect over previous issued by the Board vide no MPCB/15/025080 dated 04.03.2015. 2. Industry shall extend the BG of Rs. 10 lakhs towards Operation & Maintenance of the Effluent Treatment Plant to achieve disposal standards. 3. Industry shall extend the BG of Rs. 5 lakhs towards Operation and Maintenance of Air Pollution Control Devices to achieve emission standards. 4. Industry shall extend the BG of Rs. 2.25 lakhs towards compliance of Hazardous Waste as per the HW (M, H & TM) Rules, 2008 such as Storage (Proper Cover, leachate collection system, not exceeding 90 days storage etc), Mode of disposal, and maintaining records 103 NOCIL Ltd, C-37, MIDC TTC Indl area, Pawane village, NaviMumbai shall be issued after submission of requisite fee and letter of MIDC regarding amalgamation of plot no C-1 & C-4. 28.02.2020 It was decided to grant renewal of with increased CI by imposing following conditions. 1. Industry shall submit the BG of Rs 10 lakhs towards O & M of Pollution Control System. (increase in CI) 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 6 of 32

shall be issued after submission of requisite fee 104 Reliance Industries Ltd. (Polyester Div.), Plot B-4/5, Patlaganga Khalapur, Dist. Raigad 105 ITC Ltd., Plot B-27, MIDC Ranjangaon, Tal. Shirur, Dist. Pune. 106 Castrol India Pvt Ltd, Patalganga, Raigad to Operate (increase in CI) 30.11.2017 It was decided to grant renewal of by imposing following conditions: 1. Forfeit BG of Rs 5 lakh obtained towards O & M of PCS as the JVS results are exceeding and top-up BG of RS 10 lakh towards O & M of PCS. 2. Industry shall submit BG of Rs 4 lakh towards submission of treatability study within 3 months 3. M/s REL-Polyester shall treat the effluent coming from M/s REL, LAB. shall be issued only after submission of BG s as per decision of CAC and directions. 30.11.2021 It was decided to grant to Operate with increase in CI by imposing BG of Rs. 5 Lakh towards O & M of pollution control systems. shall be issued after obtaining additional fees. 31.08.2020 It was decided to grant renewal of by imposing following conditions. 1. Industry shall submit the BG of Rs 5 lakh towards O & M of Pollution Control System. shall be issued after submission of year-wise increment of CI and requisite fee. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 7 of 32

107 JSW Steel Ltd., (Sinter Plant-I), Geetapuram, Dolvi, Tal Raigad 108 Dow Agro Sciences, Plot A-1, MIDC Lote, Chiplun 109 Glenmark Pharmaceuticals, Shendra, Aurangabad Amendment in existing 31.12.2018 It was decided to grant by imposing following conditions: 1. Industry to extend the existing BG of Rs. 5/- Lakhs for O & M of pollution control systems. 2. This is issued without prejudice to the order passed or being passed in any legal proceedings subject to compliance of environmental norms & various statutory permissions as well as conditions stipulated in. shall be issued after obtaining addl requisite fees from the industry 30.06.2016 It was decided to grant amendment in for deletion of chloropyrifos technical and other two products and addition of three pesticide formulation product and by imposing following conditions: 1. Industry shall submit BG of Rs 5 lakh towards O & M of Pollution Control System. 2. SRO shall monitor the industry to check the water budget for four months and submit the report to CAC. 3. is issued with the overriding effect of earlier granted by the Board dated 30.01.2012 shall be issued after submission of requisite fee. 30.04.2020 It was decided to grant renewal of by imposing following conditions: 1. Industry shall extend the BG of Rs. 5 lakh towards O & M. of pollution control system. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 8 of 32

shall be issued after submission of requisite fee. 110 BEL Optronic Devices Ltd., EL-30, J Block, MIDC Bhosari, Pune 111 Bharat Bijlee Ltd., Plot No 2, MIDC Airoli, Navi Mumbai (Increase in CI) (Increase in CI) 30.04.2020 It was decided to grant renewal of with increased CI by imposing following conditions 1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards provision of 100% recycle/reuse of all treated trade effluent into the process. shall be issued after submission of requisite fee. 30.04.2020 It was decided to grant renewal of with increased CI by imposing following conditions. 1. Industry shall extend the existing BG of Rs. 8 lakh obtained towards O&M of pollution control system. shall be issued after submission of requisite fee. 112 Deepak Fertilizers & Petrochemicals Corp, JNPT, Uran 113 Asahi India Glass Ltd, T-7, Taloja. (Increase in CI) (Increase in CI) 30.06.2020 It was decided to grant renewal of with increase in CI by imposing following conditions 1. Industry shall extend the BG of Rs 5 lakhs obtained towards O & M of Pollution Control System. shall be issued after submission of requisite fee. 30.06.2020 It was decided to grant renewal of with increased CI only for Energy efficient glasses = 3000 MT/M by imposing following conditions. 1. Industry shall extend the BG of Rs 5 lakhs towards O & M of Pollution Control System. 2. Industry shall obtain specific permission to restart the production of Float glasses = 15000 MT/M from the Board and 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 9 of 32

amend the accordingly. shall be issued after submission of requisite fee. 114 Lubrizol India Pvt. Ltd, Turbhe, Navi-Mumbai (Increase in CI) 31.01.2020 It was decided to grant renewal of with increased CI and by imposing following conditions: 1. Industry shall submit BG of Rs 5 lakhs towards O & M of Pollution Control System. 2. Industry shall submit Board Resolution from company Board within one month, towards increase in investment without obtaining from MPC Board thus violated the provisions of Environmental Laws and in future, they will not do such violations and submit the BG of Rs. 2 lakhs immediately towards compliance of the same. 3. Industry shall carry out detailed study within three months period by engaging reputed third party for control of VOC emissions from 300 tanks & submit BG of Rs.5 lakh towards compliance of same. 4. Industry shall install separate STP for treatment of domestic effluent & upgrade capacity of existing ETP as per trade effluent generation within 3 months and shall submit BG of Rs. 2 lakh each towards compliance of same. 5. Industry shall install in-house treatment within 3 months for garbage by providing Biogas plant/ composting plant and shall submit BG of Rs. 2 lakh for the compliance of the same. shall be issued after the receipt of details of each product name/chemical name & quantity and after submission of requisite fee. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 10 of 32

115 USV Ltd, B-1/8, MIDC Lote Parshuram, Tal. Khed, Dist. Ratnagiri for plot B-1/8 & Part B1/8 and amalgamation with plot B- 8/1,B-9 (Increase in CI) 30.04.2020 It was decided to grant renewal of for plot B- 1/8 & Part B1/8 and amalgamation with plot B-8/1,B-9 by imposing following conditions: 1. Industry shall submit BG of Rs 5 lakhs towards O & M of Pollution Control System. 2. Industry, the byproduct generator, should ensure that all the vehicles used to transport by-product to the vendor industry to be fitted with web based GPS system to record the origin to destination position and shall self monitor the compliance and submit monthly report to the Board. 3. Industry shall obtain affidavit from vendors stating that the byproduct purchased from PP is used as raw materials in their respective industries. 4. Industry shall submit BG of Rs 2 lakhs for the compliance of point no 2 & 3. Request of the industry for permission to sale the solvents of 15000 MT/A as a by-product not considered. And obtain all technical detail and examine the possibility to reuse in the process by other industries. shall be issued after submission of requisite fee. 116 Forbes Co Ltd., (Engg. Division), Saki Powai Road, Chandivali, Mumbai 117 Liberty Oil Mills LTd., Village Bamne, Tal. Shahapur, Dist. Palghar. (Increase in CI) 30.06.2020 It was decided to grant renewal of with increased CI by imposing following conditions 1. Industry shall extend the BG of Rs. 5 lakh towards O&M of pollution control system. 2. Industry shall install adequate capacity of STP within 03 months and submit the BG of Rs. 5 lakh towards compliance of the same. shall be issued after submission of requisite fee. 31.03.2020 It was decided to grant with increase in C.I. by imposing following conditions - 1. Industry shall extend existing BG of Rs. 20 lakh submitted towards achievement zero discharge system. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 11 of 32

(Increase in CI) 2. Industry shall upgrade APC system to achieve emission standards as per conditions and submit Bank Guarantee of Rs. 10 lakh towards compliance of the same. 118 Mahindra & Mahindra Ltd., P. 89, MIDC Satpur, Tal & Dist Nashik 119 Goodyear South Asia Tyres PVt. Ltd., H-18, MIDC, Waluj, Aurangabad 120 Hindustan Insecticides Ltd, Rasayani, Panvel Raigad with Increase in CI Operate (Increase in CI) Not approved with increase in CI shall be issued after obtaining additional fees. 30.09.2020 It was decided to grant renewal of by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 5/- Lakhs towards O & M of pollution control system. shall be issued after obtaining additional fees. 31.12.2020 It was decided to grant renewal of by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 5/- Lakhs towards O & M of pollution control system. shall be issued after obtaining additional fees. ---- It was decided to issue SCN for refusal of due to following reasons: 1. Industry has not installed online continuous monitoring system as per CPCB s directions. 2. Industry has increased investment from Rs. 53.2 Cr to Rs.78.7 Crs without obtaining permission from board 3. JVS results of the sample collected on 30.07.2015 are exceeding the ed limits. 121 Gharda Chemicals Limited, Plot D-1/2 & B-1/7, Lote Parshuram MIDC, 31.07.2020 It was decided to grant plain renewal of after the receipt of additional fees by imposing following conditions: 1. Industry shall extend the BGs as per the previous upto 30.11.2020. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 12 of 32

Taluka Khed, Dist - Ratnagiri, 415722. Not Amendment in change in product-mix 2. Industry, the byproduct generator, should ensure that all the vehicles used to transport by-product to the vendor industry to be fitted with web based GPS system to record the origin to destination position and shall self monitor the compliance and submit monthly report to the Board. 3. Industry shall obtain affidavit from vendors stating that the byproduct purchased from PP is used as raw materials in their respective industries. 4. Industry shall submit BG of Rs 2 lakhs for the compliance of point no 2 & 3 5. Industry shall transfer the effluent (125 CMD ) generated from the co-gen plot F1/1 for treatment by reverse osmosis installed on main plot D1/2, The permeate (100 CMD) generated will be sent back to the cogen plot F1/1 and reject (25 CMD) will be treated in ETP on main plot D1/2. Running of RO plant located on plot F1/1 will not be d shall be issued after obtaining additional fees. 122 Skoda Auto India Pvt. Ltd., Plot A-1/1, MIDC Shendra, Aurangabad with increase in CI It was also decided not to approve amendment in change in product-mix and call the industry for presentation before MS alongwith all relevant information. 30.09.2020 It was decided to grant renewal of with increase in capital investment by imposing following conditions; 1. BG of Rs. 2/- Lakhs from BG of Rs. 5/- Lakhs obtained for O & M of pollution control systems to be forfeited as JVS reports are exceeding the ed standards & top up BG of Rs. 4/- Lakhs to be obtained to make total BG of Rs. 7/- Lakhs for O & M of Pollution control systems. shall be issued after obtaining additional fees. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 13 of 32

123 Tata Steel Ltd., S-76, MIDC Tarapur, PO Boiser, Tal Palghar, Dist Thane 124 Tata Steel Ltd., A-6, MIDC Tarapur, PO Boisar, Thane 125 Excel Industries, Plot D-9, MIDC Lote, Tal. Khed, Dist. Ratnagiri with increase in CI with increase in CI Amendment in existing for change in product-mix 28.02.2020 It was decided to grant renewal of with increase in capital investment by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 7.5/- Lakhs towards O & M of pollution control system. 2. Request of the industry to increase in water consumption for industrial process as compared to existing is not considered as the industry is located in Tarapur MIDC where CETP is not performing. shall be issued after obtaining details of water consumption from SRO and requisite fees. 28.02.2020 It was decided to grant renewal of with increase in capital investment by imposing following conditions; 1. Industry shall extend all the existing BG s for period upto 30.06.2020. shall be issued after obtaining additional fees. 31.01.2018 It was decided to grant amendment in for change in product mix as per MoEF circular dtd 14.12.2006 with overriding effect by imposing following conditions: 1. This is issued in accordance with MoEF, Govt of India circular dated December 14, 2006 stating that in cases of change of product-mix, changes in the quantities or the numbers of product may be allowed without E.C by the concerned SPCB provided such changes in the quantities of product are in the same category and are with the previously granted overall total limits. 2. This is granted on the basis of the proforma of no increase in pollution load submitted by the industry and certificate of no increase in pollution load dtd 16.09.2015 issued by ICT, Mumbai. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 14 of 32

shall be issued after submission of requisite fee. 126 Excel Industries Ltd., MIDC Dhatav, Tal. Roha, Dist. Raigad 127 Frigorifico Allana Ltd., Gat 74 to 88, Village Georai, Paithan Road, Dist. Aurangabad 128 Sudarshan Chemicals, Roha (increase in CI) (increase in CI) 31.01.2020 It was decided to grant renewal of with increase in production quantity of PCl3 from 7200 TPA to 10000 TPA & corrections in HW details by imposing following conditions. 1. Industry shall extend the BG of Rs. 5 lakh towards O & M of pollution control system. 2. Industry shall carry out Hazardous waste audit from recognized institute and submit the report within three months time period. Industry shall submit BG of Rs.2 lakh towards compliance of same. 3. By-product recovered from the scrubbing of PCl3 shall be send to their Lote plant for further processing. shall be issued after submission of requisite fee. 31.10.2020. It was decided to by imposing BG of Rs. 10 lakh towards O & M of pollution control systems. 30.04.2020 It was decided to grant plain renewal of by imposing following conditions 1. Industry shall submit the BG of Rs 10 lakhs towards O & M of Pollution Control System. shall be issued after obtaining latest balance sheet and submission of requisite fees. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 15 of 32

130 Sun Pharmaceuticals Industries Ltd., Plot A-7,8 Ahmednagar 131 D'decor Home Fabrics Pvt. Ltd., Plot F-6/1, MIDC Bhoiser, Tarapur, Thane Renewal Of with increased CI. (increase in CI) 30.04.2020 It was decided to grant renewal of by imposing following conditions 1. Industry shall submit the BG of Rs 5 lakhs towards O & M of Pollution Control System. shall be issued after submission of requisite fee. 31.01.2019 It was decided to grant plain renewal of without increase in production quantity, water budget, fuel consumption and effluent quantity by imposing following conditions. 1. Industry shall extend the existing BG of Rs. 10 Lakh towards O&M of ETP system. 2. Industry shall extend the existing BG of Rs. 5 Lakh towards O&M of APC system. 3. Industry shall extend the existing BG of Rs. 2.25 Lakh towards compliance of HW Rules 2008. It was decided to return the existing BG of Rs. 5 lakh & BG of Rs. 4 lakh obtained towards providing arrangement for treated effluent recycle& reuse at least 50% along with MEE and upgrade the existing APC system as industry has complied the same as reported by Field Officer in its visit report dated 24.08.2015. It was also decided to return the BG of Rs. 2 lakh obtained towards submission of Board Resolution after verification report of SRO. shall be issued after submission of requisite fee. Booklet 32 (Part - IV) 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 16 of 32

Fresh 132 Rohm and Haas (India) Pvt Ltd, Plot No T-22, MIDC Taloja 133 Suryalaxmi Cotton Mills Ltd., Village Nagardhan, Tal. Ramtek, Dist. Nagpur Renewal Of (increase in CI) 31.01.2021 It was decided to grant renewal of after the receipt of CPCB copy of M/s Arc Corrosion registration, clarification of increase in CI and additional fees and by imposing following conditions: 1. Forfeit BG of Rs. 2 lakh for not carrying out hazardous waste audit from renowned institute as per condition. 2. Industry shall submit double the BG forfeited i.e Rs.4 lakh towards carrying out hazardous waste audit from renowned institute & submit report up to 30.05.2016. 3. Industry shall extend the existing BG of Rs 5 lakhs towards O & M of PCS. 31.01.2021 It was decided to grant renewal of by imposing following conditions. 1. Industry shall extend the BG of Rs. 10 lakh obtained towards O&M of ETP. 2. Industry shall extend the BG of Rs. 5 lakh obtained towards O&M of APC system 3. Industry shall extend the BG of Rs. 2.25 lakh obtained towards compliance of HW Rules 2008. It was decided to return the BG of Rs. 5 lakh obtained towards Installation of CAAQM as industry has complied the same. shall be issued after submission of requisite fee. 134 GMT Mining & Power Pvt. Ltd., Kh. 16, 17, 18, Sawarkhanda, Tal. Kuhi, Dist. Nagpur with increase in CI 31.08.2020 It was decided to grant renewal of with increase in capital investment by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 5/- Lakhs towards O & M of pollution control system. 2. Industry shall install STP within 3 months & submit BG of Rs. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 17 of 32

5/- Lakhs for compliance of the same. shall be issued after submission of requisite fee. 135 Kisanveer SSK Ltd., At - Bhuinj Post - Kisanveernagar, Tal - Wai, Dist - Satara. (Mineral water) 136 Unilever Industries Pvt. Ltd., C-9(Part), MIDC Khamgaon, Dist. Buldhana 137 Supreme Petrochem Ltd., Village Amdoshi/Wakan Roha Road, Tal. Roha, Dist. Raigad (Mineral water plant) (Increase in CI Amendment in existing for change in product-mix and further renewal for two years 31.10.2020 CAC has noted that mineral water plant is located in the premises of existing Sugar unit. It was decided to grant to Operate in green category for manufacturing mineral water - 72000 Crates/Year. shall be issued after obtaining additional fees. 28.02.2021 It was decided to grant renewal of by extending BG of Rs 5 lakhs towards O & M of Pollution Control System. shall be issued after obtaining additional fees. 31.08.2019 It was decided to grant Amendment in existing for change in product-mix as per MoEF circular dtd 14.12.2006 and further renewal for two years with overriding effect to existing by imposing following conditions: 1. This is issued in accordance with MoEF, Govt of India circular dated December 14, 2006 stating that in cases of change of product-mix, changes in the quantities or the numbers of product may be allowed without E.C by the concerned SPCB provided such changes in the quantities of product are in the same category and are with the previously granted overall total limits. 2. This is granted on the basis of the proforma of no increase in pollution load submitted by the industry and certificate of no increase in pollution load dtd 19.01.2016 issued by ICT, Mumbai. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 18 of 32

shall be issued after obtaining additional fees. 138 Samarth SSK Ltd., Ankush Nagar, Dist. Jalna 139 Godrej & Boyce Mfg. Co. Ltd., Pirojshan Nagar, Vikroli, Mumbai to with decreased CI 31.07.2020 It was decided to grant to Operate for 18 MW Co-gen by imposing BG of Rs. 5 Lakh towards O & M of pollution control systems. shall be issued after obtaining additional fees. 30.04.2020 It was decided to grant renewal of with decreased CI and consolidate the broader product spectrum without change in total product quantity as per previous by imposing following conditions. 1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution control system. 2. Industry shall reuse/recycle the 60% treated trade/domestic effluent into the process, flushing, cooling tower, fire fighting etc and remaining shall be used on land for gardening as industry has inadequate land for disposal of total trade & domestic effluent. shall be issued after submission of requisite fee. 140 Unichem Laboratories Ltd., MIDC Dhatav Roha (increase in CI) 30.04.2020 It was decided to grant renewal of with increase in CI by extending BG of Rs 5 lakh towards O & M of PCS. Also the standard of BOD shall be changed from 30mg/l to 100 mg/l as per the CETP general standards as industry is recycling the effluent to maximum extent and remaining is sent to CETP. shall be issued after obtaining additional fees. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 19 of 32

141 Hindustan National Glass & Industries Ltd., MIDC Area, Malegaon, Tal. Sinnar, Nashik 142 Bharat petroleum Corporation ltd.,jnpt,at- Sheva,Tal-Uran.Dist- Raigad. 143 Crompton Greaves Ltd., Plot CTS 1007/1 to 676, Kanjurmarg, Mumbai (decrease in CI) 31.10.2020 It was decided to grant renewal of by imposing conditions: 1. Forfeit BG of Rs 2.5 lakh obtained towards O & M of PCS as the JVS reports of stack for the parameter Particulate Matter is exceeding the ed limit. 2. Industry shall top-up double the BG forfeited i.e Rs 5 lakhs and shall extend the total BG of Rs 7.5 lakhs upto 28.02.2021. 3. Industry shall extend the BG of Rs 5 lakh towards not to pet-coke fired furnace. shall be issued after obtaining additional fees. 30.06.2020 It was decided to grant renewal of by imposing BG of Rs. 5 lakh towards compliance of conditions. shall be issued after after submission of reply towards decrease in CI and other information called by SRO and obtaining additional fees. 28.02.2017 It was noted that SRO has reported that the existing of the industry was refused as the industry had not obtained Locational Clearance for expansion activity. SRO has also reported that the industry has now applied by discontinuation of stamping & tools products It was also noted that the Locational policy of GOM is also discontinued. 144 Apcotex Industries Ltd., Taloja Not Therefore it was decided to grant renewal of by dis-continuation of stamping & tools products by imposing following conditions; 1. Industry shall submit BG of Rs. 5/- Lakhs towards O & M of pollution control system. shall be issued after obtaining additional fees. ----- It was decided to issue SCN for refusal of & encashment of BGs due to following non-compliances of previous conditions: 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 20 of 32

Resubmission 145 Welspun Syntex Ltd., Plot 1, 40 & 45, 116 to 118 Dewan Industrial Estate, Mahim Village, Dist. Palghar Establish (Expansion) Cou or 5 years whichever is earlier 1. Industry has failed to carry out Hazardous waste audit. 2. Industry has not verified the in-plant steps taken to reduce water consumption 3. Also Industry lso not upgraded the APC systems as the existing conditions. It was decided to grant establish for expansion by imposing following conditions: 1. Industry shall 100% reuse/recycle the treated trade effluent in the process and submit the BG of Rs 5 lakh towards compliance of same. 2. Industry shall submit the Board resolution in prescribed format within one month and submit the BG of Rs. 2 lakh towards compliance of the same 146 PS Steel Tubes Ltd., Village Khanav, Khalapur. Dist. Raigad 147 GKN Sinter Metals Pvt. Ltd., C-18, MIDC, Ahmednagar 1st Operate (part) 1 st Operate for expansion with amalgamation of existing 28.02.2018 It was decided to grant 1 st Operate (part) for Tube/Precision steel tubes without galvanizing & surface treatment activity by imposing following conditions; 1. Industry shall submit BG of Rs. 5/- Lakhs for O & M of pollution control systems. 2. Industry shall not start galvanizing activity before obtaining Operate from the Board. 28.02.2018 The application for 1 st Operate for expansion of was returned as the work of erection of plant & machinery was not completed & only plain renewal of was granted to the industry. Now SRO, Ahmednagar vide letter dtd 21.01.2016 has reported that the industry has completed the erection of plant & machinery of the expansion activity. It was decided to grant 1 st Operate for expansion for Tin powder 10 MT/M & Sintered bearing & its parts 250 MT/M by amalgamation with existing with following conditions; 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 21 of 32

1. Industry to extend the existing BG obtained against O & M of pollution control system. 2. shall be issued with overriding effect to existing. Table item 1 CEAT Ltd, Plot SZ-39, MIDC Area Butibori, Tah.Hingna, Dist.Nagpur 1st (part) shall be issued after obtaining additional requisite fees from the industry. 30.09.2016 It was decided to grant 1st (part) by imposing following conditions 1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution control system. 2. Industry shall extend the existing BG of Rs. 5 lakh obtained towards compliance of conditions. It was also decided to return the BG of Rs. 2 lakh each towards submission of design details of proposed ETP, design details of proposed STP and design details of proposed APC system as industry has submitted the same. shall be issued after obtaining additional requisite fees from the industry. 14 th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 22 of 32