GENERATOR TRANSFER SWITCH



Similar documents
OASIS SERVICE & TROUBLESHOOTING MANUAL (WITH DM10 OR DM12)

Diesel Engine Driven Generators Page 1 of 6

Magnum Mobile Generator MMG55 Specifications

PART 8: FIELD WIRING. n WARNING NOTICE. Boiler Manual

GSM Smart Switch USER GUIDE

Fire Pump Controllers Remote Alarm Panels

HM-W536 Install Guide

ABC-1000 Automatic Boiler Level Controller Operation and Installation Manual

NELSON VOLTAGE MONITOR INSTALLATION & PROGRAMMING MANUAL

INSTALLATION & SERVICE MANUAL. Display Panel


INSTALLATION INSTRUCTIONS

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives

INSTALLATION INSTRUCTIONS

DC400 Dispensing Cutoff System

P 602. This generator set has been designed to meet ISO 8528 regulation. This generator set is manufactured in facilities certified to ISO 9001.

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS.

AIR CONDITIONING SYSTEM 1. FFH SPECIFICATION AIR CONDITIONING SYSTEM RODIUS

ILISC515-A Shift Interlock (Manual Lift Door) 2015 Ford Transit, 3.7L and 3.5L

DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

HAM841K ALARM CONTROL PANEL FOR COMMERCIAL AND RESIDENTIAL SECURITY SYSTEMS

SERVICE MANUAL FOR 12 VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOF TOP UNITS ONLY

USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR

Using your LED Plus keypad

SERVICE MANUAL 12VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOFTOP UNITS ONLY

Back-UPS 650 VA 120 V with AVR (BX650CI-LM)

Troubleshooting Guide for Jacks Down LED Lights

Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000

PK5500 v1.1 Installation Instructions

EATON Diesel Plus Diesel Engine Fire Pump Controller

Mobile Data Power Model: MDP-25

TECHNICAL DATA 60HZ MPMC POWERTECH CORP. DIESEL GENERATING SET

INSTALLATION GUIDE. Card Reader & Controller with KIM Swipe Reader for Solitaire 850 / 950 / 850L Learnlok PK2930

For Models #6-5001, #6-7501, # & #10-12K1

Signature and ISX CM870 Electronics

Oil and Coolant Circulating Heating System. Model - OCSM

Power Generation. Power Control PCL System Generator Set Control

TECHNICAL DATA 50HZ MPMC POWERTECH CORP. DIESEL GENERATING SET

Solar Home System. User Manual. AEH-SHS01-10W2L Solar Home System 2 Lamps

FIRE ALARM SYSTEM RECORD OF COMPLETION

Programmable Room Thermostat 7 Day (5-2 Day) Models: / Power Supply: Battery / Mains

Model 2300DR Installation Guide

INSTALLER S & OWNER S MANUAL

ELECTRONIC THERMOSTAT AND THERMOMETER With SPEED CONTROL

Digi-Motor Installation Guide

BB -508L/509L INSTALLATION MANUAL LATTICE BOOM CRANES. Greer Company Crane Systems. Greer Company

FIRE ALARM SYSTEM RECORD OF COMPLETION

DC Series Digital Conversion Alarm Operator s Manual

ER-1 Emergency Response System INSTALLATION & PROGRAMMING GUIDE

INSTALLATION INSTRUCTIONS FOR INTERNATIONAL 9000 SERIES ROOF TOP AIR CONDITIONERS

INSTANT HOT WATER RECIRCULATING SYSTEM

CM705B - Universal Expander Module CM707B - Plug On Zone Expander Security Systems

Owner s Manual. Walk-in Monitoring System 100. Cooler is Better! TM. Used in UL Listed Door Panel Assemblies

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

LD2 One & Two Zone Water Detection Alarm Installation and Operation Manual

AEROMOTIVE Part # INSTALLATION INSTRUCTIONS

Hydra Super-S Combo. 4-Bay RAID Storage Enclosure (3.5 SATA HDD) User Manual July 29, v1.3

Installation and Operation Guide PD4600 Series Converter Replacement

OPTIONAL FEATURES 30

DLW 8. POWER RATING 1500 rpm/50 Hz 1800 rpm/60 Hz Prime 7.5 kva, 6 kw 9.1 kva, 7.3 kw Standby 8.5 kva, 6.8 kw 10.1 kva, 8.1 kw

REGULINE 600VA / 1000VA REGULATOR USER MANUAL

Subaru Reference. This reference contains the following information: connector pinouts. connector pinouts

Service manual. Website: CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL.

VCR Ion Beam Sputter Coater

Generator Transfer Switch Model # HTS15-AUTO

Transfer Equipment Controls

Electric Panel Pump Control System. Operation, Maintenance and Installation Manual

Residential Gateway (RG) Battery Backup

Battery Charger For Nickel Cadmium and Nickel-Metal Hydride Rechargeable Batteries Model PSN Series

A/C-HEATER SYSTEM - AUTOMATIC

PUSH BUTTON START INSTALLATION MANUAL

LK Electric Boiler - 4,5

FIREDEX Conventional Fire Panels

Instruction Manual for Operating Panel 301 and 302

MTS Power Products MIAMI FL ATS-22AG. Automatic Transfer Switch And Control PLC Operator s Manual

Bypass transfer switch mechanisms

Arc Fault Circuit Interrupters Frequently Asked Questions

Installation Instructions

CONTENTS QUICK SETUP & INSTALLATION USER MANUAL. SUPA8 Quick Setup & User Manual

Rain+Birdt. Simple To Set Timer (SST) Setup & Operation Instructions. English RAIN BIRD ( ) or visit

VersaCare Bed. Quick Reference Guide

Introduction. Safety Guidelines. Part Numbers. Operation and Maintenance Manual. Operation and Maintenance Manual

VEHICLE SPEED CONTROL SYSTEM

SPR-5 FOUR SECTOR COMPOS I TE CONTROL UN I T.

E2 Series Electric Furnaces

Bussmann. All-In-One Module. Bussmann Power Module Switch. How to configure Part Numbers: Step 1: Select Switch Amperage 1

USER MANUAL CHARGING STATIONS FOR ELECTRIC VEHICLES

ViZion Installation Guide

Users Guide to Keypad Functions

SECTION 2 3 OPERATION OF INSTRUMENTS AND CONTROLS. Lights, Wipers and Defogger

AUTOMATIC TRANSFER SWITCH CONTROL UNIT OPERATOR S MANUAL

Speed Control Relays SX2

32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw

BODY ELECTRICAL TOYOTA ELECTRICAL WIRING DIAGRAM WORKBOOK. ASSIGNMENT Version 1.8 WORKSHEETS.

Drayton Digistat +2RF/+3RF

IPS Magneto-Thermal protection device for electric loads.

Powerware 5110 UPS User s manual

Installation and Operation Guide for PD4000 Series Power Control Center

Transcription:

Page 1 of 9 Power Distribution: Normal Operating Conditions All site power comes into panel MDP on the loading dock. From here it goes to: SDSS Observers Trailer SDSS Engineer Trailer Utility Building Operations Building Dormitories SDSS Plug Lab All Telescopes All power distribution on the site is 3-phase Y 208 VAC phase-to-phase and 120 VAC phase-to-neutral. SDSS Engineering trailer has itʼs own generator and automatic transfer switch. The generator is powered by LPG from its own tank and powers about 2/3rds of the trailer. It runs one time per week for about 15 minutes to exercise the motor. Load does NOT transfer during this exercise. SDSS Observers trailer has NO backup power. Utility building is backed up by the main site generator but through its own transfer switch located at the generator. 2.5m Enclosure has a 3-phase 208 generator as a backup to the main generator to just stow and close up the telescope. Dormitories, Operations building, SDSS Plug Lab and all Telescopes: The main diesel generator supplies back up power through the automatic transfer switch in the Operations building (and Utility building as noted above). All critical systems have a UPS (Utility Power Supply) that supplies power for 10-30 minutes based on UPS and load. Note: power loss for more than 10 minutes causes Computer room to warm and air pressure to the 2.5m and 3.5m primary mirror supports to bleed off. Main Generator: Normal Operating Conditions The main diesel generator has AC-powered heaters for coolant, batteries and fuel, and a battery charger to help ensure start up when needed. It also has numerous monitoring systems to alarm APO staff if something goes wrong.

Page 2 of 9 There is a light and horn on the exterior of the generator cabinet (Operations building) if there is trouble with the generator. There is a Man-Auto switch (Manual-Automatic) on the main panel inside the generator cabinet. It is normally in Auto mode, which is necessary for the transfer switch to start the generator. There is a Start-Stop switch that starts and stops the generator when the switch is in Manual mode. These are momentary switches - hold for 1-2 seconds to activate. Operations Building Transfer Switch: Normal Operating Conditions *******WARNING HIGH VOLTAGE INSIDE; DO NOT CONTACT ANY LIVE CONDUCTORS WHEN CABINET DOOR IS OPEN ********* The transfer switch is inside the Operations building by the loading dock door (Figure 1). This supplies power to the Operations building, Dormitories, SDSS Plug Lab, and all Telescopes. Figure 1

Page 3 of 9 Under normal conditions, the transfer switch routes power from panel MDP to all loads in panels DPE (near Washer/Dryer) and SDP (in boiler room). At the front panel, the green light is on indicating normal operation. The Mode Switch is in Automatic, and the Selector switch is in Auto. Power Failure: Operating Conditions When Utility power fails, the transfer switch (based on preset conditions) starts the generator within a couple of seconds and transfers the generator power to the loads within about 45 seconds. Power stays on the generator until utility power is restored for a period of time (again based on preset conditions). The generator then transfers back to Utility power. After approximately 20 minutes, the generator shuts down automatically. The same transfer (except with no generator Start/Stop) occurs in the transfer switch for the Utility building. Manual Transfer: Operating Conditions If there is a desire to manually transfer to generator power (transfer switch not functioning properly), there could be several reasons for this: 1. Fault in sense electronics; 2. Relay or limit switch failures; 3. Continuous short duration power spikes; or 4. Power anomalies that the transfer switch fails to sense. There are several methods to use and they are included in order of priority. (Figure 2).

Page 4 of 9 Figure 2 Method #1 1. On the front panel of transfer switch, take Mode Switch to Normal Test Mode Generator should start and switch (based on preset timing); Method #2 Alternate: 1A. On the front panel of the transfer switch, toggle Mode Switch to Fast Test Mode. Generator should start and switch within 5 seconds. 1. Using the selector switch on the door, move selector from Auto to STBY. 2. Start the generator by going inside the generator cabinet, select Man and press and hold Start for 2 seconds. Generator should start and power loads.

Page 5 of 9 Figure 3 Method #3 This method requires manual activation of the Generator and transfer switch. 1. Inside the transfer switch cabinet, set Maintenance Disconnect switch (located lower left back of cabinet) to Manual. (Figure 4) Figure 4

Page 6 of 9 2. Release the punch and handle mounted on cabinet door (Figure 5) Figure 5: Manual Wrench; Yellow Punch behind

Page 7 of 9 3. Using the yellow punch, push the hole labeled Trip on the main switch body. (Figure 6) The switch trips to the neutral position. NOTE: THE SWITCH ASSEMBLY IS NORMALLY UPSIDE DOWN Figure 6 Switch Box A and B windows Select and Trip holes and manual square lug on right side 4. Using the red handle wrench, place it over the square lug on the side of switch box. 5. Using the punch, press the hole labeled Select and rotate wrench until the window labeled B reads ON. 6. Set Maintenance Disconnect switch from Method #1 Step #2 to Automatic. Generator should start. 7. If generator fails to start, follow manual generator start procedure in Method 2 Step #2.

Page 8 of 9 Return to Normal Under normal conditions you do not need to return to normal power, Contact Site Supervisor or Site Manager if you need to manually engage the transfer switches or start the generator, and they will ensure we are returned to normal power. Utility Building Transfer Switch There are no critical loads in the Utility building except fire pump and a third air compressor. Under normal conditions if this transfer switch fails there is no immediate need to do anything. Contact Site Supervisor or Site Manager. Figure 7

Page 9 of 9 SDSS Engineering Trailer Generator There are no critical loads in the SDSS Engineering trailer. If this generator fails to start or transfer load, contact Site Supervisor or Site Manager, and turn off UPS units inside.