A New CHP Concept for 60 000 tons of SRF PowerGen 2015, Amsterdam 11th June 2015 Markus Bolhàr-Nordenkampf Markus.Bolhar@valmet.com Valmet GesmbH Anders Victoren Anders.Victoren@valmet.com Valmet AB 2015-05-18
Key figures 2014 Without Automation business line > Orders received 3,071 MEUR > Net sales 2,473 MEUR > EBITA before NRI (1 106 MEUR 21% Net sales split by business line 40% 11% Net sales by geographic area 15% 18% 13% > Global market leader with #1-3 market positions in all markets served 39% Services Pulp and Energy Paper 43% North America South America EMEA China Asia-Pacific 1) NRI = non-recurring items 2 2015 Valmet
Four business lines and five areas North America Services business line Pulp and Energy business line Paper business line Automation business line South America EMEA China Asia-Pacific Business lines are responsible for technology and product development, technology projects, and services solutions Areas are responsible for sales, providing services and supporting project deliveries Corporate functions - Finance, Strategy and Operational Development, HR, and Marketing and Communications - support the business operations 3 2015 Valmet
Valmet small scale Waste to Energy solution Combustion technology for shredded industrial and municipal waste Valmet BFB ACZ TM Bubbling Fluidized Bed Advanced Combustion Zone Technical features Compact design Fuel flexibility Low emissions Standardized customized sizes 20, 30, 40 MWth Corresponds to 50 000 120 000 tons waste/year About 20 references 2015 Nybro P5, Sweden 1x 22 MW (new, start up 2015) 2013 Västervik P5, Sweden 1x 20 MW 2005 Borås, Sweden 2 x 20 MW - Full scope EPC 2003 EcoEnergia, Italy 1 x 28 MW 2003 Calabria, Italy 2 x 29 MW 2002 Lidköping, Sweden 1 x 22 MW - Full scope EPC 1999 Versilia, Italy 2 x 12 MW 1999 DERL, UK 2 x 17 MW - Full scope EPC 1984 Lidköping, Sweden 2 x 15 MW - Full scope EPC 1983 Västervik, Sweden 2 x 12 MW 1983 Bollnäs, Sweden 2 x 12 MW 1979 Eksjö, Sweden 1 x 12 MW 4 2015-05-18
CHP concept for 60 000n ton SRF : Nybro Värmecentral AB SRF to power, heat and process steam (industry). District Heat 10000 m3 Hot water tank Prod max 120 GWh heat Flue Gas Treatment Dry system Process industrial extraction steam Prod xx GWh staem Waste fuel handling 3000+ 300 m3 storage 40% MSW and 60% Industrial waste Single stage shredding Gate fee 60-70 000 ton 40 Euro/ton Boiler Island 22 MWth BFB ACZ for waste fuels Steam turbine 6 net MWel Prod max 48 GWh el Waste from 60 km area 5 18 of May 2015 Valmet
Valmet small scale Waste to Energy solution Improvements summary: Nybro s CHP plant concept One stage slow rotating shredders (150 mm size) 50% reduction of LCC Overlay welding in rear pass (no need in furnace + back pass) Lower maintenance cost Increased steam data (60 bar, 410 C comp to 40 bar 400 C) 6% more electricity Increased flue gas recirculation Lower emissions + Increased fuel flexibility Modularized design Quick assembly work and increased service ability 6 2015-05-18
Principal of ACZ Advanced Combustion Zone 7 18 May, 2015 Valmet Author / Title
Feedingmaster An unique system Storage feeder Integrated parts: Valmet solution for feeding of compacting waste fuels to fluidized bed boilers With components based on long term experience Dosing feeder Rotary valve Fuel chute 1/2013, Feedingmaster Feeding process
Modular solutions Benefits Modules and interfaces are predesigned Minimizes costly and error-prone installation work at the site Modules assembled in qualityassured machine shop conditions Pretesting at the factory speeds up commissioning Well-designed equipment reduces the need for space 9
Modular design 7 parts to site - short erection time 10 2015-05-18 Valmet Author / Title
Wide fuel span- prepared for future fuel streams Combustion diagram for the Nybro boiler. 11 11 June, 2015 Valmet Author / Title
Nybro a WtEplant with a BFB ACZ boiler : For demanding wide fuel types and span NYBRO Plant and boiler data: Boiler capacity Fuels Steam data Electricity production Combustion technology Flue gas cleaning NOx abatement 22 MW th for 60 000 ton/a MSW and industrial waste 60 bar(g), 410 C 6.0 MW and process steam and heat BFB ACZ TM Lime+ activated carbon, baghouse filter SNCR (Selective Non-Catalytic NOx Reduction) Emission Measured Limit according to IED NO x (as NO 2 ) 81 200 CO 7 50 TOC (as C) 0.3 10 NH 3 2 - Ref:Emission test - Västervik 2014 simalar plant The Nybro boiler with lower and upper furnace (1,2), empty pass (3) and rear pass (4). 12 11 June, 2015 Valmet Author / Title
Valmet BFB ACZ TM Nybro WtE plant and client evaluation Criteria of Boiler Island Investment cost boiler+fuel shredder Building cost - boiler house Maintenace cost Operation cost with Performance and Technical merits 13 2015-05-18 May
Turnkey deliveries Benefits Single-point responsibility for entire delivery Schedules, costs and risks of the project are forecast and minimized Total cost and profitability known in advance Consistent quality Experienced project team handles delivery and commissioning Service and maintenance available throughout the plant s life cycle 14
WtE solution EPC Borås, ÅP1/2 2x 20 MWth BFB ACZ for waste 15 2015-05-18 May
Waste consult evaluation in latest projects Total investment 1,8-2,6 MEuro/ MWth depending of solution 16 2015-05-18 Valmet Author / Title Sorce Croatia WTE days Calambio
Conclusions The new Waste to Energy plant in Nybro implements a new CHP concept based on proven technology with newly developed improvements. It serves as a reliable concept for production of heat and electricity from waste meeting stringent emission requirements, is fuel flexible and has low LCC costs. Modularisation, low investment costs per MWth and a EPC delivery approach results in fast realisaiton times and the possibility of local thermal waste utilisaiton. The concept fits perfectly as a decentralized waste to energy solution fitting to smaller- or medium-sized communities utilizing the locally available combustible waste. 17 11 June, 2015 Valmet Author / Title
2015-05-18