PROVISIONAL VESSEL PARTICULARS (FORM C) LPG/C. ECO ENIGMA UPDATE 01/09/15



Similar documents
GAS FLAWLESS - FORM C

Dry Bulk Carriers Vessel: Bulk Americas

Grain Capacity: No Hold name Hold C.B.M. ULUSOY-11

M/V TAMARITA/FERMITA/ ROSITA/FAVORITA

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

11.6 Formulas to be used when changing atmosphere in an tank

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

Floating. Diesel power stations

Stena S ,200 DWT Product/Chemical Tanker CONQUEST CONQUEROR CONCORD CONCEPT CONSUL CONTEST

Technical Bulletin. Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

Discharge of Water & Waste from Marine Vessels Standards & Regulations (MARPOL Convention)

Engine Room Console 6

LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston

GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011

Wärtsilä Ship Power Piero Zoglia. Gas Storage and supply systems /Piero Zoglia

Copyright 2012 Mayekawa Mfg. Co.,Ltd. All Rights Reserved.

EMISSIONS FROM MARINE ENGINES VERSUS IMO CERTIFICATION AND REQUIREMENTS OF TIER 3

TANKER - SHORE SAFETY CHECK-LIST

ST. VINCENT AND THE GRENADINES

CODECASA 35M. MATERIAL: Steel hull/ ASKING PRICE: Euro (ex VAT)

Energy Savings through Electric-assist Turbocharger for Marine Diesel Engines

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

ARRANGEMENT. Main deck. Below main deck. Below tween deck. Slop. Mud. Fuel oil (FO) Base oil (BO) Fresh water (FW) Drill water (DW) Met BRIZ

HEAVY DUTY STORAGE GAS

Fuel Treatment and Conditioning Systems

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

Design and Operation of Fuel Efficient Ships. Jan de Kat Director, Energy Efficiency Operational and Environmental Performance Copenhagen

How To Build An Lng Fuel Tank Container

5 OIL TANKER DESIGN AND EQUIPMENT

ENGINE ROOM SIMULATOR (ERS 4000)

lng conversion (General)

LNG Propulsion System

New generation of modern LNG carriers with type C cargo tanks and LNG propulsion system

Basic terms deck engine room propeller shaft bow thruster rudder bulbous bow hold

The Engine Department

ABS Survey Manager SURVEY STATUS REPORT (FOR OWNER) GYRE REGISTERED OWNER : TDI-BROOKS INTERNATIONAL INC.

Radial piston pumps type R and RG

HIGH PRESSURE TECHNOLOGY HYDRAULICS PNEUMATICS TESTING EQUIPMENT

Session 2: Hot Water Supply

5.2. Vaporizers - Types and Usage

OUTCOME 1 STATIC FLUID SYSTEMS TUTORIAL 1 - HYDROSTATICS

The Ship/Shore Safety Check-List

SCP ISO. Other advantages: SCP ISO is a series of piston pumps with a fixed displacement for mobile and stationary hydraulics.

GUIDELINES FOR VOLUNTARY USE OF THE SHIP ENERGY EFFICIENCY OPERATIONAL INDICATOR (EEOI)

ANALYSIS OF FIRE HAZARD AND SAFETY REQUIREMENTS OF A SEA VESSEL ENGINE ROOMS

Recharge Procedure for Telemark TVP-2000 and TVP-3500

Air Eliminators and Combination Air Eliminators Strainers

A study into the fuel savings potential by a major rebuild of propulsion system

Unit 24: Applications of Pneumatics and Hydraulics

maersksupplyservice.com S-TYPE ANCHOR HANDLING TUG SUPPLY VESSEL Visit our web site at: maersksupplyservice.com

MAKING MODERN LIVING POSSIBLE. Thermostatic valve AVTA. Technical brochure

Flex separation systems, S-separators

Equivalents & Conversion Factors 406 Capacity Formulas for Steam Loads 407 Formulas for Control Valve Sizing

ACCOMMODATION BARGES FOR SALE OR CHARTER

Hydrostatically Balanced Loading

LEISTRITZ PUMPEN GMBH. Leistritz Screw Pumps & Systems. Cargo and Liquid Handling

Module Title: General Ship Knowledge

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

Thermostatic valve Type AVTA

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines

ECOplus Solar Cylinder

Rules for Classification and Construction Ship Technology

SOx - FUEL CHANGE MANUAL. Manual No. 01

OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE. TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS

UNDERSTANDING CENTRAL HEATING SYSTEMS

SPEEDROC D30. Surface Drill Rig for marble, granite, sandstone and limestone in the dimension stone industry.

Marine Engine. IMO Tier ll and Tier lll Programme 2015

DUAL FUEL ENGINES LATEST DEVELOPMENTS

Trends in the Development of Container Vessels

Emission support system for calculation of energy demand and emissions of ships. Hans Otto Kristensen

Alfa Laval Slide 3

3304B. Marine Auxiliary Engine SPECIFICATIONS STANDARD EQUIPMENT ACCESSORY EQUIPMENT PERFORMANCE DATA. 56 bkw (75 bhp) rpm

Alfa Laval in brief Alfa Laval is a leading global provider of specialized products and engineering solutions.

How To Clean Water From An Ammonia Refrigeration System

Midland Combustion Electric Line Heaters with Integral Panels

Open Cycle Refrigeration System

Propulsion Trends in LNG Carriers

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

Designing Small Scale LNG Carriers for the LNG Bunker Market

CH-01.qxd 4~6~04 11:22 AM Page 1. Part 1 Ship Design

FIREFIGHTING AND DAMAGE CONTROL

Factsheet & Process Description Regenerative Thermal Oxidizer (RTO) Vopak Terminal Amsterdam Westpoort

Cooling kw Heating kw

MU Cooling System. Hi-Pres. Low sulphur fuel cooling system. System specifications HI-PRES MARINE & OFFSHORE

STOUCO Drilling Equipment

a cannonball = (P cannon P atmosphere )A cannon m cannonball a cannonball = (P cannon P atmosphere ) πd 2 a cannonball = 5.00 kg

SOLAS CONSOLIDATED EDITION Supplement December 2015

Carbon Footprint of Refrigerated Goods Transportation

Kompressoren. Adsorption Dryer AD

Rusty Walker, Corporate Trainer Hill PHOENIX

Design and Construction of LNG Regasification Vessel

Bunkers Regulatory and Practical Considerations. Piraeus, 8 November 2012 Capt. Simon Rapley

IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE

Transcription:

PROVISIONAL VESSEL PARTICULARS (FORM C) LPG/C. ECO ENIGMA UPDATE 01/09/15 Specifications of the vessel and the gas installation which are representations by the Owners. (A) VESSEL S CHARACTERISTICS PREAMBLE Name : ECO ENIGMA Owner : GOLDEN SHADOW INC. Flag : MARSHALL ISLANDS Build : MURAKAMI HIDE SHIPBUILDING CO LTD Date on Service : Delivery Scheduled on 14th April, 2015 Class : Class NK GRT International : 4,258 Suez : 4,932.35 Panama : 3,637.00 NRT International : 1,376 Suez : 4,054.65 Panama : 3,637.00 Is vessel build according to USCG regulations? : Yes. 33 CFR Part 155, 156, 159 & 164 46 CFR Part 153 46 CFR Part 154 (COC) except Alaska RINA regulations? : IMO COMPLIANCE Japanese regulation? : IMO COMPLIANCE Has vessel received USCG approval? : USCG Certificate to be obtained at the 1st call of US port RINA approval? : CLASS NK APPROVAL HULL LOA : 99.98 M LBP : 93.53 M Breadth : 17.50 M (Moulded) Depth : 7.80 M (Moulded) Summer Draft : 6.15 M (Moulded) (LPG98%) (VCM76%) Air draft at full load condition : 26.90 M (est) Air draft at ballast load condition : 29.14 M (est) Estimated draft with full cargo and full bunkers are as follows. Product Draft Fore (m) Draft Aft (m) Draft Mean (m) Corresponding Deadweight (t) Propane 4.35 6.13 5.24 3506.52 VCM 5.39 6.89 6.14 4752.58 Isoprene 5.50 6.80 6.15 4752.58 i-butane 4.62 6.33 5.47 3820.23 Form C ECO ENIGMA 1

Propeller immersion : Propane Aft draft At 6.13 m correspond. : 109.30 % VCM Aft draft At 6.89 m correspond. : 130.70 % Isoprene Aft draft At 6.80 m correspond. : 128.17 % i-butane Aft draft At 6.33 m correspond. : 114.93 % COMMUNICATION EQUIPMENT Call letter : V7KV2 Radio Station normally watched : VHF, MF/HF, SAT-C, SAT FBB Radio MF/HF NBDP : 538006211 ECEN X Radio MF/HF TEL/DSC : 2180 KHZ VHF : CH. 16 Satellite Communication Inmarsat C : 453841265 ECEN X Inmarsat F : 773131250 MACHINERY Main Engine x 1. Type and make : HITACHI MAN B&W, 5L35MC6.1. Service power No of Cylinders Cyl Bore x Stroke : 3,250kW x 210 min-1 (MCR) 5 Cylinders 350φ x 1,050. Grade of fuel used : I.F.O. (380 mm2/s @ 50 deg. C) Auxiliaries Type and make (Electrical) TAIYO, AC450V x 3φ x 60Hz 360kW x 1,200min-1 (Mechanical) YANMAR, 6NY16L-SW Grade of fuel used M.D.O. (Maximum 14 mm2/s @ 50 deg. C) 2 sets Emergency Gen Type MITSUI ZOSEN MACHINERY, F5L912, MDG-50E Boiler Type MIURA, VWH-600E Evaporation 538 kg/h (Actual Evaporation) Max Design 0.7 MPa Pressure Feed Water Temp 60 deg. Exhaust Economiser Type MIURA, KF-101F Evaporation 438 kg/h (at M/E 90% load) Air Compressors (Main) Air Compressors (Emergency) Type / Capacity Type J.P. SAUER & SOHN, WP45L 2 sets J.P. SAUER & SOHN, WP15L Form C ECO ENIGMA 2

Fuel Oil Purifier Type ALFA LAVAL, PA615 2 sets Capacity 900 ltr/h (at 380 cst 50 deg. C) Lub Oil Purifier Type ALFA LAVAL, PA615 Capacity 1,100 ltr/h (at 150 cst 40 deg. C) Evaporator Type ALFA LAVAL, JWP-16-C50 Capacity 8 ton/day Fresh Water Sterilizer Fresh Water Mineraliser Type Capacity Type / Capacity NIPPON CONTROLS, L-N201F 2.0 M3/h N/A Waste Oil Incinerator Type Capacity MIURA, BGW-20N WASTE OIL24.3 Kg//H (Max. Capacity) SOLID WASTE 20.0 KG/H Oily Water Separator Type HEISHIN, HFM-200 Capacity 2 M3/h Sewage Treatment plant Type TAIKO, SBH-25 Capacity For 25P (Discharge Pump 4M3 x 0.2) Hot Water Set (Calorifier unit) Steering Gear Type RV21-017 Duty Capacity 170 kn.m Hydraulic pump unit LVPO17-210ROL Speed In Moderate weather: About: 13.00 Knots @ CSR with 15% sea margin at VCM Loaded condition CONSUMPTION/ DAY Main Engine HFO abt 12.50 ton/day at Normal Sea-going (85%, HFO 380cst) Aux. Engine DO abt 0.90 ton/day at Normal Sea-going (MGO) abt 1.00 ton/day when loading (MGO) abt 2.00 ton/day when discharging (MGO) Boiler DO abt 0.5 ton/day when in port (MGO) Permanent bunker capacity (100%) Form C ECO ENIGMA 3

HFO : 436.58 m 3 (est) Diesel : 146.14 m 3 (est) Fresh Water : 148.32 m 3 (est) (B) CARGO INSTALLATIONS 1. Transportable products and respective quantities, calculated in accordance with IMO maximum filling formula. (Tonnes) 100% (CBM) 98% (CBM) NO.1 CARGO TANK Abt. 2,500 Abt. 2450 NO.2 CARGO TANK Abt. 2,500 Abt. 2450 T O T A L Abt. 5,000 Abt. 4,900 SPSV (bar g) Ref. Temp. (deg. C.) Density at (Ref. Temp.) Corresponding Quantity (MT) at 98% Propylene 17.65 45.0 0.470 2302 Propane 17.65 45.0 0.459 2248 B/P Mixture Basis C3/30% + C4/70% 17.65 45.0 0.553 2710 n-butane 17.65 45.0 0.548 2684 i-butane 17.65 45.0 0.526 2576 Butadiene 17.65 45.0 0.588 2880 Butylene 17.65 45.0 0.565 2768 V.C.M (75% D 0.914 ) Due to Summer Draft 17.65 45.0 0.914 3500 Isoprene 17.65 45.0 0.656 3214 Pentanes 17.65 45.0 0.600 2940 Pentene 17.65 45.0 0.611 2992 Note(1): Mixing ratio of above mentioned B/P mixtures is as follows: Butane 70wt% and Propane 30wt% Note (2): MAX VCM CAN LOAD 3500 MT TO MEET THE SUMMER DRAFT. 2. Other transportable products N/A 3. TANKS Form C ECO ENIGMA 4

3.1 Design pressure (Vapour) - IGC : 17.7 bar (G) for IGC-Code - USCG : 12.7 bar (G) for U.S.C.G. 3.2 Valve setting : High: 17.7 bar (G), Low: 12.7 bar (G) 3.3 Maximum vacuum obtainable : 0.0 bar (G) 3.5 Maximum temperature acceptable : 45 deg. C 3.6 Minimum temperature acceptable : - 10 deg. C 3.7 Hydrostatic Test Pressure : 26.48 bar (G) 4. LOADING RATE (TONS/HOUR) For Full Cargo Parcels Ex-atmospheric storage with gas : 1 tank : about 450 m 3 per hour Return 2 tanks : about 790 m 3 per hour Remarks: 5. CARGO PUMPS 5.1 Type : Wartsila Svanehoj A/S How many : 2 Sets Maximum specific gravity : 0.965 5.2 Capacity (CMB/Hour) : 300 m 3 /h at 110m TH / 250m 3 /h at 120m TH Two speed or variable speed : Two speed Rated kw (each) 130 kw at 1800 min -1 Working pressure maximum : 17.65 bar G 5.3 Location : On top of each Cargo Tank Removable : Permanent Type 5.4 Booster pumps : Yes () Maximum Specific Gravity 0.90 Type : Horizontal Maker : Wartsila Svanehoj A/S 5.5 Capacity (CMB/Hour) : 300 m 3 /h Working pressure : 17.65 bar G 5.6 Location : Midship catwalk, Stbd.side above stbd. manifold 5.7 Time to discharge a full liquid cargo using all pumps against back pressure at pump 1 bar : Not Available on the manuals, check with yard 5 bars : Not Available on the manuals, check with yard 10 bars : Not Available on the manuals, check with yard 5.8 Nominal back pressure when working : Not Available on the manuals, check with yard In series corresponding head : Not Available on the manuals, check with yard Maximum back pressure : Not Available on the manuals, check with yard Nominal pressure at rail (propane) : Not Available on the manuals, check with yard 5.9 What amount of cargo remains in tanks after completion pumping before stripping: - liquid : No remaining liquid cargo after pumping Form C ECO ENIGMA 5

- vapour : NOTE: To reduce pressure by 1 bar/tank:- 3.8 hrs. 6. STRIPPING 6.1 Stripping system, if any : N/A 6.2 Time required to remove all traces of liquid cargo as stated in 5.9 for: - LPG : N/A 7. CARGO COMPRESSORS 7.1 Type : Vertical water-cooled 1 stage double acting Make : TANABE PNEUMATIC MACHINERY CO., LTD. How many : 2 sets Piston displacement About 460 m 3 /h Rated Kw 75kw Stroke 177.8 mm Max discharge pressure 20 bar g Pressure differential 4 bar Maximum 7 bar at single action No of Revolutions 540 min -1 7.2 Are compressors oil free : Yes 7.3 Can they reliquefy VCM without risk : N/A 7.4 State time to bring full cargo of butane to atmospheric pressure from : N/A 8. INERT GAS SYSTEM (N2 Generator) : TYPE: N2 PSA MAKER: MAYEKAWA Co. Ltd. 8.1 Does the vessel use inert gas? : Yes. If so, state utilization and quantities : 8.2 Can the vessel produce inert gas? : Yes. If so, state type and composition of gas produce: Nitrogen: 97.0 % to 99.9% 97.0% : Abt. 250 NM3/h 98.0% : Abt. 240 NM3/h 99.0% : Abt. 210 NM3/h 99.5% : Abt. 185 NM3/h 99.9% : Abt. 130 NM3/h Discharge Capacity Abt. 185 NM3/h at N2 Purify 99.5% 8.3 Maximum production obtainable NOTE:- Above quantities obtained at engine room temperature 45 C 8.4 State if there are storage facilities for inert gas onboard: - Size : 1.5M3 - Pressure : 10 bar Form C ECO ENIGMA 6

8.5 State if any shore supply of nitrogen may be required: : - for what purpose : Shore supply of nitrogen is required in order to reduce oxygen contents in cargo tanks less than 0.5% by volume or to save time for inerting. - what quantities : It depends on the requirement of oxygen contents of cargo tanks and time required. 9. GAS FREEING 9.1 State method used giving all details : 1. Discharge remaining cargo in cargo tanks as much as possible. 2. Purge remaining cargo in cargo tanks with inert gas produced by nitrogen generator on board the vessel. 3. After the atmosphere inside cargo tanks being reached the area well lower than critical dilution line, purge the atmosphere inside cargo tanks with open air by using portable fan or cargo compressors or nitrogen generator (air mode) 9.2 State time required including stripping : Abt. 5 days (remain 0.2 vol%) 10. CHANGING GRADE 10.1 From completion discharge of cargo Propane, time required in hours and inert gas in CBM required to reach a tank and gas installation atmosphere of less than 100 ppm of Propane in Vapour phase. Time required: 10.2 Can this operation be carried out at sea? : Yes. 10.3 Can the ship measure the number of ppm in vapour phase? : Yes. 10.4 Has vessel deck tank for changing grade/cooling operations? : N/A 10.5 Deck tanks : No Deck Tanks Capacity : Purpose : 11. COOLING BEFORE LOADING : No cooling plant on board the vessel. 12. CARGO HEATER 12.1 Type : Shell and Tube 12.2 Inside Diameter 700 mm 12.3 Overall length 5800 mm 12.4 Cargo flow rate 300 m 3 /h 12.5 Min Inlet Temp -48 C 12.6 Min Outlet Temp -10 C 12.7 Required Sea water Capacity 500 m 3 /h (min.18 C) Form C ECO ENIGMA 7

12.8 Design Pressure 20 bar G (2.0 MPa g) 12.9 Hydrostatic Test Pressure 30 bar G (3.0 MPa g) 12.10 Tightness Test Pressure 20 bar G (2.0 MPa g) 12.0 State discharging rate for propane to be brought from atmospheric pressure 13. CARGO VAPORIZER In case vapour gas is needed to feed compressors, can vessel produce its own if no shore available: No 14. REFRIGERATING APPARATUS 14.1 Is it independent of cargo? : N/A Is so, state cooling agents : 14.2 What minimum temperature can be maintained : N/A 14.3 What time required at sea to lower by 1 o C the full cargo of : N/A 15. MEASURING APPARATUS What gauges on board? Float type level gauges (Local & Remote reading) Type : MUSASINO, LMC-VA Location : for each tank 16. SAMPLES 16.1 State how tank atmosphere samples can be taken and where from? Cargo samples for vapour and liquid can be taken from the following positions; 1. Fixed sampling connection at tank domes 2. Through drain connection of cargo manifold 3. Close loop sampling system is equipped 4. Through pressure gauge tube connection of tank top Standard of fitting? : 16.2 Same question for cargo : Same as above 16.3 Are sample bottles available on board? : No 17. CARGO LINES 17.1 Is ship fitted with a port and starboard cargo manifold? : Yes. 17.2 Position of cargo manifold - distance from stern (AP) : 53.19 M - distance from stem (FP) : 46.79 M - height above deck : 1.40 m for Liquid manifold - distance from ship s rail : 2.60 M - underside keel to manifold : 9.20 M 17.3 Liquid line Form C ECO ENIGMA 8

- flange-size : 8 inches - type : ANSI 300 LB Gas line - flange-size : 5 inches - type : ANSI 300 LB : 17.4 What reducers on board For Liquid line (low temperature) 200A(8B) x ANSI300lb * 250A(10B) x ANSI300lb 200A(8B) x ANSI300lb * 150A(6B) x ANSI300lb 200A(8B) x ANSI300lb * 125A(5B) x ANSI300lb 200A(8B) x ANSI300lb * 100A(4B) x ANSI300lb 200A(8B) x ANSI300lb * 80A(3B) x ANSI300lb 200A(8B) x ANSI300lb * 200A(8B) x ANSI150lb 200A(8B) x ANSI300lb * 150A(6B) x ANSI150lb 200A(8B) x ANSI300lb * 100A(4B) x ANSI150lb 200A(8B) x ANSI300lb * 200A(8B) x JIS20K 200A(8B) x ANSI300lb * 150A(6B) x JIS20K 200A(8B) x ANSI300lb * 100A(4B) x JIS20K For Vapor line (normal temp.) 125A(5B) x ANSI300lb * 100A(4B) x ANSI300lb 125A(5B) x ANSI300lb * 80A(3B) x ANSI300lb 125A(5B) x ANSI300lb * 50A(2B) x ANSI300lb 125A(5B) x ANSI300lb * 150A(6B) x ANSI150lb 125A(5B) x ANSI300lb * 125A(5B) x ANSI150lb 125A(5B) x ANSI300lb * 80A(3B) x ANSI150lb 125A(5B) x ANSI300lb * 50A(2B) x ANSI150lb 125A(5B) x ANSI300lb * 125A(5B) x JIS20K 125A(5B) x ANSI300lb * 100A(5B) x JIS20K Blind Flange for Manifold : ANSI#300-200A 2 sets ANSI#300-125A 4 sets 17.5 Is ship fitted with stern discharge? N/A - Liquid line - diameter : - flange size : - type : 18. HOSES Are serviceable hoses available on board? : No Cargo Hoses are Onboard 18.1 Two pieces, each : N/A Length : Diameter : Flange-size : Type : Bending radius : 18.2 Minimum temperature acceptable : N/A Maximum pressure acceptable : Form C ECO ENIGMA 9

18.3 For what products are hoses suitable? : N/A 19. CRANES - Hose cranes : Yes. - Where situated : Midship - Lifting capacity : 5.0 t - Working radius : 13.0 m/r 20. SPECIAL FACILITIES 20.1 How many grades can be segregated? : No segregation 20.2 How many cooled? : No cooling plant 20.3 Can vessel sail with slack cargo tanks? : No. (Depends on stability calculation) Form C ECO ENIGMA 10