SAFE HANDLING OF PRECAST CONCRETE PRODUCTS



Similar documents
How To Ensure Safety Of Lifting Equipment

Safety Manual For Overhead Crane Operators

STANDARD PRACTICE INSTRUCTION

EMPLOYEE FALL PROTECTION

Load Testing and Lift Engineering

RIGGING HARDWARE ASME B Addresses detachable lifting hardware for lifting purposes

Savard Labor & Marine Staffing, Inc. Rigging Safety Rev3/14 Rigging Safety

WARNING! Failure to follow these inspection procedures can cause personal injury and property damage.

Operator Training Questionnaire

The Campbell operation facilities in York, PA, and Cortland, NY, conform to Quality Standard ISO 9001.

Slings, Rigging and Lifting Equipment

Owner s Manual Gantry Cranes

CHAPTER 13 LOAD HOOKS

LiftAlloy Chain Slings

Slings Effect of Angle of Lift on a Sling Rated Capacity

Product Information Report Rigging Techniques

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

CRANE & HOIST PROGRAM

What should you check for when inspecting a crane before maintenance?

POTENTIAL HEALTH & SAFETY HAZARDS

Cranes and Lifting Equipment

Contents. 1. Foreword Common accidents in lifting operations Legislative requirements and code of practice of lifting operations 2

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes

LOAD TEST PROCEDURE. Bridge, Gantry and Jib Cranes & Monorail Systems B001-R05/07

AHS-Series Steel Adjustable-Height Gantry Cranes Instruction Manual

Sling Safety. Importance of the Operator

Owner s Manual & Safety Instructions

Machine Moving. By Norm Berls

Wallace Tri-Adjustable Gantries Round Tube Assembly Instructions

MATERIAL HANDLING PROGRAM (Section 10)

Wire Rope Extender Lanyard

Ladder Program and Training Materials

SAFETY AND HEALTH PPG INDUSTRIES, INC. -- LAKE CHARLES UNIT NAME RIGGING AND LIFTING SAFETY FOR PPG LAKE CHARLES

Safe Operating Procedure

M_004 Basic Rigging Safety Lecture

CHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES

OVERHEAD CRANE OPERATOR SAFETY TRAINING

all VAC LIFT ALL-VAC-LIFT Phone Redstart Street Fax

OSHA Remove impacted systems and components. Inspect systems prior to use.

SAFETY INSPECTION AND TESTING OF LIFTING DEVICES

SAFE USE OF LIFTING EQUIPMENT

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR

fall arrest. Contact your distributor or Guardian about policies regarding replacement of Guardian components involved in a fall.

COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials

Introduction to Fall Protection

ROV shackles. your reliable partner

TABLE OF CONTENTS PART 5 - CRANES, HOISTING AND LIFTING

Fall Protection Program

Memberships. W.F. Welding & Overhead Cranes Ltd. Since W.F. Welding & Overhead Cranes Ton Overhead Cranes. Jib Cranes.

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Boom and fly capacities for this machine are listed by the following sections:

02805 Printed in China

Chicago Crane Operators Examination Study Guide

FALL PROTECTION PROGRAM

Working at Heights and Fall Protection

ELEVATED WORK POLICY

Cable Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMCA680. Americrane & Hoist Corp.

Operating instructions. 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline

Operations and Instruction Manual Might Swivel - Part # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Fall Protection Guidelines

Guidebook for Lifting Supervisors

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

CR-SERIES CARPET POLES INSTRUCTION MANUAL

TABLE OF CONTENTS. COLUMBUS McKINNON CORPORATION is a leading worldwide designer and manufacturer of material handling products,

6 LOADING AND UNLOADING A FLATBED

Wire Rope Slings SLING LEG OPTIONS WIRE ROPE SLINGS

CONSTRUCTION SAFETY SERIES: Crane Safety

Basic Rigging Workbook

Safety and Analysis in Material Handling of Construction Industry

Crane Best Practices in Tree Removal Hoisting a Qualified Arborist. By Mark Adams

Vehicle Recovery and Towing

Parts Manual & Service Manual

WIRE TIES FOR OVERHEAD LIFTING

Elkhorn Construction, Inc. Safety Manual Title: Fall Protection Policy Effective Date:

User Instruction Manual Vertical Lifelines and Vertical Lifeline Subsystems

Health and Safety Resources Caution to Users

Guidelines for the Survey of Offshore Mooring Chain Cable in Use

SECTION WINDOW WASHING SYSTEMS

Topics of the Presentation

Mobile (Truck) Cranes

The Campbell operation facilities in York, PA, and Cortland, NY, conform to Quality Standard ISO 9001.

`Fall Protection Guidelines in Construction

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

Super Slider ADJUSTABLE FROM Model #HD26229

Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)

Safe & Sound Bridge Terminology

Packaged Terminal Air Conditioner Wall Sleeve Installation

Summit Anchor Company, Inc.

TOP RUNNING SINGLE GIRDER BRIDGE CRANE

Wire Rope Replacement Criteria

ladder Safety Types of Ladders

INTER PLANT STANDARD STEEL INDUSTRY

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

D-Ring. Fixed Arm. 1.2 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

CHAPTER 7 OVERHEAD AND GANTRY CRANES

Wire rope slings, the hazards surrounding

RATCHET RELEASE SHACKLE

Hoisting and Rigging Fundamentals for Riaaers and ODerators. Pendant Control - Components

OSHA 29 CFR 1926 Subpart M ( ) OSHA 29 CFR 1910 Subparts D,F, I ( , 66, 67, and 132

Transcription:

SAFE HANDLING OF PRECAST CONCRETE PRODUCTS Safety Handling of Precast Concrete Products The lifting of any precast product requires the use of special equipment and substantial planning and knowledge. All of this equipment interacts with one another to allow for safe and effective lifting of a product. Any failure of any one component could lead to an unsuccessful lift with potential devastating effects to the product, human life or other items in the surrounding environment. A SAFE LIFT RELIES ON MANY CRITICAL POINTS Chains and Slings 1

Components of a Safe and Successful Lift Lifting Equipment Overhead Crane, Forklift, Travel Crane, etc. Lifting Anchors and Shackles Swift lift pins, utility anchors, cable hooks, etc. Rigging Equipment Lifting Bars, Straps, Chains, Cables, Slings, Hooks, Clevises, etc. Concrete Product concrete weighs about 4,000 lbs/yd 3. Lifting Equipment OSHA Standard 1910.179 Overhead Cranes Typical cranes in precast plants include overhead cranes, gantry cranes and/or jib cranes. Such cranes are subject to OSHA s General Industry Standards and as such, you should be aware of the following requirements. Lifting Equipment Crane Requirements 1. Operators must be trained and designated by the company; 2. Rated Load of the Crane must be plainly marked on each side of the crane, legible from the working level; NEVER EXCEED THE LOAD RATING!!!! Chains and Slings 2

Lifting Equipment Crane Requirements 3. Frequent Inspections - visual exams by operator or designated person with records not required. Normal service - monthly; Heavy service - weekly to monthly; Severe service - daily to weekly. Performed on all operating mechanisms, hooks and chains. Check operation items such as brakes, limit switches, pendant control, etc. Lifting Equipment Crane Requirements 4. Periodic Inspection documented, visual inspection by appointed person who makes records of apparent external conditions to provide the basis for a continuing evaluation. Normal service - Annual; Heavy service - Semi-Annual; Severe service - Quarterly; Lifting Equipment Crane Requirements 4. Periodic Inspection (cont) - All components such as loose bolts or rivets, worn sheaves or drums, cracked or distorted parts, excessive wear, etc. NOTE: The inspector will determine if disassembly is warranted by visual conditions noted during inspection. Chains and Slings 3

Lifting Equipment OSHA STANDARD 1910.178 Powered Industrial Trucks Forklift Operator Training DO NOT operate a forklift unless authorized by and trained by your employer!! The employer shall ensure that each powered industrial truck operator is competent to operate a powered industrial truck safely, as demonstrated by successful completion of the training and evaluation specified in the OSHA standard. Training must be completed prior to initial operation of equipment and recertified at least every 3 years thereafter. Retraining should also occur if an operator has an accident or is observed operating equipment in an unsafe or improper manner. Training must be equipment specific. Specialized Forklift Equipment for Precast Industry Spreader bars are commonly used to lift precast products in tandem with cranes and/or forklifts spread lifting cable or chain to required lifting width. Booms are often attached to forklifts to lift and handle products. Chains and Slings 4

Specialized Forklift Equipment for Precast Industry Any mechanism used in tandem with a forklift/crane to accomplish a lift must be designed and rated by a competent person (ie. P.E.) and be appropriately labeled. Need forklift manufacturer to approve an attachment device such as a boom in writing! Specialized Lifting Equipment Components of a Safe and Successful Lift Lifting Equipment Cranes and Forklifts. Lifting Anchors and Shackles Lift pins, utility anchors, cable hooks, etc. Chains and Slings 5

Lifting Anchors Various types available and in use within the precast industry. Follow Manufacturer s recommendations for placement and loading limitations. The rated working load of an anchor is dependent on: Proper location of the lifting anchor within the concrete product (edge distance); Concrete Strength. Selection of Lifting Anchor When selecting lifting hardware, plan for the effective weight of a lift, not the actual weight of the product. When a Fleet Angle of 120 degrees is used to lift a load, the effective weight of a load is double the actual load weight. Therefore, a load weighing 10,000 pounds has an effective load weight of 20,000 pounds. Adequate lifters and lifting chains/cables must be planned for a 20,000 pound lift. Selection of Lifting Anchor and Lifting Chains When using a 30 degree fleet angle, the effective load weight is 4% more than the actual load weight. When using a 60 degree fleet angle, the effective load weight is 14% more than the actual load weight. When using a 90 degree fleet angle, the effective load weight is 30% more than the actual load weight. Chains and Slings 6

Lift Pins Lift Pins Require a Shackle to lift with hook. Specific shackles mate with each size lift pin. Lift Pins Cast into Product Chains and Slings 7

Lift Pins Cast into Product Note that the pins are located at adequate edge distances. If unsure of pin placement, see your supervisor and/or seek advice from the manufacturer.. Lift Pins Cast into Product Ensure proper placement of pins so that adequate concrete strength surrounds the pins. Know how the product will need to be lifted in order to help determine pin location. Four pins cast into product Lift Pins Cast into Product The lift chain was choked to accommodate overhead limitations creating more lateral force on pins. Side pulling from the excessive sling angle put stress on the concrete surrounding the lift pin Result damaged product and possible pin failure. Pin location Chains and Slings 8

Utility Anchor or Lifting Cable Does not require a shackle, but requires a larger edge clearance to embed the anchor into the structure. NOTE: Chain rubbing concrete may cause damage to chain and concrete. Requires concrete around anchor Pictured are utility anchors Components of a Safe and Successful Lift Lifting Equipment Overhead Crane, Forklift, Travel Crane, etc. Lifting Anchors and Shackles Swift lift pins, utility anchors, cable hooks, etc. Rigging Equipment Lifting Bars, Straps, Chains, Cables, Slings, Hooks, Clevises, etc. OSHA Compliance for Rigging Hardware Rigging equipment shall not be loaded in excess of its recommended safe working load Types of slings covered are those made from alloy steel chain, wire rope, metal mesh, natural or synthetic fiber rope (conventional three strand construction), and synthetic web (nylon, polyester, and polypropylene). Inspections Daily visual before being used Documented Periodic Inspections conducted at a frequency based on severity and frequency of use. At least every 12 months. Damaged or defective slings shall be immediately removed from service and either destroyed or marked Danger - Do Not Use. Chains and Slings 9

1926.251(b) Alloy steel chains. (1) Welded alloy steel chain slings shall have permanently affixed durable identification stating size, grade, rated capacity, and sling manufacturer. Such tags require wire brushing on occasion for visibility of markings INSPECT FOR: Inspection Items 1. Excessive Wear (Max 10% reduction allowable or 2 critical areas with 5% reduction). Check at load bearing points; 2. Throat Opening (Max increase of 15%); 3. Twisting (Max 10 degrees from unbent hook plane) and Deformation; 4. Cracks, Nicks, Gouges; 5. Evidence of Heat Damage. Safety Latches Required on Load Block Hooks, Hoists and Chain Falls. Chains and Slings 10

Wire Rope Inspections Paint To Paint = 1 Lay 1 Lay Strands in the wire rope are the individual groups of wires that rotate around the center. Remove from service if: 10 randomly broken wires in one rope lay 5 wires in one strand in one rope lay REMOVE IF THESE CONDITIONS ARE FOUND! Kinking Bird Caging Lifting Chains Chains used to lift product must be of lifting grade material. Grade 80 or 100 alloy only Grade 100 is the strongest chain alloy and gives higher chain strengths than Grade 80. NEVER use other chains such as towing chains or tie down chains for lifting! Chains and Slings 11

Lifting Strength Concepts The optimum capacity of a chain or wire rope is when it is used at a 90 degree angle to the load. The Working Load Limit (WLL) marked on the tag is based on a 90 degree lift. Chain Load 90 degree angle Lifting Strength Concepts The actual lifting strength of a chain or cable is reduced when the angle between the load and lifting chain/cable is less than 90 degrees. Fleet Angle Load Chain/Cable to load angles are less than 90 degrees Lifting angles reduce working load limits of slings NOTE: The Working Load Limit of a Triple Chain Sling and Quad Sling is 50% more than a double chain sling of the same grade and link size and equal distribution on each leg (based on center of gravity). Maximum Working Load Limit of chain Reduction of Working Load with Varying Lifting Angle o o 60 45 30 86 1/2% Percentage shown are of the maximum Working Load Limit of chain 70% 50% Normal Working Load Limit of a Standard sling Chains and Slings 12

How does off-center tip loading affect working loads True Loading 1/4 in. Off Center 1/2 in. Off Center 3/4 in. Off Center Point Loading 15,000 lbs. 13,000 lbs. 11,800 lbs. 10,650 lbs. 6,150 lbs. 100% of Rating 88% of Rating 79% of Rating 71% of Rating 41% of Rating The Weakest Link Remember, the maximum amount you can lift safely is determined by the weakest link in the lift sequence. The lift mechanism cast into a structure may be the weakest link. The forklift, crane or other equipment used to perform the lift may be the weakest link. A single chain link or hook may be the weakest link. The Concrete Strength may be the weakest link. Yarding Product According to the National Precast Concrete Association, product must be yarded on a flat, even surface. Dunnage must be adequate to support the weight of the product. Chains and Slings 13

Yarding Product Fifth Point Rule on a flat slab, locate substantial wood blocks at both ends of slab at a distance of 1/5 of overall slab width from outside edge. 15 ft. 3 ft. Yarding Product Front View of End Wall Lifter Location Lifter Location Locate blocking under Lifters on odd shaped product, since lifters should be placed to find center of gravity. Product was blocked under lift pin locations Chains and Slings 14

FINAL DISCUSSION KNOW THE STANDARDS THAT APPLY TO YOUR COMPANY S LIFTING PRACTICES. DO NOT LIFT OR TRANSPORT PRODUCT UNLESS TRAINED AND AUTHORIZED BY YOUR COMPANY. SEEK ASSISTANCE AS NECESSARY. QUESTIONS? Chains and Slings 15