2012 Geography. Advanced Higher. Finalised Marking Instructions



Similar documents
ODF Malawi Annual Review 2013

1.0 INTRODUCTION. 1.2: The 2008 Population and Housing Census

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

Advice For the multiple-choice questions, completely fill in the circle alongside the appropriate answer(s).

WHAT MAPS SHOW US Maps do 4 things:

Development proposals will require to demonstrate, according to scale, type and location, that they:-

A Guide to Woodland Carbon for Business

MALAWI Food Security Outlook July to December High prices, declining incomes, and poor winter production cause Crisis food insecurity

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

12.5: Generating Current Electricity pg. 518

Digital Communications

Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

Environmental Impact Assessment of Forestry Projects

Worksheet A Environmental Problems

Water Quality and Water Usage Surveys

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan

What are the physical characteristics of York? Why problems do you think there could be in York use map evidence.

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

COMMUNITY-BASED CHILDCARE CENTRES IN MALAWI: A NATIONAL INVENTORY

Answer Keys to Unit Tests

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

Rainforest Concern Module 2 Why do we need rainforests?

London Underground Environment Strategy

Using the voluntary carbon market to provide funding for natural capital projects in the UK. 6 th October 2015

Map reading made easy

Station #1 Interpreting Infographs

Living & Working Managing Natural Resources and Waste

Geography. Curriculum Glance Cards

Rural Settlement Patterns

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links

Creating Green Jobs within the Environment and Culture sector.

Stage 4. Geography. Blackline Masters. By Karen Devine

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

Farming. In the Standard Grade Geography exam there are three types of farming you need to know about arable, livestock and mixed.

Renewable Energy in Fife Planning customer guidelines

Consider How can you collect solar energy for use in your school? What are other alternatives?

Key Idea 2: Ecosystems

Archant London Environmental Awards

Unit 4 Strand E Exemplar Work A Travel Package to Dahab, Egypt and Related Commentary

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

Cathkin Relief Road Planning Statement

Format for scrutinising the Hill Station Building Applications ( Current File No /2001-HSBA) The application shall be accompanied by

PLANNING APPLICATION: 12/00056/APP

GCSE BITESIZE Examinations

Rural Flooding: The Potential Role of Forestry

Field Methods in Environmental Science

Alternative Energy. Terms and Concepts: Relative quantities of potential energy resources, Solar constant, Economies of scale

Chapter 3: Climate and Climate Change Answers

Corralling the evidence about the value of Green Infrastructure. Martin Moss. Senior Advisor Green Infrastructure Operations England.

The River Ribble is one of the longest rivers in the North West of England

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

Plumpton College. Prospectus Vocational Courses for year olds. Home Educated, Schools and 6th Form.

armidale.nsw.gov.au/environment

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Answer Keys to Unit Tests

PRACTICAL STRATEGIES FOR IMMEDIATE PROGRESS ON CLIMATE CHANGE BUILDING BLOCKS FOR A GLOBAL AGREEMENT

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

Proposed Terms of Reference for EIA studies

Sea Water Heat Pump Project

Policy GRN The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders.

Banks as bridges: Investment in a sustainable and climate-friendly economic system

Advice can also be sought from specific specialist officers in the Council.

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

Sustainable Tourism Management - an overview -

OBJECTIVES: LESSON 5. Lungs of the Earth. Page 1. Overview: Suggested Time: Resources/Materials: Activities/Procedures:

Physical Environment. There are economic reasons for countries to cut down their rainforests.

City of Helsinki Culinary Culture Strategy

What do we already know about Bradford-on-Avon community area?

MALAWI NATIONAL AIDS COMMISSION

Functional Skills English Assessment Reading Level 2

Indicator. Measurement. What should the measurement tell us?

ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X

KENCOT HILL SOLAR PARK, OXFORDSHIRE PLANNING BRIEFING DOCUMENT. on behalf of MR TAD CZAPSKI FEBRUARY 2011

INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs)

Woodlands Management Plan. (Draft June 2011) A. Definition of Woodlands Areas vs. Landscaped Areas of Parkfairfax

The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect

Connecting Ecosystems & Climate

How to implement renewable energy and energy efficiency options

Part F South East Queensland Regional Plan State planning regulatory provisions

4 Alternatives and Design Evolution

Urban Ecosystem Services Seattle s Urban Forest

Low Carbon and Renewable Energy Economy 2014, First Estimates

Renewable Choice Energy

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Norwegian Forests. Policy and Resources

CALCULATING THE AREA OF A FLOWER BED AND CALCULATING NUMBER OF PLANTS NEEDED

Rainwater Harvesting

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

EMISSIONS OF AIR POLLUTANTS IN THE UK, 1970 TO 2014

SHANGHAI: TRENDS TOWARDS SPECIALISED AND CAPITAL-INTENSIVE URBAN AGRICULTURE

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

Transcription:

2012 Geography Advanced Higher Finalised Marking Instructions Scottish Qualifications Authority 2012 The information in this publication may be reproduced to support SQA qualifications only on a non-commercial basis. If it is to be used for any other purposes written permission must be obtained from SQA s NQ Delivery: Exam Operations. Where the publication includes materials from sources other than SQA (secondary copyright), this material should only be reproduced for the purposes of examination or assessment. If it needs to be reproduced for any other purpose it is the centre s responsibility to obtain the necessary copyright clearance. SQA s NQ Delivery: Exam Operations may be able to direct you to the secondary sources. These Marking Instructions have been prepared by Examination Teams for use by SQA Appointed Markers when marking External Course Assessments. This publication must not be reproduced for commercial or trade purposes.

Geography 2012 Advanced Higher Question 1 (a) Site should be drawn approximately to scale does not have to have straight lines. Candidates should consider the need to locate on private land, with access to roads. Land should be reasonably flat/gently sloping, not too high and avoid badly drained sites and large areas of woodland within the actual site. Aspect may also be considered. Two marks for size, two marks for site. (b) (i) Advantages and disadvantages will relate to site chosen. Might include access to communications and other amenities, distance from settlement, close to woodland to absorb noise/provide screening, mention of aspect/height/relief may be appropriate. Credit should be given to candidates who mention problems of using private land/farmland and how this might be overcome. May mention room to expand in future years. Candidates should make use of the atlas to put the site in context and should refer to the map eg candidates who refer to climatic data may get credit. Maximum of eight marks if they only write about one of physical or human, advantages or disadvantages. The site is fairly large and may have to cross minor roads candidates can use this to their advantage ie allows for natural segregation of parking/camping. Similarly, small areas of woodland will have the same effect. (ii) Planning/environmental considerations noise and light levels, disposal of litter, traffic management, CO 2 emissions, access for emergency vehicles, policing and security, licensing laws, local opinions, amenities toilets, catering. Solution recycling of rubbish, park and ride/car sharing/encourage use of public transport (reduced cost of tickets for people who use public transport) and additional public transport provided, involve locals free passes and job opportunities, monitoring noise and light levels and ensure that all events stop at a specified time, strict licensing hours, 24 hr policing, road diversions/closures. Maximum of 5 marks for only consideration or solution. Page 2

(c) Short-term impacts can be positive and negative. Positive generating income to local businesses eg increased BB trade, local shops and restaurants benefiting, advertising for local businesses, temporary employment, local goods sold at Festival (Glastonbury contributes over 73 million to the UK economy per annum and average spend is 293 per person) multiplier effect. Candidates may give quite a detailed response and make reference to a number of local businesses shown on the map extract. Negative localised congestion, increased crime/vandalism/litter, noise pollution. Long-term impacts increase in tourism for other areas of Northumberland eg Hadrian s Wall and Northumberland National Park, may attract more tourist related industries long-term opportunities. Festival may increase in scale and will provide opportunities for year round employment, profits generated by Northumberland Country Council may be invested in the local area new village hall, sports facilities etc. Maximum of 5 marks for only short-term or long-term. Question 2 (30) (a) There are a number of ancient systems dating back to the Romans eg Hadrian s Wall Path (945695) and Roman roads eg Dere Street (985660). Hadrian s Wall Path is at the top of the map extract where the land is higher. It corresponds with the location of Hadrian s Wall where the height of the land would have been useful for defence. Remains, such as Turrets and Onnvm Roman Fort highlight this. There isn t a great difference in height along the path so, although higher ground, the contour lines are apart so the land itself would have been fairly flat to build on at that time. Mention could be made of major east-west communication along the axis of the valley of the River Tyne (West to East) and approximately radial patterns from the market towns of Hexham and Corebridge. To begin with the railway line is north of the River Tyne where there is flatter and lower land to build on. A bridge is used to cross the river at 913659 and allows the railway line to get into Hexham. A station can be found at 941644. The line still follows close to the river and the lower land. The A69, in the west of the Extract is on the south bank of the River Tyne, again on gently sloping land. Bridges have had to be built at a number of places to allow the road to cross the river eg 922655 (credit for discrimination between old and new bridges), after this point the A69 continues along the north of the River Tyne. This has probably been done to avoid the town of Hexham and allow the road to continue on flatter land which is easier to build on. Embankments are used to reduce the risk of flooding. The amount of flatter land near the river in Hexham is limited and the railway line is already using this as its route way. The A69 runs West to East and links Newcastle with the main routes of south (M6 and A1M) and northwards (M74). Page 3

(b) There is a varied distribution and type of woodland in the map extract. Woodland should be clearly identified by grid references. There are many examples of strips of woodland running along the edge of fields eg 876634, to help protect the crops and livestock from the wind. Many smaller rivers have woodland on each side eg West Dipton Burn and Red Burn. This creates an ideal habitat for animals. Both these rivers have footpaths along the river and amongst the trees so this also means that it provides an attractive landscape for walkers too. Give credit for mentioning good schemes for woodland etc. There are many examples of forest plantation eg High Wood (903645). Within this plantation there are non-coniferous and coniferous trees. The coniferous trees are likely to be felled and there are routeways within the plantation to indicate this. Shildonhill Plantation is another example of this. Stanley Plantation (970685) is also likely to be used for felling. This plantation has examples of coppice and non-coniferous and coniferous forestry. Some areas of distributed woodland may be cut down for shooting purposes. (30) Page 4

Section B Question 3 (a) (i) Location of District Hospital Location of Nearest Neighbour Distance of km Chitipa Karonga 67 Karonga Chitipa 67 Mzimba Nkhata Bay 70 Nkhata Bay Mzimba 70 Rumphi Nkhata Bay 71 Dedza Ntcheu 54 Dowa Ntchisi 32 Kasungu Ntchisi 58 Mchinji Dowa 106 Nkhotakota Ntchisi 58 Ntcheu Balaka 38 Ntchisi Dowa 54 Salima Dowa 55 Balaka Ntcheu 38 Chikwawa Thyolo 37 Chiradzulu Zomba 40 Machinga Zomba 58 Mangochi Balaka 61 Mulanje Phalombe 26 Mwanza Chikwawa 51 Nsanje Thyolo 90 Phalombe Mulange 26 Thyolo Chikwawa 37 Zomba Machinga 58 Total 1322 Area of Malawi: 118, 484 sq km D=1322/24 = 55.08 NNI = 2D N/A = 2 55.08 24/118 484 = 110.16 0.01 = 1.10 3 working 1 correct total If unrounded values are used throughout the calculation or a value of 1.57 is obtained, this can be accepted. Page 5 4 marks

(ii) The answer, being near to 1.0 is in the random section of the significant values diagram. This shows that there is no significant distribution pattern of District hospitals in Malawi. Only 24 points were used instead of the preferred 30 used for an accurate result. The nearest neighbour index is useful in giving a more objective description of spatial pattern shown but other factors have to be considered to help explain the result. If the value 1.57 is used the significance is altered. Accept this. 6 marks (b) The text box provided tells the candidates that District hospitals are found in each district in Malawi. Use of the detailed map would allow candidates to mention how the size of each district may affect the result eg districts further north are more isolated that those in the centre and south of Malawi. Other factors which may affect the distribution of these hospitals is the physical geography of the area eg Lake Malawi and the elongated shape of the country. The detailed map also shows how well these towns are linked by road and railway. This may also influence where a district hospital is placed. The district hospitals are not found in the rural areas but in towns of a significant size good communications. This is likely to mean that people from the rural areas may find it quite difficult to access these health facilities. The actual location of the hospital in the town isn t shown so the distances have only been calculated from each town centre to the other. Up to a maximum of five marks if no mention of nearest neighbour index. 10 marks (20) Page 6

Question 4 (a) The question asks for describe and explain so there should be elements of both for full marks. There is no need to divide the marks equally between describe and explain. By far the largest % comes from Netherlands long established greenhouse growing system for fruit, vegetables and now flowers. (If candidates have read the whole question as advised they may use information from the second info box... that some of the flowers from the Netherlands may be re-exports or they compare the retail value of UK flowers of 2.2bn with the import value of 544.8m...some mark up!) 13% comes from Kenya, may be through Fairtrade and/or Commonwealth trade links. 7% from Columbia could be for different types of flowers or plants which might be worth the 1000 miles additional flying distance compared to Kenya. Different types of flowers or plants may also explain the small %s from Spain etc. (b) (c) (d) Maximum of 3 marks for description only. Again describe and explain elements required for full marks. Main points relate to huge differences in production costs Netherlands relying heavily on greenhouses often heated by expensive fossil fuels, especially outside the normal growing season which would also include lighting the greenhouses to give a longer day ; compared to Kenya where many flowers can be produced outdoors/or under simple protective shelters because of its climate. Energy which is used is renewable solar and geothermal (from info box). The packaging costs are less in Kenya because of the need to keep the weight to a minimum so will use less! (they have developed recycled lightweight cardboard boxes for easy stacking in the aircraft compared to the fossil fuel produced poly packaging which may be used in the Netherlands). The main cost for Kenya is transport by air, but even when all this is added up the overall carbon footprint of Dutch flowers is six times that of Kenyan ones. The question asks for explanation so listing the environmental issues from the diagram is not acceptable. Issues can be dealt with individually or linked together to produce a more comprehensive answer. The second info box gives the location of the flower growing area along the shores of Lake Naivasha...this will be easy to find on atlases so information may come with atlas back-up. Effects of the various chemicals on the water quality of the lake locals will use this for water supply, fishing; ingestion through food chain by locals; biodiversity may suffer since pesticides are not selective: soil erosion and compaction obvious impact on farming but also possible flooding and run-off issues resulting in poorer infiltration. Accept any reasonable explanations linked to the items on the chart. This should be very straightforward. Pie chart clearly shows proportions and therefore easy to select information from it/use for comparison. For this question it is an ideal way to present the %s of flower imports as it gives the whole picture straight away. The flow diagram may also be linked to a systems diagram as it shows inputs and outputs and organises it to allow commentary on the component parts. Any reasonable comments acceptable. Page 7 4 marks 6 marks 6 marks 4 marks (20)

Question 5 (a) (b) (c) The linear transects should be regularly spaced and (4-8 transects) cover the whole area of the beach shown on supplementary item G. Give one mark for coverage of the whole area and one mark for approximately regular spacing. A beach profile of changes in gradient and elevation can be obtained by a simple survey using a tape and a clinometer, or by levelling or by use of GPS. Give 2 marks for a straightforward and clear explanation of field work involved in such a survey. Up to 3 marks will be given for commentary. Maximum of 3 marks for only processing or only collection. Problems that may be encountered in collection of suitable field data for this survey include: Where to locate samples along the transect to collect the most appropriate data. If data are to be collected from low tide point then data can only be collected from the time of low tide. Time of the year (spring/neap tides) and weather conditions immediately before sampling will affect results. All of the transects should be surveyed at the same time (on a single day). It may be difficult to measure minor variations in beach profile accurately. However, minor variations may be important in the assessment of relationships. There will be variations in all parameters according to when the survey is conducted (eg winter or summer). Thus the data obtained only gives a snap-shot of relationships that is valid for that time of year. Safety considerations are a valid problem issue. Human error. 2 marks 4 marks [END OF MARKING INSTRUCTIONS] Page 8