The Gotthard Base Tunnel



Similar documents
Chronology of a Project of the Century Milestones in the Construction History up to 2015

RENÉ JENNI, REMIGIUS STOFFEL, MELANIE NYFELER Switzerland is generally

LVT System for. AlpTransit Gotthard AG

Success with three networks: SBB Infrastructure. InnoTrans 2012.

The Follo Line Project

TUNNELLING IN SWITZERLAND: FROM LONG TRADITION TO THE LONGEST TUNNEL IN THE WORLD

Gotthard Base Tunnel Risk Management for the World's Longest Railway Tunnel: Lessons Learnt

Proven Methods and state-of-the-art technology. Tunnelling & Underground Structures

The train-path pricing system. Who pays how much to rail infrastructure?

The Danish Transport System. Facts and Figures

Why build the Silvertown Tunnel?

presented by Michael Schürch, Train Path Management

Heavy Vehicle Fee / LSVA (Switzerland)

Member Nation Report 2010 from Denmark.

FOLLOW-UP ZURICH PROCESS:

ERTMS for a competitive railway

What to expect Space & Serviced Office. Listing Gotthardstrasse 26, 6300 Zug, 1st floor

WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE

ROADMAP SUMMARY LONG- DISTANCE FREIGHT

Sea Rail Conference. Alessandro Valenti Director Sales & Operations Shuttle Net

IQ-C Action plan for rail freight corridor Rotterdam-Genoa

Train Fund Denmark. Electrification of the main railway lines Realisation of the 1 Hour Model vision. 1 Hour. Transportministeriet

The rail engineering service provider. Consulting, planning, project management

AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE

THE LÖTSCHBERG BASE TUNNEL LESSONS LEARNED FROM THE CONSTRUCTION OF THE TUNNEL

Tram-train in the UK?

1 Introduction. 1.1 General. 1.2 Historical development

Tendering of passenger rail traffic in Norway

C a b l i n g s o l u t i o n s a t t h e c o r e o f R a i l w a y N e t w o r k s

Comparative Analysis of Swiss and Japanese Trunk Railway Network Structures

Thales: World leader in signalling technology and the worldwide ETCS infrastructure leader with the most successful track record in the industry

HSR THE TRAIN OF THE FUTURE New technologies and research trends

Preparing for the Fornebu Metro Line. Ingeborg Krigsvoll, Sporveien Oslo AS June 7, 2016

The future is already here

Documentation on Noise-Differentiated Track Access Charges Information on Status, Background and implementation

Intermodal transport in Sweden and Europe

The ScotRail Alliance a new approach to our customers and our railway. Phil Verster, Managing Director, ScotRail Alliance

High speed railway principles

(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT Nina Tveiten Norwegian National Rail Administration

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal

A Greener Transport System in Denmark. Environmentally Friendly and Energy Efficient Transport

WATERWAYS in Finland

Ventilation and safety :

References: Fully automated metro lines worldwide

Case Study. Cargo Domizil - Intermodal less than truckload transport. European Commission

Intermodal transport of marble from Bulgaria to Italy

Development of a Concept for the Public Transport Interconnectivity for Savaria International Airport. Report

Railway network. [and you drive??] PhD CE Jarosław Zwolski. 1. Railway network in Poland and in Europe. 2. Safety and traffic control

High Speed Rail in Poland plans & activities

ATLAS. Proven Technology & Partnership For interoperability

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV

SBB Infrastructure, Measurement and Diagnostic Technology.

MELBOURNE METRO RAIL NEWSLETTER

E N G I N E E R I N G E X C E L L E N C E. Tunnel ventilation

Simulation of Railway Networks

- WHERE DID WE COME FROM? -

The AMT s Reno-Tunnel Program : Improving Safety in the Mount-Royal Tunnel Is the Result of a Partnership with the Montreal Fire Department

Effects of Strong Cross Winds on High-Speed Trains a Risk Assessment Approach

Cefic Position on Intermodal Transport Network Development

Fit for the European Rail Market Training Competence - Certification

The UK Rail Industry: A Showcase of Excellence

Business Unit. Tunnelling & Civil Engineering. Infrastructure solutions from a single source.

ACTION PLAN

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund

PORTS OF. sh i p to no r way

European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R

Analysing the Metro Cityring in Copenhagen

AER Summer School 2010 W E L C O M E

Coastal Highway Route E39 Project

SBB moving us into the future. Financial Report

HELSINKI EXPERIENCE WITH MASTER PLANNING FOR USE OF UNDERGROUND SPACE

Pipe and cable fastening with plastic pipe clamps

Railway Research and Technology in China Today

November Transforming Sydney. 60% more trains. Faster, more frequent services. No timetable just turn up and go

ECT, shaping your gateway to Europe Opening Euromax Terminal and Delta Barge Feeder Terminal

Railway Simulation & Timetable Planning

Elevated Roads for Sri Lanka

HAMBURGER HAFEN UND LOGISTIK AG

CTCS Chinese Train Control System

Priority decision. High-Frequency Rail Transport Programme

Gottardo 2016 Public Event 4 and 5 June 2016

Transcription:

The Gotthard Base Tunnel

The tunnel On 11 December 2016, the Gotthard Base Tunnel will come into scheduled operation. At 57 kilometres in length, it is the longest rail tunnel in the world. It has virtually no gradients and its highest point is 550 metres above sea level. It will allow passenger trains to travel more quickly through the Alps and reduce the number of locomotives needed by freight trains. The Gotthard Base Tunnel will also shorten the travelling distance between Altdorf (UR) and Bellinzona (TI) by 30 kilometres. During peak periods, around 2,400 people were working on the tunnel construction around the clock in 3 shifts. For the 2 main tunnels and the safety, ventilation and cross cuts, a total of 152 kilometres of tunnel has been bored. Excluding the exploratory work, the construction project has taken 17 years.

Freight traffic The level rail route through the Gotthard brings major benefits for freight traffic. It allows for longer, heavier trains, fewer locomotives and shorter journey times. The efficiency and reliability of rail freight traffic will increase, making it more competitive. In addition, the transport capacity of the route will increase. As many as 260 freight trains will be able to pass through the Gotthard Base Tunnel every day. On the historic mountain route, the maximum number was 180. In future, freight trains travelling through the Swiss Alps will no longer require an additional bank engine, which eliminates the need for time-consuming shunting. This means that the tunnel will be able to absorb the expected increase in the volume of goods being transported on the northsouth route.

Passenger traffic More than 20 million people in the catchment area between southern Germany and northern Italy will benefit from the Gotthard Base Tunnel. Thanks to the level route, train connections will be faster, more reliable and more punctual. Passenger trains will travel every half hour on the north-south axis. Passenger trains generally travel through the tunnel at a speed of up to 200 km/h. In future, top speeds of up to 250 km/h are possible. The reduction in journey times will gradually become noticeable from 2016 onwards. Once work on the entire length of the Gotthard axis (incl. Ceneri Base Tunnel) has been completed, the journey between Zurich and Lugano will be around 45 minutes shorter.

The Gotthard history 1882 Opening of the Gotthard summit tunnel 1947 First drawings for a base tunnel between Amsteg and Bodio 1963 Commission on a rail tunnel through the Alps examines the different options 1989 The Federal Council decides on the network option with the Lötschberg and Gotthard/Ceneri Base Tunnels 1992 The Swiss people approve the bill for the New Rail Link through the Alps (NRLA) 1995 1998 Political debate on redimensioning and refinancing the NRLA 1995 Decision made on the route of the Gotthard Base Tunnel 1996 Initial preparatory work for the Gotthard Base Tunnel in Sedrun 1998 The Swiss people approve the Heavy Goods Vehicle Charge (HGVC) and the bill for modernising the railway (FinPT fund). Financing is secured for the NRLA. 1999 Start of work on the main part of the Gotthard Base Tunnel 2002 First tunnel boring machine in use in the Gotthard Base Tunnel 2007 Opening of the Lötschberg Base Tunnel 2010 Breakthrough in the main part of the Gotthard Base Tunnel 2016 Opening of the Gotthard Base Tunnel 2019/2020 Planned opening of the Ceneri Base Tunnel

Facts and figures Length: 57 km (the longest rail tunnel in the world) Two single-track tubes, connected by cross cuts every 325 m Total length of all the tunnels: 152 km Northern portal in Erstfeld (UR), southern portal in Bodio (TI) Highest point of the tunnel: 550 m above sea level Maximum rock cover: 2,300 m Construction time (excluding exploratory work): 17 years Main tunnels drilled with tunnel boring machines (80 %) and blasted (20 %) Excavated material: 28.2 million tonnes Cost of the Gotthard Base Tunnel: CHF 9.7 billion (cost dating from 1998, excluding increase in VAT and construction interest; effective total cost: CHF 12.2 billion) Cost of the entire NRLA, including the Lötschberg, Gotthard and Ceneri Base Tunnels: CHF 18.2 billion (cost dating from 1998, excluding increase in VAT and construction interest; effective total cost: approx. CHF 23 billion) Tunnel capacity: up to 260 freight trains and 65 passenger trains per day Timetabled speed: freight trains 100 km/h; passenger trains up to 200 km/h Maximum speed: freight trains 160 km/h; passenger trains 250 km/h Train protection system with cab signalling (ETCS Level 2) Reduction in journey time from Zurich to Lugano after completion of the axis (from 2019/2020): around 45 minutes Official opening of the Gotthard Base Tunnel: 11 December 2016

Transport policy Switzerland lies at the heart of one of Europe s most important freight transport axes. Every year around 26 million tonnes of freight is transported through the Swiss Alps by rail and 80 per cent of this is transit traffic. Studies have concluded that this volume will continue to increase. Switzerland wants to promote forms of transport that are efficient, environmentally friendly and space-saving. The population has voted on several occasions to move transalpine traffic from road to rail. The Gotthard Base Tunnel is a core element of Swiss transport policy. By providing an efficient rail infrastructure, Switzerland aims to offer an alternative to road transport through the Alps for freight and passengers. Rotterdam Zeebrugge Cologne Gotthard Lötschberg Milan Ceneri Genoa

Financing The popular vote held in November 1998 secured the longterm funding for the New Rail Link through the Alps (NRLA) and three other major rail projects by establishing the fund for the financing of public transport projects (FinPTO fund). It is financed from three sources: the Heavy Goods Vehicle Charge (HGVC, 60 per cent of the funding), mineral oil tax (10 per cent) and VAT (30 per cent). In addition to the NRLA, the FinPT fund is also financing the expansion of the rail infrastructure (Rail 2000 and ZEB), the connection to the European high-speed rail network and the project to reduce noise on the railways. From January 2016, the FinPT fund will be replaced by the Rail Infrastructure Fund (RIF), which will finance the entire rail infrastructure.

Construction During the construction of the Gotthard Base Tunnel, the tunnellers had to bore through a wide variety of different rock strata, from hard granite to crumbly sedimentary rock. Tunnel boring machines carried out 80 per cent of the work in the main tunnels and conventional blasting methods were used for the remaining 20 per cent. A total of 28.2 million tonnes of excavated material was removed from the tunnel. In order to save time and money, the tunnellers worked on different sections of the tunnel at the same time. Workers, materials and machinery were transported to the construction sites in the mountain via access galleries and shafts. With rock cover up to 2,300 metres in depth, the Gotthard Base Tunnel is the deepest rail tunnel in the world. The temperature inside the mountain reached as high as 50 degrees Celsius.

Main partners gottardo2016.ch Client: Swiss Confederation Tunnel construction company: AlpTransit Gotthard AG (ATG) Tunnel operator: SBB info@gottardo2016.ch 06/2015