Standard Site Drainage and Erosion Control Details (August 15, 2006)



Similar documents
ORDINANCE NO

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Table 4.9 Storm Drain Inlet Protetion Applicable for

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

Architectural Processing and Inspections for Home Mortgage Insurance

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

Chapter 5.0. Stormwater Credits for Innovative Site Planning

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

City of Shelbyville Site Inspection Checklist

City of Mandeville. Guidelines for Construction and Development

Outlet stabilization structure

Floodplain Development Land Use Review

Storm Drain Inlet Protection - IP

City of Beaumont, Texas Grading Permit Information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

SECTION 5 DRAFTING STANDARDS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Definition of Tower from the Bradley County Zoning Resolution

Receiving Water Body:

Storm Drain Inlet Protection for Construction Sites (1060)

MOBILE HOME LAW. Revised November 2001

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Section 801 Driveway Access Onto Public Right-of-Ways

Beseck Switching Station Inspection

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Storm Drain Inlet Protection

RESIDENTIAL DRIVEWAYS

STORMWATER MANAGEMENT CHECKLIST

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Low Impact Development Checklist

SE-10 STORM DRAIN INLET PROTECTION. Objectives

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

Storm Drain Inlet Protection for Construction Sites (1060)

Town of Beaumont. Lot Grading Guidelines

STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY

SITE IMPROVEMENT PLANS CHECKLIST

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

FLOOD HAZARD MANAGEMENT SPECIFIC PLAN GUIDELINES

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

Storm Drain Inlet Protection

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

TREE # 3 CRITICAL ROOT ZONE = 4,536 SF AREA IMPACTED = 50 SF % IMPACTED = 1 % ' BL VALVE IN BOX POP-UP EMITTER 74.7 CLEAN OUT BACKWATER

CITY OF HILSHIRE VILLAGE NEW HOUSE AND HOUSE ADDITION PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

Storm Drain Inlet Protection

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

CHAPTER 5. Storm Sewer

Homeowner s Guide to Drainage

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Preventing Storm Water Pollution: What We Can Do

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Good? Bad? Why? Training Module 4

Administrative Procedures Regarding the Application of Flood Damage Prevention

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

City of St. Petersburg Development Services. February Driveways for Residential Properties

SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:

DESCRIPTION OF WORK:

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

Activity Yes No N/A Notes

FLOOD DAMAGE PREVENTION ORDINANCE

Teller County, Colorado Floodplain Development Permit Application

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Bond Release Process for New Subdivision Developments in Fairfax County

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Storm Water Management Requirements for Construction Projects Less than One Acre

City of Valdosta Land Development Regulations. Table of Contents

How To Amend A Stormwater Ordinance

Block and Gravel Inlet Protection (BIP)

B. Improve the appearance and character of areas surrounding new development.

CHAPTER 11 STORM DRAINAGE

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL Phone: (630) x 131 / Fax: (630)

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33, Mile: Population: 80,200 Median HH Income: $34,900

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

SITE PLAN REVIEW RESOLUTION BERGEN COUNTY, NEW JERSEY

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Permeable Pavement Construction Guide

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Transcription:

City of St. Petersburg Construction Services and Permitting Standard Site Drainage and Erosion Control Details (August 15, 2006) Attached are the City Engineer s approved City standards dated September 2004, (Details S10-60, 61, 62, and 63) for Site Drainage compliance and Erosion Control for building sites. These standard details are intended to aid the general public in understanding the process necessary to obtain approval for site drainage and erosion control. The attached plans are standard approved plans, however signed and sealed civil drawings that comply with city water management should be approved. Site Drainage Lot Grading Details S10-61, 62, and 63 are guides for the suggestive resolution of site drainage pertaining to three majors scenarios which are; drainage to roadway (front), drainage to roadway and alley (front and rear), and drainage to alley (rear). Final as-built surveys must be reviewed for compliance with the above guides including the following which are found within the Notes of each guide: The design engineer must provide existing and design elevations at every corner of the lot, high points on the lot and at the corners of the building. Upon completion of the work as permitted and prior to the issuance of a Certificate of Occupancy, the Site Engineer of record must submit a signed and sealed letter of site certification. Roof gutters and down spouts shall be located as necessary to direct drainage to the front or rear of any property. Drainage onto adjoining properties is prohibited. All drainage shall be directed to the front or rear of the parcel in a minimum 6-inch deep side yard channel with 4:1 side slopes. Erosion Control Every project shall be compliant with the City s erosion control standard which shall be known as and may be cited as the Drainage and Surface Water Management Ordinance and is located in Section 16-311 of the municipal code. Exceptions: Regardless of lot size single family home, duplex, triplex, or quadruplex, which is not part of a larger common plan of development. Residential in-fill lots may require silt fencing as ordered or directed by the building official. Reconstruction in association with projects required under the Florida Administrative Code for the assessment and remediation of contaminated soils and ground waters. The exemption is limited to the area reconstructed after remediation to restore the project site to its pre assessment/remediation condition. Construction sites less than one acre, which are compliant with Erosion Control Detail Standard S10-60 shall be considered in compliance with the Drainage and Surface Water Management Ordinance -END-

(Date) City of St. Petersburg Construction Services and Permitting Division One Fourth St. N. St. Petersburg, FL 33701 Re: Permit # (Insert Permit #) To Whom It May Concern: This letter will serve to certify that the above referenced project has been constructed in accordance with the City of St. Petersburg s approved site construction plans for the items listed below. (Each site item must be specified by the Certified Engineer of record. Failure to specify those items being certified will result in the assumption that the letter is certifying all site items on the plans as submitted.) 1) Paving and grading of parking lot 2) Stormwater drainage 3) Potable water service 4) Sanitary sewer system 5) Reclaimed water system Sincerely, (Name) Engineer of Record Florida Registration # (Please Note: Original Seal must be affixed.)

ALLEY, SEE NOTE 14 STAKED SILT ARRIER,TYP., SEE NOTES 4,5,AND 8 LOT LINE, TYP. UILDING UNDER CONSTRUCTION 20' MIN. TEMPORARY SEE NOTE 9 GRAVEL ENTRANCE, 20' MIN. LOT LINE, TYP. SIDEWALK SIDEWALK ROADWAY, SEE NOTE 14 CATCH ASIN EROSION CONTROL, SEE NOTES 5,6,8,AND 11 EXISTING OR PROPOSED DRIVEWAY, SEE NOTE 10 TYPICAL AN VIEW NOTES 1. NON-CONFORMANCE WITH THE ITEMS LISTED OR SHOWN ON THIS DETAIL MAY RESULT IN A "STOP WORK" ORDER. 2. THE PURPOSE OF THIS DETAIL IS TO ASSIST THE DEVELOPER/UILDER MEET THE MINIMUM REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT ISSUED TO THE CITY OF ST. PETERSURG. 3. THIS DETAIL IS FOR CONSTRUCTION SITES OF LESS THAN ONE ACRE. 4. THE SILT ARRIER SHALL E INSTALLED ONE FOOT INSIDE THE PROPERTY LINE OR TWO FEET FROM THE SIDEWALK AS SHOWN AOVE. FOR SILT ARRIER REQUIREMENTS AND INSTALLATION REQUIREMENTS, SEE STANDARD DETAIL-STAKED SILT ARRIER; DRAWING NO. S40-92. 5. INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES DAILY AND/OR AFTER A RAINFALL. 6. FOR CUR INLET FILTER REQUIREMENTS, SEE STANDARD DETAIL-CUR INLET FILTER FOR EROSION CONTROL AT CATCH ASIN; DWG. NO. S40-93, OR FOR HALE ALE REQUIREMENTS, SEE STANDARD DETAIL-HAY ALES FOR EROSION CONTROL AT CATCH ASIN; DWG. NO. S40-94. 7. EXISTING GRASS VEGETATION SHALL E MAINTAINED AT A 10 INCH HEIGHT OR LESS, AS PER CITY CODE, CHAPTER 16; SECTIONS 16-1070 THRU 1076. 8. ALL SOIL EROSION CONTROL DEVICES MUST REMAIN IN ACE UNTIL VEGETATION IS ESTALISHED. ALL DISTURED AREAS SHALL E SODDED AFTER FINAL GRADING. 9. THE TEMPORARY GRAVEL ENTRANCE: 6 INCH MINIMUM OF #1 or #2 STONE, COMPACTED. 10. IF THERE IS NO EXISTING DRIVEWAY OR AN ALTERNATE INGRESS/EGRESS IS TO E USED DURING CONSTRUCTION THIS METHOD OF ACCESS SHALL CONFORM TO THE "TEMPORARY GRAVEL ENTRANCE" AS STATED AOVE. 11. REGULARLY REMOVE COLLECTED SEDIMENT AND DERIS FROM THE SILT ARRIERS AND GUTTER FLOW LINE. 12. FOR ALL SAND AND SOIL STOCKPILES DUST/EROSION CONTROL MEASURES SHALL E PROMOTED. 13. KEEP CONSTRUCTION SITE LITTER/DERIS, AND LEAKING CONTAINERS IN ORDERLY CONTAINMENT AREAS. 14. SWEEP ENTRANCE AND ADJACENT ROADWAY WEEKLY TO KEEP FREE OF CONSTRUCTION DERIS. 15. SWEEP PAVED SURFACES ONLY. DO NOT WASH DOWN UNTIL SITE IS FINISHED. 16. SINGLE FAMILY INFILL LOTS MAY REQUIRE SILT FENCE AS ORDERED OR DIRECTED Y THE CITY UILDING OFFICIAL. Y 12/04 ENGINEERING DEPARTMENT CITY of ST. PETERSURG SCALE: N.T.S. SITE AN-EROSION CONTROL DETAIL APPROVED Y: : SEPT. 2004 DWG. No. S10-60

A PROTECTIVE REAR SLOPE PROTECTIVE FRONT SLOPE REAR, SEE NOTE 7 LP PARKWAY SLOPE @ 2MIN. TO 8MAX. UILDING A SIDE, SEE NOTE 8 SLA LP ROADWAY ACK OF CUR TYPICAL GRADING AN VIEW REAR LOT LINE FILL FOR DRIVEWAY AND SIDEWALK ONLY UILDING SLA REAR RIGHT-OF-WAY C L SIDE (S), SEE NOTE 8 UILDING SLA EXISTING LOT SLOPE SEE NOTE 4 TYPICAL SECTION A-A TYPICAL SECTION - (DOULE SCALE) NOTES: 1. FILL IN FEMA FLOOD ZONES A AND AE IS LIMITED PER CITY CODE, SEE CHAPTER 16. A SEPERATE SITE AN SHOWING EXISTING AND PROPOSED ELEVATIONS AND DRAINAGE AN IS REQUIRED IN FEMA FLOOD AREAS. THESE ANS SHALL E SIGNED AND SEALED Y A FLORIDA REGISTERED ENGINEER. 2. FILL IN FLOOD ZONE VE IS PROHIITED, PER CITY CODE, SEE CHAPTER 16. 3. EXISTING AND DESIGN ELEVATIONS ARE REQUIRED FOR POINTS IDENTIFIED Y THIS SYMOL: 4. UILDING SLA SHALL E 1' MINIMUM AOVE THE CENTERLINE OF THE ROADWAY AND NOT LESS THAN A MINIMUM ELEVATION OF 103.00 PER CITY DATUM OR AS DICTATED Y FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA). 5. LOT GRADING SHALL MAINTAIN HISTORICAL FLOW PATHS AND PREVENT THE ACCUMULATION OF WATER OR EXCESSIVE RUNOFF ONTO ADJACENT PROPERTIES. 6. LOTS IN EXISTING SUDIVISIONS REQUIRE EXISTING ELEVATIONS 5' INTO ADJOINING PROPERTIES OR EXISTING (S). 7. REAR SHALL DRAIN TO SIDE S AND TO ROADWAY ON EACH LOT SIDE AND SHALL FUNCTION INDEPENDENTLY FROM ALL ADJOINING LOTS. 8. SIDE S SHALL E SIZED TO ACCOMMO A MINIMUM OF A 10 YEAR, 1 HOUR RAIN EVENT, MINIMUM SIZE SHALL E 6" DEEP WITH 4:1 SIDE SLOPES. 9. ROOF GUTTERS AND LEADERS IN CONJUNCTION WITH YARD DRAINS AND INLETS ARE REQUIRED WHERE NECESSARY FOR ADEQUATE DRAINAGE. 10. WHEN SILT FENCING IS REQUIRED, SEE CITY STANDARD DETAIL, SITE AN-EROSION CONTROL; DWG. NO. S10-60. 11. FINAL AS-UILT ELEVATIONS SHALL E CERTIFIED Y A REGISTERED LAND SURVEYOR TO CONFIRM COMIANCE WITH THE PROPOSED DESIGN ELEVATIONS. Y 06/02 SCALE: ENGINEERING N.T.S. DEPARTMENT CITY of ST. PETERSURG APPROVED Y: GUIDE FOR TYPE "A" LOT GRADING DETAIL (ALL DRAINAGE TO ROADWAY) : DWG. No. APRIL 1998 S10-61

A PROTECTIVE FRONT SLOPE ALLEY HIGH POINT'S UILDING SLA PARKWAY SLOPE @ 2MIN. TO 8MAX. A SIDE, SEE NOTES 7 AND 8 ACK OF CUR ROADWAY TYPICAL GRADING AN VIEW C L FILL FOR DRIVEWAY AND SIDEWALK ONLY RIGHT-OF-WAY LC SIDE (S), SEE NOTE 8 UILDING SLA UILDING SLA HIGH POINT EXISTING LOT SLOPE SEE NOTE 4 TYPICAL SECTION A-A TYPICAL SECTION - (DOULE SCALE) NOTES: 1. FILL IN FEMA FLOOD ZONES A AND AE IS LIMITED PER CITY CODE, SEE CHAPTER 16. A SEPERATE SITE AN SHOWING EXISTING AND PROPOSED ELEVATIONS AND DRAINAGE AN IS REQUIRED IN FEMA FLOOD AREAS. THESE ANS SHALL E SIGNED AND SEALED Y A FLORIDA REGISTERED ENGINEER. 2. FILL IN FLOOD ZONE VE IS PROHIITED, PER CITY CODE, SEE CHAPTER 16. 3. EXISTING AND DESIGN ELEVATIONS ARE REQUIRED FOR POINTS IDENTIFIED Y THIS SYMOL: 4. UILDING SLA SHALL E 1' MINIMUM AOVE THE CENTERLINE OF THE ROADWAY AND NOT LESS THAN A MINIMUM ELEVATION OF 103.00 PER CITY DATUM OR AS DICTATED Y FEDERAL EMERGENCY MANAGEMENT AGENCY 5. LOT GRADING SHALL MAINTAIN HISTORICAL FLOW PATHS AND PREVENT THE ACCUMULATION OF WATER OR EXCESSIVE RUNOFF ONTO ADJACENT PROPERTIES. 6. LOTS IN EXISTING SUDIVISIONS REQUIRE EXISTING ELEVATIONS 5' INTO ADJOINING PROPERTIES OR EXISTING (S). 7. SIDE S SHALL DRAIN TO ROADWAY ON EACH LOT SIDE AND SHALL FUNCTION INDEPENDENTLY FROM ALL (FEMA). ADJOINING LOTS. 8. SIDE S SHALL E SIZED TO ACCOMMO A MINIMUM OF A 10 YEAR, 1 HOUR RAIN EVENT, MINIMUM SIZE SHALL E 6" DEEP WITH 4:1 SIDE SLOPES. 9. ROOF GUTTERS AND LEADERS IN CONJUNCTION WITH YARD DRAINS AND INLETS ARE REQUIRED WHERE NECESSARY FOR ADEQUATE DRAINAGE. 10. WHEN SILT FENCING IS REQUIRED, SEE CITY STANDARD DETAIL, SITE AN-EROSION CONTROL; DWG. NO. S10-60. 11. FINAL AS-UILT ELEVATIONS SHALL E CERTIFIED Y A REGISTERED LAND SURVEYOR TO CONFIRM COMIANCE WITH THE PROPOSED DESIGN ELEVATIONS. Y 06/02 SCALE: ENGINEERING N.T.S. DEPARTMENT CITY of ST. PETERSURG APPROVED Y: GUIDE FOR TYPE "" LOT GRADING DETAIL (ALL DRAINAGE ROADWAY AND ALLEY) : DWG. No. APRIL 1998 S10-62

A PROTECTIVE FRONT SLOPE FRONT, SEE NOTE 7 LP PARKWAY SLOPE @ 2MIN. TO 8MAX. A Tue, 22 Aug 2006-8:55am J:\D_Folder\City-Standards_06\STANDARD_DETAILS\S10-GENERAL DETAILS\S10-63.dwg atcarta LC NOTES: ALLEY SIDE, SEE NOTE 8 06/02 UILDING SLA SEE NOTE 4 TYPICAL SECTION TYPICAL A-A UILDING SLA ACK OF CUR GRADING AN VIEW LC ROADWAY SIDE (S), SEE NOTE 8 TYPICAL SECTION - (DOULE SCALE) 3. EXISTING AND DESIGN ELEVATIONS ARE REQUIRED FOR POINTS IDENTIFIED Y THIS SYMOL: 4. UILDING SLA SHALL E 1' MINIMUM AOVE THE CENTERLINE OF THE ROADWAY AND NOT LESS THAN A MINIMUM ELEVATION OF 103.00 PER CITY DATUM OR AS DICTATED Y FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA). 5. LOT GRADING SHALL MAINTAIN HISTORICAL FLOW PATHS AND PREVENT THE ACCUMULATION OF WATER OR EXCESSIVE RUNOFF ONTO ADJACENT PROPERTIES. 6. LOTS IN EXISTING SUDIVISIONS REQUIRE EXISTING ELEVATIONS 5' INTO ADJOINING PROPERTIES OR EXISTING (S). 7. FRONT SHALL DRAIN TO SIDE S AND TO ALLEY ON EACH LOT SIDE AND SHALL FUNCTION INDEPENDENTLY FROM ALL ADJOINING LOTS. 8. SIDE S SHALL E SIZED TO ACCOMMO A MINIMUM OF A 10 YEAR, 1 HOUR RAIN EVENT, MINIMUM SIZE SHALL E 6" DEEP WITH 4:1 SIDE SLOPES. 9. ROOF GUTTERS AND LEADERS IN CONJUNCTION WITH YARD DRAINS AND INLETS ARE REQUIRED WHERE NECESSARY FOR ADEQUATE DRAINAGE. 10. WHEN SILT FENCING IS REQUIRED, SEE CITY STANDARD DETAIL, SITE AN-EROSION CONTROL; DWG. NO. S10-60. FILL FOR DRIVEWAY AND SIDEWALK ONLY FRONT 1. FILL IN FEMA FLOOD ZONES A AND AE IS LIMITED PER CITY CODE, SEE CHAPTER 16. A SEPERATE SITE AN SHOWING EXISTING AND PROPOSED ELEVATIONS AND DRAINAGE AN IS REQUIRED IN FEMA FLOOD AREAS. THESE ANS SHALL E SIGNED AND SEALED Y A FLORIDA REGISTERED ENGINEER. 2. FILL IN FLOOD ZONE VE IS PROHIITED, PER CITY CODE, SEE CHAPTER 16. 11. FINAL AS-UILT ELEVATIONS SHALL E CERTIFIED Y A REGISTERED LAND SURVEYOR TO CONFIRM COMIANCE WITH THE PROPOSED DESIGN ELEVATIONS. Y SCALE: UILDING ENGINEERING N.T.S. DEPARTMENT CITY of ST. PETERSURG APPROVED SLA GUIDE FOR TYPE "C" LOT GRADING DETAIL Y: (ALL DRAINAGE TO ALLEY) : DWG. No. APRIL 1998 S10-63