Skoda Supercritical Steam Turbine 660 MW



Similar documents
Piping Systems for Nuclear Power Industry. Prague, October 2011

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

Thermodynamical aspects of the passage to hybrid nuclear power plants

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

Steam Turbine Concepts for the Future Volatile Power Market

Efficiency Assessment of Condensing Steam Turbine

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

FIXED DISPLACEMENT HYDRAULIC VANE PUMPS BQ SERIES

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

EXPERIMENTAL RESEARCH ON FLOW IN A 5-STAGE HIGH PRESSURE ROTOR OF 1000 MW STEAM TURBINE

Industrial Steam Turbines

Siemens Steam Turbine-Generator SST-5000 Series. for combined cycle and subcritical steam applications. Answers for energy.

4 th EU Sout Africa Clean Coal Working Group Meeting

API Flanged Safety Relief Valves Series 526 CATALOG

FIXED DISPLACEMENT HYDRAULIC VANE PUMPS BQ SERIES

FIXED DISPLACEMENT HYDRAULIC VANE PUMPS BQ SERIES

World Bridge Replacement Parts for EMD 567 and 645 Diesel Engines

Eurovacuum EV Series. Single Stage Oil Sealed Rotary Vane Pump

OROT RABIN POWER STATION UNITS x 350 MW

INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK

The conditions below apply to the curves shown on the following pages.

SCP ISO. Other advantages: SCP ISO is a series of piston pumps with a fixed displacement for mobile and stationary hydraulics.

STEAM HEATING SYSTEM TROUBLESHOOTING GUIDE

Development of Tandem-Compound 1,000-MW Steam Turbine and Generator

Pre-designed Steam Turbines

912 MW Supercritical Boiler for the next Coal Fired Plant Generation

Thermostatic valve Type AVTA

DUGARD. Machine Tools Since Dugard 700L Series Heavy Duty CNC Lathes.

1 DESCRIPTION OF THE APPLIANCE

Committed to make a better world

MAKING MODERN LIVING POSSIBLE. Thermostatic valve AVTA. Technical brochure

THEORETICAL ANALYSIS OF THE PERFORMANCE OF DUAL PRESSURE CONDENSER IN A THERMAL POWER PLANT

EJECTOR AIR REMOVAL SYSTEMS ENGINEERING DATA BULLETIN # PVS ARS PAGE 1 OF 5

Volkswagen Golf > VW Rabbit GTI 2006->

Progress on High Efficiency Coal Power Plants

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power

PHOTOVOLTAIC (PV) solar panels. Specification. Electricity - CE & ISO 9000 certified. 83W panel. 180W panel Maximum power:

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

DiwiTherm, Resistance Thermometers Model TR75, with digital Display Battery or Solar Powered

RPT SIGMA PUMPY HRANICE ROTARY LOBE DISPLACEMENT PUMPS

Product catalogue, pipe and sewer cleaning systems

USC Steam Turbine technology for maximum efficiency and operational flexibility. Dr. Rainer Quinkertz Andreas Ulma Edwin Gobrecht Michael Wechsung

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar

Vertical selfpriming Side-Channel Pumps Type WPV

ECOplus Solar Cylinder

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

Roller bearing life. The Reaction of AISI Bearing Steel to Heat

Power Plant Electrical Distribution Systems

SIRIUX. SINGLE AND DOUBLE HIGH EFFICIENCY CIRCULATORS Heating Air-conditioning OPERATING LIMITS APPLICATIONS. 28 m 3 /h* Heads up to: Flows up to:

Solar Thermal Energy Storage Technologies

Solar Hot Water Heaters

Half the cost Half the carbon

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

V47 Series Temperature Actuated Modulating Water Valves

Siemens Steam Turbine SST-600

Cooking at the Speed of light!

Technical Specification. Generating Set with Waukesha engine burning natural gas

INTEC Engineering GmbH Heating Solutions for the Marine Industry

HT3 series Peck Feed Drills, with Equal Drill Time

Technical data. Danfoss DHP-A

The Worcester Greenstar System Filter. An innovative solution for reducing system contaminants

H I G H S P I N W A S H E R E X T R A C T O R S H C 6 0 H C 6 5 H C 7 5 H C H C H C 1 6 5

Thermostatic actuator RAVI - for 2-way valves RAV-/8 (PN 10), VMT-/8 (PN 10), VMA (PN 16) - for 3-way valves KOVM (PN 10), VMV (PN 16)

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

Series description: Wilo-Yonos MAXO

Assisted lift operated 2/2-way solenoid valves Type EV250B

DE-TOP User s Manual. Version 2.0 Beta

LLC "VT Technology" INTRODUCTION OF SCREW ROTOR STEAM ENGINES AT THERMAL POWER GENERATION FACILITIES. St. Petersburg, Russia 2015

October 8, WHP Waste Heat-to-Power Fuel and Emission Free Power

Laddomat Charging unit

Backflush filter R8-30W

STEAM TURBINE 1 CONTENT. Chapter Description Page. V. Steam Process in Steam Turbine 6. VI. Exhaust Steam Conditions, Extraction and Admission 7

IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

Webpage: Volume 3, Issue IV, April 2015 ISSN

SolCalor B.V. is officiel Benelux Service Center of SRB-Energy. Marktstraat 23, 5701 RM, Helmond, The Netherlands. Tel: +31-(0) Website:

Series description: Wilo-Yonos MAXO-D

Description of functions

Thermostatic actuator RAVK - for 2-way valves RAV-/8 (PN 10), VMT-/8 (PN 10), VMA (PN 16) - for 3-way valves KOVM (PN 10), VMV (PN 16)

Thermostatic actuator RAVK - for 2-way valves RAV-/8 (PN 10), VMT-/8 (PN 10), VMA (PN 16) - for 3-way valves KOVM (PN 10), VMV (PN 16)

How To Power A Power Plant With Waste Heat

Series description: Wilo-Drain TC 40

1/29/2008 DR70. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 43

Self-operated Pressure Regulators Universal Pressure Reducing Valve Type 41-23

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria

CDX. EBARA PUMPS EUROPE S.p.A. CENTRIFUGAL PUMPS. Page - CONTENTS 100

Generators TEM. for small hydroelectric power stations. Electric Machines

TUTORIAL ON STEAM TURBINE DRIVERS FOR FOSSIL AND NUCLEAR FEED PUMP APPLICATIONS

Session 2: Hot Water Supply

ASPE Seminar Water Heater Piping Strategies. Presented by Joe Kalarickal, EIT Regional Sales Manager AERCO International

DUGARD. DUGARD Machine. Dugard Heavy Duty Vertical Machining Centres. Machine Tools That Create Solutions Since Tools

HEAVY DUTY STORAGE GAS

Tsurumi BER. Submersible Ejectors

MEMBRANE VACUUM MINI PUMPS

Vacuum drying oven for non-flammable solvents

That s E[M]CONOMY: Not just training: Real Action! CONCEPT TURN 250. Training reality with industrial performance

Transcription:

Skoda Supercritical Steam Turbine 660 MW Jiri Fiala Head of Engineering Dept. Skoda Power s.r.o. 27th of October 2010 Vrnjacka Banja - Serbia

ŠKODA History Establishment of the company in 1859 Mr. Emil Škoda, founder of Škoda Works

ŠKODA History Eminent personalities in the history of ŠKODA steam turbines Prof. Auguste Rateau First steam turbine produced by ŠKODA Works in 1904 Prof. Aurel Stodola

History Slide with Timeline and Key Milestones 1904 - First steam turbine 550 HP system Rateau 1911 - Turbines or the Rateau system were replaced by turbines of ŠKODA s own design 1932 - Two 23 MW steam turbines with steam reheating 1959 - Turboset 110 MW 1966 - Turboset 200 MW 1976 - Turboset 220 MW for nuclear power plant 1978 - Turboset 500 MW 1992 - Turboset 1000 MW for nuclear power plant 2007 - USC unit 660 MW for Ledvice Power Plant 2009 - Company Doosan Heavy Industries & Construction has completed the acquisition s.r.o. and established s.r.o., A Doosan company

ULTRASUPERCRITICAL UNITS

Comparison of parameters 47,0% 46,0% nett efficiency 45,0% 44,0% 43,0% 42,0% vacuum: 0.045 bar 250 bar 540 C 560 C 250 bar 566 C 566 C 270 bar 580 C 600 C 285 bar 600 C 620 C 41,0% 167 bar 538 C 538 C 40,0% 39,0%

Steam parameters development

Project information Power Plant Ledvice, Czech Republic: Client: CEZ Czech Republic EPC : Skoda Praha Invest Main Deliveries: Boiler Alstom Coal - lignite heat content 11 MJ/kg, consumption 460 t/h Steam Turbine SKODA Power type MTD 70 Live steam 265 bars, temp. 597 C/606 C

Project information Škoda Power scope: Condensing turbine MTD 70-660 MW Generator with excitation system Condensers LP and HP feed water heating systems All interconnecting piping, armatures Control system, instrumentations Lube oil system By-passes DWH system TG foundation

HBD 660 MW 100% / 18,5 C

Škoda steam turbine design Turbine arrangement : 1xHP, 1x double flow IP, 2x double flow LP Length of turbine 32170 mm Weight incl. main valves approx. 1091 t

Škoda steam turbine design Concept of USC Steam Turbine ŠKODA Design Reliability: new USC turbine 660 MW is derived from successful and proven design of 500 MW configuration is identical / USC turbine takes over the majority of modules High steam temperature is enabled by application of modern heat resisting materials Suppliers of basic components rotor forgings, turbine casings, forgings and castings for turbine valves, material for blades are leading European companies with references from USC units Vallourec-Mannesmann, Saarschmiede, Alstom, Böhler

Basic Parameters of USC Turbine ŠKODA 660 MW Live Steam Pressure / before HP ES valves 27,3 / 26,5 MPa Live Steam Temperature- Boiler / before HP ES valves 600 / 597 C Steam Flow nominal 468 kg/s (1685 t/h) Reheat Steam Temperature boiler outlet / before IP valves 610 / 606,5 C Cooling Water nominal temperature 18,5 C Electrical Output 660 MW Speed 3000 rpm Thermal Efficiency of Turbine Cycle 51,5 % η tdi HP / IP / LP 92,5 / 94,6 / 92%

Materials of Main turbine Components G-X12CrMoVNbN9-1 T671 H950 X14CrMoVNbN10-1 27NiCrMoV15-6 Bolts parting Plane Inconel 718 Blades Böhler T550 / Böhler T505SC Piping P92 / P91

Materials of Main turbine Components Moving blades HP part Böhler T 550 Extra Re > 600 MPa Rm 800 to 950 MPa IP part Böhler T 505SC Re > 750 MPa Rm 870 to 1020 MPa LP part X12Cr13 mod. Re > 490 MPa Rm 650 to 800 MPa LP part L-0 Böhler T 671 H950 Re > 1103 MPa Rm > 1172 MPa Turbine rotors HP rotor COST F Re > 700 MPa Rm 800 to 950 MPa IP rotor COST F Re > 700 MPa Rm 800 to 950 MPa LP rotors 27NiCrMoV15-6 Re > 700 MPa Rm 850 to 1000 MPa Main steam valve chambers HP valves G-X12CrMoVNbN 9 1 Re > 450 MPa Rm 620 to 850 MPa IP valves G-X12CrMoVNbN 9 1 Re > 450 MPa Rm 620 to 850 MPa

Four casing configuration High pressure casing 1 x HP single flow (10 stages) Bearing span 5300 mm Weight 122 t

Four casing configuration High pressure casing

Four casing configuration Intermediate pressure casing 1 x IP double flow (2 x 8 stages) Bearing span 5450 mm Weight 154 t

Four casing configuration Intermediate pressure casing

Four casing configuration Low pressure casing 2 x LP double flow (4 x 5 stages) Bearing span 8250 mm Weight 2 x 370 t

Four casing configuration LP rotor solid forged Weight 80 t

Four casing configuration Last stage moving blade Material T 671 Length 1085 mm (42 )

Four casing configuration LP casing steam inlet

Main steam valves HP control and stop valve two chambers / left and right / alongside HP casing Valve body material P91 Basic material of inner parts P91, P92 Stop valve balanced type Control valves valve unbalanced type Graphite spindle sealing

Main steam valves LP control and intercept valve IP Interception and Control Valves - four combined valves - two on each side of IP turbine Valve body material P91 Basic materials of inner parts P91, X22CrMoV Intercepting and control valve balanced Graphite Chesterton spindle sealing

Main steam valves

Turbine journal bearings Diameter [mm] Front HP Rear HP Front IP Rear HP Front LP1 Rear LP1 Front LP2 Rear LP2 Ø 300 Ø 400 Ø 400 Ø 500 Ø 560 Ø 560 Ø 560 Ø 560

ŠKODA USC 660 MW UNIT MAIN DATA OF MACHINE HALL: Whole length of TG 59,7 m (incl. space for gen. rotor assy) TG elevation 15,00 m (TG centr. 16,3 m) Machine hall dimension cca 39 x 90 m Main machine hall elevation + 15,00 m, + 6,00 m (heaters), ± 0,00 m, - 4,50 m TG foundation No. of springs (GERB) with spring supported upper slab 142 pcs

ŠKODA USC 660 MW UNIT TG foundation

ŠKODA USC 660 MW UNIT TG foundation

ŠKODA USC 660 MW UNIT Checking point of foundation

ŠKODA USC 660 MW UNIT GENERATOR

ŠKODA USC 660 MW UNIT GENERATOR Stator weight Rotor weight 316 t 75 t

ŠKODA USC 660 MW UNIT GENERATOR

ŠKODA USC 660 MW UNIT Main steam condensers: No. of pieces for unit 2 Type of condenser surface, single path Heat transfer area 2 x 19 000 m² Tubing number 20 462 pcs dimensions Ø 22,0 x 0,70 x 13 520 mm material ss Condenser superstructure LP by pass damp tubes LPH No. 1 (condenser 1) LPH No. 2 (condenser 2) Cooling water flow 15 000 kg/s Evacuation 3 x 50% - water ring pumps Ball continuous sponge cleaning system

ŠKODA USC 660 MW UNIT Main condenser - tubes

ŠKODA USC 660 MW UNIT Main condenser

ŠKODA USC 660 MW UNIT LP heater for placing into condenser neck

ŠKODA USC 660 MW UNIT LP heater placed in condenser neck

ŠKODA USC 660 MW UNIT Feed water tank dia 4 m length 21,5 m Weight 120 t Capacity 250 m 3

ŠKODA USC 660 MW UNIT Feed water tank

ŠKODA USC 660 MW UNIT TG 660 MW

ŠKODA USC 660 MW UNIT TG 660 MW

ŠKODA USC 660 MW UNIT

ŠKODA USC 660 MW UNIT

ŠKODA USC 660 MW UNIT

ŠKODA USC 660 MW UNIT

ŠKODA USC 660 MW UNIT

ŠKODA USC 660 MW UNIT

ŠKODA USC 660 MW UNIT

ŠKODA USC 660 MW UNIT

ŠKODA USC 660 MW UNIT Thank very much you for your attention. Questions, please.