LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Similar documents
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

Request for Proposals for Photovoltaic System Installation

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

City of San Diego Residential Photovoltaic Systems Inspection Guidelines

Duke Energy Carolinas. Inverter Based Generation Interconnection

Key Concepts Of Distributed Generation

How To Plan Out An Array Of Solar Panels

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

City of Riverside Building & Safety Division Phone: (951)

TERMS AND CONDITIONS

2016 Santee Cooper Solar Home & Solar Share Home Program Manual

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Section III Schedule of Requirements TECHNICAL SPECIFICATIONS OF THE REQUIRED SYSTEMS

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

Rebates are available on a first come, first-serve basis. There are a limited number of rebates available in 2010.

NOTICE OF INTENT Department of Revenue Policy Services Division. Income Tax Credits for Wind or Solar Energy Systems (LAC: 61:I.

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

ALL STAR ELECTRIC COMPANY 10,000 Trumbull SE, Suite #F Albuquerque, NM (505) voice & fax NM License

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

County of Riverside Building and Safety Department

SPECIFICATION COG-2007

SOUTH CAROLINA. Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

Solar Panel Installations

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

RESIDENTIAL PHOTOVOLTAIC SUBMITTAL REQUIREMENTS

Photovoltaic Incentive Program

Doe Residence kw DC Roof Mounted Photovoltaic System

CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN

Ontario Electrical Safety Code 25 th Edition/ 2012

Dakota Energy Cooperative, Inc. POLICY STATEMENT

SECTION POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

Interconnection Application For Residential and Commercial Power Systems 10 kw or Smaller

To complete the process for a net metering interconnection, please follow the steps below:

DC disconnects for solar photovoltaic installations. Connecting the. power of the sun

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

ACTIVITY 6: Series and Parallel Wiring

Solar Electric Power System Owner s Manual

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

INDEPENDENCE POWER & LIGHT DEPARTMENT Independence, Missouri. Schedule NM-1 Customer-Generator Net Metering Contract Service Rider

FIT TIER 2 Application

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations

Expedited Permit Process for PV Systems AC Module

CUTES Solar Power System

Corona Department of Water & Power (DWP) Solar Partnership Program Guidelines and Application

Inverter / Charger Installation General Operations and AC and DC Connections

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

AUSTIN ENERGY INTERCONNECTION GUIDE FOR CUSTOMER-OWNED POWER PRODUCTION FOR FACILITIES UP TO 10MW A INTERCONNECTION CLASSIFICATIONS...

Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Electric Rate Schedule

Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings

Installation Guide Solar Connect-11

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

Air-cooled Generator Battery Charger Installation Guidelines

Project Name: Nortrax Section Project No: SURGE PROTECTION DEVICES Page 1

Solar Kit. Complete solution to optimize your photovoltaic system

Additional Solar System Information and Resources

AC Coupling of Inverters for Grid Tied PV Systems

SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original

Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems

INFORMATION DOCUMENT

Physical Address: City: State: Zip Code:

SOLAR PV INFORMATION. January, 2015

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Solar Matters III Teacher Page

Submittal Requirements for Solar Photovoltaic Installations 10 kw or Less in One and Two Family (Duplex) Dwellings

MicroFIT Connection Application Guidelines

HOW A DC UTILITY METER CAN TRANSFORM THE U.S. SOLAR INDUSTRY

Designing Multi-Tenant and Multi-Home Developments with Enphase Microinverters

SECTION LOW VOLTAGE LIGHTING CONTROLS

PV (photovoltaic) Basics There are generally two types of PV systems. The first and easiest (though the least flexible) is a grid tie system where

ELECTRICAL INSPECTION BULLETIN (Effective )

ADDENDUM #1(BID PACKAGE # 3)

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

Application Note: String sizing Conext CL Series

Installation Guide of Sunrise Solartech PV Modules. Term Contents. Purpose of this guide. General. Safety precaution for installing a solar

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches

Welcome 2016 Residential and Commercial Solar Photovoltaic

Solar monitoring gateway quick start guide

Plumas Sierra Solar Rebate Program Guidebook 2015

Diesel Engine Driven Generators Page 1 of 6

Activity 9: Solar-Electric System PUZZLE

TECHNICAL SPECIFICATIONS

User Manual. Hybrid 1KW-5KW INVERTER / CHARGER. Version: 1.1

When Do Solar Electric & Utility Back-Up Systems Make Sense?

HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012

Special Specification 6033 Computerized Transportation Management System

MTE SERIES RLW. World REACTORS USER MANUAL PART NO. INSTR 030 REL MTE Corporation

TERMS AND CONDITIONS

NORTH LITTLE ROCK ELECTRIC DEPARTMENT NET METERING RULES

Photovoltaic Systems II EE 446/646

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.

Transcription:

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems A. General This Net Metering Standard for Customer-Owned Grid Connected Electric Generating Systems sets forth the requirements and conditions for interconnected non-utility-owned electric generation where such generation may be connected for parallel operation with the electrical system of the City of Lehi s electrical system (Lehi City Power). Generating systems will be permitted to interconnect to Lehi City Power s electric distribution system at service level voltage only after a determination by Lehi City Power that such interconnection will not interfere with the operation of the distribution circuit and ensures the safety of Lehi City Power employees and customers. B. Interconnection Requirements 1. Customer shall comply with all the latest applicable National Electric Code (NEC) requirements [NEC Articles 690 and 705], NESC requirements, State of Utah requirements, building codes, and shall obtain electrical permit(s) for the equipment installation. 2. Meter and transformer or transformer pole serving the Customer-Generator shall be labeled to indicate potential electric current back feed. Lehi City Power will provide and install labels when Customer-Generator s electric system is approved for interconnection. 3. Customer shall provide space for metering equipment, Lehi City Power service meter base, and generation system output meter base as per Lehi City Power requirements. 4. Customer s over-current device at the service panel shall be marked to indicate power source and connection to the Lehi City Power s distribution system. 5. The Customer shall assume the full responsibility for all maintenance of the generator and protective equipment and keeping of records for such maintenance. These records shall be available to the Lehi City Power for inspection at all times. 6. Customer s power production control system shall comply with NEC Articles 690 and 705; and applicable and current Institute of Electrical and Electronics Engineers (IEEE) Standards including Standard number 1547 Interconnecting Distributed Resources with Electric Power Systems for parallel operation with the Lehi City Power; in particular the: a. Power output control system shall automatically disconnect from the Lehi City Power s source upon loss of voltage and not reconnect until the Lehi City Power s voltage has been restored for at least five (5) minutes continuously. Lehi City Power Net Metering Standards and Application.docx Page 1 Revised 1/29/2014

b. Power output control system shall automatically initiate a disconnect from the Lehi City Power source within six (6) cycles if Customer s voltage falls below 60 Volts rms to ground (nominal 120 V rms base) on any phase. c. Power output control system shall automatically initiate a disconnect from the Lehi City Power s system within two (2) seconds if the voltage rises above 132 Volts rms phase to ground or falls below 104 Volts rms phase to ground (nominal 120 V rms base) on any phase. d. Power output control system shall automatically initiate a disconnect from the Lehi City Power s system within three (3) cycles for any reverse power flow condition. 7. Customer shall provide a written description of how the protection devices will achieve compliance with the requirements of this policy as part of the License Application. 8. Customer shall furnish and install on customer s side of the meter, a UL-approved safety disconnect switch which shall be capable of fully disconnecting the Customer s generating facility from the Lehi City Power s electric system. The disconnect switch shall be located adjacent to the Lehi City Power s meters and shall be of the visible break type in a metal enclosure which can be secured by a padlock. The disconnect switch shall be accessible to Lehi City Power personnel at all times. 9. Additional Metering: For purposes of gathering billing data, production data, etc. Lehi City Power will install and operate additional metering and data-gathering devices. Customer shall furnish and install the Generating Output Meter base within 5 feet of the. The System Output Meter shall be accessible to Lehi City Power Service Meter personnel at all times. This meter shall be Electrically Located in order to record all power produced by the renewable system. 10. Solar Photovoltaic Equipment shall be in compliance with Underwriters Laboratories (UL) 1741, Standard for Static Inverters and Charge Controllers for Use in Photovoltaic Systems; UL 1703, Standard for Safety: Flat-Plate Photovoltaic Modules and Panels; and IEEE 1262-1995, Recommended Practice for Qualification of Photovoltaic (PV) Modules; and the solar system shall be installed in compliance with IEEE Standard 929-2000, Recommended Practice for Utility Interface of Photovoltaic Systems. C. Safety All Safety and operating procedures for joint use equipment shall be in compliance with the Occupational Safety and Health Administration (OSHA) standard 29 CFR 1910.269, the National Electrical Code (NEC), State of Utah rules, City standards, and equipment manufacturer s safety and operating manuals. D. Guidelines For System Diagrams The required System Diagram is one of the most important parts of the application for interconnection. The system diagram is used by Lehi City Power during the review and approval process, and again during field testing and meter Lehi City Power Net Metering Standards and Application.docx Page 2 Revised 1/29/2014

installation. The diagram is a permanent record copy of the system and is filed at Lehi City Power for reference. A good diagram can greatly shorten the Lehi City Power review period and helps ensure Lehi City Power s field testing and meter installation are straightforward. Incomplete diagrams are one of the largest sources of delays during the application process. Discrepancies between the diagram and the actual installation as built are cause for rejection at the final testing and net meter installation, which in turn means rescheduling and a significant delay in activating the system. The System Diagram can be anything from a One-Line, to a Schematic, to a complete Wiring Diagram that shows every wire and every connection throughout. Any of these are acceptable as long as the minimum key information is included. The diagram does not need to be overly complex, but accuracy and clarity are critical. The sample diagram on page 4 is for a typical PV System and is very simple, but it contains all technical information for Lehi City Power. At a minimum, the System Diagram must show how the components of the customer generator system are connected electrically. Additional information, such as equipment part numbers and physical locations, should also be included on the diagram. Some of this additional information may be contained in the application forms as well, but documenting it on the System Diagram provides a single complete reference for the project and speeds the engineering reviews and field work. Note: These guidelines and the sample diagram are applicable for systems using a UL- 1741 approved synchronous inverter. Systems not using a UL-1741 inverter have more complex requirements for interconnection and will require much more significant design drawings for review and approval. The System Diagram should provide the information as described below. Refer to the sample diagram on the following page for an example. Generator (PV Panels, Wind Turbine, Hydro Turbine, etc.) - Include manufacturer, part number, nameplate maximum capacity (kw), and physical location. For modular systems (ex. pv panels), also include: number of modules, configuration, nameplate maximum capacity of each module, and total nameplate maximum capacity. Inverter - Include manufacturer, type or series, part number, serial number, nameplate maximum capacity (kw), output voltage, physical location. Disconnect Switch - Include the physical location relative to the Lehi City Power Service Meter. Electrical Service Panel -Include the panel or main breaker size and the position at which the generation is connected. Show all panels (if there are multiple panels or subpanels) even if not directly connected into the generation system. Lehi City Power Service Meter - Include existing meter serial number, meter form, and class PV System Output Meter Base Include meter form, class, and physical location. Location within 5 of Lehi City Power Service meter. Lehi City Power Net Metering Standards and Application.docx Page 3 Revised 1/29/2014

Other Related Equipment (battery banks, transfer or bypass switches, backup generators, etc.) These items are typically associated with more custom and complex systems. Providing accurate information and connection diagrams is especially important as these systems are not routine. Sample System Diagram (PROVIDE CONDUCTOR SIZE AND TYPE) PV Array Circuit Combiner/Junction Box DC Disconnect DC/AC Inverter (PROVIDE CONDUCTOR SIZE AND TYPE) Main Service Meter Base Utility Disconnect PV Output Meter LOCATED BY METER BASE (PROVIDE FUSE SIZE) (PROVIDE SERVICE SIZE IN AMPS) Lehi City Power Net Metering Standards and Application.docx Page 4 Revised 1/29/2014

Sample Site Plan Diagram Utility Disconnect (PROVIDE FUSE SIZE) PV Array Main Service Meter Base (PROVIDE SERVICE SIZE IN AMPS) DC/AC Inverter Lehi City Power Net Metering Standards and Application.docx Page 5 Revised 1/29/2014

Lehi City Net Metering Program Application for Interconnection Please carefully read all of the following information. With the help of your installation Contractor, fully complete the form for Solar Electric Equipment, as well as Lehi City Net Metering Agreement. Building Permit Number Application Information Customer Name: Customer Address: Contact Name: Phone Number: Fax Number: Email: A: EQUIPMENT INFORMATION 1. Solar Electric Module Manufacturer: Module Model Number: 2. Power Rating per Module: DC Watts Number of Modules: 3. Total Array Output: DC Watts (No. of Modules x Power Rating) 4. Inverter Manufacturer: Inverter Model Number: 5. Inverter s Continuous AC Rating: AC Watts Number of Inverters: 6. Total Inverter Output: AC Watts (Inverters Continuous AC Rating x Number of Inverters): Lehi City Power Net Metering Standards and Application.docx Page 6 Revised 1/29/2014

B. EQUIPMENT LOCATION 1. Solar Electric Array Location: Rooftop Pole Mount Ground Mount 2. Solar Electric Module Orientation: degrees (ex., 180 degrees true south) 3. Solar Electric Module Tilt: degrees (ex., flat mount = 0 degrees; vertical mount = 90 degrees) 4. Solar Electric Module Tracking: Fixed Single-axis Double-axis 5. Inverter Location: Indoor Outdoor Location: 6. Utility-Accessible AC Disconnect Switch Location: 7. Production meter location noted on one line drawing (must be located outside near bidirectional meter) Yes No 8. System Type and Mode of Operation: Utility interactive (parallel/capable of back feeding the meter) Dedicated circuit, utility power as backup (transfer switch) Stand-alone (system confined to an independent circuit, no utility backup) 9. A one-page site map and system single line must accompany this application. This document must indicate the location of the solar electric modules, the inverter, batteries (if any), lockable disconnect switch, and point of connection with the utility system. The installation address, current account number at that address, and the installer s name and telephone number must also be included on the site map. 10. Does this system include batteries or generator back up? Yes No If yes, additional review may be required. 11. System rated output (Section A, line 3 above): DC Watts Total Installed System Cost: $ Estimated start-up date Property Owners Signature Date Lehi City Power Net Metering Standards and Application.docx Page 7 Revised 1/29/2014