Engine Removal / Installation Sea-Doo 580 / 650 / 720



Similar documents
REMOVAL AND INSTALLATION

2003 ACCORD - Automatic Transmission Removal

P7100 PUMP INSTALLATION INSTRUCTIONS Diesel Care & Performance Inc

Cylinder head gasket, replacement

Cooling system components, removing and installing

SALEEN SPEEDLAB SERIES VI STANDARD SC UPGRADE KIT

Oregon Fuel Injection

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual

Turbocharger system components, servicing

Model No: VS SAFETY INSTRUCTIONS VS INTRODUCTION & APPLICATIONS VS CONTENTS. 2.1 Introduction. 2.

This kit may void factory warranty please check with manufacturer.

Cooling system components, removing and installing

Solstice/Sky Water Pump Replacement

CAM-03, Camshaft Assembly Oil Seal Replacement

Installation instruction do88 Intercooler for Volvo S40 / V50 / C30

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 46 Brakes - Mechanical Components (Page GR-46)

ENGINE FUEL FUEL FILTER... FUEL HEATER... INJECTOR... SUPPLY PUMP... COMMON RAIL... FUEL PRESSURE LIMITTER...

2740 Whitten Rd Bldg 103 Memphis, TN Telephone

2003 Audi A4. AUDI' '3.0L V6 - AVK Engine - A4 & A6

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

Jet Propulsion System

360 Automatic Chain Saw UT Page 1 of 15 Carburetor

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 47 Brakes - Hydraulic Components (Page GR-47)

1/29/2008 DR50. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 45

Katana Supercharger Installation Instructions Rev. E Page 1 of 23

Slide the new steering column shaft through the steering column from the driver compartment.

!"#$%&'()*#%+!,-./ 011-2,.%34$5')4564%7"&8*# 9%8:;<%0<17%&=&2$'#)=

430 Power/Electronics Replacement

Figure 2 The fan and shroud also needs to be removed for access to the four a/c compressor bolts and removal of the compressor from the top.

Char-Lynn Hydraulic Motor. Repair Information Series. October, 1997

Intake Manifold: Service and Repair

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

STEERING SYSTEM - POWER

Walbro 255lph Inline Fuel Pump Install Procedure

PARTS MANUAL EH12-2 ENGINE. Model. PUB-EP5713 Rev. 7/99

Installation Guide 2010 BMW S1000RR Full Exhaust System

BR150 Pmi Baja Reaction 150cc Go Kart (VIN PREFIX L4VM)

DYNA RIDER FOOTBOARD KIT

INSTALLATION INSTRUCTIONS FOR VW MK5

COOLING SYSTEM Section Page

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250 Single Wheel 4WD Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

M V Intake Manifold INSTALLATION INSTRUCTIONS

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Before installation it is important to know what parts you have and what the capabilities of these parts are.

MFH-5057 Ford Small-Block V-8 Fresh Water Cooling Kit Instructions

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

COOPER S PULLEY UPGRADE KIT INSTALLATION INSTRUCTIONS PART NUMBER NME5011

EM REMOVE NO. 2 MANIFOLD STAY (a) Remove the bolt, nut and stay.

1/29/2008 DR70. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 43

This kit may void factory warranty please check with manufacturer.

BUGGY SETUP GUIDE. Volume GOKARTSUSA GY6 150, CN250. Buggy Setup Guide

MGB Chrome Bumper Conversion

DR125 and DR150 Hensim Dirt Runner 125cc and 150cc Dirt Bike (VIN PREFIX LLCH or LUAH)

Fuel Injection Pump, Rotary ( )

Equipped with AEM Dryflow Filter No Oil Required! INSTALLATION INSTRUCTIONS PART NUMBER DS BMW 335i 3.0L

DR90. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PART NUMBERS AND PRICES ARE SUBJECT TO CHANGE 1 of 51

Aprilia.no. RS Eng.6M

INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT CHEVROLET/GMC VANS FOR

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks

TITAN Fuel Tanks. Extended Capacity Replacement Tank for Diesel Chevrolet / GMC Trucks

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)


Volkswagen B3 Passat Manual Transmission 02A 34 Manual Transmission - Controls, Assembly (Page GR-34) 02A 5-speed. Gearshift cable/lever installing

DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT

Cylinder head, removing and replacing

Not required for most applications Not required for most applications High pressure ( provided) High pressure ( provided)

2100 AD Mirror Elevator Ball Nut Replacement Procedure

Traditional Sonar and DSI Sonar Installation

Number Wheeler P/N Description Set Rex P/N Notes Base 1 J Support, Right 1 J Support, Left 1 J Nut (M8)

FOR ANY QUESTIONS, PLEASE CALL M-F 8:00a.m.-8:00p.m. EST. REAR BRAKES 1 AEROSPACE COMPONENTS

DiscPlus DX195 and DX225 Air Disc Brakes

1/29/2008 DR125 / DR150. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PARTS AND PRICES ARE SUBJECT TO CHANGE 1 of 55

DR90. Baja Motorsports Inc. P.O. Box Phoenix, AZ Toll Free: PART NUMBERS AND PRICES ARE SUBJECT TO CHANGE 1 of 51

Drive shaft, servicing

Kobelco Extended Warranty Program.

INSTALLATION INSTRUCTIONS Air Spring Kit Ford F250/F-350 Single Wheel 2WD Ford F350 Dually 2WD IMPORTANT NOTES

Universal Adjustable Fuel Pressure Regulator

Service Manual. Fuller Automated Transmissions. Fuller Automated Transmissions. October 2007 TRSM0050. More time on the road

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

Chapter 2 Part A: In-car engine repair procedures

TABLE OF CONTENTS. Section 1 - Assembling your new pit bike.

INSTALLATION MANUAL MODEL RP-100

SCREAMIN' EAGLE "HEAVY BREATHER" PERFORMANCE AIR CLEANER KIT

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

This is the civilian transfer case with the cooling loop only found in the driven gear half of the front case.

DR50 Hensim Dirt Runner 49cc Dirt Bike (VIN PREFIX LLCH or LUAH)

5800 Temperature Sensor Cable Assembly

Manual for GlobePharma Mini-Press II Rotary Tablet Press

Engine Strobe light, 110V Strobe light, 220V Replacement bulb Compression gauge Dial indicator

SCION FR-S PERFORMANCE AIR INTAKE Preparation 2.0L F-4

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

XL PREMIUM OIL COOLER KIT

13. REAR WHEEL/BRAKE/SUSPENSION

BILLET HEADLAMP SHELL

Water Pump Replacement

3620 W 11th Streetб Houston, TX Telephone: sales@kellogg-american.com Website:

VW GOLF Mk4 TDI FRONT MOUNTING INTERCOOLER INSTALLATION INSTRUCTIONS

11. COOLING SYSTEM 11-0 COOLING SYSTEM BET & WIN 50

SCREAMIN' EAGLE "HEAVY BREATHER" PERFORMANCE AIR CLEANER KIT

Transcription:

Step 1 Battery Removal Step 3 Intake Removal 3.1 (Right) Slide the six air intake cover latches back and remove the top cover. Remove the spark plug wires, plugs & heat sensor from the head. 1.1 ( Above) Remove the two retaining straps, disconnect the battery and remove it from the hull. Disconnect the negative (black) cable first, then the positive (red). 3.2 (Right) Remove the six allen bolts securing the air silencer brace to the base and remove the brace, then lift the base off the carb(s). Step 2 Pump Removal 2.1 (Right) Inside the hull, remove the bilge siphon hoses and the water intake hose from the pump fittings. On the back of the hull, remove the four nuts & washers from the studs fastening the pump to the hull with a 17mm socket. Disconnect the steering and trim cables, if equipped. Rock the pump assembly side to side & up and down to break the seal, then pull it straight back and out of the hull. Also remove the driveshaft. NOTE: There are two rubber bumpers on either end of the driveshaft. Make sure you don t lose them, and make sure to replace them, if removed. If possible, have someone hold the driveshaft while you slide the engine t o prevent the impeller side bumper from disengaging. 1 3.3 (Below) Your craft may have an additional brace installed between the head and the carb stack. If so, remove the 4 allen bolts securing it and remove the brace.

3.4 (Below) Pull the flame arrestor out of the bracket and remove the two allen bolts securing the bracket to the carb(s). Pull off the bracket. 3.6 (Right) Four 13mm bolts hold the rotary valve cover to the block. Remove them and cover/carb assembly from the hull. Your craft may have oil injection, using an oil pump. If so, disconnect the oil feed line going to the pump, and either clamp the line, or screw a bolt into the end of the line to plug it. 3.5 (Right) Loosen the gas tank cap to relieve pressure. Unscrew the hose clam ps and remove the pulse line, fuel in and fuel return lines. Be sure the fuel switch is turned to the OFF position, and be aware of any fuel that may spill from the hoses. Make sure the Hull is clear of any gasoline fumes before continuing work, especially with power tools. Undo th e nuts securing th e thro ttle and choke cables to the carb(s) with a 10mm wrench and detach them from the carb(s ). Loosen and remove the water inlet hose(s) from the head. Note: 580, 650 and 720 head cooling line routings differ. Mark each hose for easy re-installation. 2

Step 4 Exhaust Removal 4.1 (B elow) L oosen t he clamp and detach the waterbox from the stinger pipe. 4.3 (Below) Remove the 11mm nut on the pipe clamp and remove the clamp from the pipe. Disconnect the two water lines from the pipe. This will allow you to remove the lower p ipe section from the hull. Slide it back, tilting the forward section down to clear the exhaust manifold. Step 5 Engine Removal 5.1 (B elow) Unlatch t he electrical box by pushing on the release tab. Pull the box forward so you have access to open it. 4.2 (Below) Remove t he t wo 12mm bol ts securing the lower pipe section to the exhaust manifold. 4.4 (Below) Remove the four 13mm nut s securing the top pipe section to the exhaust manifold, with a socket and wrench. Removal of the front spark plug is often required. 5.2 (Above) With the electrical box open, disconnect all the wires coming in from the flywheel assembly, and pull the wires out of the box. NOTE: DO NOT CUT THE WIRES! 3

5.3 (B elow) Remove the engine ground bolt with a 13 mm socket. Remove the starter wire nut & washer with a 10mm socket. There are two oil lines running from the oil tank to the case. These provide oil to the oil bath inside the case. Loosen the clamps and pull both lines from the case. Don't worry about spilled oil, you will inevitably lose the oil in the case. Zip-tie the two lines anywhere above the tank level so the oil will not drain out. 5.4 (Below) Next, remove the four 13mm bolts from the motor m ounts with a socket. If any of the mounts are loose, or spin, they will need to be replaced. Making sure every hose and cable have been removed, lift the engine out of the hull. 4

Step 6 Accessory Removal 6.1 (Below) With the engine on the ground, workbench or some other solid surface, begin removing the external accessories that will NOT be shipped with the core. Remove the exhaust manifold by unfastening its 8 allen bolts. 6.5 (Below) Use a universal flywheel puller to remove the flywheel. CAUTION: Do not screw the puller screws into the flywheel more than 5 complete turns or damage to the stator may occur. After tightening the center bolt of the puller, if it does not pop off, hit the end of the center bolt with a heavy hammer. 6.3 ( Above) Remove the 10mm and 8mm bolts securing the flywheel cover and remove it. 6.2 (Below) Remove the three 13mm bolts securing the starter and remove it by pulling straight back from the flywheel cover. 6.4 ( Above) Stuff a rag into one of the exhaust ports. Make sure the rag penetrates through the port, into the combustion chamber on top of the piston. This will prevent the engine from turning over while you remove the flywheel nut & PTO coupler. Remove the flywheel nut with a 14 pi pe wrench. A cheater bar may be necessary. 6.6 (Below) R emove the seven allen bolts fastening the flywheel cover to the block, and the three 4mm inner allen bolts securing the stator assembly. Remove them both. 5

6.7 (Below) Remove the PTO coupler from the shaft using a chain wrench. Do not damage the grease fitting. Remove it if you wish. As with the flywheel nut, a cheater bar may be necessary. (Yamaha coupler pictured) 6.8 (Below) Loosen the clamp with a screwdriver and remove the pulse line from the block. Remove the remaining spark plug and heat sensor from the head. 6.9 (Below) Remove the four 17mm nuts from the mounting plate and remove the plate. 6.10 (Below) And with all of th e external accessories removed, the engine is now ready to be packaged and shipped to SBT! 6

Insert Rotary Assembly Before re-assembly of your new SBT engine, your rotary valve a nd cover must be inspected and re-timed. (Below) E xamine the surface of the valve cover. It is imperative that there not be any groves, holes, cuts, etc. in the cover, especially any that connect between the two ports. If there i s any thing but minor surface scratching, the surface must be machined, or the cover replaced. For minor scratches, 400 grit wet sand paper can be used to flatten the surface. Timing Before re-assembly, your valve must be retimed. To do so requires a degree wheel, and the specifications for your particular engine. Year, Model 90-93 SP, 91 GT, 91 XP, 92-93 GTS, 93 SPi Opening BTDC ± 5 115 92 GTX, 92 XP 129 88, 89, 94+ SP, 90 GT, 93 SPX, 93-94GTX, 93 XP 94+ SPX, 94+ XP, 95+ GTX 130 147 (Below) Place a degree wheel over the rotary valve gear, aligning the 0 /360 mark at the bottom of the front (MAG) port. Using the timing spec guide, mark the opening degree on the case according to the timing wheel. NOTE: do not automatically use the notch on the case to time by. (Below) Place a screwdriver, or use a TDC gauge in the front (MAG) cylinder through the spark plug hole. Turn the crankshaft to find Top Dead Center of this piston. (Below) Align the rotary valve as shown, so that the port is open, and the edge of the valve matches as precisely as possible with the mark. NOTE: the valve is asymmetrical. Flip it around to find the closest match. Examine the rotary valve itself. It must also be free of any imperfections. It must not have any pitting, holes, scratches, dings, dents, bends, etc. If any of these are present you MUST replace the valve. 7

Engine Installation Oil Injection It is SBT s recommendation that the oil injection pump be disabled, and block-off plate(s) be installed prior to use of the new engine in your ski. This is only recommended to insure reliable lubrication and extended engine life for all of your customer s PWCs. Re-use of your functioning oil injection pump, if so equipped, does not void your warranty. Paper Gaskets It is SBT s recommendation that all paper gaskets be treated with Loctite High- Tack Gasket Sealer prior to installation. Read and follow all instructions on the product canister to insure good gasket sealing on your new engine. Special Gaskets It is SBT s recommendation that all exhaust gaskets be sealed with Loctite Copper Gasket Adhesive prior to installation. Read and follow all instructions on th e product canister to insure good gasket sealing on your new engine. Bolts It is SBT s reco mmendation th at all b olts be treated with Loctite Medium Strength Threadlocker Blue (242) during assembly. Break-In Oil It is SBT s requirement that the new engine be broken-in with additional oil in the fuel supply for the first tank. Follow the mixing chart on the back of the bottle to determine quantity needed. Electrical Connections It is SBT s recommendation that all electrical connections be sanded, cleaned and secured during the assembly process. It i s a common problem to not have solid connections due to corrosion, paint, poor wire condition, etc. Disclaimer While every precaution has been taken in the preparation of these guides, SBT assumes no responsibility for errors or omissions. Neither is any Liability assumed for damages resulting from use of the information contained herein. Publication of the procedures in these guides does not imply approval of the manufacturers of the products covered. Persons engaging i n t he procedures herein do so at their own risk. 8

Follow the removal steps in reverse order to install your new SBT short block assembly: 6.9 Install the engine mount plate. Torque to 26 ft. lbs. 6.8 I nstall the head heat sensor and block pulse line. 6.7 Install the PTO coupler. Torque to 81 ft. lbs. 6.6 Install the stator plate and flywheel housing. Torque to 44 in. lbs. 6.5 Install the flywheel, key and nut. Torque to 107 ft. lbs. 6.3 Using a new o-ring, install the flywheel cover. Torque to 44 in. lbs. 6.2 Install the starter. Torque to 16 ft. lbs. 6.1 Using a new gasket, install the exhaust manifold. Torque to 17 ft. lbs. 5.4 Install a bolt into each motor mount. Using your hand, forcefully rock it in all directions, tryin g to break each mount. If any fail, they must be replaced. Place the engine into the hull and install the mounting bolts. Be sure to replace any shims present from the old engine. Torque to 18 ft. lbs. 5.3 Install the block ground wire. Torque to 16 ft. lbs. Install the starter wire. Torque to 62 in. lbs. Install the upper and lower oil bath lines. 5.2 Reconnect all the electrical wires inside the electrical box, and seal the box. 5.1 Install the electrical box. 4.4 Using a new gasket, install the top exhaust pipe. Torque to 18 ft. lbs. 4.3 Install the exhaust stinger pipe. Use a thin bead of Copper Silicone gasket maker on each side of the copper exhaust gasket. Tighten the clamp and re-attach the three pipe water lines. 4.2 Secure the top pipe bolts and nut. Torque to 18 ft. lbs. 4.1 Re-attach the waterbox and tighten the clamp. 3.6 Install the oil feed line to the rotary valve c over. Using a new o-ring, install the rotary valve cover. Open the bleed screw and allow the line to bleed for at least one minute to remove air pockets. 3.5 Re-attach the head cooling line(s), carb fuel & pulse lines. 3.4 Using a new gasket, install the flame arrestor base. Torque to 88 in. lbs. 3.3 Install the flame arrestor and brace i f present. 3.2 Install the air silencer base and brace. 3.1 Install the air silencer cover, heat sensor, plugs and plug wires. 2.1 Install th e pump, using 100% silicone to seal the pump to the hull. Make sure all old sealer is removed and both surfaces are perfectly clean. Torque to 26 ft. lbs. Re-attach the control cables, siphon lines and water inlet hose. 1.1 Re-i nstall the battery, connecting the positive lead first. 9

Tools Needed: Sockets 8mm 10mm 11mm 12mm 13mm 17mm Sealers / Lubricants Loctite Copper Gasket Adhesive Loctite Copper Silicone Gasket Maker Loctite 2 Gasket Sealer Loctite Medium Threadlocker (Blue) 242 Loctite High-Tach SBT Break-In Oil Misc. Ratchet Long socket extension Short socket extension Screwdrivers Universal flywheel puller Parts (Available at most major External Gasket Kit auto parts stores for Zip-Ties rent/lend/purchase) * Degree Wheel Wrenches 10mm 12mm 13mm Torque wrench Pipe wrench Allen wrenches 10