UMPQUA Testing Service



Similar documents
NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

SCOPE OF WORK. COLORADO DEPARTMENT OF TRANSPORTATION Statewide

Construction Materials Testing. Classes of Test

Quality Assurance Program. June by Texas Department of Transportation (512) all rights reserved

Inspections: Central Laboratory of the Regions

QUALITY ASSURANCE PROGRAM

LOCAL PUBLIC AGENCY (LPA) QUALITY ASSURANCE PROGRAM

QUALITY ASSURANCE PROGRAM

C. Section TESTING LABORATORY SERVICE.

CHAPTER 4 CONCRETE TRAINING AND QUALIFICATIONPROGRAM

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

CHAPTER 2 AGGREGATE TECHNICIAN TRAINING AND QUALIFICATION PROGRAM

CONSTRUCTION MATERIAL TESTING

DESIGN & CONSTRUCTION MANAGEMENT SERVICES THIS AGREEMENT, Made as of (Current Date), In the Year of (Current Year),

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

GEOTECH ENGINEERING and TESTING

EASTERN KENTUCKY UNIVERSITY Serving Kentuckians Since 1906 Office of Finance & Administration Commonwealth 1410

Work Type Definition and Submittal Requirements

Example Specification for Concrete using Current Building Code Requirements

STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing

Quality Assurance Program for Design-Bid-Build Projects. January by Texas Department of Transportation 512/ All Rights Reserved

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

DRAFT VEHICLE MAINTENANCE AGREEMENT BETWEEN THE COUNTY OF SANTA CLARA AND OUTREACH

ElmTree System Engineering Laboratory Management System

TERMS AND CONDITIONS FOR QUOTATIONS. As stated herein, seller is Environ Laboratories, LLC and purchaser is the recipient of the quotation.

Hot Mix Asphalt Test Result Verification and Dispute Resolution

Shotcrete Quality Control and Testing for an Underground Mine in Canada

SITE INVESTIGATION FACILITIES

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

Acceptance Codes APPENDIX - A. Acceptance Criteria

Specification Guidelines: Allan Block Modular Retaining Wall Systems

AGREEMENT BETWEEN THE CITY OF CRESTWOOD, MO AND BIEG PLUMBING COMPANY FOR ON-CALL PLUMBING SERVICE FOR THE PERIOD

Schedule of Accreditation Issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

REQUEST FOR PROPOSALS FOR AS-NEEDED MATERIAL TESTING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019

FORM Rev. 6 (7/11)

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

ASPHALT, CONCRETE, SOILS

Chapter 8 Design of Concrete Mixes

CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

TOWN OF FARMINGTON, CT REQUEST FOR PROPOSALS FOR CONSTRUCTION EQUIPMENT RENTALS AND ON CALL CONSTRUCTION SERVICES

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Lab 1 Concrete Proportioning, Mixing, and Testing

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS

BILLING & COLLECTIONS SERVICES STATEMENT OF GENERALLY AVAILABLE TERMS AND CONDITIONS

Soils and Aggregates Division

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

PROTECTO 401 Price List

Price List January 1, 2015

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Special Inspector Qualification Michael Roach, P.E., Building Official

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

MATERIALS CERTIFICATION SCHOOLS

MATERIALS CERTIFICATION SCHOOLS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

MATERIALS CERTIFICATION SCHOOLS 2016

Crystal Clear Sealant

Math Matters: Dissecting Hydrometer Calculations

Incomplete submissions will be declined

LANDFILL SUPPLEMENT CGL (To be attached to Acord Sections 125 & 126)

Table of Contents. Introduction and Purpose Technician Certification Programs... 4

Apr 17, 2000 LAB MANUAL PARTICLE SIZE ANALYSIS OF SOILS AASHTO Designation T 88 (Mn/DOT Modified)

CONSULTANCY & MATERIAL TESTING FACILITY

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

OVERVIEW This instruction sheet is for members who already use Online Banking/Virtual Branch and are adding Bill Pay to Online Banking Account.

ELECTRICAL SERVICE CONTRACT

The University of Toledo Soil Mechanics Laboratory

MINIMUM QUALITY CONTROL PLAN FOR FIELD PLACEMENT OF LATEX MODIFIED MORTAR OR CONCRETE WEARING SURFACE

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2

CHAPTER 2 AGGREGATE TECHNICIAN TRAINING AND QUALIFICATION PROGRAM

Pay Guide - Hospitality Industry (General) Award 2010 [MA000009]

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units

SCG / SELF CONSOLIDATING GROUT

CONCIERGE SERVICE AGREEMENT. THIS AGREEMENT made this day of, 20, by and between QILIVING,

Geotechnical Investigation Test Report

Third Party Plan Review and Inspection Procedures

SAMPLE CONTRACT 121 Leonie Street Lafayette, LA Phone: Fax:

MANUAL FOR EXTERNAL USERS

MP L BAR SEALER & SHRINK TUNNEL COMBO SYSTEM QUOTE

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way.

ICC-ES Evaluation Report

Scope of Work Construction Inspection and Materials Testing Services

Schedule of Accreditation issued by United Kingdom Accreditation Service High Street, Feltham, Middlesex, TW13 4UN, UK

Scotch-Weld. Low-Odor Acrylic Adhesives DP810 DP810 NS. Technical Data June, 2004

ORANGE COUNTY BOARD OF COMMISSIONERS. DEPARTMENT: County Attorney PUBLIC HEARING: (Y/N) No

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

INTERNET BANKING & MOBILE DEPOSIT AGREEMENT

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

OREGON DEPARTMENT OF TRANSPORTATION FIELD STAFF TRAINING CURRICULUM GUIDE

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM

POZZI WINDOW COMPANY LIMITED WARRANTY WINDOWS, DOORS AND COMPONENT PARTS

Transcription:

, LLC Materials Testing and Quality Control Services June 2016 Price List & General Terms and Conditions Page 1 of 7

, LLC Labor Rates Hourly Rates Concrete Technicians: (ODOT/ACI Certified QCT & CSTT): ---------------------------------- $50.00 Includes sampling, slump, air content, temperature, sample pickup and deliveries, stripping, logging and reporting. (Grout includes flow cone test) Aggregate Technicians: (ODOT/WAQTC Certified CAgT): ------------------------------------- $50.00 Includes field sampling, sample pickup and deliveries, sample preparation, shipping, handling and reporting of aggregate and soil samples. Compaction Technicians: (ODOT/WAQTC Certified CEBT & CDT): ------------------------ $53.00 Includes visual inspections, deflection tests, and in-place moisture/density tests using Nuclear Densometers. Asphalt Technicians: (ODOT/WAQTC Certified CAT I): ---------------------------------------- $53.00 Includes sampling and testing at client s lab during production of asphalt. Laboratory Technicians: -------------------------------------------------------------------------------- $47.00 Includes sample pickup and delivery, sample prep and reports. Core Drilling: ------------------------------------------------------------------------------------------ $55.00 Includes Asphalt, Shotcrete, Concrete, Microsilica Overlay Coring Bond and Adhesion Testing: ---------------------------------------------------------------------------- $55.00 Bolt Testing: ------------------------------------------------------------------------------------------------ $55.00 Includes rotational capacity, inspection torque, and installer verification. Quality Control Management (Related to Materials Testing Services Only): Quality Control Manager ----------------------------------------------------------------------- $60.00 Concrete/Masonry Special Inspector Services& Sampling: --------------------------------------- $60.00 Roofing Inspector Services: ----------------------------------------------------------------------------- $60.00 Building Inspector: ---------------------------------------------------------------------------------------- $60.00 Nailing Inspector Services: ------------------------------------------------------------------------------ $60.00 Structural Steel/Shop/Field Inspector Services CWI AWS ------------------------------------- $60.00 Ultrasonic testing shear wave & straight beam testing : ----------------------------------------- $60.00 Magnetic particle testing: -------------------------------------------------------------------------------- $60.00 Liquid penetrant testing: -------------------------------------------------------------------------------- $60.00 Fireproofing Inspector Services: ----------------------------------------------------------------------- $60.00 Vehicle Mileage Rate:------------------------------------------------------------------------------------ $0.57/Mile Page 2 of 7

, LLC Soil Test Prices Price per Test Per Sample Liquid Limit (AASHTO T 89) --------------------------------------------------------------- $50.00 ea. Plastic Limit (AASHTO T 90) --------------------------------------------------------------- $50.00 ea. Plasticity Index (AASHTO T89,T90) ----------------------------------------------------- $100.00 ea. Consolidation of Soils (AASHTO T 216) ------------------------------------------------ $425.00 ea. Moisture Content (AASHTO T 255/265) --------------------------------------------------- $35.00 ea. Moisture Density Curves: Standard Proctor 4 & 6 mold (AASHTO T 99) --------------------------------------- $180.00 ea. Modified Proctor (AASHTO T 180) ------------------------------------------------------ $200.00 ea. Harvard Miniature (WAQTC TM 9) ------------------------------------------------------ $125.00 ea. One Point Verification (AASHTO T272V) ------------------------------------------------ $65.00 ea. Establishing a Family of Curves (AASHTO T 272) -------------------------------------- $55.00 ea. Oversized Rock Correction (AASHTO T 224) -------------------------------------------- $45.00 ea. Sand Equivalent (AASHTO T 176) --------------------------------------------------------- $65.00 ea. Sieve Analysis (Dry)(AASHTO T 27) ------------------------------------------------------ $50.00 ea. Sieve Analysis (Washed)(AASHTO T 27/11) ------------------------------------------- $100.00 ea. Sieve Analysis (Washed)(FHWA Method) ----------------------------------------------- $105.00 ea. Sieve Analysis (Larger Than 1 Washed or Dry)---------------------------------------- $50.00/hour Specific Gravity of Soils (Fine)(AASHTO T 84) ----------------------------------------- $65.00 ea. Soil Classification (AASHTO M 145) ---------------------------------------------------- $190.00 ea. (Includes Washed Sieve & Plasticity Index) Wood Waste (ODOT TM 225) --------------------------------------------------------------- $50.00 ea. Laboratory Resistivity (AASHTO T288) ------------------------------------------------- $110.00 ea. ph (AASHTO T289) -------------------------------------------------------------------------- $22.00 ea. Organic Content in Soils by Loss on Ignition (AASHTO T267) ------------------------ $65.00 ea. Particle Size Analysis of Soils (Hydrometer Test) (AASHTO T88) ------------------ $110.00 ea. Other Services Priced Upon Request Note: A sample prep charge at the Laboratory Technician hourly rate may be required. Page 3 of 7

, LLC Aggregate Test Prices Price per Test Per Sample Accelerated Weathering (DMSO)(FHWA Method) ------------------------------------------- ** Cleanliness Value (ODOT TM 227) --------------------------------------------------------- $85.00 ea. Durability Index (AASHTO T 210) -------------------------------------------------------------- ** Elongated Particles (ODOT TM 229) ------------------------------------------------------- $55.00 ea. Fractured Particles (ODOT TP-61) ---------------------------------------------------------- $50.00 ea. Friable Particles (AASHTO T 112) ---------------------------------------------------------- $70.00 ea. Lightweight Particles (AASHTO T 113) --------------------------------------------------- $95.00 ea. Los Angeles Abrasion (AASHTO T 96) --------------------------------------------------------- ** Moisture Content (AASHTO T 255/265) --------------------------------------------------- $35.00 ea. Oregon Air Degradation (ODOT TM 208) ------------------------------------------------------ ** Organic Impurities (AASHTO T 21) ------------------------------------------------------------- ** Sand Equivalent (AASHTO T 176) --------------------------------------------------------- $65.00 ea. Sieve Analysis (Dry)(AASHTO T 27) ------------------------------------------------------ $50.00 ea. Sieve Analysis (Washed)(AASHTO T 27/11) ------------------------------------------- $100.00 ea. Sieve Analysis (Washed)(FHWA Method) ----------------------------------------------- $105.00 ea. Sieve Analysis (1 and Larger Washed or Dry) ----------------------------------------- $50.00/hour Sodium Sulfate Soundness (5 Cycles)(AASHTO T 104) ------------------------------------- ** Specific Gravity/Absorption (Coarse)(AASHTO T 85) ---------------------------------- $45.00 ea. Specific Gravity/Absorption (Fine)(AASHTO T 84) ------------------------------------- $65.00 ea. Unit Weight (AASHTO T 19) ---------------------------------------------------------------- $50.00 ea. Wood Waste (ODOT TM 225) --------------------------------------------------------------- $50.00 ea. Other Services Priced Upon Request ** Tests with an asterisk under the price column are performed by an outside laboratory. Sample preparation, handling and shipping charges will apply. Please request a price quotation. Note: A sample prep charge at the Laboratory Technician hourly rate may be required. Page 4 of 7

, LLC Concrete/Masonry Test Prices Price per Test Per Sample Compressive Strength of Concrete Cylinders ---------------------------------------------- $18.00 ea. Core Drilling ---------------------------------------------------------------------------------- $55.00/hour Compressive Strength of Drilled Cores ----------------------------------------------------- $35.00 ea. Compressive Strength of Grout and Mortar ------------------------------------------------ $18.00 ea. Compressive Strength of Masonry Block --------------------------------------------------- $40.00 ea. Compressive Strength of Prism (C1314)---------------------------------------------------- $35.00 ea. Concrete Shrinkage Test, set of 3 blocks per test (ASTM C157) --------------------- $225.00 ea. Masonry Shrinkage Test ------------------------------------------------------------ Please Contact Lab Preparation of Specimen (Sample Pickup,Capping,Trimming, etc.) ----------------- $47.00/hour Note: There is a $6.00 charge for each unbroken cylinder sample. Asphalt Test Prices Compaction Testing -------------------------------------------------------------------------- $53.00/hour Core Drilling ---------------------------------------------------------------------------------- $55.00/hour Core Correlation Test (ODOT TM327) --------------------------------------------------- $125.00 ea. Other Testing Items ----------------------------------------------------------------- Please Contact Lab Other Test Prices Soil, Groundwater and Stormwater Runoff Analysis -------------------------- Please Contact Lab Chemical, Radiological and Microbiological Analysis ------------------------ Please Contact Lab Note: A sample prep charge at the Laboratory Technician hourly rate may be required. Page 5 of 7

, LLC Analytical Services: Chemical, radiological and microbiological analyses of environmental and drinking water samples are available from UMPQUA Research Company. Please contact our lab at 541-863-5201 for more information. Miscellaneous: Time and mileage are charged portal to portal. Fieldwork will include a minimum of ½ hour for equipment setup prior to leaving the lab and ½ hour for cleanup and test reporting after returning to the lab. Per Diem for travel that requires overnight stays will be negotiated. A minimum of one hour at the respective hourly rate, plus actual mileage will be charged for all late cancellations. Labor and test prices will be charged at overtime (1.5 times the base rate) for all work performed in excess of 8 hours per day. Unless prearranged schedules are approved by UTS, the overtime rate will also apply to all work performed before 7:00 AM and after 4:00 PM on Monday through Friday, and for all work performed on weekends and holidays. See page 7 for general terms and conditions. Page 6 of 7

, LLC General Terms and Conditions 1. Unless otherwise agreed upon in writing, charges for all services shall be billed by UTS to Client in accordance with this Price List & General Terms and Conditions. Normal business hours are from 7:00 AM to 4:00 PM Monday through Friday, excluding holidays. Labor and test prices will be charged at overtime (1.5 times the base rate) for all work performed in excess of 8 hours per day. Unless prearranged schedules are approved by UTS, the overtime rate will also apply to all work performed before 7:00 AM and after 4:00 PM on Monday through Friday, and for all work performed on Weekends and Holidays. Work performed in reference to project management requirements (i.e. planning, project meetings, specialized reports, work plans, etc.) will be billed at the Quality Control Manager and/or Professional Engineer rate. 2. Proposals prepared by UTS are estimates only. Invoices shall be submitted by UTS to Client on a monthly basis for actual work performed during the preceding month. The total amount billed for a project may vary from proposals or estimates based upon actual project requirements or Client requests, however quoted unit prices will remain firm. Client shall pay UTS invoices in full within thirty (30) days of the invoice date, regardless of Client s receipt of payments from third parties. Client further agrees to pay all accrued interest for past due invoices. Interest shall be calculated at 1.5% per month (18% annually) starting 30 days after the invoice date. UTS reserves the right to withhold final reports, letters of compliance, or any other relevant document until all past due invoices have been paid. 3. UTS s responsibilities shall be limited to the testing and inspections requested by Client in accordance with specifications or project provisions. UTS will not render any engineering judgments or opinions. 4. Client recognizes that the services provided by UTS do not carry a warranty or guarantee of any type. While such services may reduce the risk of construction defects, omissions, or deficiencies, it is the Client s responsibility to ensure the quality and completeness of the project in accordance with applicable plans and specifications. 5. Unless Client requests full-time services, Client understands that services provided by UTS, are on an On-Call basis. Client shall assume responsibility for adequate notification and scheduling of UTS services. UTS will make every reasonable effort to meet Client s schedule, but will not guarantee service availability without direct confirmation with Client. 6. Client agrees that UTS shall not be liable for damages, resulting from errors, omissions, or negligence, beyond the total fee received by UTS from Client. In no event shall UTS be liable for indirect or consequential damages of any kind. 7. In the event Client files a claim against UTS, and Client fails to prove such claim, Client shall pay all of the costs incurred by UTS in defense of the claim, including but not limited to, personnel costs, cause of action, claim or counterclaim, attorney fees, court costs, witness fees, and all other claim related expenses. 8. If Client transfers project responsibilities to a third party, Client shall continue to be responsible for payment of service provided by UTS until the third party has agreed to these terms, or Client terminates UTS services. In the event of termination, Client shall be responsible for payment of all services provided by UTS prior to the termination. 9. This Price List & General Terms and Conditions shall be submitted by UTS to Client before any services are performed. Client agrees that any request for service constitutes acceptance of the fees, terms and conditions stated herein, or as otherwise agreed to in writing. Page 7 of 7