Guidance on Lifting Operations in Construction When Using Excavators



Similar documents
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

Thorough examination of lifting equipment

How the Lifting Operations and Lifting Equipment Regulations apply to health and social care

Management of Lifting with Mobile Cranes

Contents. Technical Test Questions. Crawler Crane Tower Crane

RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO

Maintenance, Inspection and Thorough Examination of Mobile Cranes. Best Practice Guide

How To Ensure Safety Of Lifting Equipment

Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting

Mobile (Truck) Cranes

Lifting equipment at work

Technical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement

STANDARD PRACTICE INSTRUCTION

Machinery Safety. Presented by Paul Laidler. TÜV SÜD Product Service

Work at Height / Falling Objects

Lifting Operations and Lifting Equipment Safety Management Standard Issue 2 October 2008 Level Two Document

EXCAVATOR SAFETY TRAINING

Construction Skills Certification Scheme. Safe Operation of Earthmoving Plant. 360 Degree Excavator

Lifting Equipment - Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it.

Thorough examination and testing of lifts

Safety Manual For Overhead Crane Operators

TÜV Middle East W.L.L. Welcome

OPERATION MANUAL SAFETY PRINCIPLES, OPERATION AND MAINTENANCE FOR BRICKLAYER S PULLEY

Operation of Fork Lift Trucks Procedure

The Tomato Plant Company Ltd. Method Statement and Risk Assessment Loads requiring lifting

A36. Lorry Loader. Cleraune Plant Training June 09 1

Contents. 1. Foreword Common accidents in lifting operations Legislative requirements and code of practice of lifting operations 2

WORK AT HEIGHT UNIT 4

Safe Use of Lifting Equipment and Lifting Accessories

Working at Height. Procedure

HEALTH AND SAFETY ADVICE FOR PLANT OPERATORS

SAFE USE OF LIFTING EQUIPMENT

Guidance on Load Testing Suspended Access Equipment

Tower cranes collapsing on construction sites. A guide to loss prevention

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR

EQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING NAVFAC MIDLANT

Power presses: A summary of guidance on maintenance and thorough examination

Discharging of Scrap

SCAFFOLDING RUNWAY SYSTEM

Unit Title: Unit purpose and aim

CONSTRUCTION SAFETY SERIES: Crane Safety

LEVEL 2 AWARD IN TRACTOR DRIVING AND RELATED OPERATIONS (QCF) ASSESSMENT SCHEDULE

SOME HELP WITH BRITISH STANDARD BS EN 1570:1999 Safety requirements for lifting tables

SAFETY BULLETIN. Human interaction with backhoes and excavators

RECOMMENDATIONS FOR THE TAGGING/LABELLING, TESTING AND MAINTENANCE, DOCUMENTATION/CERTIFICATION FOR SHIPS LIFTING EQUIPMENT

Guidebook for Lifting Supervisors

POTENTIAL HEALTH & SAFETY HAZARDS

The selection and management of mobile elevating work platforms

Level 1 Award in Health and Safety in a Construction Environment

A GUIDE TO LIFTING BEAMS AND SPREADERS

UNIVERSITY OF LEEDS EQUIPMENT SAFETY CHECKLIST

Part 1 Guidance 4 Selecting a suitable truck 4 Use 5 Design 7 Permissioning control working platforms 10 Very narrow aisle (VNA) trucks 11

Site inspection: Workplace transport checklist

Slings, Rigging and Lifting Equipment

WOLFFKRAN. 1 Schedule drawing. 1.1 Schedule drawing, WOLFF clear. max. hook height above ground. Data WOLFF clear

10 TON HYDRAULIC PRESS

Unit Title: Unit purpose and aim

Burton Hospitals NHS Foundation Trust. Committee On: 20 January Review Date: December Corporate / Directorate

Fall Protection Guidelines

Boom and fly capacities for this machine are listed by the following sections:

What should you check for when inspecting a crane before maintenance?

METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS

Best Practice Guidance for MEWPs. Avoiding Trapping / Crushing Injuries to People in the Platform

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

Guidance on the Safe Use of Excavator Quick-hitch Devices

SITE CONTRACTOR PROCEDURES

QUALIFICATION DETAILS

East Anglia Construction Safety Group. Tower Crane Safety Update

HEALTH AND SAFETY REDUCING ACCIDENTS IN KITCHENS

Excavation Safe Working Practices

Cranes and Lifting Equipment

SAFE HANDLING OF PRECAST CONCRETE PRODUCTS

Powered Industrial Truck Safety Program

Requirements for Tower Cranes Alongside Railways Controlled by Network Rail

tower crane Is this compliant with European legislation? A brief guide for identification of non-compliant construction machinery

Root & Contributing Causes. Site Answers & Comments: Preventative / Recommended / Accepted Steps of Risk Mitigation, Points of Interest:

Elkhorn Construction, Inc. Safety Manual Title: Fall Protection Policy Effective Date:

tirfor lifting and pulling machines operating and maintenance instructions

Tool Box Talk. Forklift Operations

Life Saving Rules SAFETY BY CHOICE, NOT BY CHANCE

PreventING falls from height Introduction How will worksites be targeted? Approach Who will be targeted?

Construction Safety. Mark Reising, Tetra Tech, Inc. NARPM Training Program nd Annual nd Annual NARPM Training Program. NARPM Training Program

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES

ROV shackles. your reliable partner

Procedures for daily inspection and testing of mechanical power presses and press brakes

The Inspection Guide. Periodic Inspection

Mobile cranes overturning on construction sites. A guide to loss prevention

Routers and machining centres

Does this topic relate to the work the crew is doing? If not, choose another topic.

Work at Height on Construction Hoists

Worldwide network in over 40 countries.

Subcontractors compliance and adherence to the following Contractor requirements is deemed included for by the Subcontractor.

Ensure that the operator is properly trained and certified to operate the equipment in the material handling application at hand

MODEL T-4 TRENCHER. Operators Manual

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

Overhead Power Line Safety for Contractors

Nuclear Safe Work Practice 4.2. Operation of Light / Heavy Equipment

Mobile Equipment Safety

Industrial Guideline nr. 2

Warehousing and storage Keep it safe

Transcription:

Guidance on Lifting Operations in Construction When Using Excavators Working in Partnership

1. Introduction The use of excavators for lifting operations, particularly on construction sites, has become more common over the last few years. Excavators and backhoes are designed for rapid earth moving and are not designed for lifting operations as their principal function. When planning a lifting operation, you should firstly consider whether an excavator is the most appropriate machine, taking into account the type of lift and the duration of the task. The purpose of this document is to set out precautions and procedures that should be taken into account when planning and carrying out lifting operations with excavators and other types of earth moving equipment (backhoe and loaders) to enable the work to be done safely and in accordance with your legal duties. 2. Particular Hazards Associated with Lifting with Excavators The use of an excavator or backhoe for lifting creates additional hazards for personnel in the vicinity. Under normal circumstances, personnel are kept away from the working area around the bucket of an excavator, as this is considered to be a hazardous area. Where the excavator is used for object handling however, the slinger has to be in the danger area in order to hook the load on to the hooking device. This puts the slinger at risk of being struck by the load, bucket or excavator arm if the excavator moves without warning. One common incident of this type is where the excavator slews rapidly, for example when the operator catches the cuff of his coat on the left hand joystick, and the ground worker is struck by the bucket or dipper arm or crushed between the dipper arm and a fixed object. Injuries are usually severe in these cases. Excavator operators and slingers should be made aware of these dangers and effective communications must always be maintained between slinger and operator. The excavator operator should always make use of the safety lever (safety armrest) whenever the slinger is in the danger area. Traveling with a suspended load is particularly hazardous. The pre-lifting risk assessment should ensure that the hazards associated with this operation are fully considered, particularly the presence of personnel adjacent to the machine s travel path. 3. Lifting of Persons with Excavators Excavators should not be used under any circumstances for the lifting of persons as they are primarily designed for excavating with a bucket and consequently are capable of operating speeds and movements which make them totally unsuitable for the lifting of persons. Access to height on construction sites should be by machines designed for the purpose of lifting persons such as MEWPs, mast climbing work platforms, suspended access platforms or passenger/goods hoists, or by the use of scaffolds. In exceptional circumstances and where it is not reasonably practicable to achieve access by less hazardous means, a suitable crane with a man-riding basket may be used in accordance with Clause 23.1 of BS 7121:2006 - Code of practice for safe use of cranes Part 1: General. 2

4. Planning of Lifting Operations with Excavators Regulation 8 of LOLER requires lifting operations to be properly planned, appropriately supervised and carried out in a safe manner, and this includes lifting by earth moving machinery. The competent person (See LOLER ACOP and Guidance para. 220 223) should first carry out a risk assessment, which will include ensuring that the earth moving machinery is suitable for the task, that adequate lifting accessories are available and the ground conditions are suitable. The lifting accessories, including quick hitches, should be suitable for the load and marked with their safe working load. The risk assessment will also address the need to segregate the lifting operation from other persons on site. Based on this risk assessment, a written method statement setting out the safe operating procedure to be followed should be prepared and communicated to all personnel involved in the lifting operation. NOTE: For employers with 5 or more employees, the significant findings of the risk assessment must be recorded. The significant findings should include who is at risk, why they are at risk and how that risk is controlled. A comprehensive method statement could include this information. Special attachments for lifting (or other uses) should be compatible with the machine and coupling means (quick-hitch) to which they are being attached. A competent person should verify that the combination is designed to take the load in this manner. Further guidance on planning lifting operations is given in BS 7121-1:2006. 5. Lifting Operations Before lifting operations begin it is essential that all personnel involved are fully briefed on the significant findings of the risk assessment, the method statement and their individual roles in carrying out the task. The supervisor should ensure that persons are kept well away from the lifting area, and in particular that there is no one working below the lift, for example in a trench. Personnel should wear hi-visibility clothing and other appropriate PPE. Excavator operators must never move the machine or load until they have satisfied themselves that the slinger/signaler and any other persons associated with the lift have all moved away from the danger area, to a position of safety. The slinger or operator should check the lifting accessories, including the lifting point, before use to ensure they are not damaged or worn. Any defective lifting accessories should be removed from service immediately. Chain slings should not have any distorted links or components, hooks should not be bent and the safety clip should be in working condition. Fibre slings should be rejected when damaged, and in any case when the outer covering is worn to the extent that the inner cores are visible. Where the hooking device (the point on the machine designed for connection of the load) is not part of the bucket, the bucket should (where possible, and unless the operator instructions specify otherwise) be removed in order to improve visibility and reduce the weight being lifted. If the bucket is retained, then the weight of both the bucket and quickhitch has to be added to the load when determining whether the load is within the rated capacity. When attaching lifting slings to the hooking device or lifting point care should be taken to ensure that the slings and their attachments are able to hang free at all times. Attachment using a shackle may limit rotation if, for example, a pipe suspended from the slings is to be turned end for end (See Fig. 1). Fig. 2 shows the addition of a swivel to overcome this problem. Similarly, if the quick hitch is tilted backwards and/or the dipper arm is raised, the master link of the sling and any attachments may be put into bending or twisting possibly leading to damage or failure (See Figs. 3 & 4). These issues may reduce the height to which a load may be lifted to less than that indicated in the machine s rated object handling capacity table. The excavator operator should ensure that the acoustic/visual warning device indicating the load moment, is switched on prior to any lifting operation. 3

NOTE: Advice on the planning and carrying out of lifting operations is given in Lifting Operations: An explanation of LOLER published by Construction Industry Press. Figure 1 - Master link rotation restricted to approx ± 70 Figure 2. Swivel allows unrestricted rotation but reduces available headroom Bad Practice Figure 3 Hitch tilted backwards with master link subject to bending Figure 4 Hitch tilted backwards with master link subject to twisting Good Practice Figure 5 Chain and master link can hang freely without obstruction 6. Excavator Requirements when Used for Lifting The design of earth moving machinery for lifting (object handling) is covered by the European standard BS EN 474 parts 1, 3, 4 and 5 (see bibliography). Any earth-moving machine designed for object handling should have a rated object handling capacity table available inside the cab. An example is shown in Fig. 6. If a rated 4

object handling capacity table is not available then the machine should not be used for object handling. NOTE: Handling attachments (e.g. grab) that do not require the assistance of a person for hooking or guiding are considered as normal earth moving operations and do not require warning devices and a rated capacity table. An earth-moving machine used for lifting operations must be fitted with a load hooking device. This may be mounted on the dipper, the quick hitch or the bucket. If the load hooking device is a hook then this should have a clip or other device which prevents a sling slipping off the hook. Many quick-hitches provide a load hooking device in the design of the hitch. If the rated lifting capacity for an excavator or the backhoe portion of a backhoe-loader is greater than 1 tonne (or the overturning moment is greater than 40000Nm) then the machine must be fitted with: a) a boom lowering control device on the raising (main) boom cylinder(s) and which meets the requirements of ISO 8643:1997 and b) an acoustic or visual warning device which indicates to the operator when the object handling capacity or corresponding load moment is reached NOTE: Loaders and the loader portion of a backhoe/loader do not require a boom lowering control device or acoustic/ visual warning devices. NOTE: Where a risk assessment shows that there is a significant risk of overloading and/or overturning on machines with a rated capacity of 1 tonne or less, a Rated Capacity Indicator may be required. (See LOLER ACOP and Guidance paragraph 122). Suitable slings must be available to attach the load to the excavator. Slings and other lifting accessories should be CE marked, and marked with the safe working load. 7. Training and Competency Assessment Excavator drivers and slingers should be adequately trained and assessed to undertake their roles in lifting operations. This training is additional to the training required for operating the machine as an excavator. Suitable guidance is available in BS 7121 parts 1 and 3. NOTE: Prior to 2008, the CPCS category for excavator operation does not cover lifting operations. The current CPCS category has been amended to include lifting objects and will apply to all those taking the practical and theory tests from 1 st August 2008. NOTE: For existing CPCS excavator card holders, an additional module of approximately half a day s duration, on lifting with excavators is in preparation. 8. Pre-use Checks, Inspections and Maintenance All excavators, backhoes and front end loaders require pre-use checks, inspections and maintenance to ensure that they do not deteriorate to an extent where the operator or other persons are put at significant risk. Pre-use (Daily) Checks Pre-use checks are normally carried out by the operator who should have been trained and assessed to carry out this task. Pre-use checks should be recorded as having been carried out (for example on a timesheet) and a defect reporting system should be in place to ensure that any defects are rectified promptly. Weekly Inspections Weekly inspections may be carried out by the operator if they have been assessed as trained and competent. A record that the inspection has been carried out, together with 5

a note of any deficiencies should be made. A management system for eliminating deficiencies should be in place. Maintenance Maintenance should be carried out at least at the intervals required by the manufacturer s manual. The frequency of maintenance may be increased by factors such as usage and environment. Personnel undertaking maintenance should have been trained and assessed to carry out this task. All maintenance activities should be formally recorded. 9. Thorough Examination and Test An excavator used for object handling is regarded as lifting equipment and requires thorough examination by a competent person at least every 12 months.* (See LOLER Reg. 9). An excavator which is never used for object handling (for example, because it is not equipped with a load hooking device) does not require thorough examination but still requires regular inspection under PUWER which will be to a similar standard. Front end loaders, not modified or adapted for lifting operations, do not require thorough examination under LOLER, but still require regular inspection under PUWER. If the loader is used for object handling it will require thorough examination under LOLER at least every 12 months*. A report of thorough examination of lifting equipment is not required where the employer has an EC Declaration of Conformity dated within the last 12 months. Where a quick hitch is permanently mounted on an excavator then the thorough examination for the excavator will also cover the quick hitch. If the quick hitch is moved from one machine to another it is classed as an accessory and should be thoroughly examined every 6 months. Slings, loose hooks, chain slings, polyester slings, shackles etc. are classed as lifting accessories and must be thoroughly examined every 6 months. Buckets with integrated hooks/lifting eyes are also classed as lifting accessories and should be thoroughly examined every 6 months. *In the absence of a written examination scheme drawn up by a competent person 10. Bibliography BS EN 474-1:2006, Earth-moving machinery. Safety - Part 1: General requirements BS EN 474-3:2006, Earth-moving machinery. Safety - Part 3: Requirements for loaders BS EN 474-4:2006, Earth-moving machinery. Safety - Part 4: Requirements for backhoe loaders BS EN 474-5:2006, Earth-moving machinery. Safety - Part 5: Requirements for hydraulic excavators. BS 7121-1:2006, Code of practice for safe use of cranes Part 1: General BS 7121-3:2000, Code of practice for safe use of cranes Part 3: Mobile cranes ISO 8643:1997, Safety of earth-moving machinery. Specification for hydraulic excavator and backhoe loader boom lowering control device ISO 10567:1992, Safety of earth-moving machinery. Methods for the calculation and verification of the lift capacity of hydraulic excavators 6

LOLER, Safe Use of Lifting Equipment Lifting Operations and Lifting Equipment Regulations 1998 Approved Code of Practice and Guidance. HSE Books L113 PUWER, Safe Use of Work Equipment Provision and Use of Work Equipment Regulations 1998 Approved Code of Practice and Guidance. HSE books L22 Lifting Operations: An explanation of LOLER, 2006. Construction Industry Press NOTE: B = Distance of centre of slew to load attachment point NOTE: Load C must include the weight of quick hitch, bucket or other lifting accessory Figure 6 - Example of a Rated Object Handling Capacity Table Reference No. CIG 0801 First Published: May 2008 Revision 1 published: Oct 2008 Revision 2 published: March 2009 Published by: Construction Plant-hire Association 27/28 Newbury St London EC1A 7HU Telephone: 020 7796 3366 Email: enquiries@cpa.uk.net CPA Copyright May 2008 7