1 East Anglia Construction Safety Group Health and Safety Day 22 nd April 2010 Tower Crane Safety Update Tim Watson Tim Watson Consulting

2 Topics An overview of the latest advances in tower crane standards and design Some recent accidents and the lessons learned Planning for the safe and effective installation and use of tower cranes on site The Tower Crane Register

3 Latest Advances in Tower Crane Standards and Design

4 Old and New Standards National Standards DIN NF E FEM EN 14439: A1:2010 One standard across Europe Adopted by manufacturers from January 2010

5 What's New in EN14439 Improved Safety in Service Compulsory anemometer Anti-collision and zoning devices Improved cab visibility Improved Operator Comfort Requirements for cab heating and control station layout Improved Safety for Erection and Maintenance Personnel Reduction of crushing hazards Improved access Specifications for climbing systems Increased Requirements for Out-of-service Wind

6 Out-of-service Wind European Storm Wind Map CPA TIN 027

7 Example

8 Out-of-service Wind Accidents

9 Common Requirements for Access EN 13586

10 Common Requirements for Access Ladders

11 Zoning Systems

12 Standardised Minimum Requirements

13 Requirements for Operator s Cabs

14 Some Recent Tower Crane Accidents and the Lessons Learned

15 Tower Crane Accident Survey May 2000 July 2009 At least 51 Serious incidents 8 in the UK 1 in Israel 6 in China 1 in Malaysia 5 in the USA 1 in Philippines 4 in Russia 1 in Poland 4 in Netherlands 1 in Qatar 3 in South Africa 1 in Saudi Arabia 2 in Germany 1 in Spain 2 in Malta 1 in Singapore 2 in Switzerland 1 in South Korea 1 in Bahrain 1 in Taiwan 1 in Canada 1 in Tokyo 1 in Irish Republic 1 in Vietnam

16 Service Condition Service Condition Quantity In-service 22 Climbing 7 Dismantling 6 Erection 6 Out-of-service 6 Not known 3 Under test 1

17 Failure Area Failure Area Quantity Foundation/Base 11 Jib 7 Tower /Base 5 Slew section 4 Tower 4 Crane top and climbing frame 3 Falling tower section 2 Jib pendant & luffing ropes 2 Suddenly moving jib section 1 Tower tie 1 Not known 11

18 Causes Erection/Dismatling/Exten ding Extreme Weather Foundation Problems 5 Mechanical Issues Misuse 7 Not Known 9 Total 51

19 Canary Wharf May 2000

20 Canary Wharf May 2000 Crane was being climbed by a six man crew Collapse occurred as the last mast section was being added on the Sunday Three men fatally injured as result of the 120m fall Debris over wide area of Canada Square Issues: Training Long hours of work Inadequate planning Faulty equipment Manufacturer s instructions not being followed

21 Worthing February 2005 Two men killed One seriously injured

22 Worthing February 2005 De-rigging prior to dismantling The two erectors fatally injured working on the jib removing hoist and trolley ropes Third Erector had de-torqued tower bolts on one side of the mast Jib was slewed Slackened bolts failed and crane collapsed Crane owner prosecuted and fined 389,000 for not managing the dismantling process effectively Issues Training Planning

23 Battersea September 2006 BPR 222 Crane Crane had been in use for a number of weeks Joint below slew ring failed Jib fell across site into an adjacent road Crane Driver + Member of public killed Slew ring bolts had been replaced shortly after erection Investigation concentrating on method used to replace bolts.

24 Seattle November 2006

25 Seattle November 2006 Official enquiry blamed inadequate design of foundation Fatigue failure Lack of maintenance and inspection Issues: Planning Base design Maintenance Thorough examination

26 Liverpool - January 2007 JASO Luffer 3 years old CE marked DOC to EN Crane was in use Light load Close to minimum radius Wind near maximum inservice limit Jib fell backwards across the site during a lifting operation 1 Construction worker killed

27 Liverpool Investigation Findings Jib at small angle to the vertical Wind from the front held the jib up and caused the luffing rope to go slack Luffing rope jammed in the sheaves Operator tried to lower off and paid out rope from the luffing winch, which looped down the back of the crane Luffing rope became free allowing the jib to drop until the slack rope arrested its fall Large dynamic load caused the jib to fail and the slewing section and counter jib became detached from the top of the tower at the slew ring One of the counterweights fell on a construction worker causing fatal injuries Issues: Crane design standard

28 Liverpool Animation

29 Croydon June 2007

30 Croydon June 2007 Climbing team had not used the equipment before and had not had any specific training on its use Crane owner fined 100, ,196 costs Issues Training Planning Not following manufacturer s instructions

31 New York March 2008 Favelle Favco Luffing Jib Tower Crane 3 Fatalities Being climbed Fabric lifting sling failed, causing tie to fall Top of crane demolished building two blocks away Issues Planning Selection of equipment

32 Miami March 2008 Libeherr luffing jib crane Climbing operation Tower section fell 2 Fatalities Issues:- Planning Selection of equipment

33 Miami March 2008

34 New York May 2008 Kodiak luffing tower crane In-service but not lifting 2 Fatalities Slew ring support failed Said to be 24 years old Same owner as March incident Issues:- Maintenance Thorough examination

35 Rotterdam July 2008 The crane was lifting a heavy load within its rated capacity close to the mast. It was required to slew the crane & manoeuvre the load along the jib such that the load was very close to the maximum permitted at the required radius During final positioning of the load it ran away down the jib, overloading the crane and causing it to fail at the mast section Failure due to incorrect setting of the PLC/Inverter trolley motor control system

36 Common Issues Inadequate Planning Inadequate Training Maintenance Issues Through Examination Issues Not Following Manufacturer's Instructions Poor Selection of Equipment Poor Base Design Design Standard Issues

37 Planning for the Safe and Effective Installation and Use of Tower Cranes on Site

38 Planning for Installation Choose your tower crane supplier with care Maintain same key personnel from Crane Provider and Principal Contractor/Hirer throughout the process from initial enquiry to dismantling Initial meeting on site to establish Site restrictions and hazards Temporary works requirements Responsibilities for liaison Detailed risk assessments and method statements Method statement sign off Pre activity site inspection and meeting Checks on day of operation Permits to erect, climb or dismantle Keep Talking!!

39 Guidance on the Management of Installation Process

40 Guidance on the Management of Installation Process

41 Guidance on the Management of Installation Process

42 Guidance on Design of Foundations

43 Guidance on the Management of use of Tower Cranes

44 Guidance on the Management of use of Tower Cranes

45 Guidance on the Management of use of Tower Cranes

46 Guidance on Maintenance, Inspection and Thorough Examination

47 All Construction Plant-hire Association (CPA) and Strategic Forum Plant Safety Group Guidance Documents can be downloaded free at

48 The Tower Crane Register

49 The Tower Crane Register Aims to improve tower crane safety and public confidence in their safety Register required by the Notification of Conventional Tower Crane Regulations 2010 Came into effect 6 th April 2010 Only affects conventional top slew tower cranes on construction sites Not SETCs or Truck Mounted Responsibility for ensuring notification is made rests with the user (hirer) of the crane

50 The Tower Crane Register When Notification must be Made Notification must be carried out with 14 days of the date of any through examination:- following the crane s installation and before being put into use for the first time on a particular site; when the crane is reconfigured on site, eg when the height of the mast is altered; when the crane stays on-site long enough for the existing thorough examination to expire; if exceptional circumstances liable to jeopardise the safety of the crane have occurred.

51 The Tower Crane Register Information to be Notified The name and address of the company providing the crane for use on the site. The address of the construction site at which the crane has been installed; Information sufficient to identify the crane including, where known, its date of manufacture. The date of the thorough examination; The name and address of the employer for whom the thorough examination was made; Whether the thorough examination revealed any defects involving imminent risk of serious personal injury.

52 The Tower Crane Register Method of Notification and Cost Two ways to notify HSE Online at By post by completing a form which can either be downloaded from the above website, or by contacting HSE s Infoline for a form and returning it to: Cost HSE Cranes Register, Health and Safety Executive, Field Operations Division, London Divisional Administrative Office, Rose Court, 2 Southwark Bridge, London SE1 9HS 20 per Notification

53 Further Information The Crane Register Website HSE Guidance Leaflet INDG 437

54 Thank You

A Review of Recent Tower Crane Accidents and the Lessons Learned

A Review of Recent Tower Crane Accidents and the Lessons Learned A Review of Recent Tower Crane Accidents and the Lessons Learned Tim Watson Tim Watson Consulting Limited Tower Crane Accidents 130 Accidents Worldwide 1989 2012 Only Major Accidents Considered Significant

More information

Network Rail. Presentation to Tower Crane Interest Group Open Meeting. Bob Watts, Outside Parties Manager Network Rail (High Speed) 21 March 2013

Network Rail. Presentation to Tower Crane Interest Group Open Meeting. Bob Watts, Outside Parties Manager Network Rail (High Speed) 21 March 2013 Network Rail Presentation to Tower Crane Interest Group Open Meeting Bob Watts, Outside Parties Manager Network Rail (High Speed) 21 March 2013 1 Risk based decision making Network Rail expects, when planning

More information

Requirements for Tower Cranes Alongside Railways Controlled by Network Rail

Requirements for Tower Cranes Alongside Railways Controlled by Network Rail Requirements for Tower Cranes Alongside Railways Controlled by Network Rail Contents Page 1. Introduction... 2 2. Hierarchy of Risk Elimination and Reduction... 4 3. Other Planning Requirements... 7 4.

More information

TÜV Middle East W.L.L. Welcome

TÜV Middle East W.L.L. Welcome TÜV Middle East W.L.L. Welcome TÜV NORD Group Key Data Foundation of TÜV Nord e.v.: 1869 Foundation of TÜV NORD Group: 2004 Number of employees: 8,000 + A Competent and International Service Partner Competence

More information

Management of Lifting with Mobile Cranes

Management of Lifting with Mobile Cranes Management of Lifting with Mobile Cranes IOSH Eastern Branch 9 th December 2011 Tim Watson CPA Technical Consultant Topics Construction Plant-hire Association LOLER and Planning Lifting Operations Contract

More information

Tower crane incidents worldwide

Tower crane incidents worldwide Health and Safety Executive Tower crane incidents worldwide Prepared by the Health and Safety Laboratory for the Health and Safety Executive 2010 RR820 Research Report Health and Safety Executive Tower

More information

GUIDE TO TOWER CRANES 1

GUIDE TO TOWER CRANES 1 1 This Guide provides information on siting, erecting and using tower cranes and selferecting tower cranes in the workplace and supports the General guide for cranes. This Guide forms part of a series

More information

Integrating Risk Assessments, People and Processes

Integrating Risk Assessments, People and Processes Integrating Risk Assessments, People and Processes 1. Case metadata Country of origin: Ireland Year of publication by agency: 2009 Sector: F 41 Construction & Civil Engineering Keywords: 24361C 24401C

More information

Tower cranes collapsing on construction sites. A guide to loss prevention

Tower cranes collapsing on construction sites. A guide to loss prevention Tower cranes collapsing on construction sites A guide to loss prevention In recent years, a number of tower cranes have collapsed on construction sites causing serious accidents involving personal injury,

More information

Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting

Good Practice Guide. The Selection of Access Methods to Install and Dismantle Safety Netting Good Practice Guide The Selection of Access Methods to Install and Dismantle Safety Netting FASET is the trade association for the safety net rigging and temporary safety systems industry. This document

More information

WOLFFKRAN. 1 Schedule drawing. 1.1 Schedule drawing, WOLFF 6023.6clear. max. hook height above ground. Data WOLFF 6023.6clear

WOLFFKRAN. 1 Schedule drawing. 1.1 Schedule drawing, WOLFF 6023.6clear. max. hook height above ground. Data WOLFF 6023.6clear 1 Schedule drawing 1.1 Schedule drawing, WOLFF 6023.6clear [X] max. hook height above ground Data WOLFF 6023.6clear Item Crane type Design Type of setup Basis of calculation Payload torque Hoist winch

More information

Tower crane stability

Tower crane stability London 2006 Tower crane stability Hilary Skinner Tim Watson Bob Dunkley Paul Blackmore BRE formerly Laing Group formerly Laing Group BRE Classic House, 174 180 Old Street, London EC1V 9BP TEL +44 (0)20

More information

FATAL CRANE INCIDENT 22 nd nd October 2007

FATAL CRANE INCIDENT 22 nd nd October 2007 FATAL CRANE INCIDENT 22 nd nd October 2007 Germano Construction Site Brazil LESSONS LEARNED INCIDENT DESCRIPTION DATE: 22 nd October 2007 TIME: 1126 hours. Incident Description: During the construction

More information

Guidance on Lifting Operations in Construction When Using Excavators

Guidance on Lifting Operations in Construction When Using Excavators Guidance on Lifting Operations in Construction When Using Excavators Working in Partnership 1. Introduction The use of excavators for lifting operations, particularly on construction sites, has become

More information

Tower crane. Code of Practice 2006. Workplace Health and Safety Queensland Department of Justice and Attorney-General

Tower crane. Code of Practice 2006. Workplace Health and Safety Queensland Department of Justice and Attorney-General Tower crane Code of Practice 2006 Workplace Health and Safety Queensland Department of Justice and Attorney-General This Queensland code of practice was preserved as a code of practice under section 284

More information

Level 1 Award in Health and Safety in a Construction Environment

Level 1 Award in Health and Safety in a Construction Environment Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion

More information

WORK AT HEIGHT UNIT 4

WORK AT HEIGHT UNIT 4 WORK AT HEIGHT UNIT 4 WHAT IS WORKING AT HEIGHT? The Working At Height Regulations 2005 define working at height as:- Any work above or below ground level where a fall would result in personal injury.

More information

Technical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement

Technical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement Technical Advisory for Safe Operation of Lifting Equipment Programme-Based Engagement Contents 1. Introduction and Background 03 2. Case Studies of Accidents Involving Lifting Equipment 05 3. Common Systemic

More information

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR

INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR INTERNATIONAL LABOUR ORGANISATION REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR Model Form and Certificates as required by Article 25(2) of the ILO Convention concerning Occupational Safety and

More information

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS

More information

UNIT 7 Crane safety. Engineering CASE STUDY. Cambridge English for. Professional English. Part 1. Part 2

UNIT 7 Crane safety. Engineering CASE STUDY. Cambridge English for. Professional English. Part 1. Part 2 Professional English Cambridge English for Engineering CASE STUDY Part 1 Read the extract from a handbook about crane safety. Then discuss the questions about the underlined keywords with a partner. When

More information

Purchasing Managers Index (PMI ) series are monthly economic surveys of carefully selected companies compiled by Markit.

Purchasing Managers Index (PMI ) series are monthly economic surveys of carefully selected companies compiled by Markit. PMI Purchasing Managers Index (PMI ) series are monthly economic surveys of carefully selected companies compiled by Markit. They provide an advance signal of what is really happening in the private sector

More information

Thorough examination of lifting equipment

Thorough examination of lifting equipment Thorough examination of lifting equipment A simple guide for employers Health and Safety Introduction Thorough examination of lifting equipment A simple guide for employers If you are an employer or self-employed

More information

RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO

RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO RESPONSIBILITIES IN MOBILE CRANE OPERATIONS CONSTRUCTION SAFETY ASSOCIATION OF ONTARIO MOBILE CRANE OPERATIONS WHO IS RESPONSIBLE? The question of who is responsible for the various aspects of a crane

More information

tower crane Is this compliant with European legislation? A brief guide for identification of non-compliant construction machinery

tower crane Is this compliant with European legislation? A brief guide for identification of non-compliant construction machinery THE EUROPEAN MATERIALS HANDLING INDUSTRY A brief guide for identification of non-compliant construction machinery Is this tower crane compliant with European legislation? INTRODUCTION Construction equipment

More information

Financing and insuring tower cranes

Financing and insuring tower cranes CONSTRUCTING THE EUROPE O F T O M O R R O W CONSTRUCTING THE EUROPE O F T O M O R R O W Financing and insuring tower cranes CECE aisbl Bd. A Reyers 80 B-1030 Brussels (Belgium) Tel: +32 2 706 82 26 [email protected]

More information

Chapter 3: Fall Protection/ Scaffolding Safety

Chapter 3: Fall Protection/ Scaffolding Safety Chapter 3: Fall Protection/ Scaffolding Safety Learning Objectives In this chapter you will learn to: recognize the hazards commonly associated with work on or around scaffolds; be aware of common scaffold-related

More information

www.dol.govt.nz/prevent-falls/ PreventING falls from height Introduction How will worksites be targeted? Approach Who will be targeted?

www.dol.govt.nz/prevent-falls/ PreventING falls from height Introduction How will worksites be targeted? Approach Who will be targeted? PROACTIVE ENFORCEMENT APPROACH TO PREVENTING FALLS FROM HEIGHT Introduction Preventing falls is a priority for the Labour Group of the Ministry of Business, Innovation and Employment. From 1 July 2012,

More information

Grove RT. Igo and Igo M Range. Many building sites, one solution. Features and benefits. Rough Terrain Crane

Grove RT. Igo and Igo M Range. Many building sites, one solution. Features and benefits. Rough Terrain Crane Grove RT Features and benefits Igo and Igo M Range Many building sites, one solution Rough Terrain Crane CHARLIEU - France NIELLA TANARO - Italy Concentrated know-how and experience A world leader More

More information

FALL PREVENTION PLAN FPP. Sharing of Safe Work at Height

FALL PREVENTION PLAN FPP. Sharing of Safe Work at Height FALL PREVENTION PLAN FPP Sharing of Safe Work at Height Howard How Boustead Singapore Limited The Group Established in 1828, Boustead Singapore is a progressive global infrastructure-related engineering

More information

A report about the HSE investigation into the collapse of a tower crane in Canada Square London E14, on 21 May 2000

A report about the HSE investigation into the collapse of a tower crane in Canada Square London E14, on 21 May 2000 A report about the HSE investigation into the collapse of a tower crane in Canada Square London E14, on 21 May 2000 Main Report Brief summary 1) On Sunday 21 May 2000 at approximately 4:00pm the top section

More information

METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS

METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS CLIENT: Elliott Group CONTACT: Maurice Kennett SITE: Lympstone Church Ring School,

More information

Global AML Resource Map Over 2000 AML professionals

Global AML Resource Map Over 2000 AML professionals www.pwc.co.uk Global AML Resource Map Over 2000 AML professionals January 2016 Global AML Resources: Europe France Italy Jersey / Guernsey 8 Ireland 1 Portugal 7 Luxembourg 5 United Kingdom 1 50 11 Spain

More information

Sulfuric Acid 2013 World Market Outlook and Forecast up to 2017

Sulfuric Acid 2013 World Market Outlook and Forecast up to 2017 Brochure More information from http://www.researchandmarkets.com/reports/2547547/ Sulfuric Acid 2013 World Market Outlook and Forecast up to 2017 Description: Sulfuric Acid 2013 World Market Outlook and

More information

Work at Height on Construction Hoists

Work at Height on Construction Hoists Work at Height on Construction Hoists CPA Best Practice Guide Work at Height on Construction Hoists CPA Best Practice Guide Working in Partnership Reference No. CHIG 0901 First Published: June 2009 Published

More information

Construction OS&H Working at height

Construction OS&H Working at height Construction OS&H Working at height Summary Common hazards with working at height General OS&H requirements when working at height Scaffolding Structural frames Demolition of above ground structures Roof-work

More information

A Casebook of Fatal Accidents Related to Work-at-Height

A Casebook of Fatal Accidents Related to Work-at-Height A Casebook of Fatal Accidents Related to Work-at-Height Occupational Safety and Health Branch Labour Department Occupational Safety and Health Council This casebook is prepared by the Occupational Safety

More information

Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab

Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab STATE OF NEW YORK DEPARTMENT OF HEALTH FATALITY ASSESSMENT AND CONTROL EVALUATION Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab Case Report: 07NY015 SUMMARY In February

More information

Health and safety. in road haulage

Health and safety. in road haulage Health and safety in road haulage INTRODUCTION Do you employ people in general haulage and warehousing, wholesale and retail distribution, or specialised haulage such as car transport, bulk materials and

More information

DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013

DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013 DRILLING & FOUNDATION EQUIPMENT SAFETY INSTITUTION OF ENGINEERS AUSTRALIA MECHANICAL 21.11.2013 1. EN 16228-1../7 & EN 791 & EN 996 2. STABILITY OF THE RIGS; 3. AUSTRALIAN STANDARDS AND REGULATION RELATED

More information

Tremline Pty Ltd trading as The Hills Bark Blower

Tremline Pty Ltd trading as The Hills Bark Blower JSA No: Rev: 10011 Date: 10010 ABN 1 07 880 6 Website: wwwbarkblowercomau Job Number Start Time: Vehicle : Max Length Hose Date: Company Name: Product: Quantities Depth Job site address: Description of

More information

Introducing GlobalStar Travel Management

Introducing GlobalStar Travel Management Introducing GlobalStar Travel Management GlobalStar is a worldwide travel management company owned and managed by local entrepreneurs. In total over 80 market leading enterprises, representing over US$13

More information

Sample Fall Rescue Plan for Bridge Work

Sample Fall Rescue Plan for Bridge Work This document is intended to provide guidance for developing fall rescue plans for bridge contractors. The Occupational Safety and Health Administration s (OSHA) regulation 29 CFR 1926.502(d)(20) states:

More information

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Working at Height above 2trs Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE:

More information

S/N MOM Accredited Courses Relevancy Reference

S/N MOM Accredited Courses Relevancy Reference 1 2 3 4 5 6 7 8 9 Safety Orientation (Tunnelling) for Workers Compressed Air Works (Man Lock Attendant) Compressed Air Works (Medical Lock Attendant) Building Construction Supervisors Safety Building Construction

More information

Working at height A brief guide

Working at height A brief guide Working at height A brief guide Introduction This brief guide describes what you, as an employer, need to do to protect your employees from falls from height. It will also be useful to employees and their

More information

Building on +60 GW of experience. Track record as of 31 December 2013

Building on +60 GW of experience. Track record as of 31 December 2013 Building on +60 GW of experience Track record as of 31 December 2013 Can data and analysis make a difference on turbine performance? Proven technology. For Vestas, it is more than a saying it is something

More information

The Work at Height Regulations 2005 (as amended) A brief guide

The Work at Height Regulations 2005 (as amended) A brief guide The Work at Height Regulations 2005 (as amended) A brief guide Off work sick and worried about your job? Steps you can take to help your return to work Health and Safety The Work at Height Regulations

More information

The face of consistent global performance

The face of consistent global performance Building safety & security global simplified accounts The face of consistent global performance Delivering enterprise-wide safety and security solutions. With more than 500 offices worldwide Johnson Controls

More information

Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008

Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008 Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008 Purpose of Investigation This incident is investigated, and published in accordance

More information

Safe Use of Lifting Equipment and Lifting Accessories

Safe Use of Lifting Equipment and Lifting Accessories Safe Use of Lifting Equipment and Lifting Accessories STFC Safety Code No 26 Rev. 1.7, Issued January 2016 Note - This document may have been superseded by a more recent version. Version History 1 Initial

More information

OSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L

OSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L OSHA Scaffold Standard for Construction 29 CFR 1926 Subpart L EH&S Jim Walker What is the revised OSHA scaffold standard for construction? Issued on August 30, 1996 and became effective on November 29,

More information

Warehousing and storage Keep it safe

Warehousing and storage Keep it safe Warehousing and storage Keep it safe This short guide is to help those involved in warehousing and storage to reduce the number of injuries and cases of occupational ill health. It contains simple advice

More information

How the Lifting Operations and Lifting Equipment Regulations apply to health and social care

How the Lifting Operations and Lifting Equipment Regulations apply to health and social care How the Lifting Operations and Lifting Equipment Regulations apply to health and social care HSE information sheet Introduction This information sheet gives advice to employers, the self-employed, employees

More information

Mobile (Truck) Cranes

Mobile (Truck) Cranes Mobile (Truck) Cranes Definition: A truck or mobile crane consists of an upper carriage with front end attachment such as a box or lattice type boom and optional jib (boom extension). The upper carriage

More information

Work at Height / Falling Objects

Work at Height / Falling Objects Introduction This information sheet gives employers and employees practical advice on work at height and falling objects and how to eliminate or reduce the risk of harm or damage occurring. It will assist

More information

BT Premium Event Call and Web Rate Card

BT Premium Event Call and Web Rate Card BT Managed Event and BT Self-Managed Event (also referred to as Express, Plus and Premium) Conference Bridge and Call for Booked Audio Conferencing Services will comprise the following for each phone-conference:

More information

Guidebook for Lifting Supervisors

Guidebook for Lifting Supervisors Guidebook for Lifting Supervisors Contents 1. Introduction and Background 2 2. Common Systematic Lapses Involving Lifting Activities 3 3. Roles and Responsibilities of Lifting Supervisors 4 4. Common Hazards

More information

A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION

A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION ELECTRICAL CONTRACTOR RISK ASSESSMENT AND KEY CONTROL MEASURES CONTRACTOR NAME: AEC Automation Ltd. NAME OF CONTRACT: A: SIGNIFICANT RISKS Initial Risk Rating H/M/L Slips, trips and falls. Manual handling.

More information

WEEKLY SAFETY MEETING

WEEKLY SAFETY MEETING Safety Meeting Contents Meeting Notice Leaders Guide Employee Handout Employee Quiz Meeting Sign-In Sheet Employee Puzzle PRIOR TO THE WEEKLY MEETING: - Post the meeting notice by the timeclock - Read

More information

Report on Government Information Requests

Report on Government Information Requests Report on Government Information July 1 - December 31, 2015 Apple takes our commitment to protecting your data very seriously and we work incredibly hard to deliver the most secure hardware, software and

More information

Potain Igo 42. Product Guide. Features. 4000 kg (8818 lb) maximum capacity. 1100 kg (2425 lb) capacity at 36 m (118 ft)

Potain Igo 42. Product Guide. Features. 4000 kg (8818 lb) maximum capacity. 1100 kg (2425 lb) capacity at 36 m (118 ft) Potain Igo 42 Product Guide Features 4000 kg (8818 lb) maximum capacity 1100 kg (2425 lb) capacity at 36 m (118 ft) 36 m (118 ft) maximum operating hook radius 33 m (108 ft) maximum hook height with 36

More information

Work at Height on Mobile Cranes

Work at Height on Mobile Cranes Work at Height on Mobile Cranes CPA Best Practice Guide Work at Height on Mobile Cranes CPA Best Practice Guide Working in Partnership Reference No CIG 0701 First Published September 2007 Published by:

More information

Does this topic relate to the work the crew is doing? If not, choose another topic.

Does this topic relate to the work the crew is doing? If not, choose another topic. TRAINING GUIDE HIGH VOLTAGE LINES 2001 Before you begin the meeting... Does this topic relate to the work the crew is doing? If not, choose another topic. Did you read this Training Guide and fill in the

More information

WORK AT HEIGHT. STFC Safety Code No 9. Rev. 1.4, Issued April, 2015

WORK AT HEIGHT. STFC Safety Code No 9. Rev. 1.4, Issued April, 2015 WORK AT HEIGHT STFC Safety Code No 9 Rev. 1.4, Issued April, 2015 Note - This document may have been superseded by a more recent version. Revisions 1 Initial Launch November 2007 1.1 Amendments to training

More information

Work at Height. John Frontczak Construction Manager Facilities Engineering. 2011 Chevron Corporation. All rights reserved.

Work at Height. John Frontczak Construction Manager Facilities Engineering. 2011 Chevron Corporation. All rights reserved. Today Work at Height John Frontczak Construction Manager Facilities Engineering Agenda Definition and Requirements Fall Prevention Scaffolding Safety Fall Protection Fall-Arrest System Rescue Plan Training

More information

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Gantry Crane Operation Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE:

More information

JABATAN KESELAMATAN DAN KESIHATAN PEKERJAAN MALAYSIA (JKKP)

JABATAN KESELAMATAN DAN KESIHATAN PEKERJAAN MALAYSIA (JKKP) APPENDIX 1 Department of Occupational Safety and Health JABATAN KESELAMATAN DAN KESIHATAN PEKERJAAN MALAYSIA (JKKP) DEPARTMENT OF OCCUPATIONAL SAFETY AND HEALTH, MALAYSIA (DOSH) Aras 2, 3 & 4 Blok D3,

More information

RT100 ROUGH TERRAIN CRANE DATASHEET - IMPERIAL. Features:

RT100 ROUGH TERRAIN CRANE DATASHEET - IMPERIAL. Features: ROUGH TERRAIN CRANE DATASHEET - IMPERIAL Features: Rated capacity: 100 ton @ 10 ft working radius Maximum boom length: 174 ft Maximum tip height: 183 ft Maximum hook height: 174.5 ft CONTENTS Key............................................................................................

More information

Survey and Examination of Ships Lifting Appliances. In conjunction with:

Survey and Examination of Ships Lifting Appliances. In conjunction with: Survey and Examination of Ships Lifting Appliances In conjunction with: 1.0 Introduction When a lifting appliance fails the consequences can be far-reaching. Serious injury and death can occur, not just

More information

Reported Road Accident Statistics

Reported Road Accident Statistics Reported Road Accident Statistics Standard Note: SN/SG/2198 Last updated: 24 October 2013 Author: Matthew Keep & Tom Rutherford Social and General Statistics Section This Note provides a range of data

More information

International Call Services

International Call Services International Call Services Affordable rates for business calls. Wherever you are in the world. We ve got plenty to say when it comes to staying in touch when you re overseas. We have agreements with 443

More information

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment Occupational Safety and Health Division 18 Havelock Road #03-02 Singapore 059764 Tel: 64385122 www.mom.gov.sg [email protected] Application for Approved (Overseas/Local) Third Party Inspection Agency

More information

MAUVE GROUP GLOBAL EMPLOYMENT SOLUTIONS PORTFOLIO

MAUVE GROUP GLOBAL EMPLOYMENT SOLUTIONS PORTFOLIO MAUVE GROUP GLOBAL SOLUTIONS PORTFOLIO At Mauve Group, we offer a variety of complete employee management services such as Global Employment Solutions (GES), Professional Employment Outsourcing (PEO),

More information

Agilent Mobile WiMAX R&D Test Set Solutions: Software and Technical Support Contract

Agilent Mobile WiMAX R&D Test Set Solutions: Software and Technical Support Contract Agilent Mobile WiMAX R&D Test Set Solutions: Software and Technical Support Contract Product Overview Maximize the potential of the E6651A Mobile WiMAX test set and related software with the latest software

More information

Integrated Building Information Model to Identify Possible Crane Instability caused by Strong Winds

Integrated Building Information Model to Identify Possible Crane Instability caused by Strong Winds 1281 Integrated Building Information Model to Identify Possible Crane Instability caused by Strong Winds Shafiul Hasan 1, Hamid Zaman 2, Sanghyeok Han 3, Mohamed Al-Hussein 4 and Yi Su 5 1 Ph.D. Candidate,

More information

The big pay turnaround: Eurozone recovering, emerging markets falter in 2015

The big pay turnaround: Eurozone recovering, emerging markets falter in 2015 The big pay turnaround: Eurozone recovering, emerging markets falter in 2015 Global salary rises up compared to last year But workers in key emerging markets will experience real wage cuts Increase in

More information

Global Expatriates: Size, Segmentation and Forecast for the Worldwide Market

Global Expatriates: Size, Segmentation and Forecast for the Worldwide Market Global Expatriates: Size, Segmentation and Forecast for the Worldwide Market Report Prospectus January 2014 Finaccord Ltd., 2014 Web: www.finaccord.com. E-mail: [email protected] 1 Prospectus contents

More information

Rescue operations - Rescue from cranes

Rescue operations - Rescue from cranes Rescue operations - Rescue from cranes Parts of crane - Chassis - Tower (steel construction - latticework) - Arm with pulleys - Ladder - Lift - Driver's cabin Anchor points - Driver's cabin - Crane arm

More information

Mobile cranes overturning on construction sites. A guide to loss prevention

Mobile cranes overturning on construction sites. A guide to loss prevention Mobile cranes overturning on construction sites A guide to loss prevention Each year, a number of mobile cranes overturn on construction sites causing serious accidents involving personal injury, significant

More information

RT 780. RT 780 80 USt Lifting Capacity Rough Terrain Cranes Datasheet Imperial. Features

RT 780. RT 780 80 USt Lifting Capacity Rough Terrain Cranes Datasheet Imperial. Features USt Lifting Capacity Rough Terrain Cranes Datasheet Imperial Features Rated capacity: US t @ ft working radius Maximum boom length: 126 ft Maximum tip height: 1 ft CONTENTS Page: Key...3 Dimensions Crane

More information

360 o View of. Global Immigration

360 o View of. Global Immigration 360 o View of Global Immigration In a fast moving global economy, remaining compliant with immigration laws, being informed and in control is more challenging than ever before. We are a globally linked

More information

HP Technology Services HP NonStop Server Support

HP Technology Services HP NonStop Server Support Reference guide HP Technology Services HP NonStop Server Support HP Global NonStop Solution Center (GNSC) Table of contents Global NonStop Solution Center... 2 Product support for HP NonStop and Neoview

More information

FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING

FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING JOB NO: PROJECT: DATE: SWMS NO: SWMS 001.1 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: December 2015 MINIMUM PERSONAL PROTECTIVE

More information

Why fall for it? Preventing falls in agriculture

Why fall for it? Preventing falls in agriculture Why fall for it? Preventing falls in agriculture Health and Safety Introduction Why fall for it? Preventing falls in agriculture Falling from height is one of the main causes of fatal accidents in agriculture.

More information

TOXIC AND FLAMMABLE GAS CLOUD DETECTORS LAYOUT OPTIMIZATION USING CFD

TOXIC AND FLAMMABLE GAS CLOUD DETECTORS LAYOUT OPTIMIZATION USING CFD Introduction to the case Gas detectors are commonly installed in process facilities to automatically alarm and trigger safety measures in response to hazardous leaks. Without effective leak detection,

More information

Working at height - Practical Guidance for Schools

Working at height - Practical Guidance for Schools Working at height - Practical Guidance for Schools N.B. The following guidance is provided as an example of best practice, and should be adapted to suit the specific work being undertaken following a suitable

More information

UK Television Exports FY 2014/2015

UK Television Exports FY 2014/2015 UK Television Exports FY 2014/2015 Page 1 of 5 The annual UK Television Exports Survey highlights the popularity of UK programming abroad by collecting revenue figures relating to the international activity

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

INTER PLANT STANDARD STEEL INDUSTRY

INTER PLANT STANDARD STEEL INDUSTRY INTER PLANT STANDARD STEEL INDUSTRY CODE OF PRACTICE FOR REVAMPING OF EOT CRANES IPSS:3-02-014-03 IPSS Corresponding IS does not exist 0. FOREWORD 0.1 This Inter Plant Standard has been prepared by the

More information

Four steps to improving cloud security and compliance

Four steps to improving cloud security and compliance white paper Four steps to improving cloud security and compliance Despite the widespread proliferation of cloud computing, IT decision makers still express major concerns about security, compliance, and

More information

SECTION 11: EQUIPMENT MAINTENANCE

SECTION 11: EQUIPMENT MAINTENANCE SECTION 11: EQUIPMENT MAINTENANCE Who should read this section? This section should be read by equipment managers and staff, unit managers and health and safety managers. It is also relevant to a range

More information

Reporting practices for domestic and total debt securities

Reporting practices for domestic and total debt securities Last updated: 4 September 2015 Reporting practices for domestic and total debt securities While the BIS debt securities statistics are in principle harmonised with the recommendations in the Handbook on

More information

Australia s position in global and bilateral foreign direct investment

Australia s position in global and bilateral foreign direct investment Australia s position in global and bilateral foreign direct investment At the end of 213, Australia was the destination for US$592 billion of global inwards foreign direct investment (FDI), representing

More information

The VAT & Invoicing Requirements Update March 2012

The VAT & Invoicing Requirements Update March 2012 The VAT & Invoicing Requirements Update March 2012 Indirect taxes are a massive potential expense. For buyers and sellers of goods and services, how invoices are prepared and processed can affect a company's

More information

ERIKKILA INDUSTRIAL CRANES

ERIKKILA INDUSTRIAL CRANES ERIKKILA INDUSTRIAL CRANES Capacity up to 20 000 kg BRIDGE CRANES - Overhead - Under running GANTRY CRANES I-GIRDER JIB CRANES LIFTING BEAMS SERVICE ERIKKILA Reliable lifting for almost 100 years ERIKKILA

More information

Names and Contact Numbers of Competent Rescuers Assigned to Job (Please print)

Names and Contact Numbers of Competent Rescuers Assigned to Job (Please print) Emergency Plan For Rescue from Heights Department of Facilities Management Occupational Health and Safety Shop Performing Work Date Work Order No. Job Location Job Description Height of work platform /