Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version



Similar documents
Installation instructions of the HEKI 3plus rooflight

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

S4 - Top Hung Window. Outside view. Inside view. Interior frame. Exterior frame. Glazing Panel

R O A D M A S T E R, I N C.

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

- power windows - alarm system - electric door mirror control - door warning light - central locking - seat memory

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

Window Installation Instructions

Installation Instructions

TOYOTA Tundra BACK-UP CAMERA SYSTEM Preparation

Andersen Electric Window Opener for Andersen Awning and Roof Windows

Installation Instructions Avalanche XUV Cap IMPORTANT! IMPORTANT!

Integral Kit Instructions

R O A D M A S T E R, I N C.

Accessory Manual Ventilation Section Model Comfort Circle

EZ-Steer Assisted Steering System

Installation Guide of Sunrise Solartech PV Modules. Term Contents. Purpose of this guide. General. Safety precaution for installing a solar

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

AM/FM ANTENNA KIT (TOUR-PAK MOUNT)

Installation Instructions For Slider Casement Air Conditioners

149mm. Walk-Thru Assembly Gate. MODEL NO: 1161, 1167 Owner s Manual.

Installation Instructions

Post Mount Light Installation*

Slide the new steering column shaft through the steering column from the driver compartment.

Arctic Leash Instruction Manual Alaskan Products Company LLC.

3/4 PIPE CLAMP WITH STAND

Owner s Guide and Installation Manual. Vancouver Model Name , Model No. English Español

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

OWNER S MANUAL. Permolock C3. Docking system for Power wheelchair in vehicle

Extra Tall Wide Span Gate

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV Kit Number. Models. Additional Parts Required. Kit Contents

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

R O A D M A S T E R, I N C.

SECURITY SYSTEM SMART SIREN KIT

Owners & Installation Manual for the Sheridan, Mountainair, Pine Valley and Old Forge Ceiling Fan Family

ZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3.

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

WINEGARD MOTORIZED SENSAR ANTENNA Models MA1055W & MA1055G MADE IN U.S.A. U.S. Patents D500,496 and 7,358,909 INSTALLATION MANUAL

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

INSTRUCTIONS: LocknCharge Laptop Carts

R O A D M A S T E R, I N C.

Rebuild Instructions for and Transmission

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

Residential Garage Door Terminology

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

DE Frame with C Series Sidelight

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

3. Loosen 3 x grub screws in the Dec end cap and unscrew the cap and counterweight shaft. NEQ6 Belt Modification Kit.

Active and Passive Sash Replacement

Basic Spring Motor Roller Shades

Quadrant Shower Enclosure. Telephone Cleaning. All chrome surfaces should be cleaned using a clean damp cloth.

INFRARED QUARTZ WALL HEATER

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

2. Remove rear cover of head lamp if bulbs are covered/sealed within the housings, and remove halogen bulb carefully.

Owner s Manual Read and keep this manual. Patents World Wide

Installation instructions, accessories - Handsfree for cellular phone, system B, entry level

Reachout Lock Replacement for Andersen 2-Panel and 4-Panel 400 Series Frenchwood Gliding, 200 Series Narroline, and Perma-Shield Gliding Patio Doors

GENUINE PARTS INSTALLATION INSTRUCTIONS

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

AM/FM ANTENNA RELOCATION KIT

SHUTTER INSTALLATION INSTRUCTIONS. AUGUST 2006 Version 2

Fitting Instruction: Daytona 675 Street Triple from VIN , Street Triple R from VIN A

WARNING: Important: Keep these instructions for future reference. Gate Instructions (1) Assembly and Installation Instructions

Installation Instructions

Cable Drum Installation

BILLET HEADLAMP WITH SHORT/TALL MOUNTS

Rooflight INSTALLATION INSTRUCTIONS

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

DYNA RIDER FOOTBOARD KIT

Installation. Smart-UPS VT and MGE Galaxy Maintenance Bypass Panel with Power Distribution (wall-mount) kva 208 V

HP 16/18-Port Cable Management Kit Installation Guide

INSTALLATION INSTRUCTION SPEC. SHEET 7/00. City of New York Calendar #40747 ETL LISTED UNDER U.L. STD LOW VOLTAGE TRACK LIGHTING SYSTEM

R O A D M A S T E R, I N C.

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

R O A D M A S T E R, I N C.

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

Sealant. 30" Model No D: 17-7/8" TO 18-3/8" (454 to 466mm) W: 29-3/4" TO 30-1/4" (756 to 768mm) Under Countertop Installation

All-Season Sunroom Sliding Glass Door Installation Instructions

12 WATT LED AMBER LIGHT BAR

00MK-MA0190-EN00. Mounting System ASSEMBLY INSTRUCTIONS. Universal Light system with locking brackets, for sloped roof

GENUINE PARTS INSTALLATION INSTRUCTIONS

Complete System Shelter

Chelsea Loft Bed WARNING:

Ceiling Fan Installation Instructions

Operating Instructions

Cooktop Low-Profile Ventilation Hoods

H45 LED - Direct and indirect pendant

SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS

tidesmarine Smart Seal Temperature Alarm System Generation II Installation Instructions Starboard side cable

Go-kart for little race-drivers

SELF INSTALLATION GUIDE

The Rooflight Company s Operations & Maintenance Guide

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

TABLE OF CONTENTS. I. TROUBLESHOOTING Section 1.01: Common Problems/Solutions... 2

Front brakes (FN- 3), servicing

EZ-Steer Assisted Steering System

Transcription:

Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version with operating bar with crank electrical version 1. Prerequisite for a correct installation of the Midi-Heki roof light is a flat inner and outer surface of the roof (the Midi - Heki cannot be installed on a vertical surface). 2. The area where the roof light is to be installed has to be selected in such a way, that the function of adjacent components, cables, fitted cupboards in the vehicle interior, roof railings or other reinforcing components is not impaired in any way. (Follow the guidelines of the vehicle manufacturer). 3. The installation is possible with the hinged side in front in the direction of travel or the hinged side left or right in the direction of travel. 4. To avoid damage to the roof wall and to the Midi-Heki, the cut-out must be sturdy (for example reinforced with wooden frames not included in the package). 5. Use a butyl based permanently elastic sealant to seal the Midi-Heki and the roof wall (available in cartridges or as a band not included in the package). When choosing the sealant ensure that it guarantees small shrinking volume and good durability. Ask the sealant supplier for an appropriate sealant and the processing guidelines. 6. We recommend a maximum speed of 130 km/h, otherwise, depending on the construction of the vehicle or the positioning of the roof light, wind noise or material fatigue could arise. 7. The Midi-Heki roof light is ideal for a roof thickness between 25 mm and 60 mm. 8. Check the roof thickness of your vehicle. In the package are included 11 mounting blocks and 11 screws (size 4x20 for roof thickness 30-34 mm). (For a roof thickness of 25-29 mm and 35-60 mm the corresponding, commercially available installation set must be used.) These 22 screws are used for fixing the mounting blocks on the interior side of the roof. 22 screws (spax screw 3.5 x 20 mm) included in the package can be used if the cut-out is reinforced by wood as mentioned above at point 4. In other cases use corresponding screws which are not included in the package. 9. Installation steps 9.1 Determine the location of the cut-out 9.2 Execute the cut-out 9.3 Reinforce and check the cut-out 9.4 Install the outer frame 9.5 Install the inner frame 9.5.1.1 Version with operating bar 9.5.1.2 Electrical version 9.5.1.3 Version with crank 9.6 Check function of darkening system and flynet 9.7 Check function lift mechanism 9.7.1 Version with operating bar 9.7.2 Version with crank 9.7.3 Electrical version 1 MO1071 englisch

9.1 Determine the location of the cut-out 9.1.1 9.1.1 Determine the location of the Midi-Heki on the vehicle taking into account the above-mentioned conditions. Mark the cut-out as shown in picture 9.1.2. The installed Midi-Heki should have a clearance of around 1-2 mm all around. 9.1.2 A Radius = 12 mm B Ausschnitt A = 700 mm +2/-0 B = 500 mm +2/-0 9.2 Execute the cut-out 9.2.1 In order to avoid scratches on the roof surface, the perimeter should be covered with sticky tape before the cutting or mill-cutting begins. Execute the cut-out with a suitable tool (for example jig saw or a routing machine - Photo 9.2.1). 9.2.1 9.3 Reinforce and check the cut-out 9.3.1 Remove the insulating material between the roof s outer surface and the inner lining for a depth of about 25 mm all around the perimeter. (Photo 9.3.1) (Depth depends on the reinforcing frames to be introduced in the next step photo 9.3.2.) 9.3.1 2 MO1071 englisch

9.3.2 Insert reinforcing frames (e.g. wood) (Photo 9.3.2). Remark: This reinforcing frame is needed in order to avoid permanently the insulting material being compressed and the bending of the roof wall. The reinforcing frame is also needed to fix the mounting blocks to the inner side of the roof. 9.3.2 9.3.2.1 The supply line (12 volt) for the electrical version should come out for at least 250 mm out of the middle of the long side of the cut out. Consider the position of the installed Midi-Heki! (12 volt-power connection = hinge side) 9.3.2.1 9.3.3 To check the cut-out, place the outer frame on top of it to check the exact position before applying the sealant. (A clearance of 1-2 mm all around the perimeter between the cut-out and the outer frame is necessary. Photo 9.3.3). Hint: The control is recommended, because variations of production and temperature can influence the dimensions. 9.3.3 9.4 Install the outer frame 9.4.1 Clean the roof surface where the sealant is to be applied (always follow the instruction of the sealant supplier Photo 9.4.1). Remove the protective PE film outside of the acrylic dome. 9.4.1 3 MO1071 englisch

9.4.2 Apply a butyl based permanently elastic sealant (available in cartridges or as a band) uniformly all around (Photo 9.4.2). Place the outer frame in the cut-out and push gently against the roof so that the sealant is distributed. (Always follow the instruction of the sealant supplier!) 9.4.3 For the different roof thickness, the following mounting kits are needed: 9.4.2 Part No. Roof thickness 1369 25-29 mm 1370 30-34 mm (accessories trade: screws included) 1371 35-60 mm For roof thickness 35-42 mm = length of screws 20mm For roof thickness 43-52 mm = length of screws 32mm For roof thickness 53-60 mm = length of screws 40mm 9.4.4.1 9.4.4.2 9.4.4.3 9.5.1a 9.4.4 Insert the mounting blocks all the way in and align them. Drill two holes (drill 2.2 mm) on the interior roof surface if the cut-out is reinforced by wood (Photo 9.4.4.1) and fasten with included screws (Photo 9.4.4.2). In other cases use corresponding screws which are not included in the package. Attention! Do not drill through the roof! Then screw it together with the outer frame (use the bigger whole in the mounting block). (Photo 9.4.4.3) It is sufficient to tighten the screws gently (torque about 1.5 Nm). Check visually whether the sealant lies all around the roof surface and the mounting blocks are aligned in a line. (When required, tighten the mounting blocks uniformly after about 10-30 minutes) 9.5 Install the Midi-Heki inner frame 9.5.1 Place the inner frame in the slot of the mounting blocks and push in position. The inner frame can be additionally tightened on the short sides (picture 9.5.1b) with suitable screws (not included) as follows. 1. Remove the ventilation grids from the short side 2. Drill a pilot hole and screw 3. Put on the ventilation grids back 4 MO1071 englisch

9.5.1b 9.5.1.1 with operating bar The installation of the Midi-Heki with operating bar has finished. Check function (see 9.6 and 9.7). 9.5.1.2 electrical version 9.5.1.2.1 9.5.1.2.1 A = Connect the cover with the power supply (12V) of the vehicle. Attention!!! +/- Do not confuse the polarity. B = Connect plug connection of the cover to the supply line of the electrical motor. 9.5.1.2.2 Fix the cover with the 2 included screws (3,5x25mm see picture 9.5.1.2). Check function (see 9.6 and 9.7) and put on the 2 cover caps. 9.5.1.2.2 9.5.1.2. 9.5.1.3 with crank 9.5.1.3.1 Screw the inner frame to the mounting blocks with the 2 included screws (4x20 see picture 9.5.1.2). 9.5.1.3.1 5 MO1071 englisch

9.5.1.3.2 Use the adapter or the balance shaft for mounting the cover (see 9.5.1.3.3). 9.5.1.3.2.1 Install the corresponding adapter on the crankshaft according to the wall thickness (wall thickness 25-42 grey or wall thickness 43-60 black). 9.5.1.3.2 9.5.1.3.2.2 Put on the cover of the inner frame with opened crank while the installed adapter has to be placed into the six point socket.. Positionate the crank in such a way that a slight tension is noticed when closing the crank. Screw the cover with the 2 included screws (3,5x25mm see picture 9.5.1.2) and put on the 2 cover caps. Check function (see 9.6 and 9.7). 9.5.1.3.3 Installation of the cover with balance shaft 9.5.1.3.3.1 Put on the cover on the inner frame (if necessary open the crank). When closing the crank a slight tension has to result. (see picture 9.5.1.3.2.2) 9.5.1.3.2.2 9.5.1.3.3.2 If necessary open the crank, loose the screw, take off the crank and put on again in a new position (picture 9.5.1.3.2.2). Screw the crank again. The correct locking of the dome is ensured by the slight tension. Check function (see 9.6 and 9.7). 9.1.3.3.1 6 MO1071 englisch

9.5.1.3.3.2 9.6 Function of the darkening system and flynet 9.6.1 Check if the blind and fly net function properly by moving both end rods (picture 9.6.1). 9.6.2 Remove the protective foil of the acrylic dome 9.6.1 9.6.3 Follow the warning comments on the sticker of the inner frame. If necessary replace the sticker with the right language. 9.7 Check function of the glazing dome 9.7.1 Check function according to the operating instruction. 7 MO1071 englisch

10 Safety instructions Utilise only the delivered parts. Make sure that the wires are not damaged during the installation. The manufacturer accepts no liability for injuries or damage caused by an inappropriate use of the Midi-Heki. Follow the operating instructions and warning tips. - No liability is assumed for incorrect installation! - The Midi-Heki roof light is not to be installed in a vertical surface! - Registration in vehicle log s book should be carried out when the vehicle s height and/or total weight is changed. - Repairs should be carried out only by trained personnel. - Inform an approved dealer in case of defects and malfunctions. - Before starting off, check the roof light for damage in the dome (tension cracks) and the drive mechanism which could arise owing to, for example, branches and other natural causes. - Do not step on the dome. - Before setting off close the Heki completely (Check the correct locking by pushing the dome). - Do not leave the vehicle with the roof light open (danger of burglary). - Do not open in strong wind, rain or snowfall. - Before opening, remove snow, ice, dirt etc. from the dome. - Malfunctions are to be repaired by an approved dealer at once. - Do not use caustic detergents (danger of tension cracks in the dome). - Before setting off close the dome and open the blinds. - Function of the ventilation (optional) is only ensured if the gap between the roof and glazing dome is free of snow and dirt. - The protective foil is not weatherproof and has to be removed after installation. 8 MO1071 englisch

11. Problems/possible causes therof The table below is intended to give the customer instructions to identify and eventually solve small problems in case of emergency. In case of bigger problems, an authorised expert is to be consulted. Midi-HEKI electrical version problem analysis Problem description Possible cause Solution No electrical function (electrical motor does not work) 1) Power supply from vehicle interrupted 1) Check fuses of the vehicle (see instructions of the vehicle) and if necessary replace. 2) Fuse is blown 3) Switcher defective 4) Electrical motor defective 2) Remove the cover from the inner frame, check fuses and if necessary replace 3) Consult an authorised expert 4) Consult an authorised expert Roof is not closing completely Darkening system / flynet cannot be moved 1) Possible dirt between glazing dome and frame 2) Mainspring is untied from the hook, hook is touching the holding fixture 1) Dirt inside the guide tracks 1) Clean the dome 2) Check the mainspring and hook (picture) 1) Clean the guide tracks 9 MO1071 englisch

Emergency crank set for electrical version : The emergency crank set consists of 2 screw driver which are used for removing cover caps and covers. - Leverage the cover caps carefully by the small screw driver - Remove the screws with the phillips screw driver - Insert the emergency crank (2), push the electrical motor unlock (1) and close the dome by using the emergency crank. 10 MO1071 englisch