Antwerp East Port Logistic Campus



Similar documents
A59 A29 A16 A17 A58 Roosendaal

the location warehouse Port of moerdijk

Conclusions. How to optimize your. Medtec Supply Chain in Europe

MEGAHUB LOGISTICS CENTER Center of Consumers. Hämeenlinna Lahti Turku Tampere

LogisticsCentre IV Distribution Center

Network Assessment Client Risk Report Demo

EXCLUSIVE MANDATE INFORMATION MEMORANDUM. Teichweg 3, Giessen

Decree of the Ministry of the Environment. on fire safety of garages

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

Element D Services Plumbing

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

LogisticsCentre IV Distribution Center

Tyco Security Products Training Facility Echt Netherland

Security Assessment Report

Logistics Warehouse. Janco Logistics (HK) Ltd. DSC Services

LOGISTIC INVESTMENT OPPORTUNITY MOERDIJK ORIONWEG 6

Squash Court Design general points

SPRINKLER RULES & STANDARDS IN EUROPE CEA 4001 & EN 12845

Voorbeeld. Preview. praktijkrichtlijn Food safety management systems - Guidance on the application of ISO 22000:2005 (ISO/TS 22004:2005,IDT)

Data Center Due Diligence List

Recent evolutions in the tank storage sector in the Port of Antwerp. Rose-Marie Pype March 19th, 2013

INVENTORY AND CONDITION FORM CONCERNING THE PROPERTY AT

Archive Solutions BRUYNZEEL. Solutions for an efficient archive. Bruynzeel. Focus on efficiency and accessibility. Focus on sustainability

DATACENTER COLOCATION. Flexible, Secure and Connected

Facility Assessment for East Main Street, Huntley, IL

Introduction to Kowloon Bay Logistics warehouse

Fire Safety Requirements for Child Care Centre

More than shelving & racking. All for your storage demands.

Voorbeeld. Preview ISO INTERNATIONAL STANDARD. Cranes Requirements for test loads

A Member of the Constructor Group STORAGE SOLUTIONS. Clever Thinking Inside the Box

Nederlandse norm NEN-ISO/IEC (en)

TEXAS ASSOCIATION OF REALTORS

Application for Builders Risk & Wrap-Up Liability Coverage

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Scope of EN Clarification Document

How To Visit An Internet Data Center

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Voorbeeld. Preview. NEN-ISO/IEC (en)

Material test chamber with mechanical convection

The UPLANDS at ORO VALLEY Sterling Features

The Peaks Features List

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

164,491 SF Food Production Facility Situated on 10 Acres Available in

Press release. Grand Opening of Phase I of the Katoen Natie Khonaini Logistics Terminal Jubail, Kingdom of Saudi Arabia March 17 th, 2014

Integrated Services Workshop Services

Executive Flight Office & Hangar

Full scale tunnel fire tests of VID Fire-Kill Low Pressure Water Mist Tunnel Fire Protection System in Runehamar test tunnel, spring 2009

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

A. NICOLAIDES HOLDINGS LTD PACKAGE NO. 6

483/503 GARRETTS GREEN LANE GARRETTS GREEN BIRMINGHAM B33 0TL

Broadway Warehouses of Illinois

VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A

INTERLOCK PALLET RACKING SYSTEM. The complete range of Pallet Racking Solutions

Haven Genk in Limburg, Limburg LOGISTIEKE draaischijf

Fire Safety In High Rise Building

Site Survey Questionnaire

The Chinese market for environmental and water technology. Kansendossier China

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

Product description NCC Data Center

Voorbeeld. Preview. NEN-ISO (en) Road vehicles - Roof load carriers - Part 4: Magnetic fixing devices (ISO :2004,IDT)

Denver Fire Department Idle Pallet Storage Guidelines Per NFPA 13_Chpt 12

BROWN & McRAE 33 KNOCKIE ROAD TURRIFF AB53 4BG LAWYERS ESTATE AGENTS NOTARIES PUBLIC.

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

Lansdowne Court. Chippenham, Wiltshire QUIET, SPACIOUS AND LIGHT FILLED ACCOMMODATION. Business Space from 2,557 to 40,000 sq.ft* *Gross External

6. GIVE FULL DETAILS OF TYPE OF WORK, OPERATIONS AND ATTACH BROCHURES IF APPLICABLE:

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security.


Questionnaire Pure Media Systems

SPRINKLER SYSTEM PLANS AND CALCULATIONS CHECK LIST

Lighting Management solutions

BUILDERS RISK / WRAP-UP LIABILITY APPLICATION

THE POWER OF WE VOLVO CARS GENT The strength of diversity

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

Antwerpen, uw Europese breakbulk hub. Shortsea en breakbulk/project cargo. 15 mei 2012

Transcription:

LOCATION & ACCESSIBILITY Albert Canal E313 / E34 / E19/ A12 Antwerp 30 km - 3h Rotterdam 123 km - 14h Container Terminal Antwerp East by DP World WCT Rail terminal 27 km Meerhout Brussels Airport 70 km Barge terminal Trilogiport 90 km Antwerp Hasselt

LOCATION

LOCATION Address Industrieweg 38 2280 Grobbendonk ANTWERP EAST PORT Site Total LFA Site coverage Construction Floor Load Floor Flatness Clear Height # Loading docks 159.529 Sqm 114.131 Sqm 70% 10.308 Sqm (D) available in spring 2016 rest 6 months after signature 50KN/sqm DIN 18202 tabel 3, Zeile 4 12,20m 1 per 1000 sqm

PROPERTY SPECIFICATIONS AVAILABLE PER UNIT LFA TOTAL SIZE 141.000 sqm Warehouse D (under construction) Warehouse E Warehouse F Warehouse G Warehouse H Warehouse I Warehouse J Warehouse 10.308 sqm 9.113 sqm 11.300 sqm 11.200 sqm 11.200 sqm 11.200 sqm 15.000 sqm Mezzanine 2.122 sqm 1.880 sqm 2.557 sqm 2.543 sqm 2.543 sqm 2.543 sqm 3.405 sqm Offices

PROPERTY SPECIFICATIONS WAREHOUSE a Free height of 12,2 m a Span suitable for small and wide aisles a A minimum of 1 loading dock per 1.000 m² a Each loading dock has an automated, electric gate (3m x 3m, dockleveller (6 ton dynamic, 9 ton static), shelter and bumper bars a 1 automated, electric gate on ground floor level (4m x 4,2m) a Floor load of 5.000 kg/m² a Maximum point load pallet racking: 80kN/foot a Flatness floor conform DIN18202 Tabel 3, Zeile 4 (5mm/2m) a Insulated concrete plinth with a height of 2,5m a Certified ESFR sprinkler installation a Fire hose and fire hydrants conform the rules and code a Fire alarm and evacuation system conform the rules and code a Heating by way of gas-fired air heaters with ecofans a Lighting: high frequency TL5 lights equipped with ballasts, 250 Lux at 1,5m MEZZANINE a Mezzanine with a depth of 24 m on the front façade level 6 m a Floor load of 1000 kg/m² a Window for natural light OFFICES a Offices on ground floor and mezzanine level with an open floor plan a High-end VRF-system for cooling and heating a Lighting: high frequency TL5 lights, 500 Lux at worktable level a Pantry with integrated fridge, stainless steel sink and dishwasher a High-end finishing SITE a A 2m high fence around the perimeters of the site with automised entrance gates a Parking for employees a Exterior lights: circulation roads 20 Lux, loading docks 50 Lux

GROBBENDONK LOGISTIC MARKET Antwerp East Port, a unique campus located in the logistic heart of Europe Right off exit 20 on the highway E313 (which links the Port of Antwerp with the Netherlands and Germany), Groep Heylen is building a 142.000 sqm state of the art logistic campus. The site is situated along the highway and the Albert Canal (which links the Port of Antwerp with the Port of Liège). The direct neighbours of DP World run the container terminal. The campus consists of a modern and multi-functional distribution center with a total of approx. 120.000 sqm warehouse surface, that can be divided in separate or joined units as from 10.000 sqm. Spread out over the campus there is a truck parking and plenty of employee parking. To guarantee an efficient handling of all the logistic processes, the warehouse is built with a maximum amount of loading docks per unit and with a minimum standard of 1 dock/1.000 sqm of warehouse.

David Batens Business Development Director david.batens@groepheylen.be mob. +32 491 347 057 De gehele projectinformatie mag niet worden beschouwd als een aanbieding. De vermelde informatie is van algemene aard en niet meer dan een uitnodiging om in onderhandeling te treden. Alle informatie is met zorg samengesteld, is geheel vrijblijvend en is uitsluitend bestemd voor de geadresseerde, tenzij uitdrukkelijk anders vermeld. De informatie is (mede) gebaseerd op door derden verstrekte gegevens. Aansprakelijkheid veroorzaakt door onjuistheid en/of onnauwkeurigheid van door derden verstrekte gegevens aan Groep Heylen wordt niet aanvaard.