Nettpartner Group Company Presentation
Vision and Mission Nettpartner the company all others in the industry want to emulate! Nettpartner shall be a leading supplier of innovative solutions linked to the construction, maintenance and control of cable- and line-based infrastructures.
Ownership Structure Energiselskapet Buskerud AS 66% Hadeland Energi AS 34% Fredrikstad Energi AS 60% EH Holding 40% Holding AS 100% 80% Drift AS Prosjekt AS Subsidiaries / Associated companies
Organisation Group Managing Director Arild Borgersen Finance, Control & IT Åsgeir Nord Business Development Magnus Johansen Transport and communications Nettpartner Drift AS 100% Sven Hetlevik Nettpartner Prosjekt AS 80% Einar Hjetland Subsidiary / Associated company Buskerud Powerlines EB Elektro AS (88.5%) Hadeland Substations Nettpartner Arena AS (100%) Agder Construction and operations NordiConsult AS (49%) Rogaland Hordaland Powerline d.o.o (Subsidiary) KL Sørvis AS (51%) Oslo Østfold Broadband Vestfold
Key Figures 2014 Head office at Vinterbro (Oslo) 560 employees Annual sales: in excess of NOK 1 billion Equity ratio: 54% Balance sheet total: in excess of NOK 500 million
History
Subsidiaries / Associated companies EB Elektro aims to be a leading supplier of disconnectors, earthing switches and motor operating devices to the international energy and railway markets. Nettpartner Arena, a subsidiary of Nettpartner, is exclusively concerned with inspection and control of electrical installations. NordiConsult is the leading supplier of products and services for monitoring the conditions on both power network and contractor companies power plants. Kontaktledning-Sørvis manufactures and develops railway-technical equipment, mainly contact line installations.
Locations Nettpartner Drift: Akershus (Vinterbro) Aust-Agder (Arendal) Buskerud (Hokksund, Kongsberg) Hadeland (Jaren, Jessheim) Hordaland (Askøy) Oslo (Alnabru) Rogaland (Sandnes) Vestfold (Tønsberg) Østfold (Fredrikstad) Nettpartner Prosjekt: Molde Steinkjer Hokksund Arendal Mandal
Electronisation Management information Fitters ERP system CRM Project management Financial management Quality and HSE Suppliers Clients
Selection of clients Nettpartner Agder Energi Nett AS: prequalified + framework agreement + metering services Hafslund Nett AS: prequalified + framework agreements within several segments Fredrikstad EnergiNett AS: pre-qualified + framework agreements + metering services Fortum Distribution: prequalified + framework agreements + metering services Energi 1: pre-qualified + framework agreements + metering services Askøy Energi: pre-qualified + framework agreements Lyse Infra: framework agreement Statnett: pre-qualified for live working + framework agreement for upgrades Jernbaneverket (Norwegian National Rail Administration): project work Skagerak Energi: pre-qualified + framework agreement for development projects Stryn Energi: pool of fitters in connection with posthurricane Dagmar repairs EB Nett: pre-qualified + framework agreements + metering services Hadeland Nett: pre-qualified + framework agreements + metering services Viken Fibernett: framework agreement Statens vegvesen (Norwegian Public Roads Administration): operation and maintenance of roadway and street lighting ABB: substation work on regional and central grids Siemens: substation work on regional and central grids Vest Telemark Kraftlag AS: live working on distribution grid Tussa: post-hurricane Dagmar repairs and distribution grid projects Broadnett: broadband framework agreement
Services
Electrical grids Central grids Regional grids Distribution grids Green energy Small hydro power Wind power Signal transmission Broadband Fibre optics Cable TV Electrical safety Inspection Education
Electrical grids
Emergency preparedness services Emergency preparedness agreement including emergency response in the event of e.g. storms
Electrical grids installation of transformer by means of helicopter
Live working Class 1 3 Glove method
Substations New installations, maintenance, revision Outdoor and indoor switchgear up to 420 kv Control systems Power transformers Compressed-air installations
Power lines, building and construction New installations, maintenance, rehabilitation Power lines (22 420 kv) Condition monitoring and line inspection Noise measurement Thermography conducted from ground or with helicopter Installation of towers Groundwork, foundation work and construction work in connection with the power grid Oil-soak pits and oil separators
Power cables Construction of cable systems (22 170 kv) Cabling and installation
Lighting installations Artificial grass pitches Large sports arenas
Roadway lighting
Fibre optics installations
Railway and tram