SECTION 15010 BASIC MECHANICAL REQUIREMENTS

Similar documents
UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

Element D Services Plumbing

SAM HOUSTON STATE UNIVERSITY

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP

HVAC Processes. Lecture 7

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program. Seminar Outline & Sample BEST Exam Questions

Element D Services Heating, Ventilating, and Air Conditioning

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Sample - Existing Building Commissioning Plan

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

One of the fundamental design elements that every

Facilities Maintenance Standards rev

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

Contract for Weatherization Management Address City & State

6 MECHANICAL HVAC SYSTEMS

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Commissioning - Construction Documents (Page 1 of 6)

Key energy-efficient features of your new home

Element D Services Heating, Ventilating, and Air Conditioning

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

Mechanical Insulation. Hospitals and Schools

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents

Get the FACTS about SEER and Deliver Better Customer Value

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

SECTION MORTUARY REFRIGERATORS

Lesson 36 Selection Of Air Conditioning Systems

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Carnegie Mellon University School of Architecture, Department of Mechanical Engineering Center for Building Performance and Diagnostics

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87

101 Low-Cost /No-Cost. Home Energy-Saving Measures

Sample Company SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

HVAC Systems: Overview

BUILDING PERFORMANCE METRICS

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Sustainable Energy and Resource Saving Concepts for HVAC/Process/Water/Wastewater. Thomas H. (Tom) Durkin, PE Dr. Glenn Krueger, EdD Bob Jacobi

PERMITS REQUIRED & PERMIT EXEMPTIONS

By Tom Brooke PE, CEM

Design Guidelines for Facilities Construction:

How Ground/Water Source Heat Pumps Work

Maximize energy savings Increase life of cooling equipment More reliable for extreme cold weather conditions There are disadvantages

Innovent LASER Packaged Fresh Air Conditioning Units

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

APPLICATION GUIDE. Moisture Management in Waterborne Climate Systems

BoilerMate SP. benchmark. user instructions A - C L A S S

Building Commissioning

QUESTIONS TO ASK WHEN REPLACING YOUR HVAC TOGETHERWESAVE.COM

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

Center for Energy Education Laboratory

Risk Bulletin. Mold Prevention and Control for Mechanical and HVAC Contractors. XL Group Insurance

Sample Customer 123 Conservation Way TAMPA FL Tracking Number:

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Rev. No. 0 January 5, 2009

Methods for Effective Room Air Distribution. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

SPECIFICATION DIVISION 22 SECTION DESCRIPTION DIVISION 22 PLUMBING SECTION THERMOMETERS, PRESSURE GAUGES, AND ACCESSORIES

KEY ELEMENTS IN PREVENTING AND MITIGATING MOLD CLAIMS

Energy-Saving Tips. Energy Saving Tips

HVAC Checklist - Long Form

Ductless Heat Pumps. Gary Nordeen January

Residential HVAC System Sizing

The Chilled Water and Hot Water Building Deferential Pressure Setpoint Calculation Chilled Water and Hot Water Pump Speed Control

Draft UCL Heating, Cooling and Ventilation Policy

University of Maryland College Park District Energy System. IDEA Campus Energy Conference February 9, 2012

DEVELOPMENT OF A CAMPUS WIDE DISTRICT CHILLED WATER SYSTEM SAMFORD UNIVERSITY

Housing Solutions Limited. Terms and Conditions. Fixmy Boiler Service

City of Cornwall Social Housing Division Top 10 Energy & Water Saving Tips. in Multi-Unit Residential Buildings

Energy Efficiency in Industrial HVAC Systems

MECHANICAL SYSTEMS DESIGN. Team

Green Buildings Guidelines for Harvard

Heat Recovery from Data Centres Conference Designing Energy Efficient Data Centres

C I T Y O F S E L M A F I R E D E P A R T M E N T

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

Measurement & Verification Plan

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

ENHANCED LABORATORY HVAC SYSTEM

Enclosed Football Stadium Design History and Lessons Learned

Datacenter Efficiency Program

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

APPLICATION GUIDE. Comparison of Latent Cooling Performance of Various HVAC systems in a Classroom Application

Transcription:

SECTION 15010 BASIC MECHANICAL REQUIREMENTS A. DESIGN PARAMETERS 1. Climate Data a. For cooling design utilize the 1% Monthly Design Dry Bulb and Mean Coincident Wet Bulb Temperatures as listed in ASHRAE s latest Handbook of Fundamentals for the month of July. b. For heating design utilize the Extreme Annual Design Conditions (return frequency of 5 years) as listed in ASHRAE s latest Handbook of Fundamentals. 2. Seismic Data Refer to the latest editions of the Indiana Building, Fire, Plumbing and Mechanical codes for current seismic design requirements. 3. Minimum Burial Depth for Underground Piping All exterior piping shall be buried a minimum of 6 inches beneath the maximum frost penetration depth for the project location. ** Provide identification/warning tape for all buried exterior piping. (a.) Bloomington : 42 Frost Depth (b.) Indianapolis : 48 Frost Depth (c.) Gary : 60 Frost Depth (d.) South Bend : 60 Frost Depth (e.) Kokomo : 60 Frost Depth (f.) Richmond : 48 Frost Depth (g.) New Albany : 36 Frost Depth **Frost depths listed above are based on data obtained during the winters of 1935-36, 1939-40, and 1976-77. 4. Steam Pressures Bloomington: Steam is produced in the Central Heating Plant at 150 PSIG and is distributed at either 150 or 40 PSIG. Consult with I.U. Utilities at (812) 855-3551 for details. For new construction, reduce steam pressure to 15 PSIG at entry points to buildings. Verify steam pressures in existing facilities prior to commencement of design. Page 1 of 5 REVISED February 2007

IUPUI: Steam is supplied to IUPUI by Citizens Thermal Energy (CTE). Steam is supplied by CTE at 250 psig/600º F and distributed on campus at 10, 50 or 150 psig. Actual building steam pressures and temperatures are to be verified prior to design. For new construction, reduce steam pressure to 10 psig at the point of entrance into the building, unless specific equipment or process requires a higher operating pressure. Include design loads and operating parameters on construction drawings. Consider condensate heat recovery. Consult with CFS for mechanical requirements of the IUPUI/CTE operating agreement. Contact Campus Facility Services (CFS) and the University Architect s Office (UAO) to verify design parameters and design responsibilities. Regional Campuses: Currently there are no central heating plants on Indiana University regional campuses. 5. Hot Water Heating Systems a. Where available utilize campus steam for production of hot water for heating purposes. b. For new buildings, design for 180 degrees F supply and 160 degrees F return water temperature. For modifications to existing systems verify system design parameters prior to commencement of design. c. Consult with IU Engineering Services (IUB and Regionals) or Campus Facility Services (IUPUI) for reset schedules pertaining to heating water supply temperatures. 6. Chilled Water Systems a. Where available utilize Campus chilled water for cooling. b. Select cooling coils for 42 degrees F supply and 55 degrees F return water temperatures. Verify with I.U. Engineering Services for projects on the Bloomington and regional campuses. IUPUI: Chilled water is supplied to IUPUI by Citizens Thermal Energy (CTE). Contact Campus Facility Services (CFS) and the University Architect s Office (UAO) to verify design parameters and design responsibilities. 7. Domestic Hot Water Systems. a. Where available, utilize campus steam for generation of domestic Page 2 of 5 REVISED February 2007

hot water. b. Design domestic water systems for a supply temperature of 140º F. Provide thermostatic mixing valves to ensure proper temperatures at points of use. c. Water shall be supplied at 110º F to lavatories and showers. Water shall be supplied at 140º F to dishwashing and laundry facilities. 8. Domestic Water Supply. a. Design the domestic water system to maintain pressure at plumbing fixtures in the range of 40 to 80 psig. Provide pressure booster pumps and pressure reducing valves as required to maintain compliance. b. When connecting to water mains owned by local utilities, consult with the local water company for specific requirements related to backflow prevention, piping installation requirements, and metering. IUPUI: Water service is supplied by the City of Indianapolis (Veolia Water) or private Campus mains. Contact Campus Facility Services (CFS) and the University Architect s Office (UAO) to verify design parameters and design responsibilities. 9. Indoor Design Conditions. a. On large projects follow the requirements outlined by the Bureau of Facilities Programming and Utilization for specific applications. b. For projects where no other direction is given, design for the following: Dry Bulb Temperature: 75 Degrees F. Relative Humidity (summer): 50%-60% maximum. Relative Humidity (winter): 30% minimum. 10. HVAC System Noise Levels Noise levels due to the building HVAC system shall not exceed the following: Classrooms Private Offices Open Plan Offices Recital Halls NC35 NC35 NC40 NC20 Page 3 of 5 REVISED February 2007

Libraries NC35 Laboratories NC50 On projects where noise data presented by the user or the Bureau of Facilities Programming and Utilization differs from that listed above, comply with the more stringent requirement. B. Utility Metering at IUPUI Indianapolis: Metering shall be provided for all incoming building utilities including steam (vortex shedding or orifice plate meter w/compensation), electrical (Power Measurement, Ltd. w/ethernet communication; refer to Section 16300), chilled water (magnetic flow meter w/johnson Metasys or Siemens BAS communication) and where applicable natural gas and domestic water (refer to Section 15965). Contact CFS Utilities at 317-274-4553 for detailed requirements. C. Natural gas at IUPUI Natural gas service is supplied to IUPUI by Citizens Gas. IUPUI owns and is responsible for maintenance of lines from the gas meter to the building. This line length should be minimized where possible. D. Sewers at IUPUI Sewers on the Indianapolis campus are a mixture of city-owned (Department of Public Works) and IUPUI-owned. Both combined storm water/wastewater and separated systems exist on campus. Contact CFS Utilities at 317-274-4553 for specific project-related details. E. Wellfield Protection Area on the IUPUI Campus The IUPUI campus is located in a wellfield protection area. Investigation of acceptable design/construction practices and coordination with the City of Indianapolis shall be performed by the consultant as part of the preliminary design phase. F. Compliance with State and Federal Codes The designer is fully responsible for insuring that his/her design complies with all applicable state/federal codes. Where codes conflict with these standards the designer shall comply with whichever requirement is more stringent. Page 4 of 5 REVISED February 2007

G. Temporary Ventilation Requirements for Occupied Buildings Under Construction at IUPUI 1. All occupied areas of a building where there is the potential for dust or fume contamination from a construction project shall be protected by use of temporary ventilation equipment. In general a negative air pressure shall be provided in the construction area. Construction documents shall specify modifications required to existing mechanical systems or temporary equipment to be installed to provide proper ventilation. Construction documents to include (if required) temporary ductwork layouts and sizing/specifications of fans. Contractors shall not be contractually required to determine the scope of work for temporary ventilation. 2. Construction documents shall refer to SMACNA s IAQ Guidelines for Occupied Buildings Under Construction. 3. Both Division 1 and Division 15 specifications shall include the temporary ventilation requirements. Page 5 of 5 REVISED February 2007