Document No: SRT-002. DigiTRON Single Connectors Site Recieved Test Manual. www.siemens.com/energy/connector-operations-manual



Similar documents
EVC40 EMERGENCY VOICE COMMUNICATION SYSTEM

Reliance DuraStar ORDINARY LOCATION INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS

Toroidal Conductivity Sensor

Fan Coil EC Motor Control

Operating Instructions

Seven function digital multimeter

LG Air Conditioning Multi F(DX) Fault Codes Sheet. Multi Split Units

ST Series POWER SUPPLIES USER INSTRUCTIONS

ATL Fuel Level Sender Probes

Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

EX-TECH SAS CP/PB 150 EXPLOSIONPROOF MANUAL CALL POINT/ PUSH BOTTON TECHNICAL MANUAL

INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS FOR EXHEAT INDUSTRIAL IMMERSION HEATERS (INCLUDING FLAMEPROOF)

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

Series 510 Submersible Level Transmitters

Instructions for Safe Use

CONTROL PANEL INSTALLATION INSTRUCTIONS. Single Phase Simplex Page Phase Simplex Page 8-13

EVANS ELECTRONIC TEMPERATURE CONTROL TROUBLESHOOTING GUIDE for systems equipped with electric coolant valve and external PC board.

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

Explosion proof enclosures

Oil and Coolant Circulating Heating System. Model - OCSM

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application

Advantium 2 Plus Alarm

INSTALLATION & SERVICE MANUAL. Display Panel

Two Position Cable-to-Board Power Connector System (Right Angle/Straight) with Coding Contacts

The Charging System. Section 5. Charging System. Charging System. The charging system has two essential functions:

Automatic taper of charge rate for superior battery life through good equalization of cells and low water use rate.

INSTALLATION & OPERATING INSTRUCTIONS

Water Leak Detection System

4 LEAD DEDICATED SINGLE PHASE LIMA MAC GENERATOR MODELS 250MSL1185 AND 250MSL1152

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE

Mini USB and USB 2.0-IP67 Connector System

The Do s and Don ts of Pressure Transducers

CAPACITOR BANK TESTING SWP

OPERATING MANUAL CONTRACTOR STYLE AXIAL FANS

AMERBRITE UNDERWATER WHITE LED POOL LAMP

The table below lists the symbols used on the Clamp and/or in this manual. Important Information. See manual.

UT202A Operating Manual. Contents

CITY OF LOS ANGELES CALIFORNIA

Instruction Manual. 2in1 LAN Tester & Multimeter. Model: LA-1011

SMD Rework Station TABLE OF CONTENTS

AMPSEAL* Automotive Plug Connector and Header Assembly

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

SELECTION, APPLICATION AND MAINTENANCE

E-PDD Duct Smoke Detector Installation Sheet

Magnetic and Hydraulic-Magnetic Circuit Breaker 8340-G2...

5800 Temperature Sensor Cable Assembly

CHAPTER 5 PARTS. This chapter describes assemblies / subassemblies / parts considered replaceable at on-site field installation.

Safety and Installation Instructions for AC Modules

Pro Logic Version Diagnostics Manual

2. Remove rear cover of head lamp if bulbs are covered/sealed within the housings, and remove halogen bulb carefully.

INSTALLATION INSTRUCTIONS

BERMAD Fire Protection

ENGINEERING RELEASE MODEL: LEARJET MODEL 20 AND 35/36 SERIES DRAWING. NO.: SHEET: 1 OF 1

RCD Inspection Log Book

Introduction. Safety Guidelines. Part Numbers. Operation and Maintenance Manual. Operation and Maintenance Manual

Amphenol C 091 A/B/D. Circular Connectors. Amphenol-Tuchel Electronics GmbH

TC-9102 Series Surface Mount Temperature Controllers

Model 1756 Test Lead Kit

ABB Drives. User s Manual. Pulse Encoder Interface Module RTAC-01

ELECTRIC HEATER COMPANY Operating and Maintenance Manual For Immersion Heating Elements

EMERGENCY EGRESS LIGHTING POWER SUPPLY PART NO COMPONENT MAINTENANCE MANUAL WITH ILLUSTRATED PARTS LIST

ADM1TE 5/30A DIN rail single phase two wire energy meter

4 DEDICATED SINGLE PHASE LIMA MAC GENERATOR LIGHT TOWER DUTY MODELS 250MSL1278 AND 250MSL1299 SERVICE PROCEDURE ELECTRICAL COMPONENT TESTING

E&P HYDRAULICS Remote control EPRC-01 Level System Camper

ISL-540 TBTS SERIES D EMERGENCY LIGHTING EQUIPMENT

CAUTION OPC-LM1-IL. Option Card for Encoder of Line Driver Output. Instruction Manual

TraceTek TTDM Series Leak Detection and Location Modules Replacement Parts Installation Instructions

Square D Clipsal DIN-Rail Four-Channel Auxiliary Input Unit

Insulation Resistance Testing of Low Voltage Cables in the Field

Reyrolle Protection Devices. 7PG17 - XR Intertripping, Interposing, Supervision and Special Purpose Relays. Answers for energy

Best Methods for Safe Hipot Testing

GSM-EXT Cable Assembly Installation Guide

DRM75A 230V 20/100A DIN rail single phase two wire energy meter

Product and functional description

BLUE RIBBON CORP. BC001 Birdcage Installation Manual

MTI10 Insertion and MTL10 In-line Thermal Mass Flowmeter and Temperature Transmitter


IEC Connectors. Introduction

Model UT201/202: OPERATING MANUAL. Table of Contents

TROUBLESHOOTING GUIDE

ILISC515-A Shift Interlock (Manual Lift Door) 2015 Ford Transit, 3.7L and 3.5L

CONNECTOR AMPLIFIER FOR PROPORTIONAL VALVES (4-20 ma Input Version)

This page is subject to proprietary rights statement on last page

Whale 3. User Manual and Installation Guide. DC Servo drive. Contents. 1. Safety, policy and warranty Safety notes Policy Warranty.

Manual Ranging MultiMeter

Essential Electrical Concepts

Utility Distribution Systems

Installation Instructions for Alarm Module Kit A043F059

INSTALLATION INSTRUCTION SPEC. SHEET 7/00. City of New York Calendar #40747 ETL LISTED UNDER U.L. STD LOW VOLTAGE TRACK LIGHTING SYSTEM

Global Water Instrumentation, Inc.

TELEDYNE BATTERY PRODUCTS. INSTRUCTIONS FOR CONTINUED AIRWORTHINESS and COMPONENT MAINTENANCE MANUAL. For

BARDIC. 4 & 8 Zone Fire Panels Zircon range. Data, installation, operation and maintenance. by Honeywell

MGL Avionics CAN bus interface for Trig Avionics TT21/TT22 transponders

Ducoterra Radiant Heating Panel Installation Manual

Electrical Grounding. Appendix C

7 FUNCTION DIGITAL MULTIMETER

OPERATOR S MANUAL 18 VOLT, 1 HOUR CHARGER

Transcription:

Document No: SRT-002 DigiTRON Single Connectors Site Recieved Test Manual www.siemens.com/energy/connector-operations-manual

2 This page records the revision status of the entire document and its authorisation for issue. When a page or pages of the document are revised, the number of the page affected will be entered in the Page Affected/Remarks Column and a vertical margin line will appear against the latest amended text. DigiTRON Single Connectors Site Received Test Manual 4 The contents of this document are confidential and must not be disclosed to any third party without prior consent in writing from Siemens Subsea Connectors a division of Siemens plc. 3 P.Westwell B.Leach 29.4.2014 New Cover design & complete document reformat. 2 P.Westwell B.Leach 18.3.2014 Re-format, various text amendments, 1 P.Westwell B.Leach 1.8.2013 First issue By Date By Issue Date Rev Compiled Checked Remarks / Pages Affected Siemens Subsea Connectors, Page No. (a division of Siemens plc), Subsea Excellence 2 Centre, Ulverston, Cumbria, LA12 9EE, England

3 Contents 1. INTRODUCTION...4 2. SCOPE...4 3. ABBREVIATIONS...5 4. RESPONSIBILITIES...6 5. HEALTH & SAFETY...6 6. MANUAL HANDLING, UNPACKING & STORAGE...6 7. VISUAL INSPECTION AND CHECKS...7 8. ELECTRICAL TESTING...9 9. CONTINUITY TEST...9 10. IR TEST...12 11. FAULT INVESTIGATION...14 12. FINAL INSPECTION...14 13. INFORMATION AND NOTES / HEALTH & SAFETY FEEDBACK...15 14. SIGN OFF SECTION...15

4 1. INTRODUCTION This document defines the procedure and equipment required to carry out the Site Received Test (SRT) on DigiTRON Single Connectors. 2. SCOPE The purpose of this document is to ensure that the Site Received Test is performed where specified, on all DigiTRON single connectors. IR and Continuity tests will be performed along with a visual inspection for any damage pre and post test. Any information, records or Health and Safety feedback that needs to be detailed, can be recorded in the punch list at the rear of the document.

5 3. ABBREVIATIONS A Ampere AC Alternating Current Assy Assembly API American Petroleum Institute AWG American Wire Gauge BOM Bill of Material C Degree Celsius CE Community European Comms Communication Signal CP Cathodic Protection DC Direct Current DWG Drawing EFL Electrical Flying Leads EMF Electrical Magnetic field FAT Factory Acceptance Test IR Insulation Resistance ISO International Organization for Standardization ITP Inspection Test Plan K Kelvin LTC Long Term Cover M Metres Max. Maximum MFG Manufacturer Min. Minimum No. Number ROV Remotely Operated Vehicle SI Standard International SRT Site Received Test SST Stainless Steel TBD To Be Defined TSP Twisted Screened Pairs UNS Unified Numbering System for Metals and Alloys V Volt

6 4. RESPONSIBILITIES It is the operators responsibility to comply with this instruction and to ensure all test equipment is within calibration and report any problems to the Quality Control Inspector. The operator shall also be responsible for completing the Test Results Sheets. All tests shall be carried out within a test cell, or specifically designed test area, which shall be clearly identified. Controlled access to such areas shall be enforced. Care must be taken during handling, any damage to the connectors can result in schedule delays. 5. HEALTH & SAFETY Manual Handling, Lifting and Carrying are known to be the largest contributors to occupational ill-health. Ensure that mechanical handling aids are used whenever possible to avoid manual handling. Where manual handling is considered appropriate for the task safe lifting guidelines must be followed, e.g. adopt correct posture, consider team lifting, employ safe lifting technique, etc. Only competent persons are permitted to perform tasks without supervision, if in doubt ask. Good Housekeeping avoids Slips Trips and Falls, keep your area clean and tidy. It is the operator s responsibility to comply with current Company & regional health and safety legislation. Caution shall be exercised during assembly and testing to ensure that fittings and hydraulic/pneumatic equipment are properly installed All high voltage testing shall be performed by trained personnel using equipment that has been checked for safety within the last 12 months from the date of use. The operator shall be protected from electrocution by earth-screened enclosures that contain the H.V. hazard. After every H.V. test, an earth stick shall be used to verify that the conductors are discharged. For tests involving D.C. sufficient time must be allowed for the circuit to discharge before touching the conductors. The discharge period shall be at least equal to the period of charging. In the event of a safety incident or any safety improvement suggestions please contact the Health and Safety Department at prodsafe.gb@siemens.com and/or complete and return the punch list in section 13. Note All receptacle s (male pins) must be mated to its correct mating half before it is energised (this includes the correct Test, Dummy and Wet Mate Pair). 6. MANUAL HANDLING, UNPACKING & STORAGE Details on each of these sections, is explained in the IOM-002 manual.

7 7. VISUAL INSPECTION AND CHECKS Upon receipt of each connector please handle in accordance with procedures detailed in IOM-002. Each page of this document contains a signature section to be completed by the user. Visual inspection for damage to be completed by Siemens trained technician Please use check box as shown Pass Fail Check each connector is correct part ordered. If connector is wrong part please stop test and inform Technical Dept... Place connector on a clean surface and check for any visual damage or leaks. Some example images can be found are on pg 8... Check tails are undamaged along length (where fitted)... Remove protective caps from connectors and check contact face / seal for Debris or damage... Check pins / sockets for damage... Inspect connector body for any impact damage, scratches... Re-install protective caps... Check tagging and etching is to project requirements... Repackage and store in accordance with IOM-002 manual... Any failure to this criterion must be recorded on the Information and Notes / Health and Safety Feedback list at the back of this document and the technical department must be informed Photos must be taken as evidence to help rectify any non-conformance

8 Example images: - To help identify damage, debris, defects Check connector body for damage such as dents, scratches (Picture shows damage to body) Check tail wires along their length, for damage or breaks. (Picture shows broken tail wire) Make sure all contacts and mating faces are Clean and free from debris. (Picture shows debris in contact)

9 8. ELECTRICAL TESTING ALL TESTS TO BE PERFORMED BY SIEMENS TRAINED OPERATIVES ONLY. General Equipment: Ambient temperature / humidity recorder Barometer Record atmospheric pressure, temperature & humidity (in accordance with the IEC 60060 standard) during electrical & function testing Note: All calibrated equipment must have a current calibration certification at the time of the test. Details must be recorded on the results Record Sheets included in this document The appropriate test connector must always be used to make electrical contact during testing. UNDER NO CIRCUMSTANCES should a foreign object (such as a screwdriver, test probe, or crocodile clip) be used as a test connection as this could damage the seals and insulation. Such actions will invalidate the warranty of the connector / harness. 9. CONTINUITY TEST Equipment Required Continuity Bleep Tester. Cropico or Black Star Digital Ohmmeter. Wiring diagram (where applicable) Test connector (where applicable) All equipment is functional and with calibration certificates... Pre test Visual inspection of connectors completed... Test connector and leads to be inspected for damage debris... If the above criterion is passed testing may begin... If at any point the connector fails the test, stop testing and go to section 10. Procedure Touch the conductive ends of the test leads together. If the tester is in working order it will sound a "bleep". Attach one of the free ends of the test leads to one conductor, pin or socket (ensuring the plating is not damaged by the test lead). Attach the other test lead to the opposite end of the same conductor, pin or socket. If there is a "bleep" continuity is acceptable and recorded as a PASS, If there is no bleep there is a break in continuity and must be recorded as a FAIL.

10 With the test lead attached to the first conductor the second test lead shall be attached to each of the remaining conductors in turn. The bleep must not sound during this test as this determines if a contact has been shorted or cross connected and shall ensure each conductor is isolated from the remaining conductors. If the bleep does sound the item must be reworked. Table 1, Continuity test results Project: Part No: Each pin to all Equipment used: Serial No: others Connector A - Pin Connector B - Pin PASS / FAIL PASS / FAIL 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 Pin. to body Pin to body Table 5, Continuity Test Sign Off Technician Name Date

Shunted / Shorted Connector Continuity Test: Perform a continuity bleep test on shorted connectors between required pins Record pin numbers and results in Table 3. Perform a resistance test on shunted connectors between required. Record pin numbers and results in Table 4 Page 11 Table 3, Continuity Test Results Table 4, Resistance Test Results (Shorted Connector) (Shunted Connector) Pins Pass/Fail Pins Reading Confirm Resistor Yes/No eg: 1k - - - - - - - - - - - - Table 5, Continuity Test Sign Off Technician Name Date

12 10. IR TEST Equipment Required: DC H.V tester (BM 21/MIT520 Megger or similar). Electrical test board with up to 12 connections. Suitable Test Connector where applicable Test connector mount fixture where applicable Wiring Diagram All equipment to be inspected for functionality prior to starting testing completed All equipment is functional and with calibration certificates... Pre test Visual inspection of connectors completed... Test connector and leads to be inspected for damage debris... If the above criterion is passed testing may begin... IR TEST PROCEDURE: Tailed connector Insulation Resistance Test in accordance with procedure Test Voltage: 1000 Vdc for 60 seconds pin to pin and all pins to earth. Acceptance Criteria: No breakdown or flashover shall occur and resistance values are to be >100G. Open circuit or Shorted connector Insulation Resistance Test in accordance with procedure Test Voltage: 1500 Vdc for 60 seconds pin to pin and all pins to earth. Acceptance Criteria: No breakdown or flashover shall occur and resistance values are to be >100G. Shorting Resistor Circuit Insulation Resistance Test in accordance with procedure TSC-352-006 Test Voltage: 50 Vdc for 60 seconds pin to pin and all pins to earth. If all contacts are linked then only perform all pins to earth test. Acceptance Criteria: No breakdown or flashover shall occur and resistance values are to be >1G. Note: Blank term sleeves to be used on all un-used solder cups. If no inserts are required do not do any electrical testing. If at any point the connector fails the test, stop testing and go to section 11.

Table 6, Insulation Resistance Test Results Pins Reading All Above to Body Temperature C F Humidity % Barometric mb Pressure Page 13 Table 7, Insulation Resistance Test Sign Off Technician Name Date

14 11. FAULT INVESTIGATION (only complete if a fault is present) If Connector fails test: Check all connections are fully connected... Remove all connections and inspect all contacts for damage or debris... While disconnected check all equipment is working and set up correctly... If using a bench test board this must be fully checked for correct Operation... Re-connect all equipment and repeat tests... If there is still a fail please stop test and contact Technical Dept 12. FINAL INSPECTION Check connector and verify no damage has occurred... Ensure protective caps are fitted... Check to ensure that tags are fitted in accordance with the relevant drawing or tag schedule... Ensure loose items (if any) are attached with connector... FINAL CHECK Make sure this document has been fully completed and all results / information recorded in the correct section.

15 13. INFORMATION AND NOTES / HEALTH & SAFETY FEEDBACK DATE DESCRIPTION 14. SIGN OFF SECTION Please sign and date where indicated to confirm that each page of this document has been read and complied with in full. Name Signature Date