1. Introduction. P2O is automatically loaded when you open Ms Project (2010 or 2013). The add-in can be found under the M5 Tools menu. 2.

Similar documents
INTRODUCTION 5 COLLABORATION RIBBON 5 SELECT THE UPDATING METHOD 6 MAKE YOUR PROJECT COLLABORATIVE 8 PROCESSING RECEIVED TASK UPDATES 9

Introduction to Microsoft Project 2010

KPN SMS mail. Send SMS as fast as !

ProperSync 1.3 User Manual. Rev 1.2

Configuring Outlook 2013 For IMAP Connections

USER MANUAL (PRO-CURO LITE, PRO & ENT) [SUPPLIED FOR VERSION 3]

Project Management: Intermediate Microsoft Project 2010

Microsoft Access 2007 Advanced Queries

Organizing and Managing

Export the address book from the Blackberry handheld to MS Outlook 2003, using the synchronize utility in Blackberry Desktop Manager.

OUTLOOK 2003: HOW TO GET OUT OF JAIL

Symantec Enterprise Vault

Implementing Mission Control in Microsoft Outlook 2010

Using MS Project in Translation Projects Management

Microsoft Project 2007 Level 2: Working with Resources and Managing a Project

Release Notes Assistance PSA 2015 Summer Release

Creating a Distribution List from an Excel Spreadsheet

SmartLink for Outlook User Guide

BulkSMS Text Messenger Product Manual

How To Use Ms Powerbook On A Pc Or Mac Or Macbook 2 (Windows)

Microsoft Excel 2013: Using a Data Entry Form

The first thing to do is choose if you are creating a mail merge for printing or an merge for distribution over .

Microsoft. Outlook ADVANCED FEATURES AND FUNCTIONS

Microsoft Project 2010

Mail Merge Creating Mailing Labels 3/23/2011

Salesnet CRM Documents

How to install and use the File Sharing Outlook Plugin

Optomate Training Compendium Appointment Book Page 2

Module A2 Item Activities, Gantt Chart and Utilization Sheet

SharePoint List Filter Favorites Installation Instruction

Mastering Mail Merge. 2 Parts to a Mail Merge. Mail Merge Mailings Ribbon. Mailings Create Envelopes or Labels

UOFL SHAREPOINT ADMINISTRATORS GUIDE

Symantec Enterprise Vault

ATX Document Manager. User Guide

ONBASE OUTLOOK CLIENT GUIDE for 2010 and 2013

WHAT S NEW IN MS EXCEL 2013

Outlook 2007 EXPLORE THE OUTLOOK USER INTERFACE. Microsoft. Basic Tasks

Microsoft Project 2007 Level 1: Creating Project Tasks

PSA 2015 Step by Step Guide is published by Assistance Software. All rights reserved. No part of this publication may be Projects reproduced.

Using an Automatic Back Up for Outlook 2003 and Outlook 2007 Personal Folders

Outlook Plugin. What is MangoApps for Outlook?

Symantec Enterprise Vault

ICP Data Entry Module Training document. HHC Data Entry Module Training Document

Planning and Managing Projects with Microsoft Project Professional 2013

Everyday Excel Stuff Excel Day Planner Organizer Reference Guide

Outlook Profile Setup Guide Exchange 2010 Quick Start and Detailed Instructions

OVERVIEW. Microsoft Project terms and definitions

Outlook 2013 ~ e Mail Quick Tips

Microsoft Project 2013 Guide to Task and Resource Planning

Using Microsoft Project 2000

Outlook 2010 Essentials Power Point Slides Corporate Training Materials

Vodafone PC SMS (Software version 4.7.1) User Manual

Adding Outlook to a Blackberry, Downloading, Installing and Configuring Blackberry Desktop Manager

How to Create User-Defined Fields and Tables

Excel 2013 What s New. Introduction. Modified Backstage View. Viewing the Backstage. Process Summary Introduction. Modified Backstage View

Search help. More on Office.com: images templates. Here are some basic tasks that you can do in Microsoft Excel 2010.

Mac Outlook Calendar/Scheduler and Tasks

Beginning Microsoft Project

Microsoft Project 2013

Introduction to SharePoint For Team Site Owner/Administrators. Instructional Guide

Outlook Tips & Tricks. Training For Current & New Employees

Colligo Manager 6.2. Offline Mode - User Guide

Subscribe to RSS in Outlook Find RSS Feeds. Exchange Outlook 2007 How To s / RSS Feeds 1of 7

Migrating to Excel 2010 from Excel Excel - Microsoft Office 1 of 1

Symantec Enterprise Vault

Outlook Web App. in Office 365. The Outlook Window. Signing In. (Outlook Exchange Faculty & Staff) Getting Started

Symantec Enterprise Vault

Step One. Step Two. Step Three USING EXPORTED DATA IN MICROSOFT ACCESS (LAST REVISED: 12/10/2013)

How to Move Mail From Your Old POP Account To Exchange Using Outlook 2010

Staying Organized with the Outlook Journal

Word 2010: Mail Merge to with Attachments

Project Management Dashboard Pro v5 Documentation

ELECTRO-MECHANICAL PROJECT MANAGEMENT

Microsoft Outlook 2013 Workshop

Exchange Outlook Profile/POP/IMAP/SMTP Setup Guide

Outlook 2010 Essentials

Merging Labels, Letters, and Envelopes Word 2013

Instructions for Creating an Outlook Distribution List from an Excel File

To reuse a template that you ve recently used, click Recent Templates, click the template that you want, and then click Create.

CONTENTS. Introduction Outlook at a glance Configure Outlook 2010 on-campus Creating Folders Sorting s...

MS Outlook 2002/2003. V1.0 BullsEye Telecom

Planning and Managing Projects with Microsoft Project Professional 2013

User Guide. emoney for Outlook

Setting Preferences in QuickBooks

Enhanced Attendance Reporting for SmartLock Pro Plus OPERATOR GUIDE

Behavioral Health System

Creating a New Project

2) Sharing Projects Made easy by IntelliGantt s Share Wizard, there are three share options to fit the needs of your project.

OUTLOOK GETTING STARTED

Copyright 2010, MH Software, Inc. All Rights Reserved. MH Software, Inc W 120 th Ave, #311 Broomfield, CO 80020

Microsoft Outlook Tips & Tricks

Creating A Legal Document In MS Word

SENDING S & MESSAGES TO GROUPS

Using the EBS SQL Import Panel

Rx Medical. SMD Utility. Task Scheduler Configuration

Microsoft Word Revising Word Documents Using Markup Tools

Managing Expense Reports Program Administrators and Approvers

Excel 2010: Create your first spreadsheet

TIBCO Spotfire Business Author Essentials Quick Reference Guide. Table of contents:

SCOoffice Mail Connector For Microsoft Outlook. Installation Guide Outlook 2002

Transcription:

1. Introduction Project 2 Outlook (P2O) will help Microsoft Project users to improve project communication by exporting MS Project tasks and information to MS Outlook Task or Appointments. Users don t need special skills and most will use the product without referring to this guide; but just in case. Note: For the best performance start Outlook before using P2O. 2. The P2O menu P2O is automatically loaded when you open Ms Project (2010 or 2013). The add-in can be found under the M5 Tools menu. Upon starting, the application defaults to: Exporting to your default Outlook Calendar (called Calendar ) Exporting based on user highlighted (or selected) tasks. If you click Export you will export the currently highlighted Microsoft Project Tasks to your default calendar, simple isn t it! 2.1. P2O Configuration The figure below shows the Export Configuration screen, the following table describes the function of the configuration options. 1 LicorSoft Ltd

(cont.) Option Title Default Purpose Unchecked Checked: Inactive tasks are not exported. Unchecked: Active & Inactive tasks are exported. Unchecked Checked: Completed task or resource assignments are not exported. Unchecked: In-progress and Completed tasks are exported. Checked Checked: Exported tasks appear as Busy appointments in Outlook. Unchecked: Exported tasks appear as Free appointments in Outlook Checked Checked: Split tasks are exported as separate appointments Unchecked: Split tasks appear as one Outlook appointment or task. Unchecked Checked: Milestone tasks appear as All-Day Outlook appointments Unchecked: Milestone tasks appear in Outlook as appointments starting and finishing at the project s default start time. Unchecked Checked: Minimise output to the Notes field. Unchecked: The Notes field will be enriched by P2O. Fields 2 Field(F2F) is a Notes field enrichment utility. Unchecked Checked: Included the Task Number in the Task Name (eg 1. Task Name ) Unchecked: The Task Name is exported without the Task Number. Unchecked Checked: The Milestone Markers (start & end) are used for all tasks. Unchecked: Milestone Markers are only used for Milestone Tasks An identifier placed in-front of the exported Task Name. This allows exporters to include a Project Code in task descriptions. An identifier appended to the exported Task Name. This allows exporters to include a Project Code in task descriptions. Calendar Shows the folder where exported Tasks will be placed. Use the button at the end of this field to select. If the folder is an Outlook Calendar then Outlook appointments will be created. If the folder is an Outlook Task folder then Outlook Tasks will be created. Selection Tasks to be exported will be selected based this option. Currently Selected : Highlighted items will be exported. Flag : Selections will be based on the Yes/No status of the selected Flag column. Use Flags to save selections between exports. n/a Cancel P2O configuration changes. n/a Update the P2O configuration settings. 2 LicorSoft Ltd

2.2. Exporting Tasks The Export button executes the export according to the configuration settings selected in Configure Export. For ease; the central panel shows the current Outlook Folder and Export Selection method. The central panel also allows users to email appointments & tasks to assigned resources. 2.3. Export Manager The Export Manager (shown below) is displayed after clicking the Manage Exports ribbon button. The Export Manager history uses the following tree structure for P2O exports. If the email Task Assignments 2 Resources option is selected the export will have a leading (e). Outlook cancellations will be sent for emailed tasks and appointments when deleted in the Export Manager. The Outlook Item Type is either: (Appt) - (Task) - Outlook appointments were created. Outlook Tasks were created. Outlook Tasks are created if an Outlook Task Folder is selected as the Target Output folder, similarly for Outlook Appointments. 3 LicorSoft Ltd

3. Types of Export P2O supports two types of export: 1) Ad-Hoc and 2) Preserved. Ad-Hoc Exports are useful when you need to export to satisfy nonstandard requests. Preserved requests satisfy regular and unanticipated information needs. The following sections explain setting up and using both types of export. 3.1. Ad-Hoc exports When P2O is in Ad-Hoc mode it will export the currently highlighted tasks from Microsoft Project. You can highlight individual lines by pressing the Ctrl key and clicking the task rows required. 3.2. Preserved exports P2O supports exports based on the status of a user selected Microsoft Project Custom Flag field. The selections made in the Custom Flag field are saved in the project schedule (.mpp file); this approach significantly reduces the effort associated with highlighting tasks for export and introduces the flexibility needed to export different tasks to distinct stakeholder groups. For example, one custom field could be used to select milestones for export to senior project members whilst another custom field could be used for a department specific export. Process Overview: There are 5 steps required to execute a Preserved Export: 1) Setup a Custom Flag 2) Add the Custom Flag to the Gantt Chart view 3) Make Custom Flag selections 4) Configure P2O 5) Export 4 LicorSoft Ltd

3.2.1. Setup a Custom Flag Microsoft Project supports custom fields; these are fields available to enhance the information stored about Tasks and Resources. Custom Fields can be one of 9 types (Cost, Date, Duration, Finish, Flag, Number, Start, Text or Outline Code); P2O uses Custom Fields of type Flag (Flag1 Flag20) to support Preserved Exports. To setup a Custom Field of type Flag: (For this example we will setup a new Flag field called Export for Sales ) 1. Select the Project tab in Microsoft Project 2. Select Custom Fields (the Custom Fields dialog will appear) 3. Ensure the Task radio button is selected (not Resource) 4. Select Flag from the Type dropdown box. The Field list now shows a list of 20 Flags named Flag1 Flag20. Flags that are being used will show the Flag name in brackets, for example, the screen-shot below shows both Flag1 & Flag 2 have been renamed (using the Rename button) to Export for Board and Export for Dept. Heads respectively. For our exercise we are going to setup a new Field Export for Sales against Flag 3. (Note: if you are not owner of the Project document you are updating, check with the owner if they have used the Custom Flag you intend to use!) 5. Select Flag 3 6. Click the Rename button and in the Rename Field dialog enter the name you d like for the field ( Export for Sales in our example) 7. Click OK (you return to the Custom Field dialog) 8. Click OK 5 LicorSoft Ltd

3.2.2. Add the Custom Flag to the Gantt Chart view Now the Custom Field ( Export for Sales ) has been created we need to add it to the Gantt Chart view so we can select the tasks to export. To add the field to the Gantt Chart view: 1. Click the Task tab 2. Click the Gantt Chart icon in the View group. (If you are already in the Gantt Chart view nothing will change). 3. Right-mouse-click and column heading to bring up the context menu. 4. Select Insert Column 5. Scroll down and select the Flag column you have added (it is listed under Export for Sales in our example. If you cannot find the field return the Step 3.2.1 and ensure your screen matches the screen capture in that section; then return to this step and carefully check for the field. Once the field is added all of the values should be automatically set to No, if the field has not been used before. If any of the values are Yes check with the person that created the project schedule or repeat step 3.2.1 with a different Custom Flag field. 6 LicorSoft Ltd

3.2.3. Make Custom Flag selections You are now ready to select the tasks that will be exported. For any task you wish to export do the following: 1. Click in the Custom Flag cell e.g. Export for Sales in our example. 2. The field will automatically list the available options (Yes/No). 3. Select Yes 3.2.4. Configure P2O We are ready to configure P2O to export our selection based on the custom flag field. 1. Select the M5 Tools tab 2. Click the Configure Export button 3. The Project 2 Outlook - Configuration dialog will be displayed (described in Section 2.1 above). 4. Select the Export Selection Based On dropdown box. 5. Select the Custom Flag you created (in our example Export for Sales ). Select an Appointment folder or a Task folder, the default for the Target Outlook Folder is Calendar. 6. Select Update. 3.2.5. Export 1. Click Export After the Project2Outlook confirmation dialog appears. 2. Click OK Project tasks set to Yes now appear as tasks or appointments in Outlook (depending on your Target Outlook Folder choice). 7 LicorSoft Ltd

4. What s exported? The location of information in Project Tasks and Outlook is described below. The screen-captures also highlight how Manually Scheduled Tasks are managed and appear in Outlook. The first image below is from Microsoft Project. The image below is the result of selecting an Outlook Calendar Folder. The image below is the result of selecting an Outlook Task Folder. Note: Milestone Tasks Start and Finish Time is set to the Default Start Time that Microsoft Project used for the tasks (default 08:00) unless Milestones are exported as All Day Tasks (see section 2.1. P2O Configuration ). The first task is a Milestone and therefore has no user specified Start or Finish time in MS Project; therefore the default start time is used. Selecting the P2O option Milestones Export As All Day Appointments will result in Milestones created as All-Day Outlook appointments. 8 LicorSoft Ltd

4. What s exported? (Continued ) The Outlook Appointment for MS Project Task #1 is shown below. The Outlook Task for MS Project Task #1 is below Notice that the information exported is appropriate to the type of Outlook item you want to create. For example, if you create an Outlook Task, the %Completed and Status fields are used to create the task. However, for Outlook appointments %Complete and Status are not used. To enrich the content of the Notes field please use our P2O add-in Fields 2 Field (F2F). 9 LicorSoft Ltd

5. Export Manager Export Manager is a powerful tool for: Viewing exports (grouped by MS Project file) -and- Viewing Outlook items (Tasks or Appointments) created The exports are the lowest level of the hierarchy, once clicked the Outlook items created by the export appear in the list on the right. Selection of an export will enable the action buttons so you can view and delete as required. The table below explains the purpose of the action buttons. Deleting appointments Button Active Purpose Delete Exported Items from Outlook When an export is selected Deletes all items created by P2O for the selected export. Select Confirm Before Deleting Each Item to delete specific items. View Outlook Folder When an export is selected Displays the Outlook folder that contains the items created by the export. View/Edit Appointments Selecting an item from the Outlook Items list will display the associated Outlook item (this is the equivalent of opening the item from the Outlook Folder). You will be able to manage the item using Outlook functionality (including editing and deletion). 10 LicorSoft Ltd

6. Export 101 Task Assignments & Option impact This section explains what happens if a user chooses to email items and ignore completed tasks. P2O will review the Task Assignments in MS Project and only email appointments where the task assignment is not completed. See the following scenario which illustrates this: Task Resources Task Assignment P2O emails Assigned Completion Activity 1 R1, R2 R1 (100%), R2 (25%) R1, R2, - Activity 2 R1, R3 R1 (0%), R3 (90%) R1, -, R3 Activity 3 R4 R4 (100%), R4 Task Resources Task Assignment P2O emails Assigned Completion Activity 1 R1, R2 R1 (100%), R2 (25%) - R2 - Activity 2 R1, R3 R1 (0%), R3 (90%) R1, -,R3 Activity 3 R4 R4 (100%) - As expected, users with outstanding assignments are emailed but users that have completed their tasks are not emailed about completed work. Emailing Resources P2O will export Tasks and Appointments to resources assigned to a Project task if a valid email address is placed in the Resource Sheet and- the email Task Assignments 2 Resources option is selected. By default the email Address column may not be displayed. To display the email Address Column: 1. Select Resource from the main menu 2. In the View Group (it may read Team Planner) click the dropdown button. 3. Select Resource Sheet The Resource Sheet will be displayed with any resources used in your project. 4. Add the email Address column if it is not present a. Right-Mouse-Click the Resource Name column to show the context menu b. Select Insert Column from the context menu 11 LicorSoft Ltd

Emailing Resources (cont.) c. Type em to filter the list that appears. email Address should now be visible in the list of columns to add d. Click/Select email Address to add the column to the Resource Sheet. 5. Enter valid email address. You can now use the email Task Assignments 2 Resources option to ensure that resources assigned to MS Project Tasks will get an email with either an appointment or task request when you export. Note: If you enter incorrect email addresses nothing will be sent to users. 12 LicorSoft Ltd