All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.



Similar documents
SECTION FACILITY STORM DRAINAGE PIPING

SECTION SOIL AND WASTE SYSTEMS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

City of St. Charles Basement Finish or Remodel

Chapter 7 Plumbing Connections

SECTION GENERAL PROVISIONS FOR HVAC WORK

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

One Year Warranty. Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches NATURAL GAS* Six Year Warranty

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

SECTION MORTUARY REFRIGERATORS

2006 Codes. Please verify the following before calling for inspection

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

Element D Services Heating, Ventilating, and Air Conditioning

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

What to Expect From the Examination. How to Study the Plumbing Codes

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

RMF Engineering

LS 2540 SEWER LATERALS AND INSPECTION TEES

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Beacon Hill Sewer District Standard Specifications

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

PLUMBING ROUGH IN INSPECTION

CONSTRUCTION CHECKLIST Residential Plumbing Rough-In September 2004

DIVISION 22 PLUMBING PLUMBING EQUIPMENT Domestic Water Heaters

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

FIRING RANGE PHASE 1 DESIGN

Nominal Life Expectancy for Building Components

SECTION COMMERCIAL PLUMBING FIXTURES

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

A. This Section includes the following for soil, waste, and vent piping inside the building:

Acumen Enterprises, Inc.

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PLUMBING SPECIALTIES

Element D Services Plumbing

SECTION STORM DRAIN SYSTEM

CONTROL METHODS. There are five ways to control the release of asbestos fibers:

Residential Foundations and Basements

SECTION STORM DRAINAGE SYSTEM

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

B. Types of mechanical insulation specified in this section include the following:

October 5, 2015 Dear Client,

CLEANOUT FEATURES. KLEENATRON II Features CLEANOUTS

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

NFPA31FuelOilPiping 1 Revised

Plumbing Apprenticeship Program Curriculum

Uniform Construction Code (UCC) Building Permit Application Package

State of Connecticut Department of Public Health RADON PROGRAM

INSPECTION CHECKLIST Residential Plumbing Rough In April 2011 Mercer Island Mill Creek Sammamish Snohomish County Snoqualmie Woodinville

CEILING CASSETTE FAN COIL UNIT

When Should Examination Preparation Begin?

Applications for building permits will not be reviewed until all of the required information has been submitted.

DESIGN STANDARDS SECTION

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Copper and Copper Alloy Tube, Pipe and Fittings

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION AIR CONDITIONING UNIT

SECTION HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section

CHAPTER 11 STORM DRAINAGE

Section SEWER PIPE INSTALLATION AND TESTING

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

4 Installation Requirements

WATER SERVICE 2

SECTION SUPPORT OF EXCAVATION

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

COMMISSIONING OF HVAC SYSTEMS

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS

SWIMMING POOL HEAT PUMP

ONE AND TWO FAMILY DWELLINGS Plumbing July, 2007

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

1-Way Chilled Water Cassettes KCO 60, 90 & 120. Technical Brochure. TM KCO-W.1GB Date : November 2005 Supersedes : None

SECTION DUCTILE IRON PIPE AND FITTINGS

Value Engineering Considerations for Cast Iron Soil Pipe and PVC in Commercial Sanitary and Storm Drainage Applications

Home Inspection Report

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

MRI RF SHIELDING DESIGN

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

Arapahoe County Residential Water Heater Installation and Inspection Guide

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

Transcription:

DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which are part of these plumbing systems. QUALITY All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition. SUBMITTALS Submit shop drawings and equipment brochures for all plumbing equipment to the Architect for approval prior ordering material. SITE CONDITIONS This contractor shall visit the site before submitting his bid and shall verify all work necessary to provide a complete plumbing system. OPERATION AND MAINTENANCE MANUALS At least two (2) weeks prior to completion of the plumbing work, the Contractor shall provide three (3) bound copies of all operation and maintenance manuals to the Architect. PART 2 - PRODUCTS PLUMBING FIXTURES As shown on drawings. Domestic Water: Type K, soft copper, below slab with no joints. Type L, hard copper, above slab, with soldiered fittings and joints. Wrought copper fittings. Soil, Waste, Vent (Above Ground): Hub-less cast-iron, no-hub, CISPI 301. Schedule 40, galv. steel, vent piping. Cast Iron fittings at vents.

Soil, Waste: Below slab - cast iron, no hub fittings. Outside building - PVC - DWV, Schedule 40 with gasket joints. - PVC - perforated drain pipe. Gas Service Pressure Regulator: Fisher, type 166-4, in size as required. Gas (Above Grade): Schedule 40, black steel. Standard weight fittings. Screwed fittings. Gas (Below Grade): Schedule 40, POLY-GAS. Coated and wrapped fittings. Hose Bibb: Woodford, non-freezing, 3/4" connection, with antisiphon device. Floor Drains: Refer to drawings. Valves: Hammond, Nibco, or Crane as suited to use. Stop Valves: Crane, chrome plated stop valves for each hot or cold water fixture connection. Water Hammer Arrester: Wade "SHOK STOP", one per hot or cold water fixture connection. Accessories: (as required) Hangers Sleeves and Escutcheons to fit pipe. Insulation, 1/2" thick, flexible foam tubing with taped joints. CLEANOUTS General: Provide cast-iron ferrule and countersunk brass cleanout plug, with round cast-iron access frame and heavyduty, secured, scoriated cast-iron cover. IDENTIFICATION Plastic Underground Warning Tapes: Polyethylene plastic tape, 6 inches wide by 4 mils thick with continuously printed

caption in black letters "CAUTION - (SEWER) (GAS) (WATER) LINE BURIED BELOW." PART 3 - EXECUTION PREPARATION Grade trench bottom to provide a smooth, firm, stable, and rock-free foundation, throughout the length of the pipe. Remove unstable, soft, and unsuitable materials at the surface upon which pipes are to be laid, and backfill with clean sand or pea gravel to indicated level. Shape bottom of trench to fit bottom of pipe. Fill unevenness with tamped sand backfill. Dig bell holes at each pipe joint to relieve the bells of all loads and to ensure continuous bearing of the pipe barrel on the foundation. INSTALLATION, GENERAL General Locations and Arrangements: Drawings indicate the general location and arrangement of the system piping. Location and arrangement of piping layout take into account many design considerations. Install the piping as indicated, to the extent practical. Provide unions on each item of equipment for future maintenance. Install sewer piping pitched down in direction of flow, at minimum slope of 2 percent, except where indicated otherwise. Install insulation on all water piping subject to freezing. TAP CONNECTIONS Make connections to existing piping and underground structures so that finished work will conform as nearly as practicable to the requirements specified for new work. Coordinate all connections to municipal services with City of Stillwater and Okla. Natural Gas Co. at least 3 days prior to work. Do not tap service lines without approval of provider. Provide meters for both gas and water service. INSTALLATION OF IDENTIFICATION

Install continuous plastic underground warning tape during back-filling of trench for underground service piping. Locate 6 to 8 inches below finished grade, directly over piping. FIELD QUALITY CONTROL Testing: Perform testing of completed piping as follows: Sanitary Sewer Drains: 10'-0" static head of water. Gas Piping: 60 psig with no loss for 24 hours. Water Piping: 150 psig with no loss for 24 hours. Architect must be notified at least 24 hours prior to testing. Water piping must be sterilized to meet STATE Board of Health requirements. Sewer: Clear interior of piping and structures of dirt and other superfluous material as work progresses. Maintain swab or drag in piping and pull past each joint as it is completed. Place plugs in ends of uncompleted pipe at end of day or whenever work stops. ***** ****** END OF DIVISION 15100 PLUMBING SECTION 15500 - HEATING, VENTILATING, AND AIR CONDITIONING PART 1 - GENERAL 1.01 SUMMARY A. Provide commercial mechanical systems including: 1. Central Heating and Cooling system. 2. Fan powered unit heaters 3. Systems designed for gas utility service. 4. Exhaust Fans, sheet metal work, registers, grilles and diffusers. 5. Duct insulation. 6. Temperature controls. 7. H.E.P.A. filter system 8. Testing, adjusting and balancing.

B. Coordinate location of mechanical systems to avoid interference with location of other systems, including piping and lighting fixtures. C. Do not cut structural elements without prior written approval. 1.02 SUBMITTALS A. Submit for approval product data, operating and maintenance data, balancing reports and as-built record documents. 1.03 QUALITY ASSURANCE A. Comply with governing codes and regulations. Provide products of acceptable manufacturers which have been in satisfactory use in similar service for three years. Use experienced installers. Deliver, handle, and store materials in accordance with manufacturer's instructions. B. Arrangement of systems indicated on the drawings is diagrammatic, and indicates the minimum requirements for mechanical work. Site conditions shall determine the actual arrangement of systems. Take field measurements before fabrication. Be responsible for accuracy of dimensions and layout. Overhead ductwork shall be laid out to obtain maximum head room. PART 2 - PRODUCTS 2.01 MATERIALS A. Mechanical Equipment: As shown and called for on drawings. B. Valves: Provide valves required by service intended including gate,

globe, check, and ball valves. Provide valves by Kennedy, Crane, Nibco or approved equal. C. Hangers and supports: Comply with ANSI B31.1. D. Unit heaters: Copper tube coils with aluminum fins, baked enamel steel enclosure by Trane, Airtherm or approved equal. Refer to drawings for Equipment Models. E. Sheet metal work and accessories: Comply with SMACNA Duct Manual and Sheet Metal Construction for Ventilating and Air Conditioning Systems. F. Fans and air handling units: Refer to drawings for Equipment Models. G. Grilles and registers: Supply: Titus, Model TMSA, square ceiling diffuser, surface mount, 24 x 24, white steel, with model D-100 balancing dampers. Return: Titus, Model 25-RL-NT, square return grille, surface mount, 24 x 24, 1/2" spacing, white steel. H. Fan coil units: Refer to drawings for Equipment Models. I. Controls: Seven day programmable automatic temperature control system by Honeywell, Johnson Controls or approved equal. PART 3 - EXECUTION 3.01 INSTALLATION A. Install materials and systems in accordance with manufacturer's instructions and approved submittals. Install materials in proper relation with adjacent construction and with uniform appearance for exposed work. Coordinate with work of other sections. Comply with applicable regulations and

building code requirements. clearances for servicing. Provide proper B. Provide 1" dia. copper condensate drains from refrigeration drain pan to nearest floor drain. C. Install shutoff valves on each piece of equipment for gas service lines. D. Install ductwork in accordance with SMACNA recommendations. Seal duct seams with sealer. Provide splitters and balancing dampers. Provide fire dampers and automatic smoke and fire dampers where required. Provide flexible connectors and inlet and discharge connections. Clean before testing and balancing. E. Insulate ductwork. Provide vapor barrier on insulated ducts operating below 60 degrees F. F. Conceal piping and ductwork to the greatest extent practical. G. Maintain indicated fire ratings of walls, partitions, ceilings and floors at penetrations. Seal with firestopping to maintain fire rating. Provide fire dampers at all fire rated wall penetrations. H. Clearly label and tag all components. I. Test and balance all systems for proper operation. J. Restore damaged finishes. Clean and protect work from damage. K. Instruct Owner's personnel in proper operation of systems.

***** END OF DIVISION 15 MECHANICAL *****