Similar documents
THE BASICS OF SCHEDULING S & T MAINTENANCE FOR MINOR RAILWAYS

NIR-Online Getting Started Guide

THE BASICS OF OPERATIONAL TELEPHONE SYSTEMS FOR MINOR RAILWAYS

TRAIN DETECTION BONDING AND CABLES

Safety Management System Version 2

Guidance for Electrical Contractors on Emergency Lighting Legislation

Electronic Tender Management System Quick User Guide Supplier

Information Management Advice 61 How to review your records holdings

Level 5 NVQ in Occupational Health and Safety Practice (3644) Candidate logbook

Business Continuity Planning

University Mission. Strategic Plan. Organisation Structure. Jobs

How Interview Scheduling Software Simplifies the Hiring Process by Appointment-Plus Online Scheduling Software

Penalty Fares information

ACADEMIC POLICY FRAMEWORK

OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT

DOCUMENTED PROCEDURE MANUAL

How To Manage A University Computer System

5 FAM 440 ELECTRONIC RECORDS, FACSIMILE RECORDS, AND ELECTRONIC MAIL RECORDS

Applied Information and Communication Technology. Unit 9: Communications and Networks May 2009 Assessment window 3 weeks Time: 10 hours

Records Management Understanding how the pieces fit together?

How to Add Users 1. 2.

Scope and Explanation

Control of Asbestos Policy

Business Process Desktop: Acronis backup & Recovery 11.5 Deployment Guide

INFORMATION GOVERNANCE POLICY: DATA BACKUP, RESTORE & FILE STORAGE HANDLING

MONITORING AND DOCUMENTING PERFORMANCE

Common Safety Method for risk evaluation and assessment

REPORT OF: DIRECTOR OF DEMOCRATIC AND LEGAL SERVICES 13/358 WARDS AFFECTED: ALL

Personal Account Conversion Charts

LONDON STOCK EXCHANGE ACCREDITATION POLICY FOR SOFTWARE HOUSES

Outlook . Step 1: Open and Configure Outlook

University of Liverpool

Railway Management Maturity Model (RM 3 )

Subject Access Request Procedure (Data Protection) Doc No IMPR04 Rev 2 27/07/ Scope. 2.0 Responsibilities and Definitions

ARMAGH CITY, BANBRIDGE AND CRAIGAVON BOROUGH COUNCIL GPRC/P4.0/V1.0.

FREQUENTLY ASKED QUESTIONS

Moving BidMagic to a new system (Backup / Restore Utility)

Microsoft Windows SharePoint

ITD Project Management and System Development Procedure ITD PROJECT MANAGEMENT AND SYSTEM DEVELOPMENT PROCEDURE

Engineering Procurement Construction Quality Plan

Job Description and Person Specification. Post Number: HCI.C24 JE Ref: JE028

Market Research. Market Research: Part II: How To Get Started With Market Research For Your Organization. What is Market Research?

THE ANTI-SPAM REGULATORY POLICY FRAMEWORK FOR THE KINGDOM OF SAUDI ARABIA

A grant number provides unique identification for the grant.

Project Management Manual

ASSESSMENT OF SCIENCE AND TECHNOLOGY ACHIEVEMENT PROJECT (ASAP) Science and Technology Exemplars. Grade 6: Energy and Control Electricity

Electronic Logbook. Hedgehog-2. version 2.7. Quick Start. Revision 1.3 of 10/31/2012

What is a 360 degree appraisal? A short introduction to the process. Contents: Introduction: page.2.

OFFSITE BACKUP & RESTORE USER/ ADMINISTRATOR GUIDE

SYDNEY TRAMWAY MUSEUM CHANGE MANAGEMENT PROCEDURE

Level 3 Certificate in Printing and Graphic Communications (5261)

Document control sheet

LEASE CAR POLICY AND PROCEDURE

Application to access Chesters Trade

GUIDELINE RECORDS AND INFORMATION INVENTORY

Google Accounts Google Drive

Guidance on the preparation and use of company risk assessment profiles for transport operators

MERGING AND ITS PROCEDURES IN QSR SOFTWARE

Components of a Reading Workshop Mini-Lesson

Stocks and Shares ISA. Application form 2015/16

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

WHITE PAPER. Meet the BYOD, Computing Anywhere Challenge Planning and License Management for Desktop Virtualization

Problems and Measures Regarding Waste 1 Management and 3R Era of public health improvement Situation subsequent to the Meiji Restoration

How to enable Disk Encryption on a laptop

Answers to Client questions about Online Services and Statement delivery.

PPLAGSO11 Carry Out a Physical Search in the Aviation Security Environment

Building Service & Maintenance

January 2016 Issue #2 Windows Backup

SHAREPOINT 2010 FOUNDATION FOR END USERS

Life Cycle of Records

QUALIFICATION HANDBOOK

Penalty Fares Rules. 55 VICTORIA STREET, LONDON SW1H 0EU TEL May 2002

Have more questions about Self-Assessment? Find answers in Appendix 1. Frequently Asked Questions about Self-Assessment at the end of this guide.

Chapter 8. Generic types of information systems. Databases. Matthew Hinton

This procedure applies to the following categories of documents:

II. MUNICIPAL RECORDS MANAGEMENT

Qualification Specification

Learning English with CBC Radio Living in Alberta. Identity Theft

GOVERNMENT OF INDIA (BHARAT SARKAR) MINISTRY OF RAILWAYS (RAIL MANTRALAYA) (RAILWAY BOARD)

Vehicle Fleet Manager 3.0. User guide

Telephone number: Telephone number: Fax number: n/a Fax number:

Method Statement Switchboard Services

Prepared by the Policy, Performance and Quality Assurance Unit (Adults) Tamsin White

Introduction to Google Docs

Plantcom s. Fleet Management. solutions are your competitive advantage. plantcom.com.au. l

Policies for: Information Governance Information Quality Information Management Information Security. Version Control Version: 0.1

Simple Financial Records for a Small Business

Tableau for Robotics: Collecting Data

Information Management Policy

Transcription:

Ref No: PO 01 Issue No: 1.0 Issue date: March 2013 INSTITUTION OF RAILWAY SIGNAL ENGINEERS MINOR RAILWAYS SECTION GUIDELINE ON THE BASICS OF KEEPING AND MAINTAINING S & T RECORDS ON MINOR RAILWAYS

March 2013 Page 2 of 7 Issue Date Amendments 1.0 March 2013 Initial Issue Record of Amendments Anyone who wishes to contribute additional items; or correct / amend any of the entries; or wants further information may contact the IRSE Minor Railways Section Document Co-ordinator at mrsdc@irse.org or via the IRSE Headquarters. Any railway seeking to follow the guidelines in this document should ensure that it is suitable for their particular railway concern. Duty holders are reminded that they must be satisfied that they are doing all that is needed under health and safety duties to control risks. Compliance with this guideline issued by the IRSE is not mandatory as it provides advice on how an issue may be addressed.

March 2013 Page 3 of 7 TABLE OF CONTENTS 1 INTRODUCTION... 3 2 DEFINITIONS... 3 3 SAFETY CONSIDERATIONS... 4 4 RECORD KEEPING... 4 4.1 General... 4 4.2 Asset Records... 5 4.3 Task Records... 5 4.4 Log Books & Professional Development... 5 4.5 Record Systems... 6 4.6 Use of Templates... 6 4.7 Application of ROGS... 6 4.8 Installation Testing Records... 6 4.9 Maintenance Records... 7 5 REFERENCES... 7 6 APENDICES... 7 1 INTRODUCTION This document is one of a series prepared for those associated with heritage railways who do not have a direct background in railway S & T engineering. This document describes the background and process for keeping operational records for the maintenance of S & T equipment and systems on minor railways. This is to assist new operations or existing railways with new systems to get started on maintaining and preserving their assets. It is not intended to be a definitive document on how records on S & T equipment should be kept, but to disseminate best practice and advice on getting started with S & T records, collection and storage. The IRSE Minor Railways Section has used its best endeavours to ensure that the contents of this document are factually and technically correct and is suitable for its stated purpose but the IRSE Minor Railways Section cannot be liable for any subsequent use to which the document may be put. 2 DEFINITIONS See also IRSE Guideline document Glossary of terms for Signalling and Telecommunications. Is (are) required May Must RGS S & T Should Used to indicate choices where firmer guidance might be indicated. Used where guidance suggests optional choice. Used only where there is a legal or statutory requirement to the measures being described. Railway Group Standard published by RSSB Signal and Telecommunications Used as the primary verb for statements of guidance.

March 2013 Page 4 of 7 3 SAFETY CONSIDERATIONS None 4 RECORD KEEPING 4.1 General An effective method and system of record keeping is an essential contribution to the Safety Management System for the railway. It is recommended that each record should be retained for the life of the asset or for such time as is determined by the particular railway and stated in the railway s Safety Management documentation. 4.1.1 Why keep records Records are required to: Permanently retain details of the final testing and of any testing carried out during installation. Provide statistics and information on maintenance and testing activities, which could be a base for future maintenance frequency. Inform maintainers and management on the date when an activity was last carried out. Record asset performance, especially for those assets subject to dynamic influences like points. Provide evidence in the event of an inquiry. Provide an input to the safety management system 4.1.2 When should records be completed Records are best completed as soon as the work is done. 4.1.3 How should records be kept Records can be kept in any format to suit the local situation, for example: A loose-leaf book or folder. A record card kept centrally or on site. A computer in the office. A laptop/ tablet/ palmtop carried on the work site. In any convenient format providing it forms or is transferred to form a permanent record. There needs to be a permanent copy. 4.1.4 What should be recorded The railway s records should include details of the installation of all assets, their testing during installation and all testing taking place at commissioning.

March 2013 Page 5 of 7 Records should be kept of any activity carried out on maintenance visits and the results of any testing, adjustment or replacement, carried out and materials used. Records should include full details of any equipment replaced on a maintenance visit, including details of the origin and year of manufacture (if known) if a subsequent user, type, manufacturers name, serial number etc and the Asset Register updated. Records should also be kept for all activities associated with major overhauls. Taken together the records should give a picture of the performance of the equipment over its life. 4.2 Asset Records It is recommended that all assets should be formally recorded on an asset register, which should form part of the Safety Management System for the railway. As a minimum the assets name, location, installation date, type, manufacturers name, serial number history and manufacture date (if known). The asset register should be kept up to date with any change, replacement following maintenance changes or additional assets installed. 4.3 Task Records Each piece of signalling or operational telecommunications equipment, whether it is safety critical or not, should have a set of defined maintenance tasks required to be carried out on a maintenance visit. The task record may be generic for a particular piece of equipment, which is installed in more than one location like a point machine or Signal Post Telephone, or specific to detail a particular location. The task information can be combined with a check list and is dated and signed may form the basis or the maintenance records. 4.3.1 Pocket Books All individuals carrying out installation or maintenance on safety critical equipment should carry a pocket book in which all the individuals activities are noted. As a minimum the following should be recorded: the date, the task, the location, faults found, action to restore and the names of those attending. At the simplest level of record system or on smaller systems, the pocket book can be retained by the railway as a permanent record for the Safety Management System and no further records completed. 4.4 Log Books & Professional Development Logbooks are a useful way to record an individual s education, training, experience and work activity and are a useful tool in continuing professional development. Many proprietary systems such as those for the IRSE Licensing Scheme, the IET or on http://www.pd-how2.org/ but at a simple level a loose-leaf book with the necessary forms and information is sufficient. Both the IRSE and www.goskills.org the sector skills council for the transport industries also have a number of helpful papers on their web sites. Logbooks assist in demonstrating the competence and experience particularly for individuals receiving on the job training and experience under the guidance of more experienced colleagues.

March 2013 Page 6 of 7 4.5 Record Systems At its simplest the record system needs to be a book, a card or a computer record. 4.5.1 Record Book Simple ruled sheets, on the basis of one per asset type or device, on which every maintenance and test activity is recorded each time any activity is carried out. The record book can be kept on site and the contents transferred to a master record on a regular basis for the permanent record. 4.5.2 Record Card/ Index Card A ruled or template form card on which the information required is entered. A number of examples exist and information on these is available from the IRSE Minor Railways Section Document Controller at mrsdc@irse.org. 4.5.3 Spreadsheet A spreadsheet can be used to record the information, using a laptop, tablet or palmtop on site or on return to the maintenance base. 4.5.4 Database On larger systems a database can be used to record the information allowing more sophisticated analysis to be carried out using information gathered on site visits and transferred to the database. 4.6 Use of Templates Pre prepared templates for the production of the blank sheets, charts and record cards simplifies work on site making sure the correct data is collected every visit. 4.7 Application of ROGS The ROGS Regulations affect all safety critical activity on the railway including signalling and telecommunications. 4.8 Installation Testing Records Testing records should be compiled as and when the installation progresses. Each stage of testing must be recorded and signed off against the test plan by the testers. These records should be included with the as built drawings to form the completion hand-over documentation sometimes called the Test Certificate and Test Copies. This data on the systems and equipment will form the core information for the preparation of asset and maintenance records. On completion of the work all the records should be completed to reflect the new and changed assets.

March 2013 Page 7 of 7 4.9 Maintenance Records Use of the techniques described will allow the railway to build up useful data over the early years of the use of the system to be fed back into refining the maintenance periods and activities to provide cost, and resource, effective maintenance. As a minimum the following items are recorded: Date of the test What was tested Condition of the equipment, including batteries if fitted. Who made the test What was replaced or adjusted 5 REFERENCES RSSB Railway Group Standards see www.rgsonline.co.uk IRSE Publications IRSE Licensing at http://www.irselicensing.org/ RSPGs and RSPs Issued by the Office of Rail Regulation see www.rail-reg.gov.uk Railway safety principles and guidance Part 1 (1996) (HSE 1996) Railway Safety Publication 4; Safety critical tasks - Clarification of ROGS regulations requirements, (ORR 2007) Railway Safety Publication 5; Guidance on minor railways, (ORR 2007) GoSkills Sector Skills Council for passenger transport http://www.goskills.org/ 6 APENDICES None (End of document)