1 MERGING N ITS PROEURES IN QSR SOFTWRE lare Tagg Tagg Oram Partnership bstract QSR have provided tools for combining NU*IST or NVivo projects. These tools appear to offer team research projects the option to develop work separately and combine it for cross-analysis. lthough the tools are easy to use, effective use imposes some limitations on the use of QSR software. This paper discusses four strategies for using effectively in team research. Introduction Qualitative software is often seen as an important tool in managing large team-based qualitative research projects. QSR provide a tool specifically for projects involving more than one person. This paper examines the procedures involved in using the tool in team research. It is based on the author's experience of providing consultancy support to many varied team research projects using QSR software. Unfortunately, none of the QSR range of software is multi-user. The software expects all the data for a piece of research to be kept in a single 'project'; actually a collection of interrelated files in a folder. This project can only be accessed by one person at a time even if the project is on a local area network. Moreover, many team projects involve researchers working at different locations either because they are out in the field collecting data or because a number of institutions are collaborating. To solve this problem, QSR have produced software for both the NU*IST range (N4/N5/N6) and NVivo. This software basically takes two separate projects and produces a new, combined project. More than two projects can be merged by repeatedly running the program. This allows individuals to work on their own project and use to combine their work. QSR Software The software has no innate knowledge of the projects; it just combines them by following a set of rules. In general, objects (eg documents or nodes) in the project that are deemed by the software to be the same are combined and objects which are different are just copied to the resulting project. So if there is a node in each project with the same name and address, this node will be in the combined project with all the coding from both projects. The manuals for the software (only on the -ROM for NU*IST merge) provide extremely thorough descriptions of the merge rules and advice on how to use the products. The two projects must be of the same type before merging; it is not possible to merge a NU*IST project with an NVivo project without converting the NU*IST project to NVivo first. However, N4, N5 and N6 projects may all be merged with each other without conversion. The rules used for merging, and the amount of information provided by the software on the process, vary between the two products. NU*IST is provided free with the software (it is actually on the -ROM but requires separate installation). It also allows N4 projects to be translated between Mac and P. The program provides no options or interaction during use. You simply specify the two projects to be merged and a location for the result and click. ocuments are merged if they have the same name, same number of text units and their sections fall in the same place. The text in the text units does not have 1
2 to be the same; the text for the document in the combined project is taken from the first project specified. oding for matched documents is combined additively from both projects. Unmatched documents from both projects are just copied into the combined project complete with coding; names of documents from the second project are adjusted if they clash with documents in the first project. Nodes are merged if they have the same address regardless of their name. The name and description of matched nodes is taken from the first project and coding is taken from both projects. Unmatched nodes from both projects are copied complete with coding to the combined project. While matching on node address makes allowance for typos in node names and other discrepancies it can, however, mean that completely different nodes risk getting merged. This is particularly dangerous for free and search nodes. for NVivo is a much more sophisticated program released as a separate package in September Merging NVivo projects is technically more complex because of the many more different types of data in a project and the software recognises this by providing an alignment step. uring this step the two projects are compared and an aligned project is produced. for NVivo signals that the two projects being merged do not have the same status and calls them the and uxiliary (these behave in a similar way to the first and second projects in NU*IST ). In alignment, it is the uxiliary project that is converted into an aligned form. s with NU*IST the project is not altered but a new project is produced. for NVivo may be stopped at this point and the aligned project saved for investigation, or it can be merged with the project to form a new project. The dialogue also allows this new project to be merged with further projects making it very straightforward to merge many projects. uring the alignment of NVivo projects the user can decide what action should be taken regarding objects in the two projects that nearly match (skip the object, rename/relocate the object or abandon the alignment). summary and detailed log is produced of the alignment process. for NVivo considers all aspects of an NVivo project (team members, documents including memos, nodes including coding, attributes, sets, doclinks, nodelinks, internal databites, external databites and models). The rules and level of merging vary but the combined project always contains all items from the project and some from the uxiliary project. s with NU*IST the program has rules for each type of object which depend on whether objects are deemed to match, but the matching rules are different and more complex. differences are that documents only match if the number of characters, paragraphs, in-text links and internal databites are the same. Nodes only match if they have the same full name and address (tree nodes only). Search nodes are treated as a special case; descriptions also have to be the same for nodes to match. These rules mean that it is far less likely that nodes representing completely different ideas are unintentionally merged but they do have the consequence that a misplaced space in a node name, for example, will prevent two similar nodes being merged. oth programs are easy to run but difficult to use because it is hard to ensure that the right objects match. The ease with which documents may be changed, particularly in NVivo, means that it is very possible for a document in two projects that started off the same to become different. Similarly two researchers may start off with the same node tree but will want to add and move nodes as they code and the trees will become different. In NU*IST there is the danger that the two researchers will have nodes with the same address but completely different meanings. In for NVivo, the problem is that even if the two researchers discuss their new nodes and agree on addresses and names for them it will be very easy for the names to be slightly different and so not match. The very facilities that give QSR software its power in qualitative research make it difficult to merge projects. oth versions of are easy to use and are essential tools for those using QSR software in team research. for NVivo is more sophisticated but in the main this is necessary because of its technical complexity. lthough the alignment tool provides some useful information it does not tell you why things do not match when you think they should. For example, if two documents have the same name but do not match and you think they should, you probably want to know exactly where 2
3 they differ so that you can manually make them the same. Unfortunately the alignment log only tells you that the character count is different. Strategies for using QSR uring work with teams using software a number of strategies have evolved that can be adopted to alleviate these problems. The choice depends on the type of research being undertaken and the nature of the teamwork. In practice, projects often use a combination of strategies or variations on a general approach, but for simplicity the following four strategies are described separately. The first two strategies apply where a project is being undertaken by a team because it is either too large or has to be done too quickly for one person to complete it. Typical of these kinds of projects are evaluations across multiple sites or the analysis of responses to time-critical consultation exercises. The other two strategies apply where there are essentially several pieces of research being undertaken but some cross analysis is also required. ase study based projects often fall into this category where different institutions are undertaking self-contained studies but the research design calls for some cross-case analysis towards the end of the research. There are also projects where the same data is being analysed from a variety of perspectives by different researchers. The first strategy, one master project with separate data collectors, is appropriate for a large project involving many field workers. This approach has been used on a substantial evaluation of legal reform that involved interviews with stakeholders in different parts of the country and separate field worker responsible for each area. The documents were collected and imported by each field worker into their own auxiliary project. These were periodically merged into the master project where the major analysis was undertaken. Field Worker 1 Field Worker 1 E F nalysis & further coding E F G N4 H N4 Field Worker 2 Field Worker 2 G H ocument Node Figure 1: project with separate data collectors This strategy means that when merging occurs there are no matching of documents. In this type of project it can be very helpful if field workers also input attribute values (base data coding in NU*IST) and possibly do some initial coding. For this to merge properly the node tree and attributes must be defined the same way in each auxiliary project. N6 provides a task constructor for 3
4 this, but the easiest way in all other versions is to create a template project, which is copied to form the basis of each auxiliary project and the master project. If appropriate, field workers can be given their own part of the tree where they can develop nodes during their coding. These nodes can form the basis for discussion during the periodic merge. fter merging it is important that either each field worker is given an empty auxiliary project to work on or at the next merge the auxiliary projects are merged into an empty master project. If this precaution is not taken, it is likely that the field workers will alter either coding or documents that have already been merged and these changes will conflict when merging is repeated. One of the problems with the above strategy is that each researcher cannot use the power of the software to develop nodes and a node structure as they code, it has to be predefined. This is particularly problematic when multiple researchers are being used because time is short. In this situation there is generally insufficient time to develop a mature coding structure by negotiation. n alternative strategy that can work well is one master project with separate coders each coding parts of all documents. oder 1 oder oding on oder 2 oder opy and delete buckets 2 oding on oder 3 oder 3 oding on 1 ocument 3 dd attributes to master Node ttributes or ase data nodes Figure 2: project with separate coders The easiest way to set this up is for all documents to be imported and coded to 'bucket' nodes. bucket is a broad area of interest in the research; typically there will be between 5 and 15 bucket nodes. This initial bucket coding can either be undertaken by one person or can be done as part of document preparation by inserting codes into the text. Text searching or section coding can be used to automatically code to the bucket nodes. n auxiliary project is created for each researcher containing all documents but only one of the bucket nodes (by copying the project and deleting the unwanted items). This researcher can then 'code on' from this node and develop a series of nodes based on a refinement of the bucket node. The coded auxiliary projects are merged into a master that contains all the documents and attributes or base data coding. Full investigations can be undertaken on the merged project but investigations within the scope of a bucket can be undertaken on the auxiliary projects. When coding, researchers 4
5 have complete freedom to develop the coding hierarchy within the bucket node but must not amend or annotate documents otherwise the documents will not match on merging. It is simplest to organise this approach if document collection occurs before coding starts but it is possible to combine this with incremental document import. This strategy has the advantage that one person sees the full range of documents but can only be used where the research question is such that a small number of largely discrete bucket codes can be defined up front. project that has used this multiple coder approach effectively involved the evaluation by interview of business processes within an organisation during a large high visibility project. The bucket nodes related to stages of the project and relationships with other organisations and reflected sections in each interview so that bucket coding was automatic. Four people undertook the coding of a group of related buckets but during the coding on, identified additional text relevant to one of the other buckets where it could be coded by the coder for that bucket. This enabled the coding to be completed in a very short time but did involve a complex series of merges and creation of auxiliary projects. The third strategy is much simpler and applies where there are several parallel projects being developed, possibly by different institutions, with a limited amount of cross analysis. Each project develops its own master project covering their case and these master projects are merged for cross analysis. If merging occurs subsequently then a new combined project is created. This approach was adopted for research involving the investigation of interaction and relationships between different health-care bodies. ase 1 ase 1 Further development of case ross analysis Further cross analysis ase 2 ase 2 Further development of case ocument Node ttributes or ase data nodes Figure 3: Multiple master projects for separate cases To facilitate the cross analysis it is important to agree on project structure (eg naming conventions for documents and nodes) so that unlike objects do not get merged accidentally (particularly likely in NU*IST ). It is also helpful to agree on areas where cross analysis is likely to be required. This particularly applies to attribute names and values (or base data coding) but may also apply to some nodes as well. In fact discussion of these issues early in the life of the project can be very 5
6 helpful in shaping the research and providing some unity of purpose. Without these kind of initial discussions and agreements it is unlikely that merging the projects will produce many insights. The final strategy is similar but is useful where the whole dataset is being used for multiple purposes, perhaps by researchers working in different disciplines, but there is a possibility that some cross analysis may be undertaken. typical project involves the investigation by two researchers from different disciplines of the relationships between two groups of professionals working in government departments. In this case each researcher is maintaining their own project and developing their own coding structure but the documents appear in both projects. Occasional merging of the two projects will allow them to undertake cross analysis. Focus 1 Focus 1 oding & analysis ataset ross analysis opy Focus 2 Focus 2 oding & analysis ocument ttributes or ase data nodes Figure 4: Multiple master projects with separate foci n agreement on a naming convention for nodes is necessary to ensure that if projects are merged at a later stage no unwanted matching occurs. It is also important that neither researcher alters the documents. This strategy can be achieved by starting with a project containing all the documents and any automatic coding and attribute values, copying it for each researcher. However, if the data is being collected in parallel with analysis, an auxiliary project can be created just containing the new documents with automatic coding. This is merged into each researcher's master project. (In NU*IST it may be simpler to just run a set of command files against each master project.) software may also be used to combine two separate pieces of research and produce some comparative results. This is likely to be difficult because of differences in the coding trees. Probably the easiest way to approach this is to keep the coding trees separate and then use search tools to combine selected nodes. This can easily be achieved by ensuring node addresses in NU*IST or names in NVivo are unique. is also useful for recovering data from backup copies of projects. If a node or document is accidentally deleted from a project, it can be restored from a backup by removing from a copy of the backup all but the missing document or node and running. onclusion 6
7 Using effectively places limitations on the ways in which QSR software may be used. These limitations are necessary if objects are to be matched during merging. Objects need to match if information from two projects is to be compared using the full capabilities of the software. For example, to compare how people at different case study sites talk about an issue, the same node structure needs to be used for that issue for both case studies. To investigate the connections between coding by different researchers looking at alternative perspectives on a research problem, the same documents, coded by each researcher in their own project, need to match. The four strategies outlined above provide examples of how these limitations may be minimised. The choice of strategy will often depend on the nature of the research project and team structure. However, as the diagrams show, managing the procedures for creating and merging projects requires good organisation. The most successful projects appoint a single person to be the guardian of the merging process. This person needs to have good computer skills to be able to move projects between machines, keep track of the many different versions of projects and, in the case of NVivo, ensure that internal and external project names are kept consistent. They also need to be aware of the objectives of the merge process and to check before merging that researchers have heeded the necessary limitations and after merging that the results are as expected. The alignment tool in for NVivo can help with this checking. In conclusion, the software is easy to use and does allow teams to work together using QSR software. However, it is not an easy option and effective use requires careful planning and discipline. multi-user version of the software would be much easier for teams working on a local area network. 7
What is File Management. Methods for Categorizing Data. Viewing Data on a Computer
What is File Management As described earlier, file management is basically the process of designing new folders and assigning files to those folders. The main goal in file management is to have a system
Protecting Business Information With A SharePoint Data Governance Model. TITUS White Paper
Protecting Business Information With A SharePoint Data Governance Model TITUS White Paper Information in this document is subject to change without notice. Complying with all applicable copyright laws
Overview. Benefits for the Business Owner. For more information, refer to Appendix A, Client Data Review.
SHARING QUICKBOOKS DATA WITH YOUR ACCOUNTANT One feature that truly sets QuickBooks apart from other business accounting software is the ease and flexibility of sharing a copy of the data between the business
Using NVivo to Manage Qualitative Data. R e i d Roemmi c h R HS A s s e s s me n t Office A p r i l 6, 2 0 1 5
Using NVivo to Manage Qualitative Data R e i d Roemmi c h R HS A s s e s s me n t Office A p r i l 6, 2 0 1 5 Introductions Please share: Your name Department Position and brief description of what you
Data Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: [email protected] Overview: The Data and Communications Company (DCC) is required
QaTraq Pro Scripts Manual - Professional Test Scripts Module for QaTraq. QaTraq Pro Scripts. Professional Test Scripts Module for QaTraq
QaTraq Pro Scripts Professional Test Scripts Module for QaTraq QaTraq Professional Modules QaTraq Professional Modules are a range of plug in modules designed to give you even more visibility and control
Backup Assistant. User Guide. NEC NEC Unified Solutions, Inc. March 2008 NDA-30282, Revision 6
Backup Assistant User Guide NEC NEC Unified Solutions, Inc. March 2008 NDA-30282, Revision 6 Liability Disclaimer NEC Unified Solutions, Inc. reserves the right to change the specifications, functions,
CONTACT DATABASES IN MICROSOFT OUTLOOK
CONTACT DATABASES IN MICROSOFT OUTLOOK September 2007 A Davton Consulting Whitepaper Microsoft Outlook has become the standard desktop tool for managing business email. This paper shows how Microsoft Outlook
Sharing Data with Your Accountant or Your Client
Chapter 15 Sharing Data with Your Accountant or Your Client Sharing QuickBooks Data QuickBooks File Types Data Sharing for the Business Owner Data Sharing for the Accountant 412 Chapter 15 Sharing Data
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value
File Management Windows
File Management Windows : Explorer Navigating the Windows File Structure 1. The Windows Explorer can be opened from the Start Button, Programs menu and clicking on the Windows Explorer application OR by
Search help. More on Office.com: images templates
Page 1 of 14 Access 2010 Home > Access 2010 Help and How-to > Getting started Search help More on Office.com: images templates Access 2010: database tasks Here are some basic database tasks that you can
The Real Challenges of Configuration Management
The Real Challenges of Configuration Management McCabe & Associates Table of Contents The Real Challenges of CM 3 Introduction 3 Parallel Development 3 Maintaining Multiple Releases 3 Rapid Development
BlueJ Teamwork Tutorial
BlueJ Teamwork Tutorial Version 2.0 for BlueJ Version 2.5.0 (and 2.2.x) Bruce Quig, Davin McCall School of Engineering & IT, Deakin University Contents 1 OVERVIEW... 3 2 SETTING UP A REPOSITORY... 3 3
PROCEDURE Police Staff Discipline. Number: C 0901 Date Published: 9 May 2013
1.0 Summary of Changes Amendments to the 1 st bullet point of section 4.5 and the 3 rd, 4 th, 6 th and 7 th bullet point in section 4.8 have been made. Section 4.9 has been removed as the content is now
Configuration Manager
After you have installed Unified Intelligent Contact Management (Unified ICM) and have it running, use the to view and update the configuration information in the Unified ICM database. The configuration
UNSOLICITED PROPOSALS
UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY
USAGE OF NVIVO SOFTWARE FOR QUALITATIVE DATA ANALYSIS
USAGE OF NVIVO SOFTWARE FOR QUALITATIVE DATA ANALYSIS Muhammad Azeem Assessment Expert, PEAS University of Education, Lahore PAKISTAN [email protected] Naseer Ahmad Salfi Doctoral Research Fellow
Autodesk Civil 3D Styles: A Guide to the Fundamentals
AUTODESK CIVIL 3D WHITE PAPER Autodesk Civil 3D Styles: A Guide to the Fundamentals About the Author: Mark Scacco, PE, is the founder and president of Engineered Efficiency, Inc., a technology consulting
CNC Transfer. Operating Manual
Rank Brothers Ltd CNC Transfer Operating Manual Manufactured by: Rank Brothers Ltd 56 High Street, Bottisham, Cambridge CB25 9DA, England Tel: +44 (0)1223 811369 Fax: +44 (0)1223 811441 Website: http://www.rankbrothers.co.uk/
An Introduction To The Web File Manager
An Introduction To The Web File Manager When clients need to use a Web browser to access your FTP site, use the Web File Manager to provide a more reliable, consistent, and inviting interface. Popular
Frequently Asked Questions. RightNow (CRM)
Frequently Asked Questions RightNow (CRM) Table of Contents Table of Contents... 1 A note about privacy:... 2 1. Deployment... 3 What will happen when our team deploys RightNow?... 3 What support will
Data Protection Act 1998. Guidance on the use of cloud computing
Data Protection Act 1998 Guidance on the use of cloud computing Contents Overview... 2 Introduction... 2 What is cloud computing?... 3 Definitions... 3 Deployment models... 4 Service models... 5 Layered
Backup Buddy. Welcome to Backup Buddy! The simplest, friendliest backup application for the Mac.
Backup Buddy Welcome to Backup Buddy! The simplest, friendliest backup application for the Mac. Just like Apple s Time Machine, Backup Buddy will create a chronological archive of your data. But unlike
SYDNEY TRAMWAY MUSEUM CHANGE MANAGEMENT PROCEDURE
CHANGE MANAGEMENT PROCEDURE JUNE 2011February 2015 1. Document Details: Name: SYDNEY TRAMWAY MUSEUM Document Control Record Number STM6012 Version Number: 2.43 Change Management Procedure Document Status:
Using NVivo for Qualitative Data Analysis
Using NVivo for Qualitative Data Analysis 2011-2012 This document covers the basic features of NVivo. NVivo is a comprehensive qualitative data analysis software package. The software can be used to organize
SharePoint. Site Owner s Manual. Please send feedback or suggestions for updates to the following email address [email protected].
SharePoint Site Owner s Manual Please send feedback or suggestions for updates to the following email address [email protected] London School of Economics & Political Science lse.ac.uk/imt/training
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire
Qualification Specification
BCS Level 2 Certificate in IT User Skills (ECDL Core) Version 1.0 December 2015. Contents 1. About BCS 3 2. Equal Opportunities 3 3. Introduction to the qualification 4 3.1 Qualification summary 4 3.2
Atlas.ti Basic Training Qualitative Research QR II, 2006/2007 K. Fritz
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike License. Your use of this material constitutes acceptance of that license and the conditions of use of materials on this
Using Email templates and Quick Parts to deal with common queries
Using Email templates and Quick Parts to deal with common queries In this document you will find instructions to help you 1) create and use email templates; and 2) embed previously stored answers which
INLAND GPS. Installing and Using PIM Backup on Trimble TSC2 / Survey Controller
TECHNICAL TIPS from INLAND GPS Installing and Using PIM Backup on Trimble TSC2 / Survey Controller This Technical Tip provides instructions for installing and using the free PIM Backup program on a Trimble
Bocada White Paper Series: Improving Backup and Recovery Success with Bocada Enterprise. Benefits of Backup Policy Management
Bocada White Paper Series: Improving Backup and Recovery Success with Bocada Enterprise Why Policy Management Matters... 3 Data Protection Service Management: An Overview... 3 Policy Management s Role
Installing and Activating Smaart 7
Rational Acoustics, LLC 241 Church Street, Suite H Putnam, CT 06260 USA Tel. (+1) 860 928-7828 www.rationalacoustics.com Installing and Activating Smaart 7 Installation of Rational Acoustics Smaart 7 is
Welsh Government. Practice Guide. Realising the potential of pre-application discussions
Welsh Government Practice Guide Realising the potential of pre-application discussions May 2012 Digital ISBN 978 0 7504 7623 2 Crown Copyright 2012 WG 15424 (2) Table of contents 1 Introduction...3 Background...3
Portfolio Management 101:
THOUGHT LEADERSHIP WHITE PAPER In partnership with Portfolio Management 101: Moving from Just Project Management to True PPM A lot of organizations claim that they carry out project & portfolio management
Programming in Access VBA
PART I Programming in Access VBA In this part, you will learn all about how Visual Basic for Applications (VBA) works for Access 2010. A number of new VBA features have been incorporated into the 2010
Create a New Database in Access 2010
Create a New Database in Access 2010 Table of Contents OVERVIEW... 1 CREATING A DATABASE... 1 ADDING TO A DATABASE... 2 CREATE A DATABASE BY USING A TEMPLATE... 2 CREATE A DATABASE WITHOUT USING A TEMPLATE...
Data Storage And Backup
Data Storage And Backup The availability of Superfast Broadband enables you to take advantage of a range of cloud-based storage and backup solutions capable of handling vast volumes of digital data. Data
Near-Instant Oracle Cloning with Syncsort AdvancedClient Technologies White Paper
Near-Instant Oracle Cloning with Syncsort AdvancedClient Technologies White Paper bex30102507wpor Near-Instant Oracle Cloning with Syncsort AdvancedClient Technologies Introduction Are you a database administrator
Social impact assessment. Guideline to preparing a social impact management plan
Social impact assessment Guideline to preparing a social impact management plan September 2010 Looking forward. Delivering now. The Department of Infrastructure and Planning leads a coordinated Queensland
1-04-10 Configuration Management: An Object-Based Method Barbara Dumas
1-04-10 Configuration Management: An Object-Based Method Barbara Dumas Payoff Configuration management (CM) helps an organization maintain an inventory of its software assets. In traditional CM systems,
Higher National Unit specification. General information. Software Development: Analysis and Design (SCQF level 7) Unit code: HA4C 34.
Higher National Unit specification General information Unit code: HA4C 34 Superclass: CB Publication date: January 2016 Source: Scottish Qualifications Authority Version: 02 Unit purpose The purpose of
Quorum Privacy Policy
Quorum Privacy Policy Quorum Analytics Inc. ( Quorum") has created this website (the "Website" or the "Site") to provide an online analytical tool that Subscribers can use to generate Derived Analytics
EndNote Cite While You Write FAQs
IOE Library Guide EndNote Cite While You Write FAQs We have compiled a list of the more frequently asked questions and answers about citing your references in Word and working with EndNote libraries (desktop
Clinical Risk Management: Agile Development Implementation Guidance
Document filename: Directorate / Programme Document Reference NPFIT-FNT-TO-TOCLNSA-1306.02 CRM Agile Development Implementation Guidance v1.0 Solution Design Standards and Assurance Project Clinical Risk
What's new in Word 2010
What's new in Word 2010 Applies to: Microsoft Word 2010 Microsoft Word 2010 makes it easier to collaborate and to navigate through long documents. For more impact, new features focus on the polish of your
Enterprise Interface User Guide
Enterprise Interface User Guide http://www.scientia.com Email: [email protected] Ref: 3094 ISO 9001:2000 / TickIT certified Copyright Scientia Ltd 2010 This document is the exclusive property of Scientia
SONA SYSTEMS RESEARCHER DOCUMENTATION
SONA SYSTEMS RESEARCHER DOCUMENTATION Introduction Sona Systems is used for the scheduling and management of research participants and the studies they participate in. Participants, researchers, principal
Multi-user Collaboration with Autodesk Revit Worksharing
AUTODESK REVIT WHITE PAPER Multi-user Collaboration with Autodesk Revit Worksharing Contents Contents... 1 Autodesk Revit Worksharing... 2 Starting Your First Multi-user Project... 2 Autodesk Revit Worksets...
Infor SyteLine Sales/CRM User Guide
Infor SyteLine Sales/CRM User Guide Copyright 2013 Infor Important Notices The material contained in this publication (including any supplementary information) constitutes and contains confidential and
P3M3 Portfolio Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Portfolio Management Self-Assessment P3M3 is a registered trade mark of AXELOS Limited Contents Introduction
What's a backup cycle?
In part three of our series on working with Macrium Reflect, we look at scheduling full, incremental and differential images as part of a regular backup cycle (this tutorial also applies to full, incremental
Appendix 10: Improving the customer experience
Appendix 10: Improving the customer experience Scottish Water is committed to delivering leading customer service to all of our customers. This means we deliver the following activities: We will ensure
Chapter 25 Backup and Restore
System 800xA Training Chapter 25 Backup and Restore TABLE OF CONTENTS Chapter 25 Backup and Restore... 1 25.1 General Information... 2 25.1.1 Objectives... 2 25.1.2 Legend... 2 25.1.3 Reference Documentation...
Using NVivo and EndNote For Literature Reviews A/Prof Linda Sweet
Using NVivo and EndNote For Literature Reviews A/Prof Linda Sweet Produced by Flinders University Centre for Educational ICT Table of Contents Objectives... 1 Chapter 1: Introduction... 2 What is NVivo
Data Management Procedures
Data Management Procedures Introduction... 166 Data management at the National Centre... 167 Data cleaning by the international contractor... 170 Final review of the data... 172 Next steps in preparing
Business Continuity Planning and Disaster Recovery Planning
4 Business Continuity Planning and Disaster Recovery Planning Basic Concepts 1. Business Continuity Management: Business Continuity means maintaining the uninterrupted availability of all key business
A Multi-Agent Approach to a Distributed Schedule Management System
UDC 001.81: 681.3 A Multi-Agent Approach to a Distributed Schedule Management System VYuji Wada VMasatoshi Shiouchi VYuji Takada (Manuscript received June 11,1997) More and more people are engaging in
Using Windows XP and File Management Handout (Staff)
Using Windows XP and File Management Handout (Staff) The XP Interface Logging on to your computer. Logging in on campus. Analogy of a safe. Login screen Domains - FFLDU, Fairfield, Local Machine, Prep
File Management and File Storage
File Management and File Storage http://training.usask.ca Information Technology Services Division Table of Contents File Management at the University of Saskatchewan...3 Introduction...3 Creating Files
ELEPHANT. Serviced Offices. The 116 Group Limited Telephone: 0203 3713333
ELEPHANT In Serviced Offices The 116 Group Limited Telephone: 0203 3713333 Web: www.wcgl.co.uk Revision 1.9.0 ELEPHANT IN SERVICED OFFICES TABLE OF CONTENTS Elephant in Serviced Offices... 3 Table of contents...
Clickfree Software Frequently Asked Questions (FAQ)
Clickfree Software (FAQ) Last Revised: Nov 2, 2011 Clickfree_backup_software_FAQ_v1.0 Clickfree and the Clickfree logo are trademarks or registered trademarks of Storage Appliance Corporation. Other product
using version control in system administration
LUKE KANIES using version control in system administration Luke Kanies runs Reductive Labs (http://reductivelabs.com), a startup producing OSS software for centralized, automated server administration.
UCINET Quick Start Guide
UCINET Quick Start Guide This guide provides a quick introduction to UCINET. It assumes that the software has been installed with the data in the folder C:\Program Files\Analytic Technologies\Ucinet 6\DataFiles
ONLINE BACKUP MANAGER MS EXCHANGE MAIL LEVEL BACKUP
MS EXCHANGE MAIL LEVEL BACKUP In today s business world, email is a mission critical application. Email is so crucial to every modern company that downtime or lost emails causes lost of productivity and
Contents. Section/Paragraph Description Page Number
- NON CLINICAL NON CLINICAL NON CLINICAL NON CLINICAL NON CLINICAL NON CLINICAL NON CLINICAL NON CLINICA CLINICAL NON CLINICAL - CLINICAL CLINICAL Complaints Policy Incorporating Compliments, Comments,
International Post-Graduate Diploma in Legislative Drafting -IPGDLD
International Post-Graduate Diploma in Legislative Drafting -IPGDLD Introduction Welcome to the International Post-Graduate Diploma in Legislative Drafting. The International Post Graduate Diploma in Legislative
INTEGRATING MICROSOFT DYNAMICS CRM WITH SIMEGO DS3
INTEGRATING MICROSOFT DYNAMICS CRM WITH SIMEGO DS3 Often the most compelling way to introduce yourself to a software product is to try deliver value as soon as possible. Simego DS3 is designed to get you
Information Management Policy
Title Information Management Policy Document ID Director Mark Reynolds Status FINAL Owner Neil McCrirrick Version 1.0 Author Deborah Raven Version Date 26 January 2011 Information Management Policy Crown
RDS Online Backup Suite v5.1 Brick-Level Exchange Backup
Version 5.1.0.5 May 2006 1 Introduction...3 2 How To - Backup Individual Emails...3 2.1 Granting Full Mailbox Access Privileges...3 2.1.1 For one specific mailbox...3 2.1.2 For mailboxes located within
Rentavault Online Backup. MS Exchange Mail Level Backup
Version 5.1 May 2006 1 Introduction... 3 2 How To - Backup Individual Emails... 3 2.1 Granting Full Mailbox Access Privileges... 3 2.1.1 For one specific mailbox... 3 2.1.2 For mailboxes located within
PDF Invoicing. Dispelling the Myths. My suppliers want to send PDF invoices are these the same as electronic invoices?
My suppliers want to send PDF invoices are these the same as electronic invoices? Do PDF invoices provide me with structured data that can be used in my finance application? PDF Invoicing Dispelling the
æ A collection of interrelated and persistent data èusually referred to as the database èdbèè.
CMPT-354-Han-95.3 Lecture Notes September 10, 1995 Chapter 1 Introduction 1.0 Database Management Systems 1. A database management system èdbmsè, or simply a database system èdbsè, consists of æ A collection
Welcome to the QuickStart Guide
QuickStart Guide Welcome to the QuickStart Guide This QuickStart Guide provides the information you need to install and start using Express Software Manager. For more comprehensive help on using Express
Backing Up and Restoring FrontDesk Data Files
Chapter 35 Backing Up and Restoring FrontDesk Data Files FrontDesk v4.1.25 Member List Create a Merge File Create a Mailer File Create a CSV/Excel File Create Report Definition Files 338 343 344 345 346
Best Practices for Trialing the Intronis Cloud Backup and Recovery Solution
Best Practices for Trialing the Intronis Cloud Backup and Recovery Solution Intronis Cloud Backup and Recovery is a file based backup application that allows users to back up their critical data to the
Welcome to the topic on Master Data and Documents.
Welcome to the topic on Master Data and Documents. In this topic, we will look at master data in SAP Business One. After this session you will be able to view a customer record to explain the concept of
Click Home > Junk > Not Junk.
Office 365 (Outlook 2013) Overview of the Junk Email Filter No one likes spam or junk email. The Outlook 2013 Junk Email Filter doesn t stop delivery of junk email messages, but does the next best thing
1 P a g e. User Guide. 0845 456 3103 support.keytime.co.uk
1 P a g e User Guide 2 P a g e Contents Introduction to Client Manager... 4 Configuring Client Manager... 4 Register your Software... 4 Manage Software Updates... 5 Maintain Staff Grades and Charge-out
Umbraco v4 Editors Manual
Umbraco v4 Editors Manual Produced by the Umbraco Community Umbraco // The Friendly CMS Contents 1 Introduction... 3 2 Getting Started with Umbraco... 4 2.1 Logging On... 4 2.2 The Edit Mode Interface...
ESKITP5022 Software Development Level 2 Role
Overview This sub discipline covers the core competencies required to create software to address the needs of business problems and opportunities, resulting in a variety of software solutions, ranging
Project Risk Management
PROJECT ADVISORY Project Risk Management Leadership Series 9 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital programmes, but its content is
Performance audit report. Performance of the contact centre for Work and Income
Performance audit report Performance of the contact centre for Work and Income Office of the Auditor-General Private Box 3928, Wellington Telephone: (04) 917 1500 Facsimile: (04) 917 1549 E-mail: [email protected]
Data Storage and Backup
Data Storage and Backup The availability of Superfast Broadband enables you to take advantage of a range of cloud-based storage and backup solutions capable of handling vast volumes of digital data. www.business.wales.gov.uk/superfastbusinesswales
efolder White Paper: Dedicated File Backup vs. File Sync Backup: 5 Questions MSPs Should Ask to Determine the Best Backup Solution for Their Clients
efolder White Paper: Dedicated File Backup vs. File Sync Backup: 5 Questions MSPs Should Ask to Determine the Best Backup Solution for Their Clients Apri 2015 Introduction One of the most important services
Using NVivo to Analyze Qualitative Data. Anette M. DeNardo, Ed.D. California University of Pennsylvania. Lisa Lopez Levers, Ph.D. Duquesne University
1 Using NVivo to Analyze Qualitative Data Anette M. DeNardo, Ed.D. California University of Pennsylvania Lisa Lopez Levers, Ph.D. Duquesne University Abstract Analyzing data gathered by qualitative means
Introduction to MS WINDOWS XP
Introduction to MS WINDOWS XP Mouse Desktop Windows Applications File handling Introduction to MS Windows XP 2 Table of Contents What is Windows XP?... 3 Windows within Windows... 3 The Desktop... 3 The
UNIVERSITY OF GUELPH PROJECT MANAGEMENT FRAMEWORK
UNIVERSITY OF GUELPH PROJECT MANAGEMENT FRAMEWORK Table of Contents Document Purpose:... 3 What is a Project?... 3 What is not a Project? (e.g. Operational Tasks)... 3 What is Project Management?... 4
Adroit Research NVivo10 Workshop Notes
Adroit Research NVivo10 Workshop Notes GENERAL Create a new project My training project. *nvp file is stored in My Documents (default). Three views navigation, list and detail view. Detail view by default