MEMORANDUM TO: FROM: SUBJECT:



Similar documents
CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN

New Home Construction Packet

SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014

South Carolina Department of Transportation Engineering Directive Memorandum

DESCRIPTION OF WORK:

CITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA (760) Fax: (760) ARTS AND CRAFTS SHOW PERMIT

TREE PERMIT APPLICATION Private Property- Section MBMC COMMUNITY DEVELOPMENT DEPARTMENT

Moving a House in Pasadena

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting

Construction Management Plan (CMP) Application

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

5. Builder/Contractor Guidelines/Work Rules

Guide to Special Events Planning in Downers Grove 1

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Construction Management Plan Template

(3) CATEGORY III means a permanent heliport facility. (4) COMMISSION means the City of Austin Airport Advisory Commission.

Right-of Way Use Permit Application

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

Draft Transportation Management Plan for Via Verdi Repair Project

5. Specific Use Regulations

Request for Proposal for Construction Management Services

APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas Intake Date

PLANNED DEVELOPMENT PERMIT

DEMOLITION PERMIT CHECKLIST* B.H.M.C. Section

Other Fee Master Festival & Special Event Application

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

SECTION SITE PREPARATION

Film Policy Cedar Hill, Texas

City of Beaumont, Texas Grading Permit Information

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

CHAPTER 23 Wireless Communication Facilities

Whistler Village Construction Management Strategy

City of Myrtle Beach Construction Services Department Ph: Fax: Moving Permit Requirements

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

Answers to Commonly Asked Questions

CERTIFICATE OF APPROPRIATENESS APPLICATION INSTRUCTIONS AND CHECK LIST

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILING REQUIREMENTS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS

Washington City Subdivision Development Application Checklist

Minor Accommodation Planning Review Application

Special Event Permit Application Information

Building Permits Permit Counter

NEVADA COUNTY COMMUNITY DEVELOPMENT AGENCY

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Garbage and Debris. Zoning/Use Violations. Tall Grass and Weeds. Vehicle Violations. Recreational Vehicle/Trailer Parking. Property Maintenance

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Construction of 86 Dummer Street: Questions and Answers for Trustman Residents

How To Get A Street Permit In Seattle

City of Valdosta Land Development Regulations. Table of Contents

Definition of Tower from the Bradley County Zoning Resolution

SPECIAL EVENT PERMIT PROCESS GUIDE

ZONING BOARD OF APPEALS SUBMITTAL REQUIREMENTS

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

Sec Vacation Rentals.

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

CITY OF ELBERTON, GEORGIA REQUEST FOR PROPOSAL

ELECTRIC TRANSMISSION LINE CONSTRUCTION STANDARDS AND POLICIES

Activity Yes No N/A Notes

Submit a copy of your license issued by the Department of Social and Health Services.

Longport Farmers Market Vendor Information/ Application Form 2016 Season

Traffic controllers and speed zones

TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

9. Does the County of San Diego keep home plans on file for existing homes?

BUSINESS USE PERMIT APPLICATION

Parrish Park Homeowners Association. Architecture Committee Guidelines for Property & Home Improvements. June 2002

Summary of the Heritage Tree Ordinance Updated July 2013

City of San Ramon Special Event Permit Application

CITY of richmond design ConsIderaTIons for CommerCIal ProPerTIes: recycling and garbage

Trousdale Estates Area Construction. Special Transportation-Related Measures

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

CITY OF NORWALK REPORT TO THE NORWALK PLANNING COMMISSION

PROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS

GOOD NEIGHBOR HANDBOOK

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

Safety Engineering Policy Memorandum

TOWN OF HILLSBOROUGH BUILDING & PLANNING DEPARTMENT DESIGN, CONSTRUCTION AND LANDSCAPE PROFESSIONAL NEWSLETTER Fall Greetings 2013

RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE

Residential Building Permits

Public Works Department Engineering Division-Parking Section

OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

Final Construction Quality Control Plan Non-Public Properties Newhall Street Neighborhood Site Hamden, Connecticut

Transcription:

rmill VALLEY] MEMORANDUM TO: FROM: SUBJECT: For many years, the City ofmill Valley has had a requirement that major new projects submit a "Construction Management Plan" prior to beginning work. One ofthe main purposes ofthe "CMP" has been to help lessen the impacts ofconstruction activities on the surrounding neighborhood, while allowing the project to proceed in a timely and efficient manner. Mill Valley's topography, limited access, historic development patterns and the size and design of new home and major remodeling projects all contribute to making construction a challenge. More and more, we are hearing from Mill Valley residents about the impact ofconstruction on their daily lives and that construction activity has been too disruptive to immediate neighbors and to entire neighborhoods, particularly in areas where parking is limited, streets are narrow and access can be difficult. To address those concerns, the City has recently updated and expanded the scope ofand requirements for Construction Management Plans. The Planning and Building, Public Works, Fire and Police Departments have all contributed to these new requirements in an effort to be more consistent and more comprehensive in addressing potential construction impacts on neighborhoods. The new Construction Management Plan requirements are attached for your information and are now being required on applicable projects. Major revisions to the requirements include: New submittal requirements to be included with the plan set submitted for a Building or Grading Permit Job site informational signage Worker parking requirements Revised delivery and material off-haul hours RECOMMENDATION: Supervising Senior Engineer Tim McSorley from the DepartmentofPublic Works will present the updated CMP requirements and guidelines as a "Presentation" item on Tuesday's agenda. We have sent this information out to all contractors and architects that have applied for building permits with the City. We will also be doing informational mailings to the City's neighborhood 1

associations and a news item for the City's website. This is an informational item. No action by the Planning Commission is necessary. ATTACHMENTS: Attachment 1: Updated Construction Management Plan 2

CONSTRUCTION MANAGEMENT PLANS Any residential or commercial construction project that is subject to the review and approval of the Mill Valley Planning Commission or the Mill Valley Zoning Administrator, or in the determination of the Director of Public Works, Planning and Building Director or Building Official is of a size, scope of work or is located in area where there may be a concentration of development activity occurring at the same time shall be required to prepare a Construction Management Plan (CMP). The CMP shall be submitted as part of the application for a Building or Grading Permit and shall be subject to the review and approval by the Department of Public Works, Planning and Building Department, Mill Valley Fire Department and the Mill Valley Police Department, as may be necessary, prior to the issuance of any permit for the project. The CMP shall be provided on a 24 inch by 36 inch sheet (see attached example) and submitted to the City for review as part of the permit application. TheCMP shall include the following information: 1. Schedule: The applicant shall provide a project schedule. The schedule shall provide at a minimum, the following tasks : Mobilization Demolition Grading, Drainage and Erosion Control Facilities Foundation Rough Framing Landscaping (including tree and existing vegetation preservation) Completion/Occupancy All tasks shall be shown with start and end dates and displayed on a time-based chart such as a GANTI chart. The project schedule shall also show task dependencies and include the Critical Path. 2. Job Site. Facilities. and Storage: The CMP shall include the location(s) on the project site of all loading/unloading areas, job box and material storage areas, toilet(s), dumpsters and on-site temporary power pole, and protective fencing around the job site and any trees and vegetation to be preserved. These and any other construction related facilities shall not be in the public right-of-way without the prior approval of the Department of Public Works.... The fee for using the public right-of-way for storage of construction

City ofmill Valley Construction Management Requiremenis (As of September 15,2013) materials or equipment is $10.00 per space per day in residential areas, and $20.00 per day in commercial areas. A minimum of 11 feet of clearance shall be maintained at all times along the roadway. Portable toilets and job sheds shall not be permitted to be placed in the pubtlc right-of-way without prior approval of the Department of Public Works. 2. Traffic Control Plan Managing project-related traffic is an essential element of the Construction Management Plan. The primary goal of the Traffic Control Plan is to ensure that adequate and appropriate emergency response through the project site is maintained at all times. Additional goals of the TCP include minimizing disruptions to the neighborhood and preventing damage to City Streets. The three basic elements of the TCP are outlined below: a. Delivery Truck Route: The CMP shall identify the path of travel for delivery trucks to and from the project site. This travel path shall be shown starting from and returning to the City's designated truck route. All project sites not on a "through" road must provide for a "turn-around" area for delivery trucks. If no such area exists on the project site, written permission for a turn-around from a neighboring property must be obtained before any deliveries are made. Deliveries are restricted to certain times, please see below for additional information. b. Parking: All on and off-site worker parking locations shall be identified, including any carpool pick-up and drop-off locations. Worker parking shall be consistent with the approved project schedule. c. Road Closures Road closures shall only be permitted by the Department of Public Works (DPW). See below for details. CONTACT INFORMATION AND POSTING OF THE CONSTRUCTION MANAGEMENT PLAN: A 24 inch by 36 inch weatherproof copy of the approved Construction Management Plan shall be posted on the site as part of a job site sign and located so as to be clearly readable from the public right-of-way. In addition to the approved Construction Management Plan, the sign shall include the follow~ng information : Address of the project site. Permitted hours of construction and of deliveries/off-haul. Name, e-mail address and direct phone number of the General Contractor. Name, e-mail address and direct phone number of the person responsible for managing the project. Name and direct phone number of the party to call in case of an emergency. City of Mill Valley Code Enforcement Officer (415-389-4203). 2

City ofmill Valley Construction Management Requirements (As of September 15,2013) PRE-CONSTRUCTION MEETING: A pre-construction meeting shall be required prior to the start of any site work and/or the issuance of a Building or Grading Permit. Scheduling ttie meeting shall be the responsibility of the project applicant. Required attendance shall be City staff, the property owner, general contractor and all sub-contractors. The purpose of the meeting will be to review the CMP and all other construction management requirements..the required CMP sign shall be available for review by the City at the pre-construction meeting. CONSTRUCTION MANAGEMENT REQUIREMENTS: In addition to the items above, all projects are subject to the followin'g requirements throughout the duration of the project: CONSTRUCTION HOURS are weekdays from 7:00 AM to 6:00 PM. Construction noise is not allowed before 8 AM or after 5 PM. DELIVERIES AND OFF-HAUL (including equipment, materials, removal of soil, refuse or demolition debris) for sites in Impacted Neighborhoods is limited to weekdays between the hours of 9:30 AM and 3 PM. Current Impacted neighborhoods include any projects located on Lovell Avenue and Hillside Ave*. Other sites, such as sites near schools and school routes, may also be limited to this time frame. Deliveries at all other sites.shall be limited to weekdays between the hours of 8:00 AM and 5:00 PM. All drivers shall be advised of the designated project truck route, including approved tum around locations, prior to any deliveries or material removal. * Impacted neighborhoods are subject to change dependi(1g on amount and type ofprojects occurring within the City. LARGE TRUCKS which may have difficulty reaching job sites due to narrow and 'twisting streets may be accommodated through a temporary road closure as provided below. There have been reported instances 'of property damage, resident delays and inconvenience and even large trucks becoming stuck en route to job sites. All drivers shall be advised of the potential for limited access along the designated TRUCK ROUTE and that the City, with 24-hours advanced notice, will provide traffic control and assistance in reaching the job site safely. If the truck is too large and requires the closure of.the road in order to reach the site, then the procedures for ROAD CLOSURES shall be followed. ROAD CLOSURES shall only be permitted by the Department of Public Works (DPW). Applicants shall apply to DPW well enough in advance to process the request. Applicant shall provide a minimum of 48 hours notice in advance of the proposed date of closure to the affected property owners. Notice shall include date(s) and duration of proposed closure, the traffic control plan as well as any 3

City ofmill Valley Construction Management Requirements (As ofseptember 15,2013) detours that may be available. Evidence of such written notification to affected residents and property owners shall be provided to DPW. VEHICLE PARKING in the public right-of-way at or near the job site shall require a parking placard from the Mill Valley Police. The placard shall include: the project address; project placard number (for example, #2 of 3 placards); and the signature of the Police Chief or his/her designee. Depending on the site and/or the scope of work, the City may limit the number of placards to the project prior to lssulnq a Building Permit. ENFORCEMENT: It shall be the responsibility of the project applicant or their designated representative to advise the City of any modifications to the CMP, to notify the neighboring property owners of modifications to the CMP and to post any modifications of the CMP on the job site sign. Violations of any portion of the approved Construction Management Plan or other applicable construction management requirement may result in a "Stop Work" order. The "Stop Work" order will be lifted only after the City has sufficient assurance that the repeated violations will cease through the remainder of the project. 4