Council Strategy DOC/15/86752



Similar documents
Attachment 1. Drainage. Service-Driven Asset Management Plan Drainage Service-Driven Asset Management Plan Page 0

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

Summary: Introduction

Planning for Casey s Community

APPENDIX 1 Floodplain Management Strategies & Guidelines

Objective 4: Enhanced community education, flood awareness and preparedness

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Integrated Local Flood Management and Drainage Strategy OVERVIEW

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy

Council Policy. This Policy assists in the implementation of the Council Plan Revised 2010, in particular Strategy 3.1.

Asset Management Policy

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

Managing stormwater flooding risks in Melbourne

INTEGRATED WATER FOR CASEY CLYDE

Sustainable Drainage Systems (SUDS) A guide for developers

A Developer s Guide: Watershed-Wise Development

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Bolton s Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

Water Security Action Plan

Recommendations for future developments

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

5.14 Floodplains and Drainage/Hydrology

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

How To Amend A Stormwater Ordinance

Planning, Health and Environment Division

The site is Lot 1 DP Survey of this lot and Willarong Road and Koonya Circuit is given in Figure 2.

Basements and Deep Building Construction Policy 2014

Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth

Melbourne, Australia. Melbourne: The city as a catchment approach. The importance of holistic urban water management

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

4.3 Cisterns and Rain Barrels

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Home Drainage & Causes of Basement Flooding. Water

General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage

History of flooding. 12 Flood Management and Drainage Strategy. Riverine flooding

Action plans for hotspot locations - Ash Study

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

London Borough of Croydon Local Flood Risk Management Strategy

Designed and produced by geo-graphicsdesign.com DP 300 3/02

TOWNSVILLE WATER Customer Service Standards

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

WATER MANAGEMENT POLICY

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Melbourne Water Flood Risk Assessment: How flood impacts are assessed in the Port Phillip and Westernport region

Guideline: A risk assessment approach to development assessment in coastal hazard areas

Climate Change and Infrastructure Planning Ahead

Drainage Analysis for the McKownville Area

Storm water strategy of Turku City Citywater Storm water expert meeting Turku

Asset Management Plan

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual

Engineering Major Service Actual Budget Projected Request Executive Adopted

Lansdowne Stormwater UPDATE

Essex County Council Flood Investigation Report

Report Relating to Incidents of Flooding within the Dollar Catchment

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004

Innovative Approaches in Flood Damage Reduction

Flooding in Brisbane

East Riding of Yorkshire Council

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

Guidance Notes: GARDEN FLOODING

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

APPROVAL AMENDMENT HISTORY

COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary

Town of Beaumont. Lot Grading Guidelines

Essential Water. Customer Charter

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Downspout Disconnection Program FAQs

8.7 DRAINAGE MAINTENANCE SERVICES CONTRACT AMENITY JAMES LENIHAN, DRAINAGE MAINTENANCE ENGINEER

Urban greening for a healthier west

ORDINANCE NO

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN

DRAINAGE ASSET MANAGEMENT PLAN

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

Floor level for a house on a flood-prone site

Transcription:

Council Strategy Council strategy title: Council strategy owner: Adopted by: Date adopted: July 2015 Document Reference no: Drainage Upgrade Strategy Director Infrastructure Services Bayside City Council DOC/15/86752 1. Introduction Due to the age of the existing drainage network within Bayside and the lower design standards of the time of construction, much of the underground drainage system performs below current standard and in some locations the performance of the system has a detrimental impact on adjacent properties. When localised flooding occurs, a range of impacts results, from inundation of habitable floors of homes and businesses, to yard flooding to temporary ponding within the streetscape. During the investigation of flooding complaints, it is necessary to assign a category to assist in the prioritisation of drainage upgrade projects arising from incidents of localised flooding. Much of the drainage system that performs below desired capacity cannot be upgraded without significant investment. Although it is neither practical nor affordable to retrofit upgrades to bring all parts of the drainage system up to standards, it is reasonable to treat areas where flooding is demonstrated to have a negative impact on habitable rooms or business premises. Planning for drainage upgrades to address key sites has determined that a program of works to the value of $20.3M (in 2014 dollars) is necessary. An estimated 12.1km (3%) of the network has been identified as under-performing, meaning that there is a current situation where the probability of flooding and the impacts of flooding on public safety and property damage are unacceptable. The 10-year drainage upgrade strategy in Attachment 1 includes 40 projects arising from complaints of flooding occurring during intense rainfall events in 2011 and from drainage capacity assessments undertaken between 2005 and 2009. 2. Objectives & Performance Measures The objectives of the Drainage Upgrade Strategy (DUS) are to: set out a 10 year program of the highest priority drainage upgrade projects (40 in total) that aims to improve the performance standard of the underground pipe network that is under performing at locations known to be susceptible to damage from flooding, with respect to the consequences of public safety and damage to property from flooding. In 10 years, 65% of the known under-performing parts of the network will have been addressed; provide a process for categorising flooding complaints based on the consequences of the flood damage and the likelihood of recurrence (risk assessment); set out an action plan for improvements to Council s Stormwater Management service; and Improve the current level of performance of the drainage system to a desired state where the flooding of habitable floors and business premises is minimised. Page 1

3. Strategic Context The provision of drainage infrastructure is considered a key role of Council in providing a safe and functional built environment for its community. Given the unpredictability of storm events that result in damage from flooding, the provision of adequate drainage is not straight forward and is required to balance the competing objectives of community need (or level of service), cost and risk. Council s role as defined by the Local Government Act 1989 (LGA) is to monitor incidents of flooding and to undertake works and measures to address these incidents. Whereas major outfall structures are within designated flood plans and generally administered by Melbourne Water, Council is directly responsible for the preparation and implementation of drainage networks within those areas outside of the major drainage system. The LGA specifies the functions of Council related to the drainage of roads and prevention and abatement of nuisance. Other relevant legislation includes the Planning and Environment Act 1987, Building Act 1993 and Emergency Management Act 1986. The implementation of the DUS is consistent with the strategic objectives and strategies of the Bayside the Council Plan, particularly: Goal 3 - A liveable city by: Ensuring community assets and infrastructure meet current and expected needs; and Goal 7 - Financial responsibility and good governance by: Creating community value through effective management of resources and finances; and Open and transparent decision making and strong accountability to the community. 4. Bayside s Drainage Network Capacity and Current Design Standards The majority of Bayside s drainage network was constructed between 1940 and 1970. The standards of drainage design during this period were lower than if similar systems were to be implemented today, with much of the underground system being designed for typical, frequent, low intensity storms (a 100% chance of occurrence) and with little consideration of overland flow paths to convey large volumes of runoff during extreme localised rainfall. Current drainage design standards for new developments in Bayside require both the underground pipes and overland flow paths to cater for flows generated by rare, high intensity storms (with a 1% chance of occurrence). The underground pipe network should be designed for a storm event with a 20% chance of occurring in residential areas and a 10% chance of occurring in industrial and commercial areas and roads must convey the remainder of the runoff from the 1% chance storm. If the existing roads and overland flow paths cannot cater for the runoff from the 1% chance storm, the pipes need to be increased to a size where the entire system can cater for such flows. Due to the prohibitive cost and limitations imposed by the capacity of Melbourne Water s drainage system, it is not practical to retrofit upgrades to bring all parts of Bayside s drainage system up to current standards. However, drainage upgrade projects identified either from flooding complaints or capacity assessments can significantly mitigate the impact of flooding in susceptible parts of Bayside s catchments. This Strategy aims to improve the drainage system in known areas where the probability of flooding and the impacts of flooding on public safety and private property are unacceptable. 5. The 10-year drainage upgrade plan A prioritised drainage upgrade program is included in Attachment 1. This list of projects has been developed from investigations of direct flooding complaints and drainage network improvement planning work conducted between 2005 and 2009 which identified critical parts of the network that are under-capacity and locations susceptible to flooding within the municipality. Page 2

Projects listed from investigations of flooding complaints have been assessed on the severity of the flood damage and the number of properties affected and benefitting from the upgrade and the affordability of the works. Although current drainage standards are targeted during the design of these works, the attainment of the desired standard can be prohibitively expensive. In such cases, the highest reasonable level of flood mitigation for that part of the network is delivered. Projects listed on the program from planning for under-capacity parts of the network have been based on the following principles: Catchment locations at major risk of inundation are given a high priority; Properties are given a higher priority if they are subject to inundation on a frequent basis; and Cost effectiveness. In the event that future incidents of flooding result in more drainage upgrade projects being identified, the investigation of these incidents will be conducted in accordance with the category system described below to assign relative priorities to such works based on the consequence of flood damage. 6. A Category System for Assessing Flood Damage Drainage upgrade projects arising from flooding complaints need to be prioritised based on the consequence of the flood event (i.e. the severity of damage or interruption) and the likelihood of recurrence (a risk assessment). A category system for the purposes of differentiating the impacts of flooding and prioritising projects listed in the drainage capital works program is presented below. The following categories must be applied to all assessments of flooding complaints that lead to the listing of projects to the capital works program: Priority Categories Description of flooding consequence 1 A public safety matter 2 3 4 To reduce the risk of flooding of habitable floors of buildings (excluding garages, laundries etc), where the building has relevant town planning and building permits To reduce the risk of flooding to non-habitable floors, private yards, road reserves and parkland To improve amenity issues where there is no damage or loss arising from frequent nuisance drainage issues The assignment of a category to all future flooding complaints will assist in the prioritisation of capital works projects to address future flooding complaints. 7. Alignment with the Drainage DCP Council has recently adopted a 25 year Development Contribution Plan for drainage infrastructure. The project areas identified in the DCP for attracting contributions are derived from the same catchment analysis and drainage network planning discussed in Section 5 above and a number of the projects listed in the 10-year program will attract DCP funding. It is expected that the majority of the projects listed in the drainage upgrade program over the next 10 years will fulfil Council s obligation within the DCP to undertake works within the nexus of the contributing development(s). Once a DCP project listed in the upgrade program is completed, funds collected under the DCP can be refunded to rates. Page 3

8. Stormwater Quality Improvement and Reuse Council is committed to integrating measures to improve the quality of drainage flows to Port Philip bay within the scope of drainage projects wherever possible. Such measures are can take various forms depending on the target contaminant and volume of runoff to be treated and include stormwater detention systems, gross pollutant traps and Water Sensitive Urban Design (WSUD) elements such as rain gardens and infiltration swales. In some locations, there may be potential for stormwater harvesting for reuse purposes, such as irrigation for sports fields. Site specific conditions and the ability for water demand to be met by a sufficient supply of rainwater will be primary determinants of the feasibility of such initiatives. 9. Strategy Actions The drainage upgrade strategy requires the implementation of actions as listed below: 1. Council continues its current allocation and undertakes the attached program of drainage upgrade works, but considers increasing its future allocation to undertake the priority projects should further incidents of flooding occur. Timeframe Short-medium term. Cost within current funding levels of the 4-year capital works program and Long Term Financial Plan. 2. Continues to approach design and the allocation of funding of drainage upgrades that focuses on providing protection to those properties where it has been demonstrated that floor levels are inundated during heavy storms (with a probability of occurrence of 1% or less) and that a critical analysis of possible surface treatments and practical alternatives to ensure maximum benefit is achieved from any funds expended. Timeframe Short-medium term. Cost within current funding levels of the 4-year capital works program and Long Term Financial Plan. 3. Continues to advocate to Melbourne Water to upgrade the capacity of trunk mains that current limit the effectiveness of high priority planned upgrades to local drainage systems Timeframe Short-medium term. Cost Officer time only, no additional costs 4. Undertake negotiations with Melbourne Water and VicRoads to redefine their responsibility for the management of catchment size and trunk main drains. Timeframe medium term Cost Officer time only, no additional costs 5. Incorporate a rolling annual catchment analysis program for the remaining urbanised areas in the municipality, as part of Council s Capital Works design program. Timeframe Short-medium term Cost within current funding levels 6. Investigate the resource requirements of providing an On-site Detention Device (OSD) inspection service and review maintenance and enforcement processes; Timeframe Short-medium term Cost Officer time only, no additional costs 7. Undertake a municipal wide study and development of a (GIS) overlay to protect and enhance overland flow paths. Timeframe Medium term Cost within current funding levels 8. Review progress on and update the 2001 Stormwater Quality Management Plan. Timeframe Medium term Cost within current funding levels Page 4

9. Integrate stormwater quality improvement where possible as part of the design criteria during the implementation of the drainage upgrade program. Timeframe Medium term Cost within current funding levels 10. Assessing Progress & Performance The completion of the strategy actions will demonstrate Council s performance in implementing this strategy. From the community point of view, the long term effectiveness of this strategy will be demonstrated by an improved level of flood immunity for susceptible properties and catchments within the Municipality. 11. Communication Plan Communication with the Bayside community of the implementation of this strategy is based on Project information each year and responses to residents affected by flooding. The improvements to the network will be communicated in annual reports on the Council Plan and strategic resource plan 12. Definitions and Abbreviations Habitable floors The floor space of a dwelling where people cannot comfortably live if damaged by flooding, such as bedrooms, kitchen, lounge room etc Localised Inundation occurring when the rainfall intensity exceeds the capacity of the drainage flooding system at a given location (as different to regional flooding or floodplain inundation) Overland The route that surface flows take when underground drainage pipes are full. flowpaths 13. Related Documents Stormwater Drainage Network Improvement Strategy 2005-2009 MWH Consulting Australian Rainfall & Runoff (1999), Engineers Australia Bayside Development Contribution Plan for Drainage Bayside Planning Scheme Bayside Stormwater Quality Management Plan 2001 Please note: This strategy is current as at the date of approval. Refer to Council s website (www.bayside.vic.gov.au) or staff intranet to ensure this is the latest version. Page 5

10 Year Drainage Upgrade Program Project Suburb 2016/17 Year 1 2017/18 Year 2 2018/19 Year 3 2019/20 Year 4 2020/21 Year 5 2021/22 Year 6 2022/23 Year 7 2023/24 Year 8 2024/25 Year 9 2025/26 Year 10 Seaview Shops (Balcombe Road) New Street drain, Brighton (South Rd) Beaumaris $568,922 Brighton $92,700 Nepean Highway drain Brighton East $154,500 Ardoyne Street drain Black Rock $721,000 Kinane street Drain Brighton $463,500 $2,174,845 Billson Avenue drain Brighton East $218,545 Hanby Street Easement drain Brighton $76,491 William Street Brighton $163,909 Bath Street drain Sandringham $32,782 Cheltenham Recreation Reserve drain (Mackenize Street) Cheltenham $229,473 Were Street drain Brighton $65,564 Champion Street drain Brighton $188,495 North Road drain Brighton $764,909 Victory Street drain Sandringham $218,545 Head Street and Horton Close drain Brighton $2,025,916 $811,492 Page 6

Project Suburb 2016/17 Year 1 2017/18 Year 2 2018/19 Year 3 2019/20 Year 4 2020/21 Year 5 2021/22 Year 6 2022/23 Year 7 2023/24 Year 8 2024/25 Year 9 2025/26 Year 10 Harold Street drain Sandringham $231,855 Wagstaff Court drain Brighton $162,298 Howell Avenue Beaumaris $869,456 Mary Street drain Beaumaris $119,405 west of St Kilda St Brighton $19,494 west of Gillies and Kanowna Sts, Highett Rd & Bamfield St Hampton $872,389 west of Pellew St Sandringham $1,013,725 west of Wentworth Ave Black Rock/ Cheltenham $180,715 west of St Kilda St Brighton $25,099 west of Thomas St Brighton East $943,739 west of and including Hartley and Mair Sts Brighton $35,139 west of Fernhill Rd Sandringham $356,411 south of Balcombe Rd, Balcombe Park Lane and its connections Beaumaris $321,273 west of St Kilda St Brighton $15,059 west of Bluff Rd Sandringham/ Black Rock $70,277 south of Point Ave Beaumaris $15,059 Page 7

Project Suburb 2016/17 Year 1 2017/18 Year 2 2018/19 Year 3 2019/20 Year 4 2020/21 Year 5 2021/22 Year 6 2022/23 Year 7 2023/24 Year 8 2024/25 Year 9 2025/26 Year 10 connections from the Melbourne Water main drain to the fourth pit Melbourne Water main drain connections to the fourth pit west of Surf Ave Hampton $336,082 Brighton East $1,478,759 Black Rock/ Beaumaris $196,479 west of Bluff Rd Hampton $1,949,171 west of New St Brighton $69,233 south of and including Weatherall Rd Black Rock/ Beaumaris $351,063 Dendy St, connections between Kinross St and South Road, connections from Melbourne Water main drain to fourth pit, connections from South and Bluff Rds to fourth pit Brighton East $614,361 west of Fernhill Rd Sandringham $38,397 north of Tulip St Sandringham/ Highett $1,075,133 TOTALS $2,000,622 $2,174,845 $1,958,713 $2,025,916 $2,075,101 $2,025,014 $1,962,770 $2,011,319 $2,018,403 $2,078,954 Page 8