NYC Small Business Services Waterfront Permits Unit



Similar documents
AFTER HURRICANE SANDY: CONSTRUCTION IN FLOOD ZONES AND PROCEDURES FOR REBUILDING

SITE SAFETY LOGISTIC PLAN

GIS Management of NYC's Waterfront Infrastructure. Presented By: Stephen A. Famularo, P.E. Ocean and Coastal Consultants, Inc.

SECTION 15 FLOODPLAIN MANAGEMENT

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

Teller County, Colorado Floodplain Development Permit Application

TITLE XV: LAND USAGE 150. BUILDING CODE 151. FLOOD DAMAGE PREVENTION 153. SUBDIVISION REGULATIONS 154. ZONING CODE

Floodplain Development Land Use Review

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

DESIGNING FOR RESILIENCY: NYC S NEW LOCAL LAWS Version 1: April 8, 2014

1. INTRODUCTION 5. THE PERMIT PROCESS

Chapter 2 PLAN AND PLAT REVIEW PROCESS

Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida

Bureau of Engineering Special Order

Small Business Permit Service

Account Registration and Management

ORDINANCE NO

Raritan Bay and Sandy Hook Bay Highlands, New Jersey Coastal Storm Risk Management Feasibility Study. Appendix B Engineering July 2015

Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs

The Council of the City of New York. Economic Development Corporation

Evaluating the Condition of Seawalls/Bulkheads

INCORPORATED VILLAGE OF OYSTER BAY COVE TOWN OF OYSTER BAY, NASSAU COUNTY, N.Y. OFFICE BUILDING INSPECTOR FEE SCHEDULE

1. GENERAL ADVISORY BASE FLOOD ELEVATION (ABFE) QUESTIONS

Practice Note

TITLE 8 FLOOD DAMAGE PREVENTION

Check Off (Below) Information That Is Submitted With Permit

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

How To Build A Two Hour Firewall In Calgary

1 RCNY CHAPTER 100

CITY OF PITTSBURGH Department of City Planning 200 Ross Street, Pittsburgh, PA (fax)

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

ORDINANCE NO.:

Section 1. The title of Section of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

Philadelphia Insurance Companies Builder s Risk Application

SITE IMPROVEMENT PLANS CHECKLIST

Brevard County Public Works Finance and Contracts Administration

MARINE LIABILITY PRODUCTS

Estimated Cost of Repair

SAN DIEGO UNIFIED PORT DISTRICT GUIDELINES FOR COMPLIANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

Article 20. Nonconformities

APPLICATION FOR LANDLORDS CONSENT TO ALTERATIONS AND LICENCE

Residential Building Permit Process

ORDINANCE NO

Permits for Development within Floodplains

A Guide for the Homeowner/Builder

Description of Underwater Noise Attenuation System Design Unit 4. New NY Bridge Project

SOLAR PV SYSTEMS PERMITTING PROCESS

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

build safe live safe

Electronic Signature and Fee Payment Confirmation

APPLICATION FOR BUILDING PERMIT. Date of Birth: City: State: Zip: City: State: Zip: Asbestos Removal Vacant Non-Residential

MLD: Domestic Maritime Transport Project

HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Town of Surf City Community Development. General Permit Information

MEMORANDUM West Swann Avenue, Suite 225 Tampa, Florida Phone (813) Fax (813)

C. Development Permit Requirement in Flood Hazard Areas

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

FLORIDA BUILDING CODE BUILDING SECTION 3109 PINELLAS GULF BEACHES COASTAL CONSTRUCTION CODE

CC-EVER Exhibit I: Insurance Page I-1 EXHIBIT I INSURANCE REQUIREMENTS

Building Division 360 South County Road Palm Beach, FL (fax) CONSTRUCTION PERMIT APPLICATION

DEMOLITION PERMIT CHECKLIST* B.H.M.C. Section

Summary of Coastal Construction Requirements and Recommendations

Building Permits Permit Counter

City of Vernon REVITALIZATION TAX EXEMPTION BYLAW (CITY CENTRE DISTRICT) BYLAW #5362

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee

Commercial Building Permit Application & Submittal Guidelines

In an effort to improve the city s building permit and inspection processes the building permit fee schedule has been revised and updated.

CASS COUNTY COMMISSION POLICY MANUAL ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

FLOOD DAMAGE PREVENTION ORDINANCE NORTH CAROLINA MODEL

TOWN OF OHIO BUILDING PERMIT APPLICATION

APPLICATION FOR NEW CONSTRUCTION

NEW YORK STATE OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION HISTORIC HOMEOWNERSHIP REHABILITATION TAX CREDIT APPLICATION: PART 1

Uncovered Decks & Porches

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

Contractor Information 2011

SECTION THREE CONSTRUCTION CODES

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF. Amendments to Chapter 9, In General. Chapter 9 of the Orange County

Southwick Conservation Commission

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Safe & Sound Bridge Terminology

Sample Flood Damage Prevention Ordinance

Administrative Procedures Regarding the Application of Flood Damage Prevention

Transcription:

NYC Small Business Services Waterfront Permits Unit DOB Training Presentation - March 2015 Maryam Khabbazian Plan Examiner Officer www.nyc.gov/waterfrontpermits

NYC Small Business Services (SBS) Jurisdiction NYC Charter 1301 (2)(c) SBS Commissioner has exclusive power to enforce with respect to public markets, waterfront property and any structures on waterfront property under its jurisdiction, the labor law and such other laws, rules and regulations as may govern the dredging, filling, removal, construction, alteration, maintenance, use, occupancy, safety, sanitary conditions, mechanical equipment and inspection of structures in the city, and the issuance of permits and certificates of completion in reference thereto, and to establish and amend fees to be charged for the issuance of such permits or certificates of completion, which fees shall be established by the rules of the commissioner.

Administrative Code (AC) 22-116 To improve waterfront property, a permit is required: To place or maintain any building, platform, sign, advertising device or any construction or obstacle of any kind, on waterfront property owned by the City, and on any other private waterfront property when used in conjunction with and in furtherance of waterfront commerce and/or navigation. Before any piles shall be driven, or any filling-in or construction, repairs, alterations, removal, dredging or demolitions of any kind be made on any part of the waterfront.

NYC Construction Code 28-103.1.2 Enforcement of NYC construction codes on property within the jurisdiction of the Department of Small Business Services. This code and the 1968 building code shall apply to property within the jurisdiction of the department of small business services pursuant to the NYC Charter including, but not limited to, structures on waterfront property used in conjunction with and in furtherance of waterfront commerce and/or navigation.

Waterfront Permits Jurisdiction SBS has jurisdiction over all structures on City-owned waterfront property whether devoted to maritime or nonmaritime use, and all structures on privately-owned waterfront property that are devoted to maritime use, such as: piers, docks, bulkheads, and seawalls.

SBS Review and Permit New Buildings and Alterations Maritime Structures: Piers, Docks, Marinas, Bulkheads, Seawalls, Rip Rap Revetments Place of Assembly Cert. of Occupancy (PACO) Temporary Place of Assembly (TPAs) Equipment Use Permits Gas Cards CITY-owned CITY-OWNED Waterfront Property Property City-Owned Facility DOB Review and Permit Central Unit Reviews: Boilers, Elevators, Cranes and Construction Equipment Full Building Demolitions and Major Excavations, Scaffolds, Fences Electrical Work Builders Pavement Plans

SBS Review and Permit Maritime Structures: Piers, Docks, Marinas, Bulkheads, Seawalls, Rip Rap Revetments Waterfront Commerce or Navigation Structures PRIVATELY -OWNED Waterfront Property DOB Review and Permit Non-Maritime Buildings and Structures Place of Assembly Cert. of Occupancy (PACO) Temporary Place of Assembly (TPAs) Central Unit Reviews: Elevators, Boilers, Cranes and Construction Equipment Demolitions and Excavations, Scaffolds, Fences Electrical Work Builders Pavement Plans SBS Jurisdiction DOB Jurisdiction

HOW TO FILE WITH SBS 1- Visit the Online Page www.nyc.gov/waterfrontpermits 2- Fill out the Intake Checklist available online 3- Prepare all Documents, and Fees payable by check to SBS per Fee Schedule 4- Take an Appointment via Link Online (All Intakes by Appointment Only) 5- Large Projects Require Pre-filing Meetings

1- Visit the Online Page www.nyc.gov/waterfrontpermits HOW TO FILE WITH SBS

2- Fill out the Intake Checklist available online APPOINTMENTS SCHEDULING VIA ONLINE LINK PREFILING MEETINGS COORDINATED REVIEWS WITH FDNY & DOB DOB FORMS USED FREQUENTLY SBS FORMS USED SELECTIVELY

3- Fee Schedule Waterfront Applications are Subject to SBS Fee Category III.

Drawings Standards Checklist Includes But Not Limited To: Follow DOB Drawing and Graphic Standards. Submit Three (3) sets, original sealed and signed, to-scale legible drawings, max. size 24 x36. Where FDNY coordinated review is required submit Four (4) sets of which at least Two (2) sets must be 11 x17. Provide Space for SBS Received and Accepted Stamps, minimum 3 x3. Once an SBS # number is provided, note that # on all drawings and documents for that work. Note BIN numbers where available.

Document Order Checklist Includes But Not Limited To: Title/Index Page. List all drawings labelled per DOB Discipline Designator. General Notes. Include TR1 Special Inspections, design parameters, structure durability and service life, berthing vessel information, and linked applications. Include FEMA FIRM 2007 and PFIRM 2013 Panels & Appendix G Analysis. Topographic Surveys, Hydrographic and Bathymetric Surveys in NAVD 88. Include Tide Table illustrating water levels and datum relationships. DOF Block and Lot, and Zoning Maps. Indicate project site, and include Zoning Analyses. Start with Site Plans: existing, demolition, excavation limits, boring plans and logs, proposed work, location of construction crane barges, silt curtains and booms, location of proposed berthing vessels. Follow with Architectural, Structural, Mechanical, NYCECC drawings and Schedules. Cross-refer longitudinal and latitudinal sections. File Fire Protection/Suppression work separately as linked applications.

Notes and Certifications Checklist Includes But Not Limited To: Flood Zone and Appendix G Compliance. Include environmental considerations in load factors such as: wave, tide currents, uplift, ice, ice strikes, and ice expansion. Vessel Berthing Impact, and Uncontrolled Vessel Impact. Structure Durability and Service Life. Include Maintenance Requirements. Note materials and technologies to prevent water penetration, per applicable code or reference standards. Pile Driving Criteria. Follow up with Pile Driving Reports. Provide Clear Notes on any Easements, Transit, Utilities, Outfalls and Adjacent Structures that could be impacted. Provide applicable DEC, Army Corp, Coast Guard, SHPO, Waterfront Access Plan, Landmarks, and Public Design Commission approvals.

Basic Waterfront Checklist Includes But Not Limited To: Provide cross-sections in NAVD88 Datum showing, MHHW, MHW, HLW, MLLW, Highest Observed Water Level (Hurricane Sandy), Borough Datum, NGVD29 Datum for Historic Reference. Illustrate and dimension all components such as: Bulkheads, Piers, Sheet Piles, Piles, Pile Caps, Planks, Fenders System, Wave Attenuators, Wales, Tie-rods, Turnbuckle Splices, and Connection Details. Include details where connecting with adjoining Bulkheads to prevent loss of fill. Indicate Pile Tips and Cut-off Elevations. Provide plans and schedules for all components such as: Piles, Pile Caps, and Planks. Indicate prefabricated systems and note conformance with referenced standards applicable to maritime construction. Indicate berthing vessel size and characteristics, gross tonnage, draft below waterline and freeboard above, under keel clearance and height above mudline.

SBS Notice of Completion = DOB Letter of Completion

SBS Certificate of Completion = DOB Certificate of Occupancy

All Applications and Required Documentation Must Be Submitted to SBS between 10:00 AM and 1:00 PM, by Appointment Only, at: NYC Small Business Services Waterfront Permits Unit 110 William Street, 7 th Floor New York, NY 10038 For Appointments visit www.nyc.gov/waterfrontpermits Large Projects require Pre-filing Meetings and may be requested via Link Online. SBS Applications cannot be tracked in DOB BIS. To check status of an application email wpu@sbs.nyc.gov Thank You.