Description of Underwater Noise Attenuation System Design Unit 4. New NY Bridge Project
|
|
|
- Dennis Phillips
- 10 years ago
- Views:
Transcription
1 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Description of Underwater Noise Attenuation System Design Unit 4 for the New NY Bridge Project Revision 2 April 17, 2014 Prepared by Tappan Zee Constructors, LLC 555 White Plains Road, Suite 400 Tarrytown, NY Document History Issue Date Description By Revision 3/7/2014 Issued to NYSDEC for permit condition 9. VW 0 3/17/2014 Revised per comments from the NYSTA CC 1 4/17/2014 Revised per comments from the NYSDEC CC 2 NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS
2 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Table of Contents 1.0 Introduction Test Piles Unconfined Multi-tier Air Bubble Curtain NAS Design Underwater Noise Monitoring During Test Pile Installation Methods Results Conclusions NAS Design Plan and Operational Specifications Attachment 1 Daily Memoranda for Underwater Acoustic Monitoring of the Tappan Zee Bridge Test Pile Installation Attachment 2 Design Plans for the Multi-Tier Bubble Curtain Attachment 3 Air Compressor Specifications NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS
3 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit Introduction The Pile Load Test (PLT) Program includes an underwater noise monitoring program for the installation of the test piles. The purpose of this noise monitoring program is to confirm that the underwater noise attenuation system (NAS) intended for use during production impact pile driving achieves its design goal of minimizing (to the maximum extent practicable) the effects of underwater sound upon fishes in the Hudson River. This program is being conducted pursuant to the following New NY Bridge project requirements: New York State Thruway Authority (NYSTA) Tappan Zee Hudson River Crossing Project DB Contract Document Part 3 Project Requirements, Section 3 (P3PR3) Environmental Compliance, Conformed November 2012 and other applicable sections; New York State Department of Environmental Conservation (NYSDEC) DEC ID / (NYSDEC Permit); and National Marine Fisheries Service (NMFS) Biological Opinion (BO) April 10, Underwater noise monitoring is conducted to verify that the NAS is deployed and operating in accordance with design specifications and determine compliance with underwater noise attenuation requirements. Tappan Zee Constructors, LLC, (TZC) provided NYSTA and NYSDEC with a report titled Description of Pile Load Test Program and Underwater Noise Attenuation System for the Tappan Zee Hudson River Crossing (PLT-NAS Description) in July That report compared the NASs that were considered for possible adoption based upon the 2012 Pile Installation Demonstration Program (PIDP). The report also described the multi-tier bubble curtain which was selected for further testing. The PLT-NAS Description indicates the following criteria are being used to determine the effectiveness of the NAS: 1. Attenuation System has achieved at least a 10 db single strike sound exposure level (SELss) reduction during impact pile driving; 2. Ensonified Area System has attenuated underwater noise to achieve the distances to the required NMFS and NYSDEC thresholds during pile driving that were established by the BO Term and Condition 9 and by NYSDEC Permit Condition 14; and 3. System Operation and Compatibility System can be safely deployed and retrieved repeatedly during production pile driving without impact to pile driving requirements and project schedule. That report demonstrated that the multi-tier bubble curtain can achieve at least a 10 db SEL attenuation during impact pile driving and that the system could be safely deployed and retrieved repeatedly during production pile driving. As such, the multi-tier bubble curtain was selected for further testing during test pile installation. The PLT-NAS Description also provided a plan for testing the NAS to determine whether or not the required distances to the NMFS and NYSDEC thresholds are being achieved. Test pile installation monitoring results provide guidance on operational specifications of the underwater sound attenuation system monitoring, as well as the monitoring locations for production pile driving. The purpose of the present Report is to provide the results of the underwater noise monitoring of the installation of test piles for the Design Unit 4 (see Attachment 1) and based on those results, provide the design plans and anticipated operational specifications for the noise attenuation system for Design Unit 4 in accordance with the following NYSDEC Permit Conditions 8 and 9: 8. The results of sound attenuation tests conducted during the 2012 Pile Installation Demonstration Program (PlDP);and any additional test results from underwater sound attenuation studies during the 2013 PIDP2 will be used to determine the most effective underwater sound attenuation system. An underwater sound attenuation system or systems must be deployed during driving of steel piles to NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 1
4 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 minimize to the maximum extent practicable the effects of underwater sound upon fishes in the Hudson River. 9. At least 30 days before starting installation of permanent piles within each specific in-river design unit (as identified in the March 21, 2013 letter) the Permittee must give the Department design plans and operational specifications for the underwater sound attenuation system for that design unit. Except for piles installed during the 2013 PIDP2, installation of piles may begin when the Department has given written approval of the underwater sound attenuation system for each in-river design unit. Upon Department approval the final sound attenuation plan will be posted on the project website maintained by the Permittee. 2.0 Test Piles The Pile Load Test Program uses test piles in each of the 10 design units plus the Main Span (11 total design units), with the primary purpose to confirm pile load capacities. Design Unit 4 consists piles in Piers Test piles were installed with an IHC S-280 impact hammer. A summary of the impact pile driving for test piles at Design Unit 4 is provided in Table 1. Table 1. Summary of Impact Pile Driving for Test Piles at Design Unit 4 Test Pile Pile Diameter Impact Hammering Date PLT-106 8/26/2013 PLT-106P 8/27/2013 PLT-107P 10/8/2013 PLT /8/ Unconfined Multi-tier Air Bubble Curtain NAS Design Based on the NAS effectiveness determination in the PLT-NAS Description, the unconfined multi-tier bubble curtain was selected for further testing during test-pile installation. Refer to Attachment 2 for engineering details on the system NAS Components The unconfined multi-tier bubble curtain consists of aluminum bubbler ring(s) suspended from the piledriving template at four points, spaced a maximum of 10 feet vertically, and connected to the template using ½ -diameter wire rope. See Attachment 2 for bubbler ring dimensions and hole diameter, spacing, and orientation. The aluminum ring was connected to a dedicated compressor (Figure 1). This compressor was connected to a reservoir tank to allow a continuous supply of air throughout pile driving (Figure 1). During the installation of test piles, a flow meter and air pressure gauge were used to measure air flow and pressure (Figure 2). The air compressor is capable of supplying an air pressure of up to 100 pounds per square inch (psi) at an air flow of 1600 cubic feet per meter (cfm) to each bubbler ring (Attachment 3). The reservoir tank allows the system to supply an air flow of up to 2000 cfm to each bubbler ring, as was demonstrated during testing. NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 2
5 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Air Compressor Reservoir Tank Figure 1. Air Compressor and Reservoir Tank Air Pressure Gauge Flow Meter Gauge Figure 2. Flow Meter and Pressure Gauge on Outlets from the Reservoir Tank to the Bubbler Ring NAS Deployment and Operation The NAS deployment and operation proceeded as expected. After the piles were initially driven with the vibratory hammer, the bubble curtain ring was deployed with a crane and hung from the secondary template, using wire rope slings and shackles (Figure 3). The air compressor/reservoir tank pumped air into the ring (Figure 4), the impact hammer was lofted, the piles were tapped (i.e., a series of minimal energy strikes), and then driven to the required depth. NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 3
6 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Figure 3. Deployment of the Unconfined Multi-tier Bubble Curtain Figure 4. Operation of the Multi-Tier Bubble Curtain 4.0 Underwater Noise Monitoring During Test Pile Installation 4.1 Methods Details of the equipment, the calibration of the equipment, the data collected, and the signal processing for underwater noise monitoring are included in the Underwater Noise Monitoring Plan. Details on the underwater noise monitoring during the installation of PLT 106, PLT 106P, PLT 107P, and PLT 107 are provided in the Daily Memoranda for the monitoring of each test pile (Attachment 1). NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 4
7 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Figure 5 provides a typical barge and hydrophone arrangement As illustrated in Figure 5, a real time Autonomous Multichannel Acoustic Recorder (AMAR-RT) and two Autonomous Multichannel Acoustic Recorders (AMARs) were generally placed at the distances of the noise level thresholds predicted in the NMFS BO (although locations varied based on conditions, such as vessel traffic and tides). The AMAR-RT was continuously monitored through out the pile driving process while data collected from the AMARs was downloaded following pile driving. The noise level thresholds predicted in the NMFS BO (April 2013) are as follows: peak SPL (sound pressure level) located on the barge or survey vessel, approximately 33 feet from the pile, based on the distance that can be safely recorded (the distance to the 206 re 1 µpa peak SPL isopleth for piles is 20 feet) csel (cumulative Sound Exposure Level) located approximately 132 feet from the pile, based on the distance from the pile to the 187 db re 1 µpa 2 -s csel isopleth for piles rms SPL (root mean square SPL) located approximately 400 feet from the pile, based on the distance from the pile to the 150 db re 1µPa rms SPL for piles Figure 5. Plan View of a Typical Test Pile Barge Arrangement and Hydrophone Locations for piles Test pile installation for the Design Unit 4 occurred during a variety of current conditions (ebb, flood, and slack currents). Hydrophones (AMARs) were placed to capture data to analyze variation in the performance of the NAS correlated with variation in the river current and barge placement. During the installation of PLT 106 the NAS was tested up-current, down current, and cross-current in knots on the ebb current and knots on the flood current. During the installation of PLT 106P, the NAS was tested down-current and cross-current in knots during the flood current. During the installation of PLT 107P the NAS was tested up-current and cross-current in knots while the current was changing from ebb to slack. During the installation of PLT 107 the NAS was tested down-current and cross-current in knots when the current was changing from flood to slack. Table 2 provides a NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 5
8 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 summary of the underwater noise monitoring equipment deployment and position relative to the current for the driving of the four test piles. Table 2. Equipment Deployment and Position Relative to Current for PLT 106, PLT 106P, PLT 107P, and PLT 107 Date Test Pile No. 8/26/2013 PLT 106 8/27/2013 PLT 106P 10/8/2013 PLT 107P 10/8/2013 PLT 107 Hydrophone ID Location Relative to Pile* Location Relative to Current Current During Pile Driving Distance to Pile (ft) Water depth (ft) AMAR-RT 12 Peak SPL- Vessel Cross-current Ebb/ Flood 86 7 AMAR-221 csel South ( Up-Current, knots/ 0.3 Down-Current 0.6 knots) AMAR-228 csel West Cross-current AMAR-RT 11 Peak SPL-Barge Down-Current AMAR-221 rms SPL West Cross-Current Flood ( knots) AMAR-228 rms SPL North Down-Current AMAR-RT 11 Peak SPL- Barge Up-Current Ebb to AMAR-175 csel North Up-Current slack ( AMAR 228 rms SPL East Cross-Current knots) AMAR-RT 11 Peak SPL- Barge Down-Current Flood to AMAR 175 csel North Down-Current slack ( knots) AMAR-228 rms SPL East Cross-Current *Locations correspond to the hydrophone locations labeled in Figure 5 and are based on the following: peak SPL located on the barge or survey vessel, approximately 40 feet from the pile, based on the distance from the pile to the 206 re 1 µpa peak SPL isopleth for piles csel- located approximately 132 feet from the pile, based on the distance from the pile to the 187 db re 1 µpa 2 -s csel isopleth for piles rms SPL located approximately 400 feet from the pile, based on the distance from the pile to the 150 db re 1µPa rms SPL for piles The tests for this design unit were informed by previous NAS tests where air flow was varied throughout pile driving but never independently of other variables, such as impact hammer energies or tidal conditions. All tests were performed at a range of tidal conditions and hammer energies which could be expected during production pile driving. Table 3 provides the number of rings deployed and the NAS settings during the installation of the four test piles. NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 6
9 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Table 3. Description of NAS during Installation of Test Piles for Design Unit 4 Date Test Pile No. 8/26/2013 PLT 106 8/27/2013 PLT 106P 10/8/2013 PLT 107P 10/8/2013 PLT 107 Water Depth (ft) Number of Rings Air Flow (cfm) per Bubbler Ring Air Pressure (psi) Results NMFS Physiological and Behavioral Thresholds In accordance with the NMFS BO Term and Condition Number 6, the monitoring program estimated (i) the peak sound level (peak SPL in db re 1 µpa ) at each recorder and the distance from the pile at which the peak SPL exceeds the 206 db re 1 µpa peak, (ii) the csel at each recorder and the distance from the pile at which the csel exceeds 187 db re 1 µpa 2 s at the end of pile driving 1, and (iii) the rms SPL at each recorder and the distance from the pile at which rms SPL exceeds 150 db re 1 µpa. Table 4 provides a summary of the underwater sound levels measured at each recorder during the test pile installation. Table 5 provides the diameter of the sound level isopleths that serve as the NMFS physiological and behavioral thresholds. These results show that when the NAS was operational, the diameter of the 206 db re 1 µpa peak SPL did not exceed NMFS requirement of 40 ft for PLT 106P, PLT 107P and PLT 107 at Design Unit 4. The largest diameter of the 206 db re 1 µpa peak SPL isopleth was 70 ft during PLT 106, which is greater than the 206 db re 1 µpa peak SPL NMFS requirement of 40-ft However, the diameter of the 206 db re 1 µpa peak SPL isopleth at PLT 106 was calculated with a hydrophone located further than 40 ft, which makes extrapolation to 206 db re 1 µpa peak SPL isopleth more difficult. As such, the results for PLT 106 are considered unrepresentative of the NAS performance (Attachment 1: Daily Memoranda for Underwater Acoustic Monitoring of the Tappan Zee Bridge Test Pile Installation PLT 106 for additional detail). Results from PLTs 106P, 107P, and 107 were as expected, with the width of the 206 db re 1µPa peak SPL isopleth well within the 40-ft requirement. For test piles PLT 106P, PLT 107P, and PLT 107 the largest diameter of the 206 db re 1 µpa peak SPL isopleth was 20-ft, which is similar to the 206 db re 1 µpa peak SPL for the NASs tested during the 2012 PIDP. Specifically, during the 2012 PIDP the diameters of the 206 db re 1 µpa peak SPL isopleth were ft (JASCO 2012) 2. Furthermore, the estimated diameter of the isopleth at the end of installation of test piles that corresponded to 187 db re 1 µpa 2 -s csel never exceeded 290 ft. The river width is approximately 15,000 ft; therefore a fish movement corridor of more than one mile [5,280 ft], which was continuous for more than 1,500 ft, was maintained throughout pile driving, in accordance with NYSDEC Permit Condition csel increases as the number of strikes increases therefore; the diameter of the 187 db isopleth also reaches a maximum at the end of piling. 2 JASCO Underwater Acoustic Monitoring of the Tappan Zee Bridge Pile Installation Demonstration Project. NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 7
10 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Table 4. Measured Sound Levels at Each Recorder During PLT 106, PLT 106P, PLT107P, and PLT 107 Date Max. peak SPL csel Location* Test Pile No. (db re 1 µpa) (db re 1 µpa 2- s)** Peak SPL- Vessel /26/2013 csel South PLT 106 csel West Peak SPL- Barge /27/2013 rms SPL West PLT 106P rms SPL North Peak SPL- Barge /8/2013 csel North PLT 107P rms SPL East Peak SPL- Barge /8/2013 csel North PLT 107 rms SPL East *Locations correspond to the hydrophone locations labeled in Figure 5 and are based on the following: peak SPL located on the barge or survey vessel, approximately 33 feet from the pile, based on the distance from the pile to the 206 re 1 µpa peak SPL isopleth for piles csel- located approximately 132 feet from the pile, based on the distance from the pile to the 187 db re 1 µpa 2 -s csel isopleth for piles rms SPL located approximately 400 feet from the pile, based on the distance from the pile to the 150 db re 1µPa rms SPL for piles **At the completion of pile driving. Table 5. Diameters of Sound Level Isopleths that Represent NMFS Physiological and Behavioral Impact Threshold Measurement PLT 106 PLT 106P PLT 107P PLT 107 Pile Installation Duration (hh:mm) * 01:02 00:56 00:29** 00:40** Approximate Diameter (ft) of Isopleth 206 db re 1 µpa peak SPL 70*** db re 1 µpa 2 -s csel db re 1 µpa rms SPL * Net pile driving times are rounded to the nearest minute. **Hammer log digital file was corrupted; pile driving time was estimated. *** Considered unrepresentative of the NAS performance NAS Performance The NAS was tested in flood, ebb, and slack currents with hydrophones located in up-current, downcurrent, and cross current positions (Table 2). Current speed ranged from 0 to 1.2 knots. Air flow settings ranged from air pressures of 10 to 80 psi and air flows of 450 to 2300 cfm. For PLT 106, the NAS air pressure was psi ( cfm) during the first phase of installation and psi ( cfm) during the second phase. During the first ½ hour of pile driving (ebb current) sound levels at location Peak SPL Vessel remained fairly steady, despite changes in air pressure; hammer energy remained constant. Conversely, sound levels increased at locations csel South and csel West during this period. This rise in sound levels began while air pressure was maintained at 80 psi, indicating that it was unrelated to air pressure. Sound levels were higher at all recorders during the second half hour of pile driving (flood current); including while air pressure level was maintained at 70 psi. Sound levels showed very little increase with changes in air pressure from 70 psi to 10 psi despite hammer energy remaining fairly constant during this period. Therefore, it is unlikely that changes in NAS settings are responsible for observed changes in measured sound levels (see Attachment 1: Daily Memoranda for NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 8
11 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Underwater Acoustic Monitoring of the Tappan Zee Bridge Test Pile Installation PLT 106 for additional detail). Estimated peak sound levels extrapolated by linear regression of the measured sound levels during PLT 106 installation exceeded the NMFS threshold of 206 db re 1 µpa at 20 ft from the pile during both the ebb and flood current (although the sound level was less during the ebb current). It was concluded that this exceedance was related to the hydrophone location relative to the pile driving; not the NAS performance. Specifically, the nearest hydrophone was placed at 86 feet, with the other two hydrophones placed downcurrent and cross-current at 229 and 237 feet, respectively. We believe the hydrophone arrangement in this case, with the nearest hydrophone at 86 ft, did not properly capture the noise attenuation within the barge spread (i.e., the surrounding barges and pile template) and the subsequent extrapolated 206 db re 1 µpa radius of 35 ft is misleading, particularly given that it is over 50 ft from the nearest measured (groundtruth data) sound level. Note that key to the extrapolation approach using linear regression is to have the nearest hydrophone measurement (ground-truth data range) as close as possible to the expected extrapolated range, otherwise the extrapolation can be invalid. The underwater sound measurements during installation of PLT 106P provide evidence for this. Conditions during the installation of PLT 106P were similar to PLT 106 with regard to general river conditions and hammer energies, but here the nearest hydrophone was placed 35 ft (vs. 86 ft at PLT 106) from the pile. Including this one value with the three measurements from PLT 106 in the regression gives a revised extrapolated 206 db re 1 µpa peak SPL isopleth of approximately 26 ft or an extrapolated radius of 13 ft which is now about 20 ft from the nearest hydrophone measurement. Furthermore, adding the two additional measurements from the installation of PLT106P, at ranges of 461 and 579 ft, does not change this revised extrapolated peak SPL isopleth for PLT 106. For PLT 106P, the NAS air pressure was psi ( cfm) during the first phase of pile installation and was psi ( cfm) during the second phase. There was no observable effect on the measured sound levels from changes in the NAS air pressure settings or changes in river currents. During the installation of PLT 107P, the NAS air pressure remained constant at 65 psi ( cfm) for the duration of pile driving. Hammer energies remained constant around 180 kip-ft (± 10 kip-ft) throughout pile driving. There was an increase of approximately 10 db at locations csel North and rms SPL East as the current slowed. This increase occurred while hammer energy and air pressure remained constant over those periods. However, there was no observable effect on the measured sound levels from the change in current at location Peak SPL Barge. As such, there appears to be no correlation with river currents, hammer energy, or NAS settings (Attachment 1: Daily Memoranda for Underwater Acoustic Monitoring of the Tappan Zee Bridge Test Pile Installation 107P). For PLT 107 hammer energy remained constant at 180 ± 10 kip-ft and air pressure remained constant at approximately 65 psi, but the currents dropped from 0.8 knots to slack current. The measured sound levels showed different characteristics at each location. Recorded SELss at location Peak SPL Barge remained constant as the pile was driven. However the SELss recorded at locations csel North and rms SPL East increased by approximately 15 db from the start to the end of pile driving. The reason for this increase is unknown as the same trend was not observed at the other hydrophone deployed up-current (Peak SPL Barge). Changes in sound level did not appear to correlate with the river currents, hammer energy or NAS system settings. 4.3 Conclusions In accordance with NYSDEC Permit Condition 8, an underwater noise attenuation system or systems must be deployed during the driving of steel piles to minimize to the maximum extent practicable the effects of underwater sound upon fishes in the Hudson River. The PLT-NAS Description concludes that the most effective system is the one that will be capable of attenuating noise to NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 9
12 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 achieve the distance thresholds required by NMFS in the BO and that can be safely deployed and retrieved repeatedly during production pile driving without affecting pile driving requirements and project schedule. Results of test pile installation indicate that the unconfined multi-tier bubble curtain with bubble rings spaced a maximum of ten feet vertically is effective in minimizing noise in order to meet the NMFS and NYSDEC requirements. Results indicate that the largest estimated width of the 206 db re 1µPa peak SPL isopleth was measured at 70 ft for the PLT 106 but only 20-ft for the PLT 106P, as compared to the 40 ft predicted by the NMFS BO; these results were considered unrepresentative because of the measurement location. Results from PLTs 106P, 107P, and 107 also indicate that the width the 206 db re 1µPa peak SPL isopleth was less than 40 ft. These results indicate that the typical size of the 206 db re 1 µpa isopleths measured for the piles in ft of water were similar or smaller than the 206 db re 1 µpa isopleths measured during the 2012 PIDP. Furthermore, the diameter of the 187 db re 1 µpa 2 -s csel isopleth at the end of installation of each pile was never estimated to be more than 290 ft. Therefore, a corridor was maintained where sound levels were less than 187 db re 1µPa 2 s csel. The total length of the corridor was at least one mile (and was continuous for 1,500 feet) across the Hudson River, running east to west. 5.0 NAS Design Plan and Operational Specifications The installation of the four test piles also demonstrated that the unconfined multi-tier bubble curtain is readily and safely deployable and retrievable. Given these logistical attributes, combined with the proven effectiveness at obtaining required distances to NMFS and NYSDEC thresholds, the unconfined multi-tier bubble curtain is considered most effective to minimize harm to fish in the Hudson River, to the maximum extent practicable. During production pile driving for Design Unit 4, the unconfined multi-tier bubble curtain will be deployed and retrieved in a similar manner to the PLTs 106, 106P, 107P, and 107 pile installations. Based on dredging and armoring, the river bottom at Design Unit 4 will be approximately -11 feet at mean lower low water (MLLW). Bubbler rings and compressors will be deployed for each pile, so that vertical spacing in the water column is a maximum of 10 feet or less at mean higher high water (MHHW). That is, the NAS will consist of two bubble rings if the water depth greater than 10 feet. Table 6 provides the expected range of water depths at each Design Unit 4 pier and the number of bubble curtain rings to be deployed for pile driving at that pier. The NAS will be deployed according the Construction Work Plan. Table 6. Range of Water Depths at Each Design Unit 4 Pier and the Number of Bubble Curtain Rings to be Deployed Pier Water Depth (feet) Number of Bubble Curtain Rings* *The number of bubble rings at specific piles within a pier is subject to change with approval from the ECM or designee, based on field measurements of water depth during pile installation The NAS system contains three valves at the: 1. air compressor outlet to the reservoir tank (Figure 6), 2. reservoir tank inlet (Figure 7), 3. reservoir tank outlet (Figure 8) to the bubbler ring. NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 10
13 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Prior to impact pile driving, the compressor will be turned on and the valves will be open such that air will be supplied to the bubbler ring(s) individually to visually confirm sufficient air to each ring. All valves will be opened during the operation of the bubble curtain. The bubble curtain will remain on during periods of active pile driving. The air pressure gauge will be used to monitor NAS operation during production pile driving. Air pressure at the outlet from the reservoir tank will be maintained at a target pressure of between 60 and 80 psi with a minimum pressure of 40 psi to each bubbler ring (Figure 9). The following will be checked for each of the piles at each pier within Design Unit 4 (as outlined in the Construction Work Plan): Reservoir tank is pressurized prior to pile driving. The tank inlet and outlet valves are open immediately prior to starting the compressor. Air pressure at each reservoir tank outlet approximately 5 minutes after pile driving begins. Visual inspection of the water surface for sufficient air bubbles Figure 6. Valve at the Air Compressor Outlet to the Reservoir Tank NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 11
14 New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 4 Figure 7. Valve at the Reservoir Tank Inlet Figure 8. Valve at the Outlet from the Reservoir Tank to the Bubble Curtain Figure 9. Air Compressor Controls NAS Design Plans - Unit 4_Rev _Clean PLT and Underwater NAS - 12
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
December 12, 2012. Dear Ms. Bornholdt:
December 12, 2012 Maureen Bornholdt Renewable Energy Program Manager Office of Renewable Energy Bureau of Ocean Energy Management 381 Elden Street Herndon, Virginia 20170 RE: Proposed Mitigation Measures
HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long
HYDRAULICS H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long 1. General The series of channels H91.8D has been designed by Didacta Italia to study the hydrodynamic
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
Effects of Underwater Noise
Effects of Underwater Noise Impact pile driving noise prediction Marten Nijhof, Christ de Jong, Bas Binnerts, Michael Ainslie 2 Wind energy agenda Dutch energy agreement for sustainable growth (2013):
7.0 Construction Noise Impact Assessment
7.0 Construction Noise Impact Assessment Contents 7.0 Construction Noise Impact Assessment...7.1 7.1 Terrestrial Noise...7.5 7.1.1 Noise Generation, Transmission, and Reduction...7.7 7.1.2 Ambient or
SECTION 02845 GUARDRAILS
SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein
WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS
GAP.14.1.2.2 A Publication of Global Asset Protection Services LLC WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS INTRODUCTION A hydrant or other large-volume flow test is necessary for proper water
Basic Math for the Small Public Water Systems Operator
Basic Math for the Small Public Water Systems Operator Small Public Water Systems Technology Assistance Center Penn State Harrisburg Introduction Area In this module we will learn how to calculate the
3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
Environmental Compliance Plan
Tappan Zee Hudson River Crossing Environmental Compliance Plan Environmental Compliance Plan for the Tappan Zee Hudson River Crossing Project Revision 2 May 7, 2013 Prepared by Tappan Zee Constructors,
Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants
OMB Approval No.: 0648-0538 Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants Instructions The National Environmental Policy
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
MLD: Domestic Maritime Transport Project
Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication
The following definitions apply with regard to requirements specified in this document:
GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved
Basics. this is a form of solar energy, as the sun drives water evaporation from the ocean and winds carry the moisture overland
Hydropower Basics this is a form of solar energy, as the sun drives water evaporation from the ocean and winds carry the moisture overland largest form of alternative energy used today (but only 2% of
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
Method to Determine PERFORMANCE OF INDIRECT-FIRED WATER HEATERS March 2003 Edition
Supplement to TESTING STANDARD Method to Determine PERFORMANCE OF INDIRECT-FIRED WATER HEATERS March 2003 Edition [NOTE: This supplement incorporates testing and calculations to determine heat source friction
SPCC Plan - Calculation Guidance
SPCC Plan - Calculation Guidance The following example compares two different design criteria: one based on the volume of the tank and one based on precipitation. Scenario: A 20,000-gallon horizontal tank
TENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
ELECTRIC/DIESEL FIRE PUMP CHECK LIST
BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested
Training Guide. An Introduction to Well Drawdown
Training Guide An Introduction to Well Drawdown Rural and Small Systems Training Guide An Introduction to Well Drawdown Michael J. Lytle, Arizona Water Association Contributing Author Paul Markowski, Nebraska
Centrifugal Fans and Pumps are sized to meet the maximum
Fans and Pumps are sized to meet the maximum flow rate required by the system. System conditions frequently require reducing the flow rate. Throttling and bypass devices dampers and valves are installed
PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
Cat Electronic Technician 2015A v1.0 Product Status Report 4/20/2016 2:49 PM
Page 1 of 19 Cat Electronic Technician 2015A v1.0 Product Status Report 2:49 PM Product Status Report Parameter Value Product ID WRK00337 Equipment ID WRK00337 Comments A01-52 C9 330D (THX37891) Parameter
Activity 2.3b Engineering Problem Solving Answer Key
Activity.3b Engineering roblem Solving Answer Key 1. A force of 00 lbs pushes against a rectangular plate that is 1 ft. by ft. Determine the lb lb pressure in and that the plate exerts on the ground due
BRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
Mobile Home Pre-Inspection Checklist
Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING
Residential Decks. Planning and Development Services Department
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: [email protected] Planning and Development Services Department Residential Decks
Auto-belay Cable Replacement Process
Auto-belay Cable Replacement Process Version 2.00 WARNING: The air pressure in the auto-belay system is what causes the cable to be retracted when releasing the cable or climbing the wall with the cable
Index 11.1. Page. Pumping Systems...11.2-11.4 Intensifiers...11.5 Gas Boosters...11.6-11.7 High Pressure Generators...11.8-11.9
Pumping Systems, Intensifiers, Gas Boosters and High Pressure Generators High Pressure Equipment Company produces a number of components and systems for general industrial, elevated pressure applications.
Practice Tests Answer Keys
Practice Tests Answer Keys COURSE OUTLINE: Module # Name Practice Test included Module 1: Basic Math Refresher Module 2: Fractions, Decimals and Percents Module 3: Measurement Conversions Module 4: Linear,
Voltage Loss Formula s
www.litz-wire.com HM Wire International Inc. Phone: 330-244-8501 Fax: 330-244-8561 Voltage Loss Formula s www.hmwire.com Voltage loss in a wire is synonymous to pressure loss in a pipe. Electric current
NYC Small Business Services Waterfront Permits Unit
NYC Small Business Services Waterfront Permits Unit DOB Training Presentation - March 2015 Maryam Khabbazian Plan Examiner Officer www.nyc.gov/waterfrontpermits NYC Small Business Services (SBS) Jurisdiction
In-Line Air Separators
Air Elimination & Control In-Line Air Separators The AC models of air separators deliver all the quality and performance you expect from Taco products. They are built to last with shell, heads and ANSI
Show that when a circle is inscribed inside a square the diameter of the circle is the same length as the side of the square.
Week & Day Week 6 Day 1 Concept/Skill Perimeter of a square when given the radius of an inscribed circle Standard 7.MG:2.1 Use formulas routinely for finding the perimeter and area of basic twodimensional
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or
VOLUME of Rectangular Prisms Volume is the measure of occupied by a solid region.
Math 6 NOTES 7.5 Name VOLUME of Rectangular Prisms Volume is the measure of occupied by a solid region. **The formula for the volume of a rectangular prism is:** l = length w = width h = height Study Tip:
The following definitions apply with regard to requirements specified in this document:
GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved
Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems
Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values
DOUBLE SEAT BRONZE BODY HIGH CAPACITY
PS593DB HEAVY DUTY BRONZE GLOBE CONTROL VALVES DB DOUBLE SEAT BRONZE BODY HIGH CAPACITY 1, 1-1/4, 1-1/2, and 2 Union Ends ANSI Class 250 Body Rating ANSI Class II Close off Bronze or Stainless Steel Trim
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
SECTION 15 FLOODPLAIN MANAGEMENT
SECTION 15 15.1 Purpose Certain areas of the City of Gardiner, Maine, are subject to periodic flooding, causing serious damages to properties within these areas. Relief is available in the form of flood
Revised April (May) 2015
Section 19.0 Cross Connection Control Policy 19.1 Responsibility 19.1.1 The Elkhart Water Utility has the responsibility to supply safe, potable water from the source to the point of delivery defined as
Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet
Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet 1. Definitions a. AHJ Authority Having Jurisdiction. The Fire Chief or Fire Marshal of a given Fire District
Approval Standard for Plastic Suspended Ceiling Panels
Approval Standard for Plastic Suspended Ceiling Panels Class Number 4651 February 1978 2002 FM Approvals LLC. All rights reserved. Foreword The FM Approvals certification mark is intended to verify that
CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General
General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling
Remote Monitoring of Bridge Scour Using Echo Sounding Technology
Remote Monitoring of Bridge Scour Using Echo Sounding Technology IVAN R. LASA Florida Department of Transportation GEORGE H. HAYES Environmental Data Systems, Inc. EDWARD T. PARKER Federal Highway Administration
UNITED WATER LEAK DETECTION SERVICE
UNITED WATER LEAK DETECTION SERVICE M. O'BRIEN Field Supervisor, United Water International ABSTRACT This paper details information on United Water's recently developed leak detection service, the aim
NITROUS TRANSFER PUMP INSTRUCTIONS
NITROUS TRANSFER PUMP INSTRUCTIONS SAFETY TIPS Never directly inhale nitrous oxide. When inhaled in large quantities, nitrous oxide can cause respiratory ailments or in extreme cases, death by suffocation.
OREGON FIRE CODE Interpretations and Technical Advisories
OREGON FIRE CODE Interpretations and Technical Advisories A collaborative service by local and state fire professionals, along with our stakeholders and customers, to provide consistent and concise application
LIQUID FLOW PROVERS (Conventional) Class Number 252. Brendan S. Ryan Smith Meter Inc P.O. Box 4658 Corpus Christi, Texas 78404
LIQUID FLOW PROVERS (Conventional) Class Number 252 Brendan S. Ryan Smith Meter Inc P.O. Box 4658 Corpus Christi, Texas 78404 Introduction Flow meters need to be calibrated for accurate measurement! To
Air Eliminators and Combination Air Eliminators Strainers
Description Air Eliminators and Combination Air Eliminator Strainers are designed to provide separation, elimination and prevention of air in piping systems for a variety of installations and conditions.
Requirements for Building Application Submission
THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: [email protected] To: Architects, Designers
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
California Department of Transportation Doyle Drive Test Program Contract No. 04A3362
California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,
Density Measurement. Technology: Pressure. Technical Data Sheet 00816-0100-3208 INTRODUCTION. S min =1.0 S max =1.2 CONSTANT LEVEL APPLICATIONS
Technical Data Sheet 00816-0100-3208 Density Measurement Technology: Pressure INTRODUCTION Pressure and differential pressure transmitters are often used to measure the density of a fluid. Both types of
Operating, Installation, and Maintenance Instructions
ELKHART BRASS MFG. CO., INC. 1302 WEST BEARDSLEY AVENUE P.O. BOX 1127 ELKHART IN 46515 (574) 295-8330 FAX (574) 293-9914 Operating, Installation, and Maintenance Instructions RAM Personal Portable Monitor
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
Wind Direction Smart Sensor (S-WDA-M003)
(S-WDA-M003) The Wind Direction smart sensor is designed to work with HOBO Stations. The smart sensor has a plug-in modular connector that allows it to be added easily to a HOBO Station. All sensor parameters
MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION
MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION Moser and Associates Engineering for CDOT Region 6 Date: 9/30/10 Memorandum to File: Recommendations for Pipe Material Selection for Construction
STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL
STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting Coastal
1. Site plans assist the Fire Department to determine where a potential spill can be contained. The detailed site plan shall include the following:
Secondary Containment, Spill Control and Drainage Guidelines for Hazardous Materials per 2010 CFC PURPOSE The intent of this guideline is to provide the requirements for the design and construction of
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
APE Pile Driving Course: Understanding Pile Driving Leads
APE Pile Driving Course: Understanding Pile Driving Leads Pile Driving Leads Box lead dimensions Box lead swinging Box lead clip on type Box lead, fixed, extended Box lead, semi-fixed travel Flying hammer
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
Building Design for Advanced Technology Instruments Sensitive to Acoustical Noise
Building Design for Advanced Technology Instruments Sensitive to Acoustic Noise Michael Gendreau Colin Gordon & Associates Presentation Outline! High technology research and manufacturing instruments respond
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
(0008854) A981653 REV B. 4125 system setup and deployment quick start guide
(0008854) A981653 REV B 4125 system setup and deployment quick start guide OPERATION IN AIR Do not operate the system while the tow fish in air for extended periods. The system may be enabled to transmit
SECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
Exhaust Calculation Booklet
Exhaust Calculation Booklet American Dryer Corporation 88 Currant Road Fall River MA 02720-4781 Telephone: (508) 678-9000 / Fax: (508) 678-9447 e-mail: [email protected] ADC Part No. 450450 Exhaust
SEAPRO has both foam filled flotation boom and inflatable boom systems.
BOOMING OPERATIONS SEAPRO Response Operations Manual General Information Booming operations are necessary for the containment and concentration of spilled oil on water. By containing product, potential
Pizza! Pizza! Assessment
Pizza! Pizza! Assessment 1. A local pizza restaurant sends pizzas to the high school twelve to a carton. If the pizzas are one inch thick, what is the volume of the cylindrical shipping carton for the
Lighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: [email protected] Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
Approval Standard for Water Motor Gong
Approval Standard for Water Motor Gong Class Number 1055 July 1970 2002 FM Approvals LLC. All rights reserved. Foreword The FM Approvals certification mark is intended to verify that the products and services
I. Introduction. 10 minutes
I. Introduction 10 minutes Introduction (1 of 2) An uninterrupted water supply is: The primary weapon for extinguishment Essential for fire fighter safety Ensuring a dependable water supply is a critical
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
GLOSSARY OF TERMINOLOGY
GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1
IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 CHAPTER 44 ON-SITE CONTAINMENT OF PESTICIDES, FERTILIZERS AND SOIL CONDITIONERS [Prior to 7/27/88, see 21 Ch 9] PESTICIDES 21 44.1(206) Definitions.
Summer Math Exercises. For students who are entering. Pre-Calculus
Summer Math Eercises For students who are entering Pre-Calculus It has been discovered that idle students lose learning over the summer months. To help you succeed net fall and perhaps to help you learn
1805 Series Relief Valves
October 2011 1805 Series Relief Valves P1026 1805G Type 1805-2 Type 1805-4 Figure 1. Typical 1805 Relief Valves Introduction The 1805 Series relief valves are designed for use in farm tap applications
Heavy Duty Industrial Air Compressors
HEAVY DUTY SERIES - VERTICAL TANK MOUNTED All units mounted on air receivers rated at 200 psi and CRN approved for Canada. All units may be ordered with magnetic starter (Starter supplied loose). All units
security products metric sizes Redefine your comfort zone. www.titus-hvac.com
metric sizes secure lethal objects monitoring areas suicide deterrent Redefine your comfort zone. www.titus-hvac.com humid areas prevents corrosion minimum security medium security maximum security Table
Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load
Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Nature of Services The company has a long history of performance of tests of piles and pile groups under a variety
Incidental Harassment Authorization
UNITED STATES DEPARTMENT DF COMMERCE National Oceanic and Atmoapharic Administration NATIONAL MARINE FISHERIES SERVICE Silver Spring, MD 20910 Incidental Harassment Authorization Washington State Department
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather