Title: Plant and Equipment Management Procedure



Similar documents
Title: Confined Space Procedure

Title: Confined Space Procedure

Issue Date: April 2011 Review Date: April 2013 Page Number: 1 of 8

Title: Hazardous Building Materials Procedure

Title: OHS Risk Management Procedure

OHSMS Implementation Guide

Title: Hazard/Incident Reporting and Investigation Procedure

Excavation & Trenching Procedure

Code of Practice (No. 19) - Plant 01 July 1995

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

Occupational Health & Safety Policy Box Hill Institute Group

Release 1. BSBWHS508A Manage WHS hazards associated with plant

AS/NZS 4801:2001. Safety Management Systems (SMS) Self-Assessment Checklist. Revision 1 (January 2014)

Contractor Environment, Health and Safety Management Plan

WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES

SafetyMAP Initial Level User Guide

MANAGING RISKS OF PLANT IN THE WORKPLACE

POLICY ON OCCUPATIONAL HEALTH AND SAFETY RISK MANAGEMENT

WHS Policies and Procedures Package

MANAGING THE RISK OF PLANT GUIDELINES

Hazard Identification, Risk Assessment And Control Procedure

Risk Assessment Tool (example only)

OH&S Management Systems Audit Checklist (NAT, E3)

Construction and Civil Work Management

PART 3: RIGHTS AND RESPONSIBILITIES

CONTRACTOR INDUCTION HANDBOOK

Information for a person conducting a business or undertaking

Event Management Guidelines. Month Event Management Guidelines (Month, 2011)

Contractor s Safe Working Agreement

ASBESTOS in state and local government

Safety Systems Review Facilities Management Guidance and specification Version

Getting the occupational safety basics organised

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

Community support services occupational health and safety compliance kit

CHAPTER 10. FALL PROTECTION PROGRAM

Approved Contractor Application (SAFE Form B)

Job safety analysis Installing wall frames and roof trusses on-site

INTRODUCTION Purpose Policy Exception for Short-Term Workplace Visits Relevant Legislation and Regulations...

Contractor Safety Management

Hazard Identification, Risk Assessment and Control Procedure

Step 4. Monitor / Review Control Measures

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

How To Monitor Safety Management System Performance

Risk management a practical approach

UTILITIES. June 2006 WORKING AT HEIGHTS RESOURCE. WorkCover. Watching out for you.

OCCUPATIONAL SAFETY AND HEALTH RECORDS

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

Victorian Purchasing Guide for UEG11 Gas Industry Training Package Version No 2

OHS Training Guidelines

OHS Contractor Management Procedure

Project & Task Work Health and Safety Risk Management Procedure

WORK HEALTH AND SAFETY

Unit Title: Unit purpose and aim

Guide Document for Development of WHS Management Plans

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS

Unit ID: 482 Domain AUTOMOTIVE ELECTRICAL AND ELECTRONICS Title: Install and repair electrical lighting system of vehicles Level: 2 Credits: 6

PORT HEDLAND PORT AUTHORITY

Elements of an Occupational Health and Safety Program

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

SITE CONTRACTOR PROCEDURES

FARM SAFETY STARTER GUIDE

OSHA Compliance Checklist ASC

Health and Safety Pre-Qualification Application Self-employed/Small businesses and Consultants

City of Belmont Contractor Induction Program

A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION

Six steps to Occupational Health and Safety

WHS CONTRACTOR MANAGEMENT PROCEDURE

Workplace Safety and Health (Risk Management) Regulations

Independent Contractor Policy

Providing and using work equipment safely

WHS Contractor Management Procedure

Small Business. Safety Solutions

The Fort McMurray Catholic Board of Education is committed to the protection of our employees, contractors, volunteers and the students we serve.

COSVR404 Erect and dismantle plant (cranes and rigs)

To affirm the Institute s commitment to provide and maintain, as far as is reasonably practicable, a safe and healthy work and learning environment.

Health and safety in construction procurement

ACCREDITED SAFETY TRAINING FOR EQUIPMENT OPERATORS

SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399

Code of practice Occupational safety and health in the Western Australian Public SectoR 2007

Getting Started with Workplace Health and Safety

WORKING IN CONFINED SPACES GUIDELINES

A guide for Victorian workplaces. Consultation. October 2012

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

ENVIRONMENT MANAGEMENT PLAN

Working for business. Workplace Safety Discount Application With employees

Working at Height. Procedure

Guide to Assessment and Rating for Regulatory Authorities

Safety Training Needs Assessment

ENVIRONMENT, HEALTH & SAFETY

Policy Work Health & Safety (WHS) (AUS)

Health and Safety Management Standards

After ensuring the safety of our people and care for the environment, Flagstaff s Strategic intent will be:

22231VIC Course in Safe Use of Machinery for Technology Teaching

The terms hazard and risk are often used, which we define as the following:

Accident/Incident Investigation & Reporting Procedure

Unit Title: Unit purpose and aim

Work Health and Safety. Seven Steps for Small Business

SAFETY and HEALTH MANAGEMENT STANDARDS

CONTRACTOR MANAGEMENT SYSTEM

Transcription:

Page Number: 1 of 7 1. Purpose: The purpose of this procedure is to ensure that risks associated with plant and equipment within the Department of Education and Early Childhood Development (DEECD) are identified and managed. 2. Scope: This procedure applies to all plant and equipment which are used in DEECD workplaces including schools and central and regional offices. 3. References Occupational Health and Safety Act 2004 Occupational Health and Safety Regulations 2007 School Policy and Advisory Guide - Curriculum 4. Definitions: Danger Do not operate Tag Deputy Health and Safety Representative: Hazard: Health and Safety Representative (HSR): Management OHS Nominee: Out of Service Tag Plant and equipment: A signed and dated label that is attached to energy isolation points of equipment, plant, pipes or lines by the person responsible for undertaking repairs, maintenance, service alteration or cleaning, to indicate isolation is in place and that plant, equipment, etc. must not be operated. It must only be removed by the person whose name is on the tag. An elected employee responsible for representing employees within a Designated Work Group (DWG) on matters relating to Occupational Health and Safety(OHS) in the absence of the Health and Safety Representative (HSR). Anything with the potential to cause harm, injury, illness or loss. An elected employee responsible for representing employees within a DWG on matters relating to OHS. A position nominated by the Workplace Manager to oversee the operational aspects of implementing health, safety and wellbeing initiatives, policies and procedures. A signed and dated label that is placed on a machine or piece of equipment to identify the equipment as being inoperable or requiring maintenance or repair. All machinery, tools, appliances and equipment. Plant and equipment cover a diverse range of items from office equipment to industrial machinery. Examples of plant and equipment include tractors, lifts, amusement structures, forklifts, printing presses, hand tools, ladders and computers.

Page Number: 2 of 7 Regulated Plant: Risk: Workplace Manager: 1. Plant that processes material by way of a mechanical action that: a) Cuts, drills, punches or grinds the material; or b) Presses, forms, hammers, joins or moulds the material; or c) Combines, mixes, sorts, packages, assembles, knits or weaves the material. 2. Plant that lifts or moves people or materials (other than a ship, boat, aircraft) or a vehicle designed to be used primarily as a means of transport on public roads or rail, if that vehicle is being used in a workplace other than a public road or rail; 3. Pressure equipment; 4. Tractors; 5. Earthmoving machinery; 6. Lasers; 7. Scaffolds; 8. Temporary access equipment; 9. Explosive-powered tools; 10. Turbines; and 11. Amusement structures. A description of the likelihood and consequence of a hazard causing injury or illness. The Manager or Principal responsible for the school, central office, regional office or other DEECD workplace. 5. Responsibility: Workplace Managers and/or Management OHS Nominees are responsible for: identifying and recording all plant and equipment within the workplace on a Plant and Equipment Register, which is regularly reviewed; consulting with employees in relation to identifying and managing plant and equipment hazards; ensuring that identified plant and equipment hazards are entered on to a Plant and Equipment Risk Management Form; ensuring that identified plant and equipment hazards are entered on to the OHS Risk Register, the risks reviewed and appropriate controls implemented; checking that Safe Work Procedures (SWP) are readily accessible for each item of plant and equipment; ensuring maintenance and repairs to plant and equipment is recorded on the Plant and Equipment Maintenance Form; complying with legislation relating to plant and equipment. HSR functions can include: reporting plant and equipment hazards; assisting in the completion of the Plant and Equipment Risk Management Form as requested; participating in the identification and implementation of risk controls; reporting on the use and effectiveness of plant and equipment risk control measures. Employees are responsible for:

Page Number: 3 of 7 reporting plant and equipment hazards; assisting Workplace Managers and/or Management OHS Nominees with completion of the Plant and Equipment Risk Management Form; participating in the identification and implementation of risk controls; complying with SWP for plant and equipment. 6. Procedure: 6.1 Identify Plant and Equipment The Workplace Manager and/or Management OHS Nominee must identify all plant and equipment within the workplace in consultation with the HSR and employees and record this information on the Plant and Equipment Register. Examples of plant and equipment include: All regulated plant Ladders Table saws Powered hand tools Lifts. Hazard identification should take place: when new plant and equipment is introduced into the workplace; for all existing plant and equipment; before any changes are made to the system of work for plant and equipment; before the plant and equipment is used in a manner other than what it was designed for; when new information regarding the safety of the plant and equipment becomes available. 6.2 Risk Assessment of Plant and Equipment The Workplace Manager and/or Management OHS Nominee are to ensure that a risk assessment is completed as per the requirements of the OHS Risk Management Procedure and documented on the Plant and Equipment Risk Management Form. This should be completed for each identified hazardous item of plant and equipment in consultation with: HSR Employees Relevant standards, codes of practice or legislation. When determining the level of risk of a hazard the Workplace Manager and/or Management OHS Nominee should also consider: the systems of work related to the use of the item of plant or equipment; the layout and physical conditions of the workplace; the range of methods by which the work can be completed; the type of hazards involved with the method of use and item of plant or equipment proposed to be used; The competence of persons to undertake the work. 6.3 Purchase or acquisition of Plant The Workplace Manager and/or Management OHS Nominee must ensure that prior to the purchase or acquisition of plant and equipment, that an OHS Purchasing Checklist is completed in

Page Number: 4 of 7 accordance with the OHS Purchasing Procedure. This should occur in consultation with: HSR Employees 6.4 Controlling Plant and Equipment Risks 6.4.1 Control Measures The Workplace Manager and/or Management OHS Nominee in consultation with the HSR and employees are to ensure suitable controls, as outlined in the OHS Risk Management Procedure are selected and implemented where plant and equipment risks are identified. This is to be documented on the Plant and Equipment Risk Management Form. Examples of plant and equipment controls (from most to least effective) could include: determining whether the task can be completed by an alternative method e.g. purchasing timber pre-cut to the correct length; installing and maintaining fixed guarding on machinery; training employees in appropriate courses to obtain the required competencies; developing SWP; providing Personal Protective Equipment (PPE) such as ear and eye protection. Where the controls include development of procedures for the safe operation and/or use of plant and equipment, a Safe Work Procedure template should be completed and displayed adjacent to all items of static plant and accessible to operators of portable plant. Plant and equipment that is identified as being unsafe must be isolated and tagged as per the Isolation and Tag Out Procedure. 6.4.2 Training and Education The Workplace Manager and/or Management OHS Nominee are to ensure teachers are competent to use plant and equipment in their facilities. Teachers are required to have the necessary qualifications as outlined in the Victorian Institute of Teaching (VIT) Qualification for Teacher Registration Qualification Policy to enable them to teach Materials Technology in schools. This shall be supplemented by successful completion, every five years, of relevant modules of the Safe Use of Machinery in Technology Teaching course. Further information on this course is available from the DEECD OHS Advisory Service on 1300 074 715. Training records are to be maintained by the Workplace Manager and/or Management OHS Nominee as outlined in the OHS Induction and Training Procedure. 6.4.3 Maintenance A record of inspections and maintenance must be kept for each item of plant and equipment. This includes scheduled maintenance, breakdown maintenance and replacement of parts (e.g. blades and belts) outside the scheduled maintenance program. Maintenance requirements should be determined in accordance with the supplier or manufacturer recommendations. Details recorded for plant and equipment should as a minimum include: plant and equipment name; location; serial or identification number;

Page Number: 5 of 7 description of work performed; completion date of repairs/maintenance; who the work was performed by. If the workplace does not have an existing recording system, the Plant and Equipment Maintenance Form may be used. When items of plant are being maintained or repaired they must be isolated and tagged as per the Isolation and Tag Out Procedure. The Workplace Manager and/or Management OHS Nominee should ensure that contractors engaged to undertake maintenance are managed as per the Contractor Management Procedure. The frequency of the maintenance program will depend on: legislative requirements; manufacturer recommendations and requirements; results of the Plant and Equipment Risk Management Form; plant and equipment breakdown/failure rates. 6.5 Reviewing Controls The Workplace Manager and/or Management OHS Nominee are responsible for reviewing the effectiveness of risk controls in consultation with the HSR and employees. The Workplace Manager and/or Management OHS Nominee should review the completed Plant and Equipment Risk Management Form, OHS Risk Register and any other relevant sources of information (e.g. operating manual) to determine if the current controls are appropriate for individual items of plant and equipment. Any changes to the risk controls must be documented on the relevant Plant and Equipment Risk Management Form and the OHS Risk Register. Plant and Equipment Risk Management Forms are to be reviewed and revised whenever there is evidence to indicate that the controls may no longer be valid, for example: when the system of work for plant and equipment changes; if the plant and equipment is used in a manner other than what it was designed for; when new information regarding the safety of the plant and equipment becomes available. 6.6 Licensing Requirements WorkSafe Victoria requires the operator of certain items of plant and equipment to hold a relevant license. Licensing requirements can be found in Schedule 3 of the Victorian Occupational Health and Safety Regulations. The Workplace Manager and/or Management OHS Nominee should ensure that all operators of plant and equipment required to be licensed are identified as per the Induction and Training Procedure. A photocopy of the current licence must be collected by the Workplace Manager and/or Management OHS Nominee and retained in the training records. The licensing requirements for contractors are to be managed as per the Contractor Management Procedure. 6.7 Plant Requiring Registration WorkSafe Victoria requires certain items of plant and equipment to be registered. Examples of plant which must be registered include: air receivers pressure vessels boilers tower cranes

Page Number: 6 of 7 self-erecting tower controls lifts building maintenance units amusement structures concrete placing units. The Workplace Manager and/or Management OHS Nominee should contact the DEECD OHS Advisory Service on 1300 074 715 for further information. 6.8 OHS Risk Register The Workplace Manager and/or Management OHS Nominee are to ensure that the OHS Risk Register is kept up to date and is reviewed when plant and equipment hazards are identified, assessed, controlled and reviewed. Communication of any changes to the hazards associated with plant and equipment is to occur as per the Consultation and Communication Procedure. 7. Related Documentation: Consultation and Communication Procedure Contractor Management Procedure Safe Use of Machinery in Technology Teaching Electrical Equipment Procedure Induction and Training Procedure Isolation and Tag Out Procedure OHS Risk Management Procedure OHS Risk Register Plant and Equipment Register Plant and Equipment Risk Management Form Plant and Equipment Maintenance Form Safe Work Procedure OHS Purchasing Procedure OHS Purchasing Checklist 8. Version Control Version Section Amended Amendment Date Created Author 2 All Updated procedure to include the requirements of the Isolation and Tag Out Procedure 3 All Updated procedure to include the requirements of the Plant and Equipment Maintenance Form 4 All Minor wording changes, removal of reference to Safe Use Tests for students as this sits with the curriculum area and is not part of the OHSMS February 2010 March 2010 April 2011 WN BW EHU

Page Number: 7 of 7 5 All Two yearly review as per OHSMS requirements. Change to definitions to include regulated plant Change to 6.3 to include purchasing or acquisition of plant Change to 6.4.2 Training and Education to include requirements for teaching. Inclusion of 6.46.6 licencing requirements November 2012 ESWB