CTI-Investors Forum 2007 CDM/ JI Project Porfolio No. Project Activity Country 1 Small Scale Hydropower Plant Armenia 3 395 ca. US$ mln 3 35% 2010-2031 2 Small Scale Hydropower Plant Armenia 8 741 ca. US$ mln 10 40% 2010-2031 Draft PDD, pre-feasiblity study PDD, feasibility study under development (50% finalized) 3 Biogas Plant (registered CDM Project) Armenia 62 832 ca EUR mln 3.4 35% 2008-2029 PDD, Pre-Feasibility Study 4 Restoration of Heat and Hot Water Supply Armenia 36 924 US$ mln 21 20% 2008-/ PIN, Feasibility Study 5 Methane capture at oil field Azerbaijan 25 977 US$ mln 2.05 / 2009-2019 PIN, PDD 6 Hydropower Plant Azerbaijan 172 500 EUR mln 80.28 / 10 years within 2009-2020 PIN, PDD, First Version of Feasibility Study 7 Heating of houses by biogas from wastes Azerbaijan 28 000 US$ mln 2.7 / 7x 3 years Pre-PIN, 8 Afforestation Azerbaijan 20 000 US$ mln 8 / / PIN 9 Landfill Gas Azerbaijan ca. 78 712 EUR 550 000 / 10 years PIN, PDD Seite 1 von 7
No. Project Activity Country 10 Energy efficiency in CHP Belarus 57 500 EUR mln 215 Planned to be financed from the Innovation Fund of the Ministry of Energy of the Republic of Belarus 2011-/ PIN Planned to be financed from 11 Energy efficiency in CHP Belarus 147 000 EUR mln 148.306 the Innovation Fund of the Ministry of Energy of the 2009-/ PIN, technical documentation Republic of Belarus 12 Energy efficiency in CHP Belarus 155 200 EUR mln 10.2 Planned to be financed from the Innovation Fund of the Ministry of Energy of the Republic of Belarus 2008-/ PIN 13 Energy efficiency in public buildings Belarus 673 621 EUR mln 3 930.1 80% governmental funds expected / PIN 14 Energy Efficiency in CHP Belarus 30 400 EUR mln 7.2 / 2009-/ Pre-PIN 15 Suppression of N 2 O formation Belarus 225 000 EUR mln 2.5 / 2009-/ Pre-PIN Seite 2 von 7
16 Waste management Belarus 8 340.42 EUR mln 7.51 17 Waste management Belarus 23 247,6 EUR mln 7.19 Financing expected through Environmental Fund of the town of Novopolotsk partly financing expected through Environmental Fund of the town of Mogilev / PIN 2009-/ PIN 18 Waste management Belarus 57 000 EUR mln 22.2 30% 2009-/ Pre-PIN 19 Hydropower Plan Belarus 35 000 EUR mln 33.6 / 2011-/ Pre-PIN 20 Installation of Wood-fired Boiler at CHP Belarus 62 700 EUR mln 17.58 financed by the Innovation Fund of the Ministry of Energy of the Republic of Belarus 2009-/ PIN 21 Methane recovery from Poultry Farms Belarus 300 000 EUR mln 40 50% 2008-/ Pre-PIN 22 Methane recovery from livestocks Belarus 200 000 EUR mln 29 50% 2008-/ Pre-PIN 23 Landfill Gas Belarus 60 000 EUR mln 4.5 / 2008-/ Pre-PIN 24 Landfill Gas Belarus 18 500 EUR mln 3 / 2008-/ Pre-PIN Seite 3 von 7
25 Landfill Gas Belarus 64 000 EUR mln 3.6-6 (bundled EUR mln 16) 30% 2008-/ PIN 26 Landfill Gas Belarus 40 000 EUR mln 3.8 / 2008-/ Pre-PIN 27 Landfill Gas Belarus 40 645,5 EUR mln 67.10 / 2009-/ PIN 28 Installation of Wood-fired boilers at CHP Belarus 62 000 EUR mln 13 50% 2008-/ Pre-PIN 29 4 Small Scale Hydro Power Plants 30 Small Scale Hydro Power Plant Bosnia and Herzegovina Bosnia and Herzegovina ca. 18 000 EUR mln 8.8/20 / 2008/2009-2029 PIN ca. 18 000 EUR mln 8.4 2008-/ PIN 31 Wind Farm Bulgaria ca. 20 000 EUR mln 12.2 / 2008/2009-/ PIN, First Draft PDD, feasibility study 32 Efficient Residential Lightning Georgia 2 859 8 577 EUR 695 200 / 2008-/ PIN 33 Methane capture and utilization from waste water treatment plant Georgia 34 318 EUR mln 12 / 2010-2031 PIN, Draft PDD Seite 4 von 7
200 000 (1. 34 Energy Efficiency in Gas Distribution Network Georgia year), 350 000 (2. year), then EUR mln 35 EUR mln 10 2009-/ PIN 434 000 p.a. Patardzeuli / / PDD 35 Methane Recovery from Poultry Farm Georgia 10 100; Savaneti 14 EUR mln 1.29 600 36 Small Scale Hydropower Plant Georgia 30 712 US$ mln 10.53 / / PIN, Pre-Feasibility Study 12 000 / 2008-2017 PIN (2008); 24 37 Wind Farm Georgia 000 (2009), 60 000 EUR mln 58.58 (from 2010 on) 38 CHP Kazakhstan 756 807 Expd. US$ mln 260 / 2010-/ PIN Seite 5 von 7
39 Small Scale Hydropower Plant Kazakhstan 2 000 expd US$ mln 1.78 / 2010-/ PIN 40 Switching schools to electric heating Kyrgizstan Republic 60 000 EUR mln 1.17 EUR 270 800 2008-/ PIN 41 Methane recovery from poultry farm Kyrgizstan Republic 8 000 EUR 500 000 EUR 250 000 2008-/ PIN 42 Hydropower Plant Macedonia 60 060 / / 2008-2029 Pre-PIN 43 Small Scale Hydropower Plants Macedonia 25 272 / / 2007-/ Pre-PIN 44 Landfill Gas Macedonia 71 918 ca. EUR mln 1.8 / / Pre-PIN 45 Hydropower Plant Moldova 21 271 EUR mln 13.74 0 2010-2031 PDD 46 Methane recovery from poultry farms Moldova 38 658 EUR mln 8.74 / 2009-/ PDD Phase I - 21 / / PIN 47 Methane recovery from Coal Mine Poland 400, Phase EUR mln 4.49 II - 84 000 48 Energy efficiency in CHP Ukraine ca. 274 000 EUR mln 54.2 EUR mln 8.25 2009-/ / 49 Energy Efficiency in CHP Ukraine 102 289 EUR mln 16 EUR mln 6.4 2008-/ / Seite 6 von 7
50 Fuel Switch from natural gas to waste wood Ukraine 35 000 EUR mln 4 EUR mln 1.22 2008-/ / 51 of power losses through construction of new power transmission line Uzbekistan 116 866 US$ mln 80 US$ mln 55 2007-/ PIN 52 Leak reduction in natural gas pipeline compressor stations Uzbekistan 57 956,29 US$ mln 1.5 100% (unilateral) 2008-/ PIN Seite 7 von 7