TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS



Similar documents
Committed to make a better world

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

steam centre of excellence Steam Boiler System Optimization

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

HOW TO SELECT A LOW VOLUME (L.V ) BOILER

Best Practice in Boiler Water Treatment

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

The soot and scale problems

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Steam System Efficiency. Bill Lumsden Leidos Engineering

CHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS

It s the coal Rod Hatt

The Owners Coated Coil, Cleaning and Maintenance Service Manual.

CoalGen 2010 Pre-Air Heater Control of SO3 and Related Condensables

BOILER OPERATORS HANDBOOK

Heat-Pipe Heat Exchanger

Continuous flow direct water heating for potable hot water

University of Iowa Power Plant

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

Long-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station

Energy Efficiency in Steam Systems

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

Coal Properties, Sampling & Ash Characteristics by Rod Hatt Coal Combustion, Inc. Versailles, KY

Introducing an All New Line of Cleaning Chemicals

Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY

INTEC Engineering GmbH Heating Solutions for the Marine Industry

EFFICIENCY WITH DIFFERENT GCV OF COAL AND EFFICIENCY IMPROVEMENT OPPORTUNITY IN BOILER

Description of Thermal Oxidizers

MODERNIZATION OF STEAM GENERATORS

Chapter 2.2: Boilers

This chapter is devided into two sections:

1.3 Properties of Coal

New and improved slagging and corrosion control techniques for biomass firing. Martti Aho IV Liekkipäivä

PRESENTER: Yusuf Abdul General Manager- Technical Services. Guyana Sugar Corporation Inc. Ogle, East Coast Demerara GUYANA

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas

Development and Operating Results of Low SO2 to SO3 Conversion Rate Catalyst for DeNOx Application

A Review of Biomass Boiler Technologies. Fernando Preto CanmetENERGY, Natural Resources Canada

Improving the Thermal Efficiency of Coal-Fired Power Plants: A Data Mining Approach

Heating with wood chips and pellets

Steam Generation Efficiency Module Blowdown Losses Section

Multi-pollutant control solutions for coal based power plants

Well Positioned for the Future

Hydrogen from Natural Gas via Steam Methane Reforming (SMR)

This article appeared in a journal published by Elsevier. The attached copy is furnished to the author for internal non-commercial research and

Energy Efficient Operations and Maintenance Strategies for Boilers

Presentation Outline. Background

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance

Stora Enso Fors Ltd Sweden

Condensing Economizers Workshop Enbridge Gas, Toronto. MENEX Boiler Plant Heat Recovery Technologies. Prepared by: Jozo Martinovic, M A Sc, P Eng

BASIC WATER TREATMENT OF STEAM BOILERS

Energy Saving Fact Sheet Boilers

VACUUM REFRIGERATION SYSTEMS

GAS HEATING IN COMMERCIAL PREMISES

Recover Heat from Boiler Blowdown Water

B0401 Abstract 029 Oral Presentation Session B04 Innovative Applications and Designs - Tuesday, July 1, :00 h

Recovery Boiler Research Needs An Industry Perspective

Maximizing Boiler Plant Efficiency. Presenter: Dan Watkins, LEED BD+C Sales Engineer Bornquist, Inc.

Energy Saving Solutions. Bob Montgomery Technical Solutions Specialist Waterloo Manufacturing

R&D on Oil-Burning, Environment-Friendly, High-Efficiency Boiler

Hardness ions also interfere with many chemical processes such as chemical compounding and aqueous cleaners.

Overview of Waste Heat Recovery for Power and Heat

OROT RABIN POWER STATION UNITS x 350 MW

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

Hot Water Boilers and Controls Why Condensing Boilers are Different. Presented Oct. 14, 2008 Long Island Chapter, ASHRAE

Hands-On Labs SM-1 Lab Manual

Mechanical Systems Competency 1.20

SULFUR RECOVERY UNIT. Thermal Oxidizer

BOILER TUNE-UP GUIDE FOR NATURAL GAS AND LIGHT FUEL OIL OPERATION GREG HARRELL, PH.D., P.E.

Austin Peay State University Department of Chemistry CHEM Empirical Formula of a Compound

Wastewater Reuse. Typical treated wastewater is:

12 Ways To Avoid Boiler Tube Corrosion

A Primer on Protecting Idle Boilers By Howard Benisvy, Member ASHRAE

Routine and Emergency Boiler Operation

MILLIKEN CLEAN COAL TECHNOLOGY DEMONSTRATION PROJECT UNIT 2 ELECTROSTATIC PRECIPITATOR PERFORMANCE TEST RESULTS BEFORE AND AFTER MODIFICATION

Removing Thallium from Industrial FGD Scrubber Water with Sorbster Adsorbent Media

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

CATALYSTS IN COMBUSTION TECHNOLOGY AND FLUE GAS CLEANING COMBUSTION AND FUELS

Extracting Valuable Lignin for Biorefinary Production and Replacement of Fossil Fuels

How To Clean Up A Reactor Water Cleanup

FREQUENTLY ASKED QUESTIONS (SOLAR WATER HEATER)

Saving Boiler Fuel. Figure 1: Boiler System Operation Costs

Waste to Energy in Düsseldorf. for a clean city.

Evaluate, Clean, and Tune Guidance

Boiler Blowdown. Boiler Blowdown Benefits. Best Operating Practices for Boiler Blowdown

TABLE OF CONTENT

Aeration Air & Digester Gas Flow Metering Using Thermal Mass Technology. HWEA 2011 Conference Craig S. Johnson

Munchkin Heat Exchanger Maintenance

By K.K.Parthiban / Boiler specialist / Venus Energy Audit System

This will also provide you with the knowledge to insure long life for your Investment

What is Cement? History Overview of the Cement Manufacturing Process Brief Overview of Kiln Operations Why Burn Wastes?

Abstract Process Economics Program Report 136A PLANT UTILITIES COSTS (January 1995)

experiment5 Understanding and applying the concept of limiting reagents. Learning how to perform a vacuum filtration.

Ultrasonic support removal tank

Boiler Efficiency. Charles Stark Department of Poultry Science.

AMMONIA AND UREA PRODUCTION

Transcription:

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS Dr. Abhay Kumar Sahay, AGM(CC OS) Bijay Manjul, AGM( Operation) Kahalgaon

Boiler has three inputs Steam generator 1. WATER 2. COAL 3. AIR Burner Air preheater AIR PRE HEATER Secondary air Primary air Pulverized fuel Coal bunker Coal mill Intermed. Flyash bunker Fly ash Excess Air FD-Fans Electric precipitator Flue gas 2

This is LUNGS of the Boiler. 322 0 C 371 0 C 38 0 C 143 0 C Air enters to the Boiler & exits from the Boiler through APH. Though it cost only 2%of total cost of boiler but transfer 20% of total heat fed to the boiler. 3

The purpose of air preheater is to recover the heat from the boiler flue gas which increases the thermal efficiency of the boiler by using the useful heat which would be lost in the flue gas. 4

1% improvement in boiler efficiency is realized for each 20 C increase in boiler inlet air temperature 1% improvement in boiler efficiency = 1% improvement in heat rate = 24 K Cal / KW Heat gain 20 C +1%Efficiency 5

Air heater fouling is usually in the form of plugging of the element channels by deposits of: Fly Ash Sulfur (and Sulfuric Acid) Other Corrosion and Flow limiting Deposits An increase in pressure differential across the air heater is directly related to the degree of fouling 6

An increase in pressure differentials across the air heater can cause: Increase in Fan Amps/Aux. Power Decrease in Mw Output Reduced Boiler Efficiency Increased Heat Rate Increased CO 2 Emissions 7

Severe fouling of fin tube surfaces in steam coil air preheaters Severe Fouling of element channels in rotary air preheaters 8

AN INSIGHT INTO COLD END DEPOSIT Precipitation fouling: Precipitation of dissolved substances on lowering of temp. Chemical reaction fouling: Deposits formed due to chemical reaction. Particulate fouling: Deposition of impurities from gas stream & reduction of heat transfer, increase in pr drop. Corrosion fouling: Heat transfer surface reacts itself. Deposition of Al 2 O 3, Fe 2 O 3, SiO 2 particulates, sulfur, sodium, vanadium & chlorine from oil. Dew point condensation of Na 2 SO 4, K 2 SO 4, P 2 O 5, Na 2 CO 3, NaCl. 9

AIR PRE HEATER COLD END GAS SIDE DEPOSIT SO 3 (H 2 SO 4 ) in Flue gas ppm S + O2 = SO2, 2SO2 + O2 = 2SO3 Excess air increases dew point of flue gas from designed 129 0 C. Below dew point temp free sulphuric acid appear and dissolve calcium and depositing calcium sulphate retarding heat transfer. Calcium sulphate can not be removed by water or acid cleaning. 10

Common methods for cleaning of air preheater elements include; High pressure water jetting Saturated/superheated steam Compressed air The most common method is high pressure water jetting 11

The amount of wastewater produced during cleaning can exceed 17500 M 3. Removing one waste at the cost of generating another waste Tenacious deposits & sulphate scales cannot be removed by present methods of cleaning. Even in a freshly cleaned Air Preheater air temp does not go beyond 260 0 C to 280 0 C. Reducing Mill outlet temp threatening moisture separation in P.F.Pipe. 12

Comparison between HP hydro jet cleaning versus chemical cleaning Hydro jet cleaning Oil on basket surface remains Due to criss cross geometry of the mess of basket, water enters at one angle and leaves the basket at another angle leading to taper formation of the deposits rather than complete removal Metal loss / damage of the baskets due mechanical rubbing huge amount of water required and cleaning not effective Being hard siliceous deposits,,longer cleaning time ( 10 12hrs per basket ) required with proportionate labour cost Too cumbersome, Chemical cleaning Effective removal of all deposits including oil with simultaneous protection of the metal as the chemicals including inhibitors are carefully selected for this specific lot of baskets exactly in the similar manner as we usually do for post operational chemical cleaning of boilers which has been an established practice in NTPC so far. Total cleaning time is reduced by 50% and so is the labour cost Quality of cleaning with due protection of the base metal is far superior as compared to that of water jet cleaning.

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS

During operation the Air Pre Heater Basket became fouled with oil, grease, dust and carbonaceous matter. Deposits of these materials has affected affect the performance of the system. Composition of the deposit : Acid insoluble Ca PO4 Oil

Initially HP water jetting has been tried on these fouled baskets. But issues with water jet cleaning are : Too cumbersome, time taking( 8 10hrs per basket ) huge amount of water required and cleaning not effective. Particularly oil on the basket surface remains which is a potential problem when the baskets will be put back into service. In view of above, a chemical cleaning has been attempted.

Basic Mechanism on which this chemical composition works The Air Pre heaters Basket are immersed in a bath containing Composite chemicals. By continuous Air agitation in the liquid it creates microscopic vacuum bubbles, which implode forcefully onto the surface that is to be cleaned. This phenomenon is called cavitation.

This energy produces a powerful cleaning effect that is able to remove stubborn contamination, even in spaces that are hard to reach, drastically shortening the cleaning time. Then composite chemicals penetrates the deposits dissolving oily matter and loosening insoluble solids, so that they can be easily removed by agitating.

The Cleaning has been envisaged by using eco friendly readily available chemicals with appropriate cleaning performance. 1. A temporary tank of suitable capacity has been prepared to immerse the APH BASKET with air header, water line and drain point connection. 2. WATER FLUSHING: Before immersing the APH Basket, flush with plenty of water to remove all loose, deposits, dirt, dust, etc. This can be carried out to the duration of 15 minutes and drain the dirty water.

PROCEDURE FOR CHEMICAL CLEANING OF one no of fouled APH BASKET. Composite chemical consist mixture of (a ) 1 kg of Formic acid(85%purity)commercial grade,( b) 2 Kg Phosphoric acid ( 85% purity) commercial grade, ( c) 500 ml Corrosion inhibitor, and (d) 3 Kg Wetting agent and Dispersant Fill up the tank with fresh water. Now add the composite chemical cleaning Compound in the ratio of 1: 10 (i.e.) one part of chemical and 10 parts of water Allow for soaking to the duration of 4 Hrs. Compressed Air purging should be given throughout process period. The ratio of the cleaning chemical and also the process time of soaking may increased or decreased depending upon the extent of deposit. Drain the entire solution.

WATER WASH: Fill up the tank with fresh water and carry out the mass flushing. Remove Air Pre Heater Basket from the Tank and flush with water if required. Apply High pressure cleaning to remove the loosened dislodged deposit from the system.

Seeing is believing!!

Fouled basket inside the tank

After putting the chemicals inside the tank with air blowing

Continuous air scouring in progress

Soaking step nearing completion

Basket taken out of tank after completion of soaking period

First we tried with fire water

Flushing with fire water in progress

Jet piping got ready

Flushing with HP jet pipe in progress

Flushing with HP jet pipe in progress

Flushing with HP jet pipe in progress

After flushing Cleaned basket resembling very closely to new one

Even side plates are thoroughly cleaned

More than 95 % of the mesh has been cleaned effectively

Before cleaning After cleaning

Before cleaning After cleaning

Cost comparison Approx. Cost New APH basketis Rs 60000/ Per basket.once reclaimed there is a realistic prospect of a savings of Rs 58000 per basket and let us say for a set of 100 baskets of one APH,it translates into a direct savings of Rs 5800000/ besides other associated benefits. With a fleet size of 100 (+ )of thermal units, there is a great opportunity of savings!! Cost of in house chemical cleaning of one basket is Apprx.2000/ Time taken is approx. 5 hrs (4 hrs soaking +1 hrs flushing)*. *(This can be optimized with simultaneous cleaning using a bigger tank ) Since it is proposed to be a in house activity, therefore worth trying.

But we have to keep in mind the following : Cleaning of each set of baskets shall be taken up on case to case basis, as the chemical composition needs to be formulated based on the deposit material on the target baskets. Conclusion : We plan to go for one more trial cleaning of affected basket for one of our stations for finalizing the structured procedure of this cleaning method. And of course, Most important point is support from all concerned!!