IDP. for. Contractors



Similar documents
INFRASTRUCTURE DEVELOPMENT PROCESS MANUAL

Planning and Zoning Commission Johnston, Iowa June 29, 2015

Permit No. Permit Fee: $ Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: Address:

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING Subdivision Improvement Performance Bond Requirements

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

CITY OF GRAND PRAIRIE PUBLIC IMPROVEMENT DISTRICT POLICY AS ADOPTED BY THE CITY COUNCIL ON MARCH 1, 2011

CONTRACTORS APPLICATION WESTCAP INSURANCE SERVICES, INC. 4. PRODUCER CONTACT NAME 6. PRODUCER

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

APPENDIX I DEVELOPMENT PROCESS CHECKLIST

Name of Event: Sponsoring Organization: Name of Person Responsible for application: Address of Organization: Phone: Event Contact during event

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

City of Valdosta Land Development Regulations. Table of Contents

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)

PERFORMANCE AGREEMENT AND SURETY PROCESS FOR SUBDIVISIONS AND SITE PLANS

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

104 INTERPRETATION OF TEXT

RONALD WASTEWATER DISTRICT LINDEN AVENUE NORTH - P.O. BOX SHORELINE WA (206)

BUILDERS & CONTRACTORS INSURANCE COMPANY, RRG, A RISK RETENTION GROUP CONTRACTORS APPLICATION NATIONAL BUILDERS INSURANCE SERVICES, INC.

City of Yakima. Home Occupation. Application Packet

City of Douglas Commercial Building Permit Site Application

APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas Intake Date

SECTION EIGHT BONDING REQUIREMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Test Bore, Monitoring Well, & Underground Storage Tank Decommissioning Permit Application Packet

Bond Release Process for New Subdivision Developments in Fairfax County

Engineering Major Service Actual Budget Projected Request Executive Adopted

PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP;

CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS

DPIE FY2016 Fee Schedule (Effective July 1, 2015)

STORMWATER MANAGEMENT CHECKLIST

Things N~eded to Obtain a Building Permit

Year 2015 Contractor License Packet

Lansdowne Stormwater UPDATE

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

MAINTENANCE AND PERFORMANCE BONDS

CITY OF LUDINGTON RENTAL REHABILITATION PROGRAM PROGRAM GUIDELINES 2009 GENERAL

Please Refer to Attached Sample Form

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS

Permits for Development within Floodplains

Pro Builders Specialty Insurance Company, RRG contact Nations Builders Insurance Services, Inc.

LICENSE APPLICATION FOR CONTRACTORS

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Bylaw No Private Sewer and Water Service Connection Bylaw, 2010

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

ATTENTION HOMEOWNERS

Essex Insurance Company P.O. Box 22778, Oklahoma City, OK Fax:

CHAPTER XIX PLUMBING

Lincoln County Floodplain Development Permit Application

SPECIFICATIONS FOR WEED CUTTING/STREET TREE TRIMMING/REMOVAL RFQ NO MARY ANN MILLER, CPPO PURCHASING AGENT.

CONFORMITY WITH PLANS; DRAINAGE.

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri Manchester Road. Des Peres, Missouri 63131

Chapter 9 Sanitary Sewers

CITY of DALY CITY INSURANCE REQUIREMENTS

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

RESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form

Essex Insurance Company P.O. Box 22778, Oklahoma City, OK Phone: Fax:

Commercial Construction Permit Application

SECTION 7 UNDERDRAIN SERVICE

CITY OF CRESTVIEW. TRADES PERMIT APPLICATION (Mechanical, Electrical, Plumbing, Irrigation, Fire Alarm & Gas Permits)

PERMIT FOR WRECKING OR DEMOLITION

HOW TO OBTAIN A NEW CONTRACTOR LICENSE

Twenty Mile Insurance Contractor Application (5/2009)

SECTION 7: SITE INFORMATION (refer to 780 CMR for details on each item) Sewage Disposal: Indicate municipal or on site system

Commercial Real Estate Construction Lending Checklist. Presented by:

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

Land development manual Section 73 Compliance Certificate application process

Please Refer to Attached Sample Form

CONTRACTORS GENERAL LIABILITY APPLICATION Note: Throughout this questionnaire the words you and your include all entities seeking coverage

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

Sims Bayou Federal Flood Damage Reduction Project

Illinois Department of Revenue Regulations

PROPOSAL DOCUMENT LEGAL NOTICE - PROPOSALS WANTED GENERAL INFORMATION AND INSTRUCTION (IF YOU CHOOSE NOT TO SUBMIT A PROPOSAL, PLEASE COMPLETE PAGE )

Guidelines for Fiber Optic Cable Permits

Town of West New York Hudson County, NJ Notice for R.F.P. (Request for Proposal) Animal Control Shelter Services (2 nd Occasion)

OAK Airport Ground Transportation Limousine Application Package Requirements

InsuranceTek, Inc Bothell-Everett Hwy #6129 Mill Creek WA Phone (888) * Fax (425)

RFP Request for Proposal Drain and Sewer Line Maintenance Services

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS

SITE IMPROVEMENT PLANS CHECKLIST

City of Balch Springs, Texas. Request for Proposal (RFP ) Pipe Bursting Sewer Line Replacement

Chapter 2 PLAN AND PLAT REVIEW PROCESS

Transcription:

Developing in Tulsa IDP for Contractors 1

Topics IDP Process Contracts Bonds Insurance Escrow Accounts Permits Construction/Inspection Acceptance by City 2

What is IDP? Process to build public infrastructure by the private development community Water and Sanitary Mains Streets Stormwater Facilities Pipes Channels Detention Ponds 3

IDP Process Pre-development meetings Design Permits Construction/Inspection Acceptance by City 4

Infrastructure Development Process Design Period DEVELOPER Substantial Completion Plat Filed CITY Formal Acceptance Sanitary Sewer Water Construction 2 Yr Maint Street & Stormwater Permit Application Infrastructure Permit Issued Building Permit Construction Complete Certificate of Occupancy 5

IDP Contracts City Contract Developer Contract Every development project Engineer Contractor A A Contractor B Pool of Engineers under annual contract Pool of Contractors under annual contract 6

Annual Contracts Engineers Contractors Arterial $250K Bond Annual Contract City Contractors Non-Arterial $100k Bond 7

ANNUAL CONTRACTS CONSTRUCTION CONTRACTOR APPLICATION Signed Contract $250 fee Annual Bond: $250,000 Arterial $100,000 Nonarterial City Attorney Planning & Economic Development Director TMUA MAYOR CONTRACT APPROVED Type of Work Insurance Certificate Taps & Water Mains must have D License 8

Contracts Type of Work 175 E. 2 nd Street, Ste 450 Tulsa, OK 74103 918-596-2514 www.cityoftulsa.org APPLICATION FOR ANNUAL CONTRACTOR S CONTRACT FOR INFRASTRUCTURE DEVELOPMENT PROCESS (IDP) Please print or type. Incomplete applications will be rejected. Date: Name of Company Account Number Type of Legal Entity: Corporation Partnership LLC Other Address City State Zip Phone FAX Point of Contact Phone Email Level of Work: Major Construction and/or Minor Construction Arterial Right-of-Way (includes Minor Non-Arterial Right-of-Way) (Requires $250,000 Bond) Minor Construction Non-Arterial Right-of-Way (Constructed using standard Design, Requires $100,000 Bond) Bonding Level: (Copy of Bond Required) Bonding Company Amount of Bond $100,000 or $250,000 Type of Work: WATER* SEWER STORMWATER TRAFFIC & TRANSPORTATION Main Extension New Detention Streets/Median Modification Revision Revision Floodplain Sidewalks/Driveways Tap Tap Pipes/Channels Traffic Signalization *Contractor must have Class D Water License Boring OTHER City of Tulsa Construction Experience Other Construction Experience Please include:. Application Copy of Insurance Copy of Bond $250 application fee 9

Bonds Annual Bond Standard Form Performance, Payment, 1 year Maintenance $250,000 Includes Arterial, non-arterial streets and IDP projects $100,000 Non-arterial streets only 2 year maintenance bond IDP Major Permit work (every project) Value of the work Starts at Substantial Completion 10

Insurance Worker s Comp State requirements Public Liability $175,000 Individual $1 million per accident $100,000 property damage City named as additional insured Owners Protection Liability Coverage amounts same as public Same Company as public 30 day cancellation notification 11

ESCROW Field Inspection $68 per day Testing & QA $50 per day ODEQ Fees $2 /100ft ($10 min) Water Main Force Acct $200 per connection W M Testing & Chlor $0.25/ft of water line 12

Right-of-Way Permits R/W, Major Construction (Engineer Designed) Commonly called IDP Permit R/W, Minor Construction (Standards Used) Arterial Streets All other R/W, Temporary Use 13

R/W Major Construction Permit APPLICATION FOR ROW MAJOR CONSTRUCTION PERMIT List type of work Escrow Number of construction days Value of work 2-yr. Maintenance bond Send Contractor s Permit to Field Engineering 2-Year maintenance period begins Substantial Completion PreWork Conference Inspection and Testing by COT ACTUAL CONSTRUCTION (All construction contracts between Developer & Contractor) 14

R/W Major Construction Permit 175 E. 2 nd Street, Ste 450 Tulsa, OK 74103 918-596-7815 www.cityoftulsa.org PERMIT APPLICATION FOR INFRASTRUCTURE DEVELOPMENT PROCESS MAJOR CONSTRUCTION (IDP) Please print or type. Incomplete applications will be rejected. IDP Name IDP Location Subdivision IDP Number (If known) Name of Contractor Account Number Point of Contact Phone Type of Work: E-Mail WATER SEWER STORMWATER TRAFFIC & TRANSPORTATION [ ] Main Ext [ ] New [ ] Detention [ ] Streets [ ] Revision [ ] Revision [ ] Floodplain [ ] Sidewalks/Driveways [ ] Taps [ ] Taps [ ] Floodway [ ] Median Modification [ ] Pipes/Channels [ ] Traffic Signalization [ ] OTHER If Water is checked please include 6 sets of plans. If Sewer is checked please include 3 sets of plans. If both Water and Sewer are checked please include 9 sets of plans. Estimated Work Days Estimated Total Cost of Improvement 15

SUBSTANTIAL COMPLETION Infrastructure project that has been inspected by the City Certified to be complete for all intended purposes Authorizes the public use of the infrastructure for which the facility was designed The maintenance period begins at this time 16

R/W Minor Construction Permit APPLICATION FOR WATERSHED - ROW MINOR CONSTRUCTION PERMIT Must have Annual Contract Issue Permit PreWork Conference ACTUAL CONSTRUCTION (All construction contracts between Developer & Contractor) 1-Year maintenance period Inspection and Testing by COT 17

Contacts Harold Tohlen Infrastructure Development Manager (918) 596-7344 Julie Miller IDP Coordinator (918) 596-2514 Website www.cityoftulsa.org Business Get a Permit Permits and Licensing Infrastructure Development 18