MicroFIT Connection Application Guidelines



Similar documents
Interconnection Service - Frequently Asked Questions

Dakota Energy Cooperative, Inc. POLICY STATEMENT

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

FIT TIER 2 Application

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

Photovoltaic Incentive Program

Electric Rate Schedule

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Physical Address: City: State: Zip Code:

HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012

Ontario Electrical Safety Code 25 th Edition/ 2012

TERMS AND CONDITIONS

Applying For New or Revised Electric Service

TECHNICAL INTERCONNECTION REQUIREMENTS FOR DISTRIBUTED GENERATION. Micro Generation & Small Generation, 3-phase, less than 30 kw

Glossary PowerClerk Term Definition

ALL STAR ELECTRIC COMPANY 10,000 Trumbull SE, Suite #F Albuquerque, NM (505) voice & fax NM License

Corona Department of Water & Power (DWP) Solar Partnership Program Guidelines and Application

Request for Proposals for Photovoltaic System Installation

Distributed Generation: Frequently Asked Questions

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Rebates are available on a first come, first-serve basis. There are a limited number of rebates available in 2010.

Interconnection Application For Residential and Commercial Power Systems 10 kw or Smaller

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

To complete the process for a net metering interconnection, please follow the steps below:

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

SolarFlair Energy Inc. 190 Pleasant St, Ashland, MA

TERMS AND CONDITIONS

Welcome 2016 Residential and Commercial Solar Photovoltaic

DELIVERING BUSINESS ENERGY GO GREEN AND SAVE MONEY

SPECIFICATION COG-2007

Net Energy Metering Solar PV Interconnection Handbook. Effective January 1, 2016

Solar*Rewards Frequently Asked Questions

AUSTIN ENERGY INTERCONNECTION GUIDE FOR CUSTOMER-OWNED POWER PRODUCTION FOR FACILITIES UP TO 10MW A INTERCONNECTION CLASSIFICATIONS...

Model Number Electrical Compatibility Module Connector Type. M LL-S22 60 cell PV module MC-4 Type 2 Locking

Connecting to the network information pack Version 2

Current Transformer (CT) Selection Guide

SOLAR TECHNOLOGY CHRIS PRICE TECHNICAL SERVICES OFFICER BIMOSE TRIBAL COUNCIL

SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems

The Electricity Grid. The why, the where and the future. 26 March Dr Robert Barr AM. Sothern Highlands & Tablelands Group Engineers Australia

To assist you with getting started with the SRECs program, find enclosed a copy of the following:

SOUTH CAROLINA. Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

Net Metering Summary Within Northeast Utilities

PV SOLAR RESOURCE GUIDE FOR RURAL DISTRIBUTORS IN TN

MICRO HYDRO FOR THE FARM AND HOME

Information Required for Submission of a LREC/ZREC Bid to Connecticut Light and Power dba Eversource Energy ( Eversource )

Rule Fast Track Analysis for National Life Insurance Co.

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

Key Concepts Of Distributed Generation

Smart Grid and Renewable Energy Grid Integration. Jian Sun, Professor and Director Department of ECSE & Center for Future Energy Systems

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

AC COUPLED HYBRID SYSTEMS AND MINI GRIDS

Guidelines and Instructions to Fill out UI Application for Small ZREC Tariff YEAR 4

Fronius inverters named on the "Go Solar California Eligible Inverter listing

Expedited Permit Process for PV Systems AC Module

INFORMATION DOCUMENT

ACTIVITY 6: Series and Parallel Wiring

About Southern California Edison

Solar power system installation for homes & businesses

New energy leads low carbon life.

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 135 STATE OF UTAH. Net Metering Service

300 MY HOME Energy management

Solar Photovoltaic System, Valuation and Leasing Overview

FEED-IN TARIFF CONTRACT (FIT CONTRACT)

RENEWABLE ENERGY INVESTMENTS

Schedule NEM Sheet 1 NET ENERGY METERING

TECHNICAL BRIEF. Commercial PV in Australia and New Zealand Using the Enphase Microinverter System

PV (photovoltaic) Basics There are generally two types of PV systems. The first and easiest (though the least flexible) is a grid tie system where

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

Green Industries, Department of Trade and Industry

Oregon s s Renewable Energy Action Plan and Renewable Energy Working Group. Renewable Energy Working Group

Free electricity for your home, offices or factory with solar PV panels

Solar Power Frequently Asked Questions

Md. PUBLIC UTILITIES Code Ann

City of Riverside Building & Safety Division Phone: (951)

NORTH CAROLINA INTERCONNECTION PROCEDURES, FORMS, AND AGREEMENTS. For State-Jurisdictional Generator Interconnections. Effective June 16, 2009

YOUR GUIDE TO. Connecting Micro-generation to the Electricity Network

INTEGRATION OF ALTERNATIVE SOURCES OF ENERGY

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Transcription:

MicroFIT Connection Application Guidelines These guidelines serve to ensure the efficient processing and implementation of your project. Please read and follow them carefully and completely in order to avoid delays in your application process. 1. Documents Required for Processing Offer to Connect (OTC) In the case where the supplier name and the Toronto Hydro customer name for the existing service are different, a signed agreement that authorizes the supplier to have access to the roof top for the PV installation is required. 2. Payment (Non-Refundable) The cost for processing the MicroFIT Connection Application, and performing a preliminary capacity assessment, is $500 plus HST. Please make your cheque payable to Toronto Hydro-Electric System Limited. Official invoice(s) stamped PAID will be sent to you for your records. 3. Submission of Payment & Documents All required documents, as outlined in the Connection Application Checklist below (with the exception of 1.7) will be submitted directly to: 5800 Yonge Street, Toronto, ON M2M 3T3. Attn: Eleanor So, Ellipse Accounts Receivable There are two options for submission of payment and documents: 1. By mail to Accounts Receivable Department at 5800 Yonge Street (as shown above). 2. Drop box located outside the building at 5800 Yonge Street. NOTE: Security and AR staff cannot accept the payments due to security reasons. Please submit via either option #1 or option#2, as listed above. 4. ESA Notice of Inspection (1.7) A scanned copy of the ESA notice of inspection shall be emailed to the Generation Planning section (fit@torontohydro.com) as soon as the final ESA inspection is completed. Please specify in the email subject line: ESA Notice of inspection, project address and FIT ID number. 5. MicroFIT Connection Application Checklist. Connection Application Checklist 1.1 Completed Connection Application Form signed by legal OPA applicant. 1.2 Single Line Diagram showing proposed service, and including all required information. 1.3 Inverter Manufacturer information (Must be CSA 22.2 #107.1 Certified.) 1.4 Copy of Lease agreement between Developer and Landlord (if applicable) 1.5 Payment fee payable to. 1.6 Send payment and all required documents as mentioned in Guideline 3. 1.7 ESA Notice of Inspection after project has had the final ESA inspection completed. 1

Micro FIT Connection Application Form This application form provides information required for an initial assessment of the Embedded Generation project OPA FIT Project Identification Number: 1. DG System Owner: (Supplier Name as per OPA contract) Supplier Name: Address: Contact Name: GST/HST Number: 2. Customer Legal Name: (Toronto Hydro Customer Name at existing service) Customer Name: Service Address: Contact Name: Toronto Hydro Account Number: 3. Engineering Consultant (Electrical)/Developer: Company / Person: Contact: Address: 2

4. Project Description: Proposed Dates: (dd/mm/yyyy) Start of Construction: In-service: Project Size: Output Voltage: (VAC) 1-Phase 3-Phase [A] No. of units (i.e. Solar Panels): (Must match data on SLD) [B] Rating of unit (i.e. each panel): (kw) (Must match data on SLD) Proposed Total Capacity (A x B): (kw) Proposed Total Capacity (Future): (kw) (If future expansion is planned) Generator Type: (Must match data on SLD) Inverter Synchronous Induction Other (please specify); Inverter Manufacturer: Model No.: No. of Inverters: Rating: (kw) Total Inverter Capacity: (kw) Note: Technical Information on inverter shall be provided with the connection application. Only CSA (22.2 #107.1) certified inverters are acceptable. Mode of Operation: Load Displacement? Yes: Existing Load: (kw) New Load: (kw) No Power Export? Yes (kw) No Peak Period Only? Yes (kw) No Proposed Connection Method: Indirectly Connected (Parallel) Load Embedded (Series) Directly Connected 3

5. Project Type: Solar Photovoltaic (PV) Wind Bio-gas Renewable Biomass Landfill Gas Other (please specify below): 6. Single Line Diagram (SLD) Requirements: A Single Line Diagram (SLD) must be provided that shows the project proposal from the generator / PV array to the connection point to Toronto Hydro s distribution system. This diagram will include, in detail, all electrical components required to complete the installation. Such components to include (but not be limited to); generator equipment (including the number of PV panels, inverters, and their ratings), disconnect switches, meter base sockets, splitter troughs, phase loss protection, transformers, cables, protective relays / devices, metering, synchronizing etc. The Single-Line diagram requires a title block to indicate the following; OPA MicroFIT Reference Number (7-digit form: FIT-MXXXXXX) Location s Address Output Voltage and phase to the distribution system Solar Array Rating (kw) Inverter Rating (kw) Nameplate Capacity (kw) Note (1) : Single-phase inverters on a three-phase service will not be permitted. Only three-phase inverters on three-phase services will be accepted. Note (2) : If the project includes upgrades to existing EG facilities, show the existing and new electrical equipment. Be sure that the diagram is complete, and has the proper information in the title block for each location. This is required in order to have your connection request processed. (If you are unsure of how to create a proper Single-Line Diagram, please consult a qualified professional for assistance.) SLD Drawing Number: Rev.: 4

7. Is the Generation Facility financed by a lender? Yes No 8. Other Relevant Information: 9. Signature Information: Customer Name (print): Date: Customer Signature: IMPORTANT NOTE - Following the OTC submission to the OPA A Connection Cost Estimate (CCE) document will be sent by email from the Generation Planning Section, once a positive offer to connect is submitted to the OPA for the MicroFIT project. This document, which is to be signed by the legal OPA applicant, must be scanned and emailed to fit@torontohydro.com within 7 business days. Only once this document is received will Toronto Hydro issue the scope package to have the meter locate/ site visit scheduled. 5