PROJECT COST ESTIMATES & FEASIBILITIES



Similar documents
RECOMMENDED MODEL AGREEMENTS BETWEEN HOUSING CONSUMERS AND HOME BUILDERS FOR THE CONSTRUCTION OF A HOME

Commercial Building Valuation Report

CHAPTER 2 QUANTITY TAKE-OFF

A Guide to... Home Renovation Incentive (HRI)

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE

Commercial Building Valuation Report

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Estimated Cost of Repair

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

HOME INSURANCE ASSESSMENT

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

How To Build A Luxury Apartment Complex In London

Product description NCC Data Center

Requirements for Building Application Submission

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Activity Schedules in the NEC3 Engineering and Construction Contract

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

WORK SCOPE. Domains in which we work:

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

Estimate Memorandum/ Basis of Estimate

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Buildings Construction Procurement Strategy

Sample Drawing Package for One and Two Family Dwelling Applications

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Important Information for Owners of Buildings in Flood Zones

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Building Condition Assessment Report

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT

The Florida Building Code

Special Use Commercial Properties

HATFIELD TOWNSHIP DRY CLEANING PLANT PERMIT APPLICATION PROCEDURES

The minimum reinforcement for the stem wall is the placement of:

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Building Condition Assessment Report

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Saint Cloud Business Center

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

Building Condition Assessment: West Lexington Street Baltimore, Maryland

Standards Committee T echnical Technical Conference

TECHNICAL SCHOOL. Construction. Construction. Build your future the INTEC way

Health & Safety Strategy. Construction Industry in New Zealand

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

Capital Expenditure. The common definition of capital expenditure is

Quantity Take-off. Quantity Take-off

What Every Commercial Broker Should Know About Construction & Design

InfoforBuilding.com Owner-Builder Spreadsheet

Notice to Property Owners

MEMORANDUM. General: Foundation:

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

Site Survey Questionnaire

Cost of Building a Typical Home The impact of using PVC and alternative construction materials in house construction

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Technical qualifications for licensing

COST MANAGEMENT / COST CONTROL. Bill Ibram, FRICS

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

Name of course: Residential Construction Site Management (RCSM) Level 1

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

Are You Ready for the New Insurance Required for Condominiums?

David Watkins RIBA Part 3 Course Cost Control and Management

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

City of Fort Smith Building Permit Process Frequently Asked Questions

FOR SALE Office Building

CHAPTER 4 TYPES OF COST ESTIMATES

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

WAIVER OF MECHANICS LIENS

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

Fame Design Ltd (10295) Plot # A-115/116,BSCIC Hosiery I/A, Narayangonj, Bangladesh ( , ) 18.June.2014

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator

RE: Benchmark Costs Per Square Metre for School Function Areas

HATFIELD TOWNSHIP. FLAMMABLE and COMBUSTIBLE LIQUIDS PERMIT APPLICATION PROCEDURES

Quantity Takeoff. Dr. Ahmed Elyamany

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

REAL ESTATE DESCRIPTION

SUCF PROJECT COST REPORTING GUIDE

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

The UPLANDS at ORO VALLEY Sterling Features

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

NOTICE TO CONTRACTORS

Mesirow Financial An Ounce of Prevention: Emergency Preparedness and Response

Consultants Estimating Manual

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

TOWNSEND APPRAISALS, INC TH AVENUE SOUTH, SUITE #11 NAPLES, FLORIDA TEL: (239) FAX: (239)

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

CHECKLIST FOR SUBMISSION Construction Productivity Awards - Projects 2015

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

Estimating Database Checklist

RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE

Transcription:

PROJECT COST ESTIMATES & FEASIBILITIES

Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed and constructed within the established programme Meets or exceeds industry standard of quality Communication is well documented and communicated

Project Cost Estimate Estimate a prediction of quantities, cost and resources required for defined scope of a project As a prediction there will be risks and uncertainties that must be addressed Estimates are used as inputs for budgeting, cost analysis and decision making on a project Determined using experience and forecasting of future costs within a given time frame

Types of Estimates Order of magnitude estimate early or preliminary prediction of cost based on similar previous projects or rate per square metre of a similar project. Level of information usually low and level of accuracy equally low - -50% to +50% or more Elemental estimate level of information has increased and costs can be categorised into various elements of the project, e.g. foundations, floors, external walls, roof, fittings, electrical installation, etc. Level of accuracy improves to about -25% to +25%

Detailed estimate detailed design available and schedule of materials can be produced. This can be in the form of Bills of Quantities or Schedule of Materials for pricing. Level of accuracy has increased to - 10% to +10%

Use of Estimating Techniques Single Rate estimates or Rate/m2. Very crude method usually based on previous experience of similar projects. Must not be relied on for budget approval purposes. Use for initial investigations only. Elemental estimate or project cost plan. As the name implies this is used when more planning information is available. Can be used for budget approval or in smaller projects for final procurement. Detailed schedule of materials estimate. Widely used in building projects for procuring contractors.

Components of a Project Estimate Cost of design consulting team fees Cost of construction Contractor s general expenses plant, insurances, site establishment Material Labour Overhead Profit Contingencies Project unknowns & risk allowance Construction period variances Cost of land, finance, rates & taxes, municipal planning fees, etc

Typical Estimate Template Single Rate Estimate. Building size: 200m2 Applicable rate / m2 derived from previous experience: R2,000/m2 Project estimate = 200m2 x R2,000 = R400,000 Pitfalls use with caution as 2 buildings with same area may cost differently.

Building 1 has 2,000m2 floor area and is 3,5m high floor to ceiling height Building 2 has same floor area but is 3,0m high floor to ceiling Building 1 will have 500mm more walls and plaster and paint than building 2 Building 1: 2000 x 3000 = R6,000,000 Building 2: 2000 x 2900 = R5,800,000 The additional 500mm height costs R200,000

More factors that will influence rate/m2 Shape of the building Number of internal walls within the building Services within air-conditioning, lifts, etc Finishes marble floors vs vinyl tiles Extent of external works paving, landscaping, etc Use rate/m2 with caution!!!

Elemental Estimate Sub structure Foundations, Ground floor slab Superstructure Structural frame comprising columns & upper floor slabs, External walls, Internal walls, Roof Internal finishes floor and wall finishes, ceilings Services electrical and lift installations, airconditioning, fire installation External works paving, boundary wall, landscaping, etc Contingency sum Preliminary and general items Escalation Value Added Tax

ELEMENTAL COST PLAN Floor Area 1 590m2 Description Amount 1 Substructure 100 000 2 Ground floor construction 70 000 3 Structural Frame 800 000 4 External Envelope 900 000 5 Roofs 600 000 6 Internal divisions 300 000 7 Internal floor finishes 400 000 8 Internal wall finishes 80 000 9 Ceilings & Bulkheads 200 000 10 Fittings 1 000 000 11 Services 1 000 000 12 Plumbing Installation 700 000 13 Sprinklers, hydrants & hose reels 30 000 14 External Works 900 000 Sub Total R 7 080 000 15 Preliminaries 380 000 16 Allowance for Contingencies 400 000 Sub Total Construction Costs 7 860 000 17 Escalation 120 000 Estimated Total Project Cost Excluding VAT R 7 980 000 Rate per square metre of floor area For given specification and assumptions R 5,019/m2

Bills of Quantities DESCRIPTION UNIT QTY RATE AMOUNT BILL NO. 3 CONCRETE, FORMWORK AND REINFORCEMENT REINFORCED CONCRETE 20MPa/19mm concrete Surface beds m3 100 1 000,00 100 000,00 20MPa/19mm concrete Strip footings m3 80 1 000,00 80 000,00 Column bases m3 50 1 000,00 50 000,00 25MPa/19mm concrete Slabs including beams and inverted beams m3 100 1 200,00 120 000,00 Stairs including landings, beams and inverted beams m3 40 1 200,00 48 000,00 Carried to summary 398 000,00

Project Capital Cost Additional items to include to obtain total estimate for feasibility and approval Land cost + transfer costs Finance cost Bond raising fee Plan approval fees Rates & taxes Geotechnical investigation Registration NHRBC fees VAT

GPF APPROVALS To arrive at a feasible project and get funding approvals certain milestones and thresholds must be achieved 1. Provide Business plan including cost estimates and income projections 2. Land or building must have appropriate zoning 3. For Greenfield developments opportunity cost per unit should not exceed R60 000 4. The sale agreement must be signed by both parties 5. The value of the project on completion should exceed the total development cost

Choosing the Professional Team Professional team must be registered with their respective bodies, Institute of Architects; Engineering Council; etc Must have Professional Indemnity, with the relevant qualifications and experience