Pavement Management Systems



Similar documents
Pavement Management Implementation: Success Stories for Maryland Counties

Date: 10/10/2014 Initiated by: AAS-100

CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM

Transportation Infrastructure Asset Management

IMPLEMENTING PAVEMENT MANAGEMENT SYSTEMS FOR LOCAL AGENCIES

Implementing Pavement Management Systems, Do's and Don ts at the Local Agency Level

Pavement Maintenance Management Katie Zimmerman, P.E. Applied Pavement Technology, Inc. (APTech)

Decision Matrix for Pavement Preservation. Mike Mamlouk Arizona State University

RoadMatrix V3.1 has incorporated many engineering enhancements including the following:

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

Pavement Management Program

How To Manage Transportation Asset Management

MODULE 3. Upon completion of this module the participants will be able to:

Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective -

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS

Improving Rehabilitation Selection for Pavement Life Cycle Cost Analysis

Road Asset Management

STATE HIGHWAY ASSET MANAGEMENT MANUAL

DEVELOPMENT OF A NATIONAL ROAD ASSET MANAGEMENT SYSTEM FOR THE KINGDOM OF SAUDI ARABIA. Hazim M Abdulwahid Abdullah Al Kahtani Mustafa Abdulaziz

TAMS 2.1 User s Manual. Utah LTAP Center. Contact: Utah LTAP 4111 Old Main Hill Logan, UT

How To Improve Road Quality

Managing the Risk of Aging Pavement Infrastructure in New Brunswick Through Innovative Decision Making

Road maintenance policy based on an expert asset management system. - Concept and case study - Author Philippe LEPERT IFSTTAR Nantes

Benefit Cost Models to Support Pavement Management Decisions

Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.

CHAPTER 2 LCCA APPROACHES

How To Manage Asset Management

Glossary. means the asset valuation module of Municipal DataWorks. means Geographic Information System

RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity

Life Cycle Cost Analysis (LCCA)

ethekwini Metropolitan Municipality s

Transportation Asset Management Program 2009 Federal Aid PASER Road Survey. August 2009

Reformulated Pavement Remaining Service Life Framework

700 Life-Cycle Cost Analysis

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005

Rehabilitation for Concrete Pavements

Township of Enniskillen. Asset Management Plan

Road Asset Management vs Pavement Management A new Paradigm. Arthur Taute Stewart Russell

Washington Airport Pavement Management System. Pavement Management Manual

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

Asset Management Plan

Pavement Management Systems Peer Exchange Program Report

CHAPTERS PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS

Comparison of Pavement Network Management Tools based on Linear and Non-Linear Optimization Methods

QUICK GUIDE. Asset Management 101. A Step by Step Asset Management Plan. Asset Management 101: A Step by Step Asset Management Plan

Final Report Evaluation of I-Pave Low Volume Road Design Software

Cornell Asset Management Program - Roads & Streets (CAMP-RS) 2014

Presented via Video Recording at IHEEP Conference June 2014

Road Asset Management: Evolution and Trends

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Status of Asset Management in the Roads Sector. L Kannemeyer

Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis. Arnar Agustsson Sulton Azamov

Evaluation of PMS Recommendations for Flexible Pavement Rehabilitation Using RWD Deflection Data

CID STREET INFRASTRUCTURE ASSESSMENT

Asset Management Guide for Local Agencies in Michigan

How To Manage The County Of Simcoe'S Infrastructure

The Pavement Management System

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

TRANSPORTATION ASSET MANAGEMENT

City of Mercer Island

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.

HERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015

Asset Management: A Best Practices Guide

Pavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads

Research Article Determination of Pavement Rehabilitation Activities through a Permutation Algorithm

Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000

Asset Management for MAP-21. Gary Lasham, P.E. Jonathan Pollack

A GIS Enabled Cost Estimation Tool for Road Upgrade and Maintenance to assist Road Asset Management System

USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS. Paul W. Wilke, P.E. Applied Research Associates, Inc.

Modern Techniques for Concrete Pavement Design

INNOVATIVE USE OF A CORPORATE SURVEY TOOL FOR PUBLIC CONSULTATION FOR THE SUSTAINABLE RURAL ROADS MASTER PLAN FOR STRATHCONA COUNTY, ALBERTA

APPENDIX B. I. Background Information

Asset Management Plan for Pavements PREPARED BY: MECOSTA COUNTY ROAD COMMISSION

TAC Primer Pavement Asset Design and Management

Road Asset Management Research Program In Finland

Butch Wlaschin P.E. Director, Office of Asset Management, Pavements, and Construction FHWA

Pavement Management Program

Texas Transportation Institute The Texas A&M University System College Station, Texas

I-66 Pavement Rehabilitation

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs

Cost-Effective Pavement Preservation Solutions for the Real World

Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT

Transcription:

Pavement Management Systems Presented by Bill Weiss, P.E. Applied Pavement Technology, Inc. (APTech) At the 2015 Municipal Streets Seminar Ames, Iowa

Why Pavement Management??? Pavements are expensive Budget constraints Accountable for infrastructure assets Move from reactive to proactive management of pavement repairs

Some Challenges of Starting a PM System A different way of doing business Staffing issues Start up costs Tried it before never worked out

Different Way of Doing Business Pavement Management supports this new way of doing business

Different Way of Doing Business Document needs Improve accountability in decisions Assess and manage risk Make better use of technology Change The Way Assets Are Managed Increase service life Improve performance Preserve asset value Reduce annualized costs

What Is Pavement Management? a management approach used by personnel to make cost-effective decisions about a road network. AASHTO Pavement Management Guide (2001) A pavement management system is a set of tools or methods that assist decision-makers in finding optimum strategies for providing, evaluating, and maintaining pavements in a serviceable condition over a period of time. AASHTO Guide for Design of Pavement Structures (1993)

Pavement Management Concept $X/mile $~4X/mile Pavement Condition 40% of life 70% of life 90% of life $~6-10X/mile $>10X/mile Pavement Age

Three Levels of Pavement Management Network Level Collect condition information on the network Analyze condition information Provide information to upper management to assist in making strategic decisions Provide information to other users to support project selection, design, and other types of analyses

Three Levels of Pavement Management Strategic (Policy) Level Make policy decisions Set funding allocations Establish preservation strategies Identify corridor projects Project Level Determine final project recommendations Design rehabilitation strategies Conduct special studies

Benefits of Pavement Management More efficient use of available resources Ability to justify funding needs More accurate and accessible information on the pavement network Ability to track pavement performance Present consequences of different treatments and timing Improved communication AASHTO Pavement Management Guide (2001)

Pavement Management Components Network Inventory Network Definition Condition Assessment Reports Pavement Management System Database Analysis Tools System Customization Models Costs Treatment Rules

Network Inventory Type of Data to be Collected Physical characteristics Construction and maintenance history Traffic levels and/or street classification Soils information Minimal Amount of Information Required Surface type Physical dimensions (length, width, area), From/To Last construction date (or best guess)

Street Segmentation The general rules for segmentation are Same surface type Similar construction age, condition range Contiguous Similar maintenance and traffic characteristics Think of them as management units Those that are managed together get segmented together

Network Definition Local Agencies

Condition Assessment All pavement management recommendations are based on the most recent condition assessment. Therefore, the assessment of current condition MUST be objective, repeatable, and reflect current conditions.

Types of Pavement Condition Data Collected Surface distress (ex. cracking, surface deformation) Roughness (ride quality) Faulting Rutting Structure (pavement strength and deflection)

Pavement Distress Type what kind? Severity how bad? Quantity how much?

Methods for Quantifying Pavement Condition Pavement Condition Index (PCI) ASTM D6433 Modified PCI Windshields

Customization Activities Performance models Priority ranking Viable treatment options (& conditions to apply) Maintenance (ex. crack sealing, patching, etc.) Major repair (overlay, slab replacements, reconstruction, etc.) Costs Unit costs, annual budgets

Why Use Performance Models? Needs assessment $$ Performance models Predict condition Multi-year workplans What-if analysis Predict M&R

Example Performance Model Curve flattens (age 12 20 yrs) Condition Age ( each line represents 3 years)

Family Modeling Approach Group pavement sections by characteristics Reduces number of variables and models Assume similar deterioration Reflects average deterioration for family Allows ranges of values to be used for developing families

Other Customization Activities Treatment Costs Based on recent bid documents May vary based on certain factors (location, street network, and so on) Budgets Funds available for each analysis year Some agencies have separate budgets for maintenance and rehabilitation activities

Methods of Managing Assets Preservation Approach Good Pavement Condition Poor Traditional Worst First Strategy

What Is Pavement Preservation? Good Preventive Maintenance Pavement Preservation Pavement Condition Reconstruction Poor Rehabilitation Routine/Corrective Maintenance Time

Getting the Most Bang for Your Buck Condition Deterioration & Treatment Triggers / Resets 100 Condition Index Original Pavement $ 1 $ 2 $ 6 $ 15 Seal Coat Thin Overlay Structural Overlay 50 Remaining Service Life (RSL) = 0 Reconstruction Years / AADT (ESALs) From Utah DOT

Keys to Success Be proactive Keep roads from dropping into poor condition Incorporate a mix of fixes into your program Good Fair Poor Effectiveness of Pavement Preservation A pavement management system helps identify what treatments are needed and when they are cost-effective

Resource Allocation and Utilization Sample network distribution Initial distribution: 25 mi in good, 50 mi in fair, and 25 mi in poor 20 year repair cycle = 5%/year = 5 mi/year 10% deterioration from good & fair each year $500 available ($100/mi to fix poor & $25/mi to fix fair) Scenario 1: Fix roads in poor condition Scenario 2: Fix some roads in poor & some in fair

Sample Outputs After 3 Years Now Good Fair Poor Scenario 1 Scenario 2

Demonstrating Pavement Preservation Benefits Average Pavement Condition over Time Pavement Condition Rating 86 84 82 80 78 76 74 72 70 0 2 4 6 8 10 12 14 16 Year Worst First Pavement Preservation

Using Pavement Management To Tell Your Story

5 Core Questions 1. What is the current state of our pavements? What do we own? Where is it? What condition is it in? What is the remaining service life and economic value?

5 Core Questions 2. What is the required level of service? What do stakeholders expect? How different is this from actual conditions?

5 Core Questions 3. What level of deterioration is acceptable? How do these assets deteriorate? What are the likelihood and consequences of deterioration?

5 Core Questions 4. What are the feasible strategies to consider? What repair options are most feasible for our agency? How do these strategies impact system performance?

5 Core Questions 5. Which long-term funding strategy should be selected? Does the selected strategy align with policy goals?

Reporting Network Conditions

Determining Impacts of Program Choices 100 Pavement Condition Index (PCI) 90 80 70 60 50 40 30 20 10 0 86 87 84 84 83 73 74 71 69 66 2015 2016 2017 2018 2019 Alternate Repair Program Recommended Repair Program Program Year

Compare Various Budget Scenarios

Setting Agency Goals Cumulative Cost ($) $3,500,000 $3,000,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 $0 1 2 3 4 5 70% in Good Expected $ 75% in Good Year

Presenting Results to Stakeholders Network Level City Counsel/County Board Senior agency management Public Project Level Design engineers Mid-level management

Don t Take My Word For It Due to the state of the economy, the pavement management system has become more important City of Naperville, IL We are now able to reduce political pressure Champaign County, IL Complete the right work at the right time for the right reasons Edgar County, IL We wanted to have more engineering behind decisions. Stark County, IL

Take Away Points Start with the basics, then grow it Identify your agency s PM champion Don t rely on a worst first strategy Use a mix of fixes that includes preventive maintenance treatments on roads in good or fair condition Consider the use of pavement management tools to: Help you make the best use of your road $ Help you tell your story

Questions? Contact me at (217) 398-3977 or by email at: bweiss@appliedpavement.com