Flexible High Pressure Pipelines

Similar documents
Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

PRESSURE PIPE REHABILIATION CIPP TECHNOLOGIES

PIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes

Oil and Gas Pipeline Design, Maintenance and Repair

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

epros DrainLiner Program

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

Water Main Lining A Sustainable Alternative to Open Cut Replacement

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

U-LINER AC NEW AND UNIQUE ADHESIVE PE-LINER FOR DOMESTIC CONNECTIONS. Construction Automotive Industry

Puddle Flange. FRANK Puddle Flange

VdS en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS en : (01)

FLEXWELL Safety Pipe. Pipe systems for installations Technical details

SASTT contact details:

BKP Berolina Polyester GmbH & Co. KG. Berolina-Liner System Lightspeed in gravity pipe rehabilitation!

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

GRP Pipe systems. for Water, Sewage and Industrial Applications

The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes.

LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION

Introduction to Pressure Pipe Rehabilitation with CIPP

THE DEVELOPMENT OF TWO-LAYER LINING METHOD FOR PREVENTING BREAKAGE OF GREY CAST IRON PIPES

Water Transmission & Sewer Force Main Renewal 16 through 60

building applications copper - redefined

District Cooling Best Practices Piping Systems

SIGRAFLEX . Properties. Applications

Where life interacts with infrastructure.

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

THERMA-TUBE preinsulated pipes and fittings Catalogue of products

Meeting the Challenge of Pipeline Emergency Repair

Self-operated Pressure Regulators Universal Pressure Reducing Valve Type 41-23

Pipeline Replacement using Relining

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

High pressure reactors Where are your limits?

TRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING

Bypass level indicator With magnetic display Model BNA

Company and Product Presentation

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

OPTIMASS 6000 Technical Datasheet

Appendix A: Acceptable pipe and fitting materials

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

SPECIALTY FIBER OPTIC CABLE. Downhole Sensing Subsea

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

WATERPROOFING OF WET ROOMS

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

Pressure Pipe and Sewer Renovation

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

RUBBER SLEEVE KNIFE GATE VALVE

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Concrete Pipes. Concrete Pipes

NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

GPD Rubber Press Seals

Fittings and valves. Ductile cast iron valves. for water and gas supply

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

Structural Pipe Lining Technology

SPR PE Steel Reinforced Liner

Metal Pressfitting Pipe Systems

Self-operated Temperature Regulators Temperature Regulator Type 1u

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Couplings. Drain Couplings Standard Couplings Large Diameter Couplings Adaptor Couplings Flexible Saddles Bushes

TARIFF CODE and updates standard

Sewer network renovation using glass-fiber reinforced (GRP) pipe liners

ElastoFlake & ElastoTec

HOSE AND TUBING CATALOGUE SOLD BY THE ROLL OR IN INCREMENTS OF 1M, STANDARD COIL LENGTH 30 METRES. SIZE (I.D x WALL) CODE SIZE (I.

PP MASTERTM S T I F F N E S S S N 1 2 R I N G THE NEW POLYPROPYLENE SEWER PIPE SYSTEM

Type 3353 Angle Seat Valve

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

Trade Standard of Town Construction in PRC

Sustainable trenchless rehabilitation of supply pipelines applying static pipe bursting or close-fit lining

solarplus solar systems general features

Metalworking to go. Discover direct on-site mobile machining!

REPAIRS TO DAMAGED SEWERS

Cable Trays Technical Instructions & Specifications

Terminal Boxes Series 8146

Installation of Large Diameter Buried Pipes

BETAtrans. Cables and Systems for Rolling Stock. Edition 2006

The Engineering Science of Oil Pipelines

Module 3: Sewer Material Lecture 3: Sewer Material

WEKO-SEAL Internal Joint Sealing WEKO-SEAL. internal pipe-joint sealing

Module 3 : Sewer Material. Lecture 3 : Sewer Material

ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION

The leader in trenchless rehabilitation

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

Session 14 Cable Support Systems

DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT. Jim Riley, Texas A&M University February 10, 2015

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS

SEKISUI SPR CONSTRUCTION PIPE SYSTEMS FOR THE NEXT GENERATIONS

PAGE 2. Figure 1: Difference between PWL ins and SPL 1m

Pipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant).

T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A

GAS INSTALLERS MANUAL CINERGY AND SUBSIDIARY COMPANIES CUSTOMER PROCEDURE FOR INSTALLING 3", 4", 6", AND 8" IPS PLASTIC GAS SERVICE PIPING

Transcription:

Flexible High Pressure Pipelines

Primus Line The Flexible System for the Transport of Different Media Primus Line is a trenchless technology for the rehabilitation of pressure pipelines for different media such as water, gas and oil. The process is based on a flexible high-pressure hose which is specially developed for the connection technique of the system. Due to its multi-layered structure and very small wall-thickness, the Primus Line hose provides both flexibility and ultra high material strength. The inner layer of the hose can be selected for the specific media. The outer layer - regardless of medium - is made of wear-resistant PE. Seamless aramid fabric is between the inner and outer layers, functioning as a static load-bearing layer. Primus Line is produced in nominal diameters from DN 150 to DN 500. The hose is inserted into the host pipe from small construction pits - thus avoiding large roadworks. Primus Line is not attached to the host pipe and is self-supporting. An annulus remains between Primus Line and the host pipe. Via a specially developed high-pressure connector on each end, the Primus Line hose is connected to the host pipe (steel, iron cast, PE or other materials), and thus to the pipe network. Primus Line has short rehabilitation times and rapid recommissioning, and thus represents not only an inexpensive alternative to open rehabilitation, but also a high-quality method for the renewal of pressure pipes. Primus Line Hose Outer Layer Abrasion-resistant PE sheath Kevlar -Fabric Seamless, woven aramid fibres (single-layer or double-layer fabric design) Inner Layer Media-specific based on PE or TPU 2

Water Gas Mineral Oil Water: Drinking water, hot water, industrial water, waste water and sea water Gas: Natural gas, sweet gases, sour gases, gas mixtures Mineral Oil: Crude oil, refined oils, fuel oil, fuels, oil sludge Other Media: Chemicals, abrasive media Primus Line Connector At the ends, the Primus Line hose is connected to the existing pipe using Primus Line connectors. The high-pressure connector consists of a contoured internal core and external sleeve. The external sleeve has a malleable steel jacket on the inside. A resin, which is injected through a valve on the external sleeve, forces the steel sleeve and Primus Line into the contours of the internal core. So we obtain a durable, pull-proof connection. After pressure-resistant sealing of the connector on the rehabilitated pipe section, a leak test is performed. Depending on requirements, the Primus Line can be fitted either with a flange or welded ends. This way, it is also possible to join bends, tees or other fittings and fixtures (made of different materials). Connector with Flange or Welded End Host pipe Connector with welded end Host pipe Welded seam Welded seam Primus Line hose Flange Host pipe Connector with flange Fitting piece Host pipe

Primus Line Low Pressure System A New Development for the Drinking Water Sector In order to maximize the use of products for you, we are constantly improving and refining them. For this reason we have optimized our system for drinking water and developed Primus Line low pressure system. Primus Line was originally developed for the high-pressure gas sector. The advantages of the Primus Line system have been found useful in other forms of media as well; therefore the new Primus Line system has been adapted especially for these areas of application. The new alternative has been designed for applications for which Primus Line has, up to now, been too large. The aramid fabric for the new system has been modified and the connector technology has been revised to adapt it to the operating pressure of the media. Primus Line low pressure hose Primus Line low pressure connector Primus Line can be flexibly integrated into the pipeline network 4

The Primus Line Low Pressure Connector Compact construction with double-sided DIN flange High-quality epoxy powder coating Immediately ready for operation after installation Can be removed and is therefore reusable Light weight Short delivery times due to modular construction Cost-optimised solution Nominal Size Burst Pressure [bar] Operating Pressure [bar] DN 150 74 28 DN 200 53 20 DN 250 40 15 DN 300 33 12 Commonalities with the High Pressure System Same insertion technology Easy connector installation; no complex special tools required Connector technology has been subjected to long-term testing and is resistant to burst pressure Suitable for drinking water, approved acc. to the German standards KTW and W270 Operating temperature up to +50 C

Primus Line Installation 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 Shutdown of host pipe, estabilish construction pit, cut and drain pipe Sectional pipe inspection with a mobile TV camera and subsequent analysis of video recordings Insertion of an auxiliary rope via TV camera Mechanical coarse cleaning of the pipe interior using scraper pigs and pull through pigs Positioning of the Primus Line coiled hose at the start pit and the pulling winch at the destination pit Installation of pulling head, hose guides and feeder cable Insertion of the Primus Line hose (folded or unfolded) Assembly of the connector fixed to the host pipe Running of pressure tests Integration of the renewed pipe in the pipeline network and commissioning Pit closure 9 10 6

5 6 7 8 Technical Details Nominal Sizes 150-500 DN 11 Operating pressure max. (water) 55 bar Single-layer fabric depends on diameter 76 bar Double-layer fabric Operating pressure max. (gas) 34 bar Single-layer fabric depends on diameter 46 bar Double-layer fabric Bursting pressure max. 137 bar Single-layer fabric depends on diameter 190 bar Double-layer fabric Wall thickness 6,0 mm Single-layer fabric 8,0 mm Double-layer fabric Weight (from / to) 2,0-8,5 kg/m Single-layer fabric depends on diameter 4,0-8,7 kg/m Double-layer fabric Abrasion resistance (DIN 53516) 10,5 mm 3 Insertion length max. 2.500 m Hose length per drum max. up to 6.000 m depends on diameter Bendability up to 45 degree Bend radius 5 D Continuous operating temperature up to 50 C Service life duration 50 years

Primus Line Projects, References, Partners Water Project: Drinking Water Pipeline in Sao Paulo, Brasilia, Sanit Engenharia Sao Paulo The renewed cast iron drinking water pipeline DN 500 runs in Sao Paulo along a main traffic road. Laying of Primus Line DN 500 PN 16, MOP of pipe 10 bar Total length: 230 m, 1 installation section Water Project: Drinking Water Pipeline in Grums, Sweden, Scandinavia VA-Teknik The drinking water pipeline runs between a railroad and a motorway, crosses under the railroad and passes through a bridge. Primus Line was inserted from already existing concrete chambers and from chambers in the bridge abutment. Laying of Primus Line DN 250 PN 30, MOP of pipe 10 bar Total length: 330 m, 5 installation sections Oil Project: Crude Oil Line in the Ruehlermoor Oil Field, Germany, ExxonMobil Production The oil pipeline renewed runs crossways through the Ruehlermoor oil field in the administrative district of Meppen. ExxonMobil Production Deutschland GmbH was convinced of the concept and technology of Rädlinger primus line GmbH and achieved enormous cost savings versus conventional pipe construction in stainless steel. Laying of Primus Line DN 250 PN 38 and DN 200 PN 39, MOP of pipe 32 bar Total length: 2.200 m Water Project: Parallel Drinking Water Pipelines in Dresden, Germany, DREWAG Stadtwerke Renewal of parallel drinking water pipelines under the Elbe River. DREWAG Stadtwerke Dresden GMBH supplies approx. 500,000 residents with drinking water. The parallel drinking water pipelines constructed in 1929 using the open construction method represents a major part of the supply network. The client and the engineering consultant have decided on Primus Line technology for economic and time-related reasons. Laying of Primus Line DN 500 PN 16, MOP of pipe 10 bar Total length: 2 x 220 m Water Project: Drinking Water Pipeline in Telfs, Austria, Swietelsky-Faber Kanalsanierung GmbH The renewed drinking water pipeline DN 150 PN 25 runs with a length of 175 m along a steep hillside through a wooded area and above a waste deposit in the town of Telfs. Laying of Primus Line DN 150 PN 55, MOP of pipe 25 bar Total length: 175 m 8

Gas Project: Gas Pipeline in Braunschweig, Germany, E.ON Avacon AG The renewed gas pipe runs through the city of Braunschweig. The first section runs along a residential area. The second section passes under a driving practice ground and a federal road. A new high pressure gas pipeline was established in the existing pipe and the planned reduction of the host pipe diameter was achieved. Laying of Primus Line DN 400 PN 25, MOB of pipe 25 bar Total length: 2 x 360 m Water Project: Drinking Water Pipeline in Kornwestheim, Germany, Zweckverband Landeswasserversorgung Stuttgart The renovated drinking water pipe runs in Kornwestheim along busy roads. The supply of drinking water could be restarted after a short time and without any interference with the traffic. The security of supply is ensured for the next decades. Laying of Primus Line DN 300 PN 26, MOB of pipe 16 bar Installation: 300 m and 1.100 m Gas Project: Gas Siphon Pipeline in Sibiria, Russia, E.On Ruhrgas Ag and OAO Gazprom Gas transportation siphon pipeline under the Ob River in the Siberian taiga, OAO Gazprom, OAO Tomsktransgaz. Within the scope of the technical co-operation with E.ON Ruhrgas AG, OAO Gazprom was looking for suitable technical solutions for the sustainable renewal of the gas pipeline, which has laid under the Ob River for 40 years. The solution was Primus Line technology. Due to the successful implementation of the Primus Line system the gas and heat supply of the city is assured on a long-term basis with far more favourable cost conditions for the households connected. Laying of Primus Line DN 150 PN 45, MOB of pipe 25 bar Total length: 2.500 m 2.500 m Licence Partners Rädlinger primus line GmbH works successfully with national and international partners from the pipe rehabilitation industry. Due to the low-investment cost and simple process, Primus Line convinces both sales and co-operation partners. To implement our high quality standards in construction, licensees are trained in a several-day course which combines theory and practice in mutually reinforcing ways. In addition, we offer reliable technical support to local construction sites. Are you interested in becoming our licensing partner and tapping into new markets with us? Then please contact us. Of course we are happy to give you more information on the telephone or at a visit to our offices.

Primus Line Benefits Benefits of Trenchless Pipe Rehabilitation Technology Compared to open construction, trenchless construction methods have environmental and economic benefits. In terms of environmental protection and constant increasing traffic density laying pipes without damaging the surface makes economic sense. Because of the expense of road surfaces, soil replacement and high groundwater levels, trenchless design can be more economical than conventional construction even at relatively shallow depths. In addition, there are also considerable economic savings such as the avoidance of congestion, environmental protection and the elimination of weather-related downtime. Benefits at a Glance Low intervention in landscapes and protected areas No disruption to road, rail and shipping traffic Reduction of noise and emissions Low interference with existing structures Protection of vegetation and species due to small construction sites Sustainability due to the use of existing infrastructure (host pipes) Specific Benefits of Primus Line Easy to Use Reduced use of machinery Up to 6.000 m at a time can be delivered on a transport drum Short construction period due to long insertion lengths Small pits and reduction of roadworks Elimination of digging and transportating large soil masses Omission or limitation of groundwater treatment Coarse cleaning of the host pipe only, as no adhesive is required Fast recommissioning Full piggability, also during operation High Strength and Quality Pipe renovation with a lifetime of at least 50 years High abrasion and cut resistance of the outer coating No corrosion of Primus Line High Flexibility Fewer construction pits due to bendability Insertion through bends of up to 45 High Performance Minimal cross-section loss due to low wall thickness of 6.0 and 8.0 mm Improved flow properties of the pipe 10

History Rädlinger primus line GmbH is part of the Rädlinger Group which has been active in the construction sector for over 40 years. Today, the company is one of the most successful construction companies in Germany whose expertise mainly lies in road construction, civil engineering and asphalt construction. Josef Rädlinger already had the idea of using a hose for civil engineering 20 years ago. The hose was to be characterised by flexibility, portability, light weight and low wall thickness, while having the material strength of a steel pipe. From the Idea to Success Primus Line was developed to solve the recurring, time-consuming and costly problem of run-down pipelines in existing buildings. Ten years later, with being open to new ideas, the know-how from the fields of construction, mechanical engineering and web technology were combined to find a creative and efficient solution. Together with research and industry partners, Rädlinger experts developed the Primus Line technology. This technology now sets new standards in gas and liquid transportation. Milestones 1963 Establishment of Josef Rädlinger Kiesbaggerei und Fuhrunternehmen e.k in Cham 1971 Establishment of Josef Rädlinger Bauunternehmen GmbH in Cham 1988 Establishment of Rädlinger Maschinen- und Anlagenbau in Cham - Production of circular looms for fabric hoses - Production of construction equipment 1995 Opening of the new ready-mixed concrete mixing plant in Weiding 1996 Establishment of Rädlinger Straßen- und Tiefbau GmbH in Selbitz / Frankenwald 1996 Development of a high-pressure hose for pipe rehabilitation 2000 Establishment of Rädlinger Asphaltbau GmbH 2001 Establishment of Rädlinger primus line GmbH - Production and distribution of the flexible, high-pressure pipe Primus Line 2002 Establishment of Josef Rädlinger Ingenieurbau GmbH in Vilshofen 2004 Establishment of Rädlinger Bauunternehmen Ges.m.b.H. in St. Pölten Austria 2005 Establishment of S.C. Trust Constructii Rädlinger S.R.L. in Romania 2006 Establishment of RWenergy GmbH in Schwandorf 2006 Takeover of the Berufsbildungszentrum in Schwandorf (BBZ) 2008 New construction of the production plant for Primus Line in Weiding

Rädlinger primus line GmbH, 12/2014. This document cannot be used to derive any legally binding assurance or warranty for certain properties of the product or the suitability of the product for a specific application. Rädlinger primus line GmbH Kammerdorfer Straße 16 93413 Cham Germany Phone.: +49 9971 4003-100 Fax: +49 9971 4003-123 primusline@raedlinger.com www.primusline.com