Installation Instructions



Similar documents
SPECIFICATION & INSTALLATION GUIDE FOR MASPORT LE4000 PROVINCIAL INSERT FIRE, NEW ZEALAND MODEL

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

FREESTANDING CLEAN AIR WOODBURNER

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

MAJESTIC. OUTDOOR / INDOOR WOOD FIREPLACES Model: ODSR36A OWNERS INSTALLATION & OPERATING INSTRUCTIONS. KEEP THESE INSTRUCTIONS FOR FUTURE REFERANCE.

THIS BOOK CONTAINS IMPORTANT INFORMATION. PLEASE KEEP IT IN A SAFE PLACE FOR FUTURE REFERENCE.

Ravelli Camino Insert Wood Pellet Burning Heater. Wood Pellet Fire Installation Specifications. Safety testing of the

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS

Across America. Wood & Coal Brochure

Mark Cramer Inspection Services, Inc.

CHIMNEYS AND FIREPLACES

Boston, Venice, Kodiak. Enviro Wood Fireplace Inserts

How to build a Pizza Oven in 4 days

The Savannah Steel Series Wood Burning Stoves and Inserts

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko

780 CMR CHIMNEYS, FIREPLACES AND SOLID FUEL-BURNING APPLIANCES

Wood Heat The Safe Way

If you are a web registered user of ArlingontPermits.com you may also request an inspection at:

Chimneys in Thatched Properties

SRP Pricelist 2015 Including VAT. Stoves for every home

October 5, 2015 Dear Client,

Pre-site Installation Instructions for Aga Electric Cooker Models Electric C Electric E

Guidelines for Earthquake Bracing Residential Water Heaters

556/586 NEW NEW. One step closer to the fire.

Guidelines for Earthquake Bracing of Residential Water Heaters

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Wood Burning Safety Guide

Residential Inspection Guidelines

Masonry Heaters: Planning Guide for Architects, Home Designers and Builders. By Alex Chernov, a Certified Heater Builder.

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

Gas Water Heaters Regulation 35A of Building (Planning) Regulations

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

woodburning stoves installation and procedures

Installation Instructions Horizon Natural Draft Electronic Ignition Gas Fireplaces

CONTENTS OF LOOSE PARTS BAG (Note: You may not need all these parts for your installation)

Building Code Clarifications - 7. Fire Resistance

Repair of Earthquake-Damaged Masonry Fireplace Chimneys SOUTH NAPA EARTHQUAKE RECOVERY ADVISORY

plumbing products guide

Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual

technology UICK progressive sustainable any design, any shape, any colour, anywhere you like!

Excerpts from the Canadian National Building Code (NBC)

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Integral Kit Instructions

CHESTERFLEX ROOF WATERPROOFING MEMBRANES

STOVES & INSERTS PELLET. PELLET STOVES & INSERTS. woo

Basement Moisture Problems

Facility Assessment for East Main Street, Huntley, IL

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A

RODENT PROOFING CHECKLIST

B. DEFINITIONS LINING OLD CHIMNEYS A. INTRODUCTION C. REASONS FOR LINING

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

SIM Spartherm Installation Modules NEW

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

SD. Flat roof. Rack Mounting. Installation instructions (2010/11) AU

Fire-resistance test on fire collars protecting a concrete slab penetrated by services

Built to Last. Built for Beauty. Good. Solid. Logix. TM

GAS STOVES woo GAS STOVES

Installation Instructions

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

Composite Panel Firewall Systems

GC 3 (PF) (THREE OVEN) GAS FIRED POWER FLUE COOKER

Installation Instructions

How To Build A Basement House

version 1.0 Made by NARVI Oy Finland Kota Kuru 14 and 20 sauna heaters Installation, user and maintenance instructions

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

Rockwool Flexi Insulation Application Guide

Ubiflex. Non-lead flashing system

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Studio Stove 14. Studio Stove clean air approved wood burner Installation instructions

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation

Services Enclosures and Protected Shafts - Maintaining Compartmentation

A new range of clean burning multifuel stoves

Cooktop Low-Profile Ventilation Hoods

Integrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue

PROFESSIONAL ENGINEERING INSPECTIONS, INC.

Flue Installation. High Efficiency Condensing Boilers

2010 Residential Water Heater Replacement Check List

Pre-Drywall Inspection Report

High Efficiency Copper Finned Tube Boilers 750,000-2,000,000 BTU/HR

What you need to know about. Termite management

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

Gas-Fired, Residential Storage Type Water Heaters

Residential Foundations and Basements

Crawford Inspection Services C.C.B. #

Module 3.7. Thermal bridging

ModuSec. Secure and efficient IT room solutions Composite Panel Systems Compared. Panel Systems are not all the same!

Management Consultancy Training. Asbestos Materials. Residential Guide

3 IN 1 BATHROOM HEATER

Base Cabinet with Self-storing Folding Doors and Floor

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Transcription:

Installation Instructions Pedestal Models FS 500 LE FS 800 LE Insert Models IS 500 LE IS 800 LE Pecan Engineering Pty Ltd 13 Acorn Road Dry Creek South Australia 5094 Email info@pecan-eng.com.au Phone: (08) 8349 8332 Fax: (08) 8260 6643 ACN 007 741 693

THE INSTALLATION INSTRUCTIONS IN THIS MANUAL APPLY TO THE BLAZE FS 500 LE & FS 800 LE FREE-STANDING, AND IS 500 LE & IS 800 LE INSERTT WOOD HEATER MODELS. THEY HAVE BEEN TESTED FOR EMISSIONS AND EFFICIENCY AND COMPLIES ACCORDING TO AS/NZS 4012:1999 & AS/NZS 4013:1999. 1. INTRODUCTION Most building regulatory Authorities in Australia require any wood heater installation to comply with Installation Standard AS/NZS 2918:2001. Different states and councils may have varying regulations. Check local building regulations before installing the appliance. All Blaze wood heaters have been tested to ensure that they will meet the appropriate safety Standard requirements if the instructions in this manual are followed. As the safety and emissions performance can be affected by altering the appliance, no modifications are allowed without written permission from the manufacturer. WE RECOMMEND THAT THE INSTALLATION OF YOUR BLAZE WOOD HEATER BE CARRIED OUT BY A QUALIFIED INSTALLER. CAUTION: CRACKED AND BROKEN COMPONENTS, EG. GLASS PANELS OR CERAMIC TILES, MAY RENDER THE INSTALLATION UNSAFE. 2. INSTALLING PEDESTAL (FS) MODELS 2.1 Positioning the Heater First review the necessary clearances specified below before considering where to position the heater. Also check the practicability of installing the flue system in relation to any obstructing roof beams before positioning the heater. These clearance distances can only be reduced if the surrounding walls are made of non-combustible material, eg. Stone, brick, or concrete. If non-combustible material, distance can be reduced to 100 mm. Alternatively, shielding of the wall(s) can reduce clearances (refer to next section for more detail). 2.1.1 Standard Installation: WARNING: THE APPLIANCE AND FLUE SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH AS/NZS 2918:2001 AND THE APPROPRIATE REQUIREMENTS OF THE RELEVANT BUILDING CODE OR CODES. WARNING: APPLIANCES INSTALLED IN ACCORDANCE WITH THIS STANDARD SHALL COMPLY WITH THE REQUIREMENTS OF AS/NZS 4012 & AS/NZS 4013 WHERE REQUIRED BY THE REGUALTORY AUTHORITY, I.E. THE APPLIANCE SHALL BE IDENTIFIABLE BY A COMPLIANCE PLATE WITH THE MARKING TESTED TO AS/NZS 4012 & AS/NZS 4013. ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE TESTING AUTHORITY IS CONSIDERED TO BE IN BREACH OF THE APPROVAL GRANTED FOR COMPLIANCE WITH AS/NZS 4012 & AS/NZS 4013. CAUTION: MIXING OF APPLIANCE OR FLUE-SYSTEM COMPONENTS FROM DIFFERENT SOURCES OR MODIFYING THE DIMENSIONAL SPECIFICATION OF COMPONENTS MAY RESULT IN HAZARDOUS CONDITIONS. WHERE SUCH ACTION IS CONSIDERED, THE MANUFACTURER SHOULD BE CONSULTED IN THE FIRST INSTANCE. Hearth Hearth Model Rear (X) Side (Y) width (A) depth (B) FS 500 LE 125 350 900 300 FS 800LE 175 425 1000 400 (Measurements are in millimetres mm)

2.1.2 Corner Installation: 3. Reducing Clearances to Combustible Walls If it is necessary to install a heater closer to a combustible surface than the stated requirements in Section 2 of this Installation Guide, it must be done in accordance with Australian Standard AS/NZS 2918:2001 Section 3, Tables 3.1 & 3.2. Shield Construction :- The shield shall be constructed from a heat resistant material. The shield must be fixed to the surface that requires protection and NOT the heater. The Standard allows three options to reduce stated clearances. Hearth Hearth Model Side (Z) width (A) depth (B) FS 500 LE 100 900 300 FS 800LE 150 1000 400 (Measurements are in millimetres mm) 2.2 Floor Protector (Hearth) Unless the FS heater will be standing on a heat resistant floor such as concrete slab with slate or tiles, it will be necessary to provide a floor protector (hearth). The dimensions given in above (Section 2.1) are the minimum required for the floor protector. It may be desirable, for example aesthetic reasons, for the floor protector to be larger than these minimum dimensions. The floor protector shall be constructed of 15mm minimum thick fibre cement sheet with thermal conductivity not greater than 0.33W/m ºK. The floor protector may be laid directly on the combustible floor. For more details and variations on floor protectors refer to AS/NZS 2918:2001 Clause 2.2, 3.3.1, & 3.3.2. Single layer of continuous material with Minimum Air Gap of 12mm Clearance Factor = 0.40 Single layer of continuous material with Minimum Air Gap of 25mm Clearance Factor = 0.30 Two spaced layers of continuous material with Minimum Air Gap of 12mm + 12mm Clearance Factor = 0.20 The shielding must be open at the top and bottom (vented) to allow a continuous air flow. It is this air flow that keeps the surface requiring protection cool. Fixings should not impede this air flow. The shielding needs to go far enough along and up the wall so that the original side and rear required clearances are not compromised. As the flue is now closer to the wall the shielding should also protect the wall from the flue pipe. For example: Side wall clearance for the FS 800 LE is 425mm. A 12mm gapped shield on the wall with a factor of 0.40. Calculate:- 425mm x 0.40 = 170mm. This is the new side wall minimum clearance. The shielding needs to be large enough so that none of the original clearances of 425mm are compromised.

4. INSTALLING THE FLUE The flue system used when installing the heater MUST comply with the current installation standard AS/NZS 2918. Full instructions on the installation of the flue will be supplied with the flue kit. These MUST be followed closely, including the minimum exit height from the top of the floor protector being not less than 4.6m, and the minimum exit height above the roof line of roof ridge as detailed in the instructions. The flue must be fitted with a full length, half radius perforated decro mesh flue shield extending from the heater through into the drop box penetrating the ceiling. Stainless Steel Flue Heat Reflector The heater is supplied with a 525mm long stainless steel heat reflector. This must be installed inside the decro mesh casing and positioned behind the flue immediately above the heater. Flue Spigot Heat Reflector A flue spigot heat reflector is also supplied inside the heater. This must be fitted to the flue spigot on the heater. The three lugs on the reflector hang inside the flue ring (spigot) with the reflector orientated at the rear of the heater. If the draft is insufficient or periodic down drafting occurs and the heater smokes or only burns slowly, extending the flue or fitting a specialist cowl will usually resolve the issue. This device reflects the heat radiating from the flue spigot on to the rear wall.

5. INSTALLING INSERT (IS) MODELS 6. INSTALLING BAFFLE PLATE The dimensions given below for the Blaze IS 500 LE and IS 800 LE models represent the minimum clearance to combustible materials, i.e. mantle-piece, when installed in a non-combustible fireplace. For variations to clearances relative to a combustible mantlepiece refer to AS/NZS 2918 Clause 3.4.2. The baffle plate should be installed before installing the fire bricks. Place the baffle inside the firebox with the larger of the folds at the front and directed upwards (refer to diagram below for correct orientation). Raise the front of the baffle, tilting it back and raise so that it clears and rests on the front support rods. Raise the rear of the baffle, bringing it forward enough to clear the rear support rods. Once clear of the rear support rods, push the baffle back so that it is resting hard up against the rear of the firebox. MODEL X (Height to Mantel-piece) 1100 IS 500 LE (500 above air vent) 1500 IS 800 LE (850 above air vent) (Measurements are in millimetres mm) Y (Width between columns) A (Hearth Width) B (Hearth Depth) 900 900 450 1080 1000 600 Floor Protector (Hearth) The dimensions given in the table above are the minimum required for the floor protector. It may be desirable, for example aesthetic reasons, for the floor protector to be larger than these minimum dimensions. The floor protector shall be constructed of 22.5mm minimum thick fibre cement sheet with thermal conductivity not greater than 0.33W/m ºK. The floor protector may be laid directly on the combustible floor. For more details and variations on floor protectors refer to AS/NZS 2918:2001 Clause 2.2, 3.3.1, & 3.3.2.

7. INSTALLING FIRE BRICKS 8. TECHNICAL DRAWINGS FS 500 LE & IS 500 LE Brick Layout Model FS 500 LE 1) Place two full size (235 x 175 x 25) and one (235 x 140 x 25) along the back 2) Place once full size and one half size (235 x 85 x 25) along each side 3) Place two full size and one half size in the base 4) Place the two corner retainers on the corners to hold the bricks upright 5) Place a straight flat retainer over each of the other joins along the rear and sides Model FS 800 LE FS 800 LE & IS 800 LE Brick Layout 1) Place three full size (285 x 175 x 25) along the back 2) Place two full size along each side 3) Place three full size in the base 4) Place the two corner retainers on the corners to hold the bricks upright 5) Place a straight flat retainer over each of the other joins along the rear and sides

Model IS 500 LE Model IS 800 LE