Forensic engineering of a bored pile wall



Similar documents
Optimising plate girder design

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

METHOD OF STATEMENT FOR STATIC LOADING TEST

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Technical Notes 3B - Brick Masonry Section Properties May 1993

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

How to Design Helical Piles per the 2009 International Building Code

Stability. Security. Integrity.

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

High Strain Dynamic Load Testing of Drilled Shafts

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

MECHANICS OF SOLIDS - BEAMS TUTORIAL 1 STRESSES IN BEAMS DUE TO BENDING. On completion of this tutorial you should be able to do the following.

Safe & Sound Bridge Terminology

Design and Construction of Cantilevered Reinforced Concrete Structures

HORIZONTAL INSTALLATION

STEEL BUILDINGS IN EUROPE. Single-Storey Steel Buildings Part 5: Detailed Design of Trusses

New approaches in Eurocode 3 efficient global structural design

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SECTION 7 Engineered Buildings Field Investigation

King Post Wall Information

Söderströmtunnel: immersion in downtown Stockholm, Sweden

Introduction to Beam. Area Moments of Inertia, Deflection, and Volumes of Beams

Objectives. Experimentally determine the yield strength, tensile strength, and modules of elasticity and ductility of given materials.

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Overhang Bracket Loading. Deck Issues: Design Perspective

System. Stability. Security. Integrity. 150 Helical Anchor

Laterally Loaded Piles

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Solid Mechanics. Stress. What you ll learn: Motivation

Optimum proportions for the design of suspension bridge

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

METHODS FOR ACHIEVEMENT UNIFORM STRESSES DISTRIBUTION UNDER THE FOUNDATION

ARCH 331 Structural Glossary S2014abn. Structural Glossary

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

Numerical Modelling for Shallow Tunnels in Weak Rock By Evert Hoek Unpublished Notes

Outline MICROPILES SUBJECT TO LATERAL LOADING. Dr. Jesús Gómez, P.E.

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Dip is the vertical angle perpendicular to strike between the imaginary horizontal plane and the inclined planar geological feature.

Tutorial for Assignment #2 Gantry Crane Analysis By ANSYS (Mechanical APDL) V.13.0

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Step 11 Static Load Testing

Transverse web stiffeners and shear moment interaction for steel plate girder bridges

Geotechnical Building Works (GBW) Submission Requirements

Design rules for bridges in Eurocode 3

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels

Deflections. Question: What are Structural Deflections?

EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES

Lab 7: Rotational Motion

DEVELOPMENT OF A NEW TEST FOR DETERMINATION OF TENSILE STRENGTH OF CONCRETE BLOCKS

High Capacity Helical Piles Limited Access Projects

Loads Tools Checks Reports

AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels

How To Retaining Wall Guide

Lighthouse Engineering, L.L.C.

SECTION GUARDRAILS

Structural Integrity Analysis

Page 1 of Sven Alexander Last revised SB-Produksjon STATICAL CALCULATIONS FOR BCC 250

Section 16: Neutral Axis and Parallel Axis Theorem 16-1

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Brandangersundet Bridge A slender and light network arch

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

ick Foundation Analysis and Design

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Stresses in Beam (Basic Topics)

Technical Report Example (1) Chartered (CEng) Membership

Design Manual to BS8110

Detailing of Reinforcment in Concrete Structures

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

Foreword. This manual provides technical information for designers and contractors to design and plan the construction operation.

Preliminary steel concrete composite bridge design charts for Eurocodes

Structural Axial, Shear and Bending Moments

6 RETROFITTING POST & PIER HOUSES

Torsion Tests. Subjects of interest

MATERIALS AND MECHANICS OF BENDING

8.2 Elastic Strain Energy

COMPUTATIONAL ENGINEERING OF FINITE ELEMENT MODELLING FOR AUTOMOTIVE APPLICATION USING ABAQUS

ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

bi directional loading). Prototype ten story

Mechanics. Determining the gravitational constant with the gravitation torsion balance after Cavendish. LD Physics Leaflets P

UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0

The Basics of FEA Procedure

Eurocode 2: Design of concrete structures

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

Solving Simultaneous Equations and Matrices

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

Residential Foundations and Basements

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Transcription:

NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Forensic engineering of a bored pile wall Willem Robert de Bruin Geovita AS, Norway, rdb@geovita.no Abstract: At present, bored pile walls in Norway are designed and executed in accordance to regulations of the Norwegian Public Road Administration as described in Handbook R762. During the construction of a 180-meter-long and 18-meter-high bored pile wall for the municipally owned public transporter of Oslo: Sporveien AS, deflections of the wall, the performance of the structural elements and the quality of the welding were monitored on a regular basis. From the evaluation of these data, it was concluded that the geometry of the cross-section did not meet the design requirements. During the construction works, a method was developed to redesign the walls structural characteristics. The performance of materials, products, and structural components used were investigated by forensic engineering. This type of engineering has led to a guideline for future design of bored pile walls. This guideline accounts for: Design of a bored pile wall with plastic behaviour instead of elastic behaviour; Calculation of the section modulus in accordance with the achievable structural properties and dimensions; Design of effective welding with regard to limitations in daily practice; It was demonstrated in this case that the bored pile wall still complied with the current design standards and that the guidelines developed may be considered in early design stages with designing and engineering of bored pile walls in future projects. 1 AVLØS STATION The updating of the Kolsåsbanen includes presence of maintenance and cleaning halls. The intended area however was not big enough and needed to be expanded. In order to widen the area, a large part of an existing slope had to be removed; see the red line in Figure 1 and planned excavation along the retaining wall in Figure 2. Retaining wall. Retaining wall. Boarder. Figure 2 Overview of Avløs station. 1.2 Geological advantages Figure 1 Aerial view of Avløs station, The geology in the area is a part of the Cambro-Silurian sedimentary rocks of the Oslo region. The sequence consists of limestone, nodular limestone and shale. Figure 3 shows the geological profile. IGS 403 NGM 2016 - Proceedings

Investigation, testing and monitoring The stroke direction of the sedimentary rocks is N55 o east, which is parallel to the rock slope. sømboring. In this way the mass was easier and more gently removable. Boarder. Figure 3 Detail of the geological profile. The slope angle of the sedimentary rock is 70 to the horizontal, see Figure 4 for a detail. The distance between the fracture planes varies between some centimetres and half a metre. Figure 4 Slope angle of the sedimentary rock. The only way to remove this type of rock mass was by installing a bored pile wall, to be bored from top in several levels, and removal of stones on the front side afterwards: see Figure 5. The bored piles were installed by a tubular pipe of 273mm in diameter to the required depth, drill out the core and hanging in a steel H-beam. After installing the wall small holes were bored each 0,50 meter small holes, so-called Figure 5 Principal for building of the pile wall. 1.3 Design of the bored pile wall The design of the bored wall was done by following the next steps: A. Determining centre distance of the piles and required dimension of the pile. The inner pressure arc, or arching effect of the soil mass, plays a decisive factor on the centre distance of the piles. This centre distance is mostly based on experience and engineering judgement because no practical calculation methods for this type of phenomena are available. The centre to centre distance of the piles was set to 600mm which, combined with a tubular pipe of 273mm, created a cap of 327mm. See Figure 6. Figure 6 Inner pressure arc or arching effect. B. Control of several critical cross sectional areas. The moment of inertia and NGM 2016 - Proceedings 404 IGS

Forensic engineering of a bored pile wall sectional modulus of the piled wall as well as required dimensions for the anchors were calculated in both the ultimate limit state and the serviceability limit state. This process resulted in a bored pile wall according to the following drawings and specifications in Figure 7 and Table 1. Figure 7 Cross section of the pile wall. Specifications of bored pile wall at Avløs station Total length of bored 177 m pile wall Maximal height of 18 m bored pile wall Total number of piles 295 pieces Ø273x6,3 Total length of piles 3900 m Ø273x6,3 Total length of HE160-3900 m B piles Total length of braces 300 m double UNP350 Total length of top 177 m girdle UNP400 Total number of 112 pieces anchors Total length of anchors 735 m Total cost of materials 16,5 NOK and installing million Table 1 Overview of costs and quantities 1.4 Monitoring In order to achieve the obtained quality, the following steps for monitoring were taken included in the contract: 1. Geometry of the pile wall: Positioning tolerance of the tubular bored pile, +/- 100mm horizontal; Placement tolerance of the installed HE160B: rotation of the axis maximum 1% in relation to theoretical axis; Control of straightness by measurement with electrical inclinometer; Tolerance on HE160B at maximum skewness D = d:1000 with d = core diameter; Tolerance on cutting of the HE160B at +/- 10mm; Tolerance on squareness or perpendicularity of the tubular pipe head: skew D = d:1000 with d = core diameter; Deviation from theoretical designed level pile top of finished mounted pile top: 50mm; 2. Materials of the pile wall: Mortar cement /water factor 0,4 or lower, compressive strength after 28 days: 40 MPa, and further demands from the Norwegian Concrete Association ( Norske Betongforeningen ) publication nr. 14 with necessary tests; Steel grade of the tubular pipes; Material of the HE-B profile; 3. Protocol for each bored pile, including written rapports containing pile number, depth into hard rock, rate of drilling, soil encountered during drilling etc.; 4. Inspection of welding by both visual inspection and inspection with control with x-ray pictures; 5. Inspections of the tightness of the welding by controlling the presence of water in the bored pipe; 6. Inspections of the tightness of the welding by placing water in the pipe, a water lock and to place pressure on the water; These contractual requirements on quality were carried out in different stages of the process and on a regular basis by control engineers of Sporveien AS with the help of a control plan. The process of installing the bored pile wall had already reached 60% when the control of welding was done by IGS 405 NGM 2016 - Proceedings

Investigation, testing and monitoring taking x-ray pictures. The result of these tests showed that up to 60% of all welding work did not meet the requested quality. On top of this, the tests were not sufficient to determine in which degree the welding itself was able to fulfil its duty. The outcome of the test was simply: approved of not-approved. Besides the fact that the welding was not approved, it showed, during a visit at the building site, that the demand for tolerance on positioning and alignment was exceeded. The image on Figure 8 shows both rotation and translation of the profile beyond acceptable and allowable tolerances. The profiles were displaced with maximum 45 degrees rotation in relation to the theoretical axis and in addition against the inner side of the pipe leaving no concrete cover. Combining these tolerances creates an image as shown in Figure 11 were the bored pile deviates from the theoretical straight line. The different sections, A D, are sketched in the cross sections below in Figure 9. This Figure shows inconsistency in relation to the theoretical axis. Figure 9 Rotated, eccentric and a- profile. When the HE-B profile is installed, the pile will make contact at one side of the pipe, see Figure 10. Figure 8 Rotated, eccentric and a-symmetric HE-160B profile. From the evaluation of these data, it was concluded that the quality of the structural cross-section did not meet the design requirements and measures had to be taken. 1.5 Forensic engineering By contract the tolerance of placement for the HE beams was limited to one-degree rotation. After having spoken with the craftsmen on the job the comment on why the beam had been rotated was: it will always turn. There was no further explanation. The principle is as follows. The straightness of the bored pile depends on the tolerances from both practical side as well as theoretical and contractual side as mentioned before. Figure 10 Collison of the profile with the inner side of the pipe. With this contact the HE-B profile will follow the direction or alignment of the pipe locally which has different directions in cross section A, B, C and D. As a consequence, the HE-B profile will turn and finally rotate. This process is a direct result of the profiles own weight and therefore the rotational movement goes with great forces which cannot be adjusted during installing neither changed after the profile has reached its final depth. Figure11: Deviation of practice and theoretical placement. NGM 2016 - Proceedings 406 IGS

Forensic engineering of a bored pile wall After having established the very cause of the rotation and displacement of the combined profile, the next step was to check the influence of this changed combined profile. See Figure 12 for the calculation of the displaced and rotated profile, with corresponding deviation in relation to the obtained capacity. Table 2 shows an overview. It is not allowed to simply add the moment capacity of the tubular pipe and that of the beam, M pipe +M HEB160 = (78,72 + 105) * centre distance (1/0,6) = 306,4 (knm). This will give considerable more capacity in relation to the calculated. This is due to the fact that both profiles do not have the same neutral line to be followed with calculating the maximum moment capacity, see Figure 13. Figure12 Calculation of the rotated, eccentric and a-symmetric composite profile. Figure 13 Capacity overview of the rotated, eccentric and a-symmetric composite pile profile. The capacity of the piles was reduced with 19% in elastic state and approximately 15% for the plastic state. The proper way to calculate the moment of inertia for hybrid profiles with translational and rotational motion is buy using Steiner s theorem. The challenge with the welding was charted by checking welding protocols on welding positions along the tubular pipe. The charted overview visualized that the first elements which were bored, were 6 meters long, containing no welding. Table 2 Capacity overview of the rotated, eccentric and a-symmetric composite pile profile. This led to the conclusion that 100% of the designed capacity was still in place over the first 6 meters, off course with deduction of capacity due to corrosion. Along the remaining part of the wall the capacity was reduced to the sum of the rotated profile and the surrounding concrete. Figure 14 shows that calculated data from Figure 12 and Table 2 still provides enough capacity for the lower 6 meters. IGS 407 NGM 2016 - Proceedings

Investigation, testing and monitoring Length 6m Length 6m Sectional area 5 Figure 14 Chartered moment capacities versus placement of welding. The remaining length was checked by heavily reduced moments of a profile without contribution of the tubular pipe, in addition to capacity calculated as given in the overview of Figure 15 and Table 3. Elastic capacity was reduced with 64% and plastic with 40%. Figure15 Calculation of the rotated, eccentric and a-symmetric non-composite profile. As shown in Table 3 the capacity of these piles was reduced with 64% in elastic state and approximately 40% for the plastic state in relation to the original capacity. Profile: Ø 269,0 x 4,3 + pored HE160-B Profiel + My;el:R d (knm) Diff. related to centric symmetric (%) Profiel+ Table 3 Capacity overview of the rotated, eccentric and a-symmetric non-composite pile profile. Diff. related to centric, symmetric My;pl:Rd (knm) (%) Centric and 175,55-25 199,48-15 Rotated 15 gr. + 137,15-42 192,68-18 Rotated 30 gr. + 107,83-54 172,77-27 Rotated 45 gr. + 84,20-64 141,65-40 Rotated 45 gr. + a- 84,20-64 141,65-40 Profile: HE160-B with ignored poured concrete shell. NGM 2016 - Proceedings 408 IGS

Forensic engineering of a bored pile wall Length 6m Length 6m Sectional area 5 4 Figure 16 Chartered moment capacities versus placement of welding. Other phenomena which need to be checked included: Local buckling Shear buckling Axial torsional buckling Lateral torsional buckling Web crippling and web yielding Figure 17 a) Web yielding d) Web cripling Figure 18 Strut buckling and lateral torsional buckling The presence of the concrete poured scale surrounding the HE-B profile functioned as plate girder, web stiffener and transverse stiffener which showed to be sufficient after control. The soil anchors with girders functioned as bucking strut, reducing the buckling length considerably. Controlling capacity after installing showed that in future cases the location of the welding should be done in front. Locations of moment should be linked with necessary welding and described on as-built drawings, preventing welding in the vicinity or directly near locations with large moments in the pile wall. The same is also important for the girders along the pile wall, here it s also possible to end up with welding in the vicinity of or influence zone of large moments. The reduced shear force capacity did not create a problem since this was sufficient from the HE-B profile. In order to achieve enough covering on the safety a last component was added in the overall control by using the plastic capacity. In order to proceed with this the Eurocode had to be checked whether this way of calculating was permitted. IGS 409 NGM 2016 - Proceedings

Investigation, testing and monitoring 1.6 CONCLUSION Monitoring and controlling the bored pile wall showed a considerable amount of inconsistency between design and practice. However solvable the situation turned out, there is a need for improvement of engineering and designing discipline besides the information flow towards contractor in both contract and drawings. In future projects concerning pile walls it is advisable to take into account the following guidelines: A. Calculation of the section modulus in accordance with the achievable structural properties and dimensions. Use of reduced moment capacity as a result of rotated HEprofiles, as a preventive tool; B. Design of effective welding with regard to limitations in daily practice. Homogeneous parts of pipe without welding for the pile wall zones with largest moments. This can also be used as a preventive tool; 2 REFERENCES 1. EN 1994-1-1 Eurocode 4 (2004), Design of composite steel and concrete structures, Part 1.1 General Rules for buildings, European Committee for Standardizations, Brussels. 2. ENV 1992-1-1 Eurocode 2 (1994), Design of concrete structures, Part 1.1 General Rules for buildings, Provisory Version, European Committee for Standardizations, Brussels. 3. EN 1992-1-1 Eurocode 2 (2004), Design of concrete structures, Part 1.1 General Rules for buildings, European Committee for Standardizations, Brussels. 4. Gaylord, E.H.jr. & Gaylord C.H. (1975). Design of steelstructures, McGraw-Hill Book company. 5. W.H. Verburg, M.A. Barendsz and C.H. van Eldik (2002). Overspannend staal, deel B. Balkema. C. Design of a bored pile wall with plastic behaviour instead of elastic behaviour, as a corrective tool in case of deviation from the original design. Figure 21 Bored pile wall at Avløs station NGM 2016 - Proceedings 410 IGS